Sr No Section

Action Point

CGP2 heat loss due to insulation

CGP2

CGP2

Steam trap

3 RUP

Steam leaks

Recommendation

Present Status

The un-insulated areas like valves, flanges, etc have high temperatures. An insulation spray eg. nonsulate may be applied where it is not possible to insulate with glass wool. To be attened in S/D All the HRSG manholes skin temperature found high. Porper ceramic insulation to be provided.

To be attened in S/D

Both HRSG steam drum manhole doors insulation found missing. To be insulated to avoid heat loss. To be attened in S/D All BFP's suction strainer insulation found missing . To be insulated. RUP HP freature extension valve is not insulated. Insulation to be provided. To be attened in S/D Thermography survey to be taken at regular intervals. Main Steam common header PCV found passing at deaerator floor. Main Steam common header steam trap found passing at CGP2 battery limit. Both deaerator vent water flash overat high loads. Deaerator trays to be checked. To be done.

To be attened.

To be attened in S/D

To be attened in S/D

To be attened in S/D

South Block HP steam line trap found missing between both isolation valve at PRDS area. To be attened in S/D Atomising steam PRDS isolation valve passing near SWAS room. To be attened in S/D HRSG 5 MS sampling line found punctured in threee places. To be attened in S/D

HP Steam header after battery limit along road no 4 vent valves found passing.

To be attened in S/D

LP steam header root valve gland leak near SWAS room to be attended. To be attened in S/D The enclosed steam leaks (next sheet) in RUP are to be attended. To be attended in co-ordination with concerned units.

Remarks

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL

Sr. Database Zone No. Tag No.

Ups Select End Trap Opertin Trap Mak Press Applicati ion - Install Module U/s Location Details Conc size g Type e ure on Trap ation code valve tn NB Status Level Type Boiler No.4 NorthEast Side Boiler No.4 East Side Boiler No.4 East Side Boiler No.4 East Side Boiler No.4 East Side Boiler No.4 East Side Boiler No.4 East Side NorthNorthNorthNorthNorthNorthW W W W W W W W 20 20 20 20 20 20 25 25 NT NT NT NT NT NT BPT21 TD-3 SPX SPX MP MP MP MP MP MP MP MP Tracing Tracing Tracing Tracing Tracing Tracing Tracing Drain OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

1 2 3 4 5 6 7 8

TPS TPS TPS TPS TPS TPS TPS TPS

TPS/BPT-01 TPS/BPT-02 TPS/BPT-03 TPS/BPT-04 TPS/BPT-05 TPS/BPT-06 TPS/BPT-07 TPS/TD-08

NT NT NT NT NT NT LK RC OK OK OK NT OK OK OK OS OS OK PL OK

UO UO UO UO UO UO UO UBO

GL GL GL GL GL OK GL OK

Boiler No.4 NorthEast Side Boiler No.4 NorthEast Side Boiler No.4 NorthEast Side Boiler No.4 NorthEast Side Boiler No.4 NorthEast Side Boiler No.4 NorthEast Side Boiler No.4 NorthEast Side Boiler No.4 NorthEast Side

TPS

TPS/TD-09

FW

20

TD

PNT

MP

Drain

OK

OK

UBO

OK

10

TPS

TPS/TD-10

FW

20

TD-3

SPX

MP

Drain Cu.Tracin g Cu.Tracin g Cu.Tracin g Drain

OK

OK

UBO

OK

11 12 13

TPS TPS TPS

TPS/TD-11 TPS/TD-12 TPS/TD-13

FW FIT SCR FW

20 9 20

TD NT TD-3

PNT SPX

MP MP MP

OK NOK OK

OK OK OK

UBO O UBO

OK NO OK

14

TPS

TPS/TD-14

20

TD

PNT

MP

OK

OK

UBO

OK

15

TPS

TPS/TD-15

20

BPT

PNT OTHE R OTHE R PNT

MP

Drain

NOK

OK

UBO

OK

16

TPS

TPS/FT-16

17

TPS

TPS/FT-17

Air Preheater Coil outlet of Boiler NO. FWF 4 Air Preheater Coil outlet of Boiler NO. FWF 4 Boiler No.3 North Side Boiler No.3 North Side Boiler No.3 North Side FW

40

IB

MP

Heating

OK

OK

UBDO

OK

40

IB

MP

Heating

OK

OK

UBDO

OK

18

TPS

TPS/BPT-18

20

TD

MP

Tracing

OK

OK

UBO

OK

19

TPS

TPS/BPT-19

FW

20

TD-3

SPX

MP

Tracing

OK

OK

UBO

OK

20

TPS

TPS/BPT-20

FW

20

TD-3

SPX

MP

Tracing

OK

OK

UBO

OK

Work Order No.23689773 dated 27.08.2012

Page 7 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL

21

TPS

TPS/TD-21

Boiler No.3 North Side Boiler No.3 North Side Boiler No.3 North Side Boiler No.3 North Side Boiler No.2 North Side Boiler Side Boiler Side Boiler Side Boiler Side Boiler Side No.2 North No.2 North No.2 North No.2 North No.2 North

SCR

15

TD-3

SPX

MP

Cu.Tracin g Cu.Tracin g Cu.Tracin g Drain

OK

OK

OS OS OS OS OS PL PL PL PL PL OS OS PL OK NT PL OS

NO

22

TPS

TPS/TD-22

SCR

15

TD-3

SPX

MP

OK

OK

NO

23

TPS

TPS/TD-23

SCR

15

TD-3

SPX

MP

OK

OK

NO

24

TPS

TPS/TD-24

20

TD-3

SPX

MP

OK

OK

UBO

OK

25 26 27 28 29 30 31

TPS TPS TPS TPS TPS TPS TPS

TPS/TD-25 TPS/TD-26 TPS/BPT-27 TPS/TD-28 TPS/TD-29 TPS/TD-30 TPS/TD-31

W W W SCR SCR SCR W

20 15 15 15 15 15 15

TD-3 TD BPT21 TD-3 TD-3 TD-3 BPT21 TD-3 TD-3 TD-3 NT TD-3 TD-3

SPX VRL SPX SPX SPX SPX SPX

MP MP MP MP MP MP MP

Drain Drain Tracing Cu.Tracin g Cu.Tracin g Cu.Tracin g Drain

OK OK OK OK OK OK NOK

OK OK OK OK OK OK OK

UBO UBO UBO O O O UO

OK OK OK NO NO NO OK

Boiler No.2 North Side Boiler No.2 North Side Boiler No.1 North Side Boiler No.1 North Side

32 33 34 35 36 37

TPS TPS TPS TPS TPS TPS

TPS/BPT-32 TPS/TD-33 TPS/TD-34 TPS/TD-35

W W W FIT SCR W W

20 20 20 12 20 15

SPX SPX SPX SPX SPX

MP MP MP MP MP MP

Tracing Cu.Tracin g Cu.Tracin g Cu.Tracin g Drain Drain

OK OK OK NOK OK OK

OK OK OK OK OK OK

UBO UBO UBO O UBO UBO

OK OK OK NO OK OK

Boiler No.1 North Side Boiler No.1 North TPS/TD-36 Side TPS/TD-37 Boiler No.1 North Side

38

TPS

Pipe Track South of TPS/BPT-38 Boiler No.1 towards FW FO TANK Pipe Track South of TPS/BPT-39 Boiler No.1 towards FO TANK Pipe Track South of TPS/BPT-40 Boiler No.1 towards FO TANK

15

TD

ARM

MP

Tracing

OK

OK

OK

UBO

OK

39

TPS

15

NT

MP

Tracing

OK

OK

NT

UO

OK

40

TPS

15

NT

MP

Tracing

OK

OK

NT

UO

OK

Work Order No.23689773 dated 27.08.2012

Page 8 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL

41

TPS

Pipe Track South of TPS/BPT-41 Boiler No.1 towards FO TANK Pipe Track South of TPS/BPT-42 Boiler No.1 towards FO TANK

15

NT

MP

Tracing

OK

OK

NT

UO

OK

42

TPS

15

NT

MP

Tracing

OK

OK

NT

UO

OK

43

TPS

Pipe Track South of TPS/BPT-43 Boiler No.1 towards FW FO TANK Pipe Track South of TPS/TD-44 Boiler No.1 towards FO TANK Pipe Track South of TPS/BPT-45 Boiler No.1 towards FO TANK Pipe Track South of TPS/BPT-46 Boiler No.1 towards FO TANK Pipe Track South of TPS/BPT-47 Boiler No.1 towards FO TANK Pipe Track South of TPS/TD-48 Boiler No.1 towards FO TANK Pipe Track South of TPS/TD-49 Boiler No.1 towards FO TANK Pipe Track South of TPS/TD-50 Boiler No.1 towards FO TANK TPS/TD-51 Near FO Heater No.1 Near FO Heater No.1 Near FO Heater No.1

15

TD

ARM

MP

Tracing

OK

OK

OK

UBO

OK

44

TPS

20

TD-3

SPX

MP

Drain

OK

OK

OK

UBO

OK

45

TPS

20

NT

MP

Tracing

OK

OK

NT

UO

OK

46

TPS

20

NT

MP

Tracing

OK

OK

NT

UO

OK

47

TPS

20

NT

MP

Tracing

OK

OK

NT

UO

OK

48

TPS

20

TD-3

SPX

MP

Drain

OK

OK

OK

UBO

OK

49

TPS

20

TD-3

SPX

HP

Drain

NOK

OK

PL

UBO

OK

50

TPS

20

TD-3

SPX

HP

Drain

NOK

OK

PL

UBO

OK

51

TPS

FW

20

TD

PNT

MP

Drain

OK

OK

OK OK OK

UO

OK

52

TPS

TPS/TD-52

20

TD

PNT

MP

Drain

OK

OK

UBO

OK

53

TPS

TPS/TD-53

20

TD

PNT

MP

Drain

OK

OK

UBO

OK

54

TPS

TPS/TD-54

Near FO Heater No.1 Near FO Heater No.1

20

TD

PNT

MP

Drain

OK

OK

PL PL

UBO

OK

55

TPS

TPS/TD-55

20

TD

PNT

MP

Drain

OK

OK

UBO

OK

Work Order No.23689773 dated 27.08.2012

Page 9 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL

56 57 58

TPS TPS TPS

TPS/BPT-56 TPS/BPT-57 TPS/BPT-58

Near FO Heater No.1 Near FO Heater No.1 Near FO Heater No.1 -1

W W W

15 15 20

TD-3 TD TD

SPX PNT PNT

MP MP MP

Tracing Tracing Tracing

OK OK OK

OK OK OK

OK PL OK OK OK OK RC RC LK OK OK OK OK OK OS NT NT NT NT NT

UBO UBO UBO

OK OK OK

59

TPS

60

TPS

61

TPS

62

TPS

Between Heater TPS/TD-59 & Heater -2 Between Heater TPS/BPT-60 & Heater -2 Between Heater TPS/TD-61 & Heater -2 Between Heater TPS/BPT-62 & Heater -2 TPS/BPT-63

W -1 W -1 W -1 W

15

TD-3

SPX

MP

Drain

OK

OK

UBO

OK

15

TD-3

SPX

MP

Tracing

OK

OK

UBO

OK

20

TD-3

SPX

MP

Drain

OK

OK

UBO

OK

20

TD-3

SPX

MP

Tracing

OK

OK

UO

OK

63

TPS

Between FO Tank-1 & Tank-2 Between FO Tank-1 & Tank-2

20

TD BPT21 TD

VRL

MP

Tracing

OK

OK

UC

OK

64

TPS

TPS/BPT-64

20

SPX

MP

Tracing

OK

OK

UC

OK

65

TPS

TPS/BPT-65

East of Tank-1 Near FW Man hole East of Tank-1 Near Man hole W

15

PNT

MP

Tracing

OK

OK

UBO

OK

66

TPS

TPS/BPT-66

15

TD

PNT

MP

Tracing

OK

OK

UBO

OK

67

TPS

TPS/BPT-67 East of Tank-1

20

TD

PNT

MP

Tracing

OK

OK

UBO

OK

68

TPS

TPS/BPT-68 East of Tank-2

15

TD

PNT

MP

Tracing

OK

OK

UBO

OK

69

TPS

TPS/BPT-69 East of Tank-2

15

TD

PNT

MP

Tracing

OK

OK

UBO

OK

70 71 72 73

TPS TPS TPS TPS

TPS/BPT-70 West of Tank-2 TPS/FT-71 TPS/FT-72 TPS/TD/73 Tank-2 Coil Outlet Tank-1 Coil Outlet PUMP HOUSE,NEAR TANK-2 PUMP HOUSE,NEAR TANK-2 PUMP HOUSE,NEAR TANK-2

FWF F F O

20 50 50 9

TD TD TD NT

PNT -

MP MP MP

Tracing Heating Heating

OK NOK NOK

OK OK OK OK

UO O O O

OK NO NO

MP Cu.Tracing NOK

NO O NO O NO

74

TPS

TPS/TD/74

NT

MP Cu.Tracing NOK

OK

75

TPS

TPS/TD/75

NT

MP Cu.Tracing NOK

OK

Work Order No.23689773 dated 27.08.2012

Page 10 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL

76 77 78 79

TPS TPS TPS TPS

TPS/TD/76

PUMP HOUSE,NEAR TANK-2

O O O O

9 9 9 9

NT NT NT NT

MP Cu.Tracing NOK MP Cu.Tracing NOK MP Cu.Tracing NOK MP Cu.Tracing NOK

OK OK OK OK

NT NT NT NT OS

O NO O O O NO NO NO OK

TPS/TD/77 MP-3 FO PUMP TPS/TD/78 MP-1/2 FO PUMP TPS/TD/79 MP-1/2 FO PUMP

80

TPS

TPS/TD/80 TG-3

20

TD-3

SPX

HP

Drain

NOK

OK

UBO

81

TPS

TPS/TD/81 TG-3 TG-3, NEAR TPS/TD/82 SURFACE CONDENSATE TG-3, NEAR TPS/TD/83 SURFACE CONDENSATE TPS/TD/84 BOILER FEED WATER PUMP-3 BOILER FEED WATER PUMP-3 BOILER FEED WATER PUMP-3 BOILER FEED WATER PUMP-3 TG HOUSE EAST PIPETRACK TG HOUSE EAST PIPETRACK TG HOUSE(N),PIPETRA CK TG HOUSE(N),PIPETRA CK TG HOUSE(N),PIPETRA CK TG HOUSE(N),PIPETRA CK TG HOUSE(N),PIPETRA CK

20

TD-3

SPX

HP

Drain

NOK

OK

OS

UBDO

OK

82

TPS

25

TD-62 SPX

HP

Drain

OK

OK

OS OS OS OS OS OS OK RC PL LK RC PL PL LK

UO

OK

83

TPS

25

TD-62 SPX BPT21 BPT21 BPT21 BPT21 TD-3 TD

HP

Drain

OK

OK

UO

OK

84

TPS

20

SPX

HP

Drain

NOK

OK

UO

OK

85

TPS

TPS/TD/85

20

SPX

HP

Drain

NOK

OK

UO

OK

86

TPS

TPS/TD/86

20

SPX

HP

Drain

NOK

OK

UO

OK

87

TPS

TPS/TD/87

20

SPX

HP

Drain

NOK

OK

UO

OK

88 89 90

TPS TPS TPS

TPS/TD/88 TPS/TD/89 TPS/TD/90

FW W FW

20 20 20

SPX DGLS

MP HP HP

Drain Drain Drain

OK NOK OK

OK OK OK

UBDO UBO UBO

OK GL OK

TD-62 SPX

91

TPS

TPS/TD/91

20

TD

DGLS

HP

Drain

NOK

OK

UBO

OK

92

TPS

TPS/TD/92

20

TD

DGLS

HP

Drain

NOK

OK

UBO

OK

93

TPS

TPS/TD/93

FW

20

TD-3

SPX

HP

Drain

NOK

OK

UBO

OK

94 95

TPS TPS

TPS/TD/94

W FW

20 20

TD TD-3

DGLS SPX

HP HP

Drain Drain

NOK NOK

OK OK

UBO UBO

OK OK

TPS/TD/95 OUTSIDE OF TG H

Work Order No.23689773 dated 27.08.2012

Page 11 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL

96

TPS

TPS/TD/96

NEAR M/M OFFICE , PIPETRACK(N) NEAR M/M OFFICE , PIPETRACK(N) NEAR M/M OFFICE , PIPETRACK(N) NEAR M/M OFFICE , PIPETRACK(N) NEAR M/M OFFICE , PIPETRACK(N)

20

TD-3

SPX

HP

Drain

NOK

OK

LK PL PL PL OK PL PL RC RC LK LK OK OK PL LK OK LK OK

UBO

OK

97

TPS

TPS/TD/97

FW

20

TD

PNT

MP

Drain

OK

OK

UBO

OK

98

TPS

TPS/TD/98

FW

20

TD

PNT

HP

Drain

NOK

OK

UBO

OK

99

TPS

TPS/TD/99

FW

20

BPT

PNT

HP

Drain

NOK

OK

UBO

OK

100 101 102 103 104 105 106 107

TPS TPS TPS TPS TPS TPS TPS TPS

TPS/TD/100

20

TD TD-3 TD-3 TD TD TD TD TD

DGLS SPX SPX PNT PNT DGLS PNT PNT

HP HP MP HP MP HP MP HP

Drain Drain Drain Drain Drain Drain Drain Drain

NOK NOK OK NOK OK NOK OK NOK

OK OK OK OK OK OK OK OK

UBO UBO UBO UBO UBO UBO UBO UBO

GL GL OK GL GL OK OK OK

TPS/TD/101 WEST OF CONTROL ROOM W 20 TPS/TD/102 WEST OF CONTROL ROOM FW 20 TPS/TD/103 WEST OF CONTROL ROOM W 20 PIPETRACK EAST OF DM PLANT PIPETRACK EAST TPS/TD/105 OF DM PLANT PIPETRACK EAST TPS/TD/106 OF DM PLANT TPS/TD/104 TPS/TD/107 PIPETRACK EAST OF DM PLANT PIPETRACK NORTH OF DM PLANT PIPETRACK NORTH OF DM PLANT PIPETRACK NORTH OF DM PLANT PIPETRACK NORTH OF DM PLANT PIPETRACK NORTH OF DM PLANT PIPETRACK NORTH OF DM PLANT FW W W W 20 20 20 20

108

TPS

TPS/TD/109

FW

15

TD-62 SPX

MP

Drain

OK

OK

UBO

OK

109

TPS

TPS/TD/110

20

TD-62 SPX

HP

Drain

OK

OK

UBO

OK

110

TPS

TPS/TD/111

FW

20

TD-3

SPX

HP

Drain

NOK

OK

UBO

OK

111

TPS

TPS/TD/112

20

TD

PNT

MP

Drain

OK

OK

UBO

OK

112

TPS

TPS/TD/113

FW

15

TD-3

SPX

MP

Drain

OK

OK

UBO

OK

113

TPS

TPS/TD/114

20

TD

DGLS

HP

Drain

NOK

OK

UBO

GL

114

TPS

PIPETRACK NORTH OF DM TPS/TD/115 PLANT,NORTH OF DM PLANT PIPETRACK NORTH OF DM TPS/TD/116 PLANT,NORTH OF DM PLANT

20

TD

PNT

HP

Drain

NOK

OK

PL

UBO

OK

115

TPS

20

TD-3

SPX

MP

Drain

OK

OK

PL

UBO

OK

Work Order No.23689773 dated 27.08.2012

Page 12 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL

B/y D/s valve valve

Direct leaks

Total Steam Action to be loss(kg/hr taken ) 0.0 0.0 0.0 0.0 0.0 0.0 7.7 need to be installed need to be installed need to be installed need to be installed need to be installed need to be installed Replacement Replacement Future Recommendatio n Future Recommendatio n Future Recommendatio n need to be installed Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n Repair with spare kit

Recommedations for Remarks Steam Trap Group Trapping (01-07)

NO NO NO NO NO NO NO OK

NO NO NO NO NO NO NO NO Root isolation valve GL

Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) 20NB CM TD-62M

7.6

OK

NO Root isolation valve GL

0.0

20NB CM TD-62M

PS

NO

1.5

20NB CM TD-62M Compact Assembly (20NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) 20NB CM TD-62M Group Trapping (11-12) 9 mm

OK NO OK

NO NO NO

0.0 0.0 0.0

OK

NO

0.0

OK

NO

0.0

20NB CM TD-62M

OK

OK

0.0

40NB FT-20-14

OK

OK Upstream Flange leak Upstream Flange leak

0.0

40NB FT-20-14 Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3)

OK

NO

3.1

PS

NO

2.1

OK

NO

0.0

Future Compact Assembly Recommendatio (20NB PC34+UTD-3) n

Work Order No.23689773 dated 27.08.2012

Page 13 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL


Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n Replacement Repair with spare kit Repair with spare kit Repair with spare kit Repair with spare kit Future Recommendatio n Future Recommendatio n Repair with spare kit Future Recommendatio n need to be installed Repair with spare kit Future Recommendatio n

NO

NO

0.0

Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) 20NB CM TD-62M

NO

NO

0.0

NO

NO

0.0

OK

NO

0.0

OK PS OK NO NO NO NO

NO NO NO NO NO NO NO

0.0 0.0 0.0 0.0 0.0 0.0 0.0

20NB CM TD-62M 15NB CM TD-62M Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) 15NB CM TD-62M Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) 20NB CM TD-62M 15NB CM TD-62M 12 mm Trap in corroded condition

OK OK PS NO OK OK

NO NO NO NO NO NO

0.0 0.0 0.0 0.0 0.0 0.0

OK

NO

0.0

Future Compact Assembly Recommendatio (15NB PC34+UTD-3) n need to be installed Compact Assembly (15NB PC34+UTD-3)

NO

NO

0.0

NO

NO

0.0

need to be installed

Compact Assembly (15NB PC34+UTD-3)

Work Order No.23689773 dated 27.08.2012

Page 14 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL

NO

NO

0.0

need to be installed

Compact Assembly (15NB PC34+UTD-3)

NO

NO

0.0

need to be installed

Compact Assembly (15NB PC34+UTD-3)

OK

NO

0.0

Future Compact Assembly Recommendatio (15NB PC34+UTD-3) n Future Recommendatio 20NB CM TD-62M n need to be installed Compact Assembly (20NB PC34+UTD-3)

OK

NO

0.0

NO

NO

0.0

NO

NO

0.0

need to be installed

Compact Assembly (20NB PC34+UTD-3)

NO

NO

0.0

need to be installed

Compact Assembly (20NB PC34+UTD-3)

OK

NO

V/v weld joint leak

1.5

Future Recommendatio 20NB CM TD-62M n Repair with spare kit

OK

NO

0.0

20NB CM-TD250M

OK

NO

0.0

Repair with spare kit

20NB CM-TD250M

NO

NO

0.0

PS

NO

0.0

PS

NO Root isolation v/v Gland leak

0.0

Future Recommendatio 20NB CM TD-62M n Future Recommendatio 20NB CM TD-62M n Future Recommendatio 20NB CM TD-62M n

OK

NO

2.6

Replacement

20NB CM TD-62M

OK

NO

0.0

Replacement

20NB CM TD-62M

Work Order No.23689773 dated 27.08.2012

Page 15 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL


Future Compact Assembly Recommendatio (15NB PC34+UTD-3) n Compact Assembly Replacement (15NB PC34+UTD-3) Future Compact Assembly Recommendatio (20NB PC34+UTD-3) n Future Recommendatio 15NB CM TD-62M n Future Compact Assembly Recommendatio (15NB PC34+UTD-3) n Future Recommendatio 20NB CM TD-62M n Replacement Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (20NB PC34+UTD-3) 50NB FT-20-14 50NB FT-20-14 Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) not in use/ no steam supply COND. Drained into tank COND. Drained into tank

OK OK O

NO NO NO

0.0 0.0 0.0

OK

NO

0.0

OK

NO

0.0

PS

NO

0.0

NO

NO

6.1

NO

NO

6.1

Replacement

NO

NO

7.7

Replacement Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n need to be installed need to be installed need to be installed need to be installed need to be installed

PS

NO

0.0

OK

NO

0.0

PS

NO

0.0

OK

NO

0.0

OK

NO

0.0

NO NO NO

NO NO NO NO

0.0 0.0 0.0 0.0

NO NO NO NO NO 0.0 4.5

Work Order No.23689773 dated 27.08.2012

Page 16 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL

NO NO NO NO NO OK NO NO NO

0.0 0.0 0.0 0.0

need to be installed need to be installed need to be installed need to be installed

Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) Compact Assembly (15NB PC34+UTD-3) not in use/ no steam supply not in use/ no steam supply

NO

0.0

Future Recommendatio 20NB CM-TD250M n Future Recommendatio 20NB CM-TD250M n Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n Future Recommendatio n 20NB CM-TD250M

OK

OK

0.0

NO

NO

0.0

NO

NO

0.0

20NB CM-TD250M two traps on single line two traps on single line two traps on single line two traps on single line

NO

NO

0.0

20NB CM-TD250M

NO

NO

0.0

20NB CM-TD250M

NO

NO

0.0

20NB CM-TD250M

NO

NO

0.0

20NB CM-TD250M

OK OK PS

OK u/s i/v gl lk NO NO

1.5 18.2 0.0

Future Recommendatio 20NB CM TD-62M n Replacement Repair with spare kit Replacement 20NB CM-TD250M 20NB CM-TD250M root i/v closed i/v crack open

OK

NO

22.7

20NB CM-TD250M

GL

NO

18.2

Replacement Repair with spare kit Replacement Replacement

20NB CM-TD250M

OK

NO

0.0

20NB CM-TD250M

GL OK

NO NO

0.0 22.7

20NB CM-TD250M 20NB CM-TD250M

Work Order No.23689773 dated 27.08.2012

Page 17 of 18

STEAM TRAP SURVEY REPORT OF TPS UNIT BY FORBES MARSHALL

PS

NO

22.7

Replacement

20NB CM-TD250M

OK

NO

0.0

Replacement

20NB CM TD-62M

OK

NO

0.0

Replacement

20NB CM-TD250M

u/v close online sealing of u/v

GL

NO

0.0

Replacement

20NB CM-TD250M

PS PS OK OK PS OK PS PS

NO NO NO NO NO NO NO NO

0.0 0.0 0.0 18.2 6.1 22.7 7.7 0.0

Future Recommendatio 20NB CM-TD250M n Repair with 20NB CM-TD250M spare kit Repair with 20NB CM TD-62M spare kit Replacement Replacement Replacement Replacement 20NB CM-TD250M 20NB CM TD-62M 20NB CM-TD250M 20NB CM TD-62M

rt v/v close u/v partially open

OK

NO

0.0

Future Recommendatio 20NB CM-TD250M n Future Recommendatio 15NB CM TD-62M n Repair with spare kit Replacement 20NB CM-TD250M

no support

OK

NO

0.0

u/v close

OK

NO

22.7

20NB CM-TD250M

PS

NO

0.0

Future Recommendatio 20NB CM TD-62M n Replacement 15NB CM TD-62M u/v partially open

OK

NO

7.7

OK

NO

0.0

Future Recommendatio 20NB CM-TD250M n Replacement 20NB CM-TD250M

PS

NO

0.0

PS

NO

0.0

Repair with spare kit

20NB CM TD-62M

Work Order No.23689773 dated 27.08.2012

Page 18 of 18