S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra

0201027

Subpresupuesto
Fecha
Lugar

002
01/01/2012
021808

CONSTRUCCION DEL COMPLEJO DEPORTIVO J.J. PERALTA EN EL DISTRITO DE SANTA,


PROVINCIA DE SANTA - ANCASH
LOSA MULTIUSO Y GRADERIAS
ANCASH - SANTA - SANTA

Cdigo

Recurso

Unidad

Cantidad

Precio S/.

0147010001
0147010003
0147000022
0147010002
0147010004
0147000032

CAPATAZ
OFICIAL
OPERADOR DE EQUIPO LIVIANO
OPERARIO
PEON
TOPOGRAFO

MANO DE OBRA
194.7733
hh
772.5328
hh
120.8853
hh
1,054.4812
hh
hh
1,653.5190
hh
7.3850

15.82
12.62
12.62
14.39
11.40
14.39

0205010000
0239050000
0202000007
0202000008
0204000000
0205010004
0213520041
02300100E1
0229600005
0221000000
0221000093
0202170002
0243510061
0203000032
0238000000
0230900005
0217000026
0230990016
0243000024
0244000016
0245010001
0246000040
0205030075
0205000003
02050000E1
020500002
0205000009
0254450070
0254110096
0254010051
0263010013
0243160052
0260000002
0253030027

AFIRMADO
AGUA
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO RECOCIDO # 8
ARENA FINA
ARENA GRUESA
ASFALTO RC250 PARA JUNTAS I/FLETE
CAL HIDRAULICA (25KG)
CASTILLO METALICO ARCO Y TABLERO F G
2"
CEMENTO PORTLAND TIPO I (42.5KG)
CEMENTO PORTLAND TIPO MS
CLAVOS CON CABEZA DE 2 1/2", 3", 4"
ESTACA DE MADERA
FIERRO CORRUGADO PROMEDIO
HORMIGON
IMPRIMANTE SINOLITE
LADRILLO K.K. 18 HUECOS 9x13x24cm
LIJA PARA METAL
MADERA ANDAMIAJE
MADERA TORNILLO CEPILLADA
MADERA TORNILLO INC.CORTE P/ENCOFRADO
MALLA CUADRADA NYLON PARA VOLEY
MATERIAL GRANULAR SELECCIONADO
PIEDRA CHANCADA DE 1/2"
PIEDRA CHANCADA DE 1/2" Y 3/4"
PIEDRA CHANCADA DE 3/4" - 1"
PIEDRA GRANDE DE 8"
PINTURA DE TRAFICO
PINTURA ESMALTE MATE
PINTURA LATEX
POSTES DE FG 2" PARA NED DE VOLEY
REGLA DE MADERA
TEKNOPOR DE 1" x 4' x 8'
THINER

MATERIALES
m3
m3
kg
kg
m3
m3
gln
BOL
und
BOL
bls
kg
p2
kg
m3
kg
und
plg
p2
p2
p2
und
m3
m3
m3
m3
m3
gln
gln
gln
und
p2
pln
gln

Parcial S/.Presupuestado S

3,081.26
9,749.33
1,525.63
15,173.97
18,850.13
106.20

3,090.93
9,748.19
1,525.26
15,169.88
18,854.86
103.53

48,486.52

48,492.65

86.9323
112.0320
105.0606
31.1331
3.8131
65.4500
4.6000
5.5214
2.0000

27.20
10.17
4.00
4.00
24.00
25.00
9.92
7.50
2,500.00

2,364.50
1,139.35
420.24
124.52
91.44
1,636.25
45.63
41.40
5,000.00

2,367.24
1,137.64
420.23
126.90
90.74
1,636.43
46.00
41.41
5,000.00

347.3918
925.6145
111.9472
17.2545
1,219.4805
18.9504
24.8640
1,453.2000
5.6832
17.3000
60.3840
2,685.7578
1.0000
96.1200
24.8824
9.7968
40.9948
10.8288
3.0892
7.1280
3.1968
2.0000
5.7360
8.2800
2.1884

15.90
16.70
5.10
3.50
2.98
30.00
1.42
0.68
1.50
4.20
4.70
4.50
150.65
25.45
50.00
52.00
40.00
30.00
44.50
35.00
32.50
16.40
5.00
16.80
15.60

5,523.50
15,457.69
570.94
60.38
3,634.05
568.51
35.31
988.18
8.52
72.66
283.80
12,085.92
150.65
2,446.25
1,244.12
509.60
1,639.60
324.86
137.50
249.55
103.90
32.80
28.70
139.10
34.16

5,523.28
15,458.58
574.25
62.11
3,635.22
568.51
35.52
988.18
8.52
72.66
284.16
12,085.93
150.65
2,446.25
1,244.12
509.43
1,639.79
324.86
137.67
250.27
103.72
32.80
29.83
138.00
35.41

57,193.58

57,206.31

4.26
3.90
1,390.40
715.70
130.09
1,457.58
1,863.20
1,629.90
92.25
172.14

3.36
3.17
1,390.37
716.25
127.75
1,457.58
1,863.82
1,629.95
89.72
172.17

7,459.42

7,454.14

113,139.52

113,153.10

EQUIPOS
0337010023
0337010025
0348040034
0349040010
0348960005
0337010001
0349100007
0348850092
03305500E1
0349070006

BROCHA DE 2"
BROCHA DE 4"
CAMION VOLQUETE 12 M3.
CARGADOR S/LLANTAS 125-155 HP 3 YD3.
CIZALLA P/CORTE DE FIERRO
HERRAMIENTAS MANUALES
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
PLANCHA COMPACTADORA VIBRAT. 7.0 HP
TEODOLITO Y MIRA
VIBRADOR DE 3/4" - 2" CONCRETO

und
und
hm
hm
hm
%MO
hm
hm
hm
hm

0.7051
0.5227
12.6398
4.2133
37.1651

6.00
7.50
110.00
170.00
3.50

93.1557
108.6601
7.3850
18.1221

20.00
15.00
12.50
9.50

Total

S/.
S/.

113,153.10

La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando