Вы находитесь на странице: 1из 1

Phase V Addition Phase VI Addition Phase V & VI Addition

Future Aerated Stabilization Basin No. 3 Future Aerated Stabilization Basin No. 4 Future Settling Basin
Volume = 16,500,000 Volume = 16,500,000 Volume = 12,000,000

Chemical
Feed Pump

Chemical
Defoamer Feed Pump
Tote/Drum
Process Wastewater From
Mill, Utility Wastewater, Aqua Ammonia
Landfill Leachate and Tank
Stormwater
Chemical
Feed Pump
Flow Monitoring Aerated Stabilization Basin No. 1 Aerated Stabilization Basin No. 2
Station 1 Volume = 16,500,000 GAL Volume = 16,500,000 GAL
Phosphoric
Acid Phase I - III HRT = 5 Days Phase I - III HRT = 5 Days
Phase IV HRT = 3 Days Phase IV HRT = 3 Days

Phase I - III Flow = 3.3 MGD


Phase IV Flow = 5.5 MGD

Surface Aerators Surface Aerators Settling Basin


(75 HP Each) (75 HP Each) Volume = 12,000,000
Phase I-III HRT = 3.6 Days
Phase IV HRT = 2.2 Days

Phase I-III Flow


To Town of Cherokee Flow Monitoring = 3.3 MGD
Sanitary Wastewater Publicly Owned Station II (NPDES Phase IV Flow
= 5.5 MGD
Treatment Works Monitoring Point) Phase V Flow
= 8.8 MGD
Phase III Flow
Outfall = 11 MGD
Phase I - VI Flow = 0.035 MGD 001
Pump Station Pump Tennessee River
Phase I Converting Wastewater (Temporary)

Phase I Flow = 0.030 MGD Figure 2-6


Proposed Process Flow Diagram
Wastewater Treatment Facility
Southeast Tissue Company, LLC.
Phases I - IV Structures and Equipment Proposed Barton, Alabama Facility
Phases V & VI Additions Earth Tech Project No. 51840 Sept 2002
work/cadd/51840/F_1.7-7NPDES Permit.fh9
Archive CD April 2002

Вам также может понравиться