Вы находитесь на странице: 1из 5

 

Furniture Manufacturing Industry 
 
Sofa Sets Manufacturing Company
BACKGROUND:
Company’s product range consists of, bed sets, dining sets,
sideboards, cabinets, sofa sets, center tables, side tables, corners,
consoles, fireplaces and every such thing that can form a part of
home or office furniture.
Most furniture manufactures are not organized or working
systematically, barring few large corporate companies. Here is
management software that helps small and medium size companies
to manage business effectively. ERP for this sector addresses the
new, more customer-centric orientation of the furniture industry with
an affordable software package that supports end-to-end integration
and enhances operational efficiency.

Supply chain ISSUES & CHALLENGES:


management Today, furniture firms in India face many challenges. Although
manufacturers in different line of products may have significantly
Furniture Items
different operating structures, their business requirements are
¾ Ply wood
similar.
¾ Sponge
In an economy that’s become increasingly competitive, all furniture
¾ Clothing
making firms must efficiently respond to a more demanding
¾ Wood
customer-base and build long term, profitable relationships.
¾ Dacron cover
Meeting these challenges requires new IT strategies that can boost
and fabric
revenues, improve the productivity, cut costs, and enhance the
cover
overall management of your business.
¾ Springs
In addition, you must be innovative, while seeking operational
¾ Legs
excellence at all levels.
¾ Imported
Real-time organizational control is necessary, for that sophisticated
accessory
workflow is required.
items
Low literacy level of users.

www.dnserp.com                                                 j.zaveri@dnserp.com   Page 1 
 
 

Furniture Manufacturing Industry 
 
HOW ERP CAN ADDRESS THESE ISSUES:
ERP has developed application specifically for the furniture industry
that can help users achieve your business goals.
By implementing following ERP Modules:
• Security module • BOM – Bill of
• Accounts module – Materials module
General Ledger • Production module
Accounts (Assembly Production
• VAT / Sales Tax and Process
module Production)
• Excise module • CRM module
• Inventory (Customer
Management module relationship
• Purchase module management) and
• MRP - Material pre-sales module.
Requirement Planning • Order Fulfillment
module module – Sales
Accounting.

www.dnserp.com                                                 j.zaveri@dnserp.com   Page 2 
 
 

Furniture Manufacturing Industry 
 

Material Issue
note from the
store.

Quality check
inspection report
in ERP

www.dnserp.com                                                 j.zaveri@dnserp.com   Page 3 
 
 

Furniture Manufacturing Industry 
 

Production
In some cases it is tedious to make the BOM and so many work orders
planning
for the furniture production such as sofa set.
register.
The job card / work order data entry screen is designed to
User can find
capture various stages of the production of the sofa.
information
There are two parallel activities on the shop floor one line is
about the
cutting and stitching and the second line is carpentry and forming; as
pending job
shown in the ERP screen above. The user will report the status, just by
cards and the
clicking the tick box. And finally the fitting, followed by the QC, and
status shows
packing.
‘done’ or
pending.

www.dnserp.com                                                 j.zaveri@dnserp.com   Page 4 
 
 

Furniture Manufacturing Industry 
 

The production plan Register will show the following seven stages:
Cutting, Stitching, Carpentry, Foaming, Fitting, QC, Packing

There are two options that user can select - pending job card and closed
job cards.

The register will show the items under each stage. Ashok will visit to
show the same.

Like in all reports, the column heading is a sorting button, user can sort
on the column heading in ascending, or descending order, the report if
required can be exported to excel file.

www.dnserp.com                                                 j.zaveri@dnserp.com   Page 5 
 

Вам также может понравиться