FORMULARIO No.

2
NOMBRE DEL OFERENTE:

ING. RENE RODRIGO VELEPUCHA VELEPUCHA

COTO-GADMSR-001-2012
HOJA 1 de 2

TABLA DE DESCRIPCION DE RUBROS, UNIDADES, CANTIDADES Y PRECIOS

RUBRO

DESCRIPCION

UNIDAD

CANTIDAD

PRECIO
UNITARIO

PRECIO
TOTAL

ML
M3
M3
M3
M2
M3
M3
M3
M3
M3
M3
M3
ML
ML
ML
M2
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
HORAS

2326.22
1676.28
2183.08
110.72
1888.10
34.56
188.81
167.48
699.40
2080.84
565.86
2314.07
1582.67
711.55
60.00
480.00
60.00
20.00
10.00
30.00
15.00
5.00
2.00
40.00

0.96
3.92
4.06
4.19
1.00
23.64
19.96
18.64
17.75
3.60
18.36
5.34
22.59
33.79
60.43
16.15
14.07
119.11
187.62
165.27
16.91
50.77
508.47
2.29

2,233.17
6,571.02
8,863.30
463.92
1,888.10
817.00
3,768.65
3,121.83
12,414.35
7,491.02
10,389.19
12,357.13
35,752.52
24,043.27
3,625.80
7,752.00
844.20
2,382.20
1,876.20
4,958.10
253.65
253.85
1,016.94
91.60
153,229.01

ML
M3
M2
M3
M3
M3
M3
M3
ML
UNIDAD
UNIDAD

505.25
381.60
332.29
30.38
23.43
114.51
182.23
457.97
492.50
51.00
51.00

0.96
3.92
1.00
19.96
18.64
17.75
3.60
5.34
20.87
160.16
14.07

485.04
1,495.87
332.29
606.38
436.74
2,032.55
656.03
2,445.56
10,278.48
8,168.16
717.57
27,654.67

ML
M3
M2
M3
M3
M3
M3
M3
ML
UNIDAD

2304.96
1673.39
1521.27
140.44
90.96
512.23
617.95
268.95
1595.00
144.00

0.96
3.92
1.00
19.96
18.64
17.75
3.60
5.34
13.49
160.16

2,212.76
6,559.69
1,521.27
2,803.18
1,695.49
9,092.08
2,224.62
1,436.19
21,516.55
23,063.04
72,124.87

M3
M3
M3
M3
M3
M3
KG
ML
UNIDAD
ML
UNIDAD
UNIDAD
ML
UNIDAD
UNIDAD
UNIDAD
GLB

437.98
437.98
99.24
116.76
10.24
130.00
16900.00
11.00
6.00
105.00
11.00
11.00
9.00
4.00
4.00
6.00
2.00

3.92
5.34
23.74
19.29
147.63
207.74
2.07
49.72
84.92
20.87
215.73
107.49
12.96
19.88
187.71
517.22
290.47

1,716.88
2,338.81
2,355.96
2,252.30
1,511.73
27,006.20
34,983.00
546.92
509.52
2,191.35
2,373.03
1,182.39
116.64
79.52
750.84
3,103.32
580.94

ALCANTARILLADO
A

RED PRINCIPAL

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

TRAZADO Y REPLANTEO DE LA RED


EXCAVACION MECANICA DE ZANJAS SUELO COMUN DE 0-2 MT
EXCAVACION MECANICA DE ZANJAS SUELO COMUN DE 2-4 MT
EXCAVACION MECANICA DE ZANJAS SUELO COMUN DE 4-6 MT
RAZANTEO EN FONDO DE ZANJA
RELLENO DE PIEDRA BOLA PARA BASE DE TUBERIA
ENCAMADO FONDO DE ZANJA CON MATERIAL GRANULAR
RELLENO ACOSTILLADO MATERIAL GRANULAR
RELLENO INICIAL CON MATERIAL DE MEJORAMIENTO
RELLENO DE ZANJA CON MATERIAL DE EXCAVACION SELECCIONADO
RELLENO DE ZANJA CON MATERIAL DE MEJORAMIENTO
DESALOJO DE MATERIAL SOBRANTE
SUMINISTRO E INSTALACION DE TUBERIA PERFILADA E/C D= 250 MM
SUMINISTRO E INSTALACION DE TUBERIA PERFILADA E/C D= 315 MM
SUMINISTRO E INSTALACION DE TUBERIA PERFILADA E/C D= 400 MM
ENTIBADO METALICO
CONEXIN DE TUBERIA A POZO
POZO DE REVISION PREFABRICADO DE 0-2 MT
POZO DE REVISION PREFABRICADO DE 2-4 MT
TAPA CIRCULAR DE H.F. D= 60 CM CON CERCO
RECONECCION DE ACOMETIDA DE AA.PP
RECONECCION DE TUBERIA PRINCIPAL DE AA.PP
LETRERO IDENTIFICACION DE OBRA DOBLE CARA
BOMBEO

B
25
26
27
28
29
30
31
32
33
34
35
C
36
37
38
39
40
41
42
43
44
45
D
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62

SUB-TOTAL
TIRANTES
TRAZADO Y REPLANTEO DE LA RED
EXCAVACION MECANICA DE ZANJAS SUELO COMUN DE 0-2 MT
RAZANTEO EN FONDO DE ZANJA
ENCAMADO FONDO DE ZANJA CON MATERIAL GRANULAR
RELLENO ACOSTILLADO MATERIAL GRANULAR
RELLENO INICIAL CON MATERIAL DE MEJORAMIENTO
RELLENO DE ZANJA CON MATERIAL DE EXCAVACION SELECCIONADO
DESALOJO DE MATERIAL SOBRANTE
SUMINISTRO E INSTALACION DE TUBERIA PERFILADA E/C D= 200 MM
CAJAS DOMICILIARIAS HASTA 2 MT DE 50*50 CM INTERNO DOBLE MARCO METALICO CON TAPA HoAo.
CONEXIN DE TUBERIA A POZO
SUB-TOTAL
RED TERCEARIA
TRAZADO Y REPLANTEO DE LA RED
EXCAVACION MECANICA DE ZANJAS SUELO COMUN DE 0-2 MT
RAZANTEO EN FONDO DE ZANJA
ENCAMADO FONDO DE ZANJA CON MATERIAL GRANULAR
RELLENO ACOSTILLADO MATERIAL GRANULAR
RELLENO INICIAL CON MATERIAL DE MEJORAMIENTO
RELLENO DE ZANJA CON MATERIAL DE EXCAVACION SELECCIONADO
DESALOJO DE MATERIAL SOBRANTE
SUMINISTRO E INSTALACION TUBERIA PERFILADA E/C D= 160 MM
CAJAS DOMICILIARIAS HASTA 2 MT DE 50*50 CM INTERNO DOBLE MARCO METALICO CON TAPA HoAo.
SUB-TOTAL
REACTOR Y ESTACION DE BOMBEO
EXCAVACION A MAQUINA
DESALOJO DE MATERIAL DE EXCAVACION
MEJORAMIENTO CON PIEDRA BOLA
RELLENO COMPACTADO CON LASTRE DE MEJORAMIENTO
HORMIGON SIMPLE REPLANTILLO F'C= 180 KG/CM2
HORMIGON SIMPLE (TOTAL) F'C= 210 KG/CM2
ACERO DE REFUERZO EN BARRAS FY= 4200 KG/CM2
SUMINISTRO E INSTALACION TUBO PVC PRESION U/Z 200 MM 1MPA
SUMINISTRO E INSTALACION CODO PVC PRESION U/Z 200 MM 1MPA
SUMINISTRO E INSTALACION TUBERIA PERFILADA E/C D= 200 MM
SUMINISTRO E INSTALACION TEE D= 200 MM
SUMINISTRO E INSTALACION CODO D= 200 MM
SUMINISTRO E INSTALACION TUBO PVC PRESION U/Z 110 MM 1MPA
SUMINISTRO E INSTALACION CODO PVC PRESION U/Z 110 MM 1MPA
POZOS DE REGISTRO
VALVULAS DE HIERRO FUNDIDO TIPO COMPUERTA
COMPUERTA CON VOLANTE

63

REJILLA ATRAPA SOLIDOS

GLB

1.00

90.38

90.38
83,689.73

M3
M3
M3
M3
M3
M3
M3
M3
KG

22.86
22.86
12.16
0.93
4.66
19.68
3.94
2.58
1460.00

7.96
5.34
19.29
147.63
174.68
196.82
207.89
224.50
2.07

181.97
122.07
234.57
137.30
814.01
3,873.42
819.09
579.21
3,022.20
9,783.84

M3
M3
M3
M3
KG
ML
M2
UNIDAD
M2

2.47
11.56
2.89
1.91
961.00
330.72
177.72
1.00
9.00

224.50
196.82
207.89
203.47
2.07
7.05
17.07
91.29
43.35

554.52
2,275.24
600.80
388.63
1,989.27
2,331.58
3,033.68
91.29
390.15
11,655.16

M3
M3
M3
M3
M3
M3
M3
M3
KG
UNIDAD
M2
M2
ML
UNIDAD
M2
M2
M2

15.22
15.22
12.98
1.96
2.00
1.53
1.43
4.22
750.00
125.00
50.16
148.04
126.00
1.00
1.80
6.75
148.04

7.96
5.34
19.29
147.63
174.68
207.89
224.50
256.91
2.07
0.81
14.16
6.86
3.01
178.83
90.20
30.92
3.84

121.15
81.27
250.38
289.35
349.36
318.07
321.04
1,084.16
1,552.50
101.25
710.27
1,015.55
379.26
178.83
162.36
208.71
568.47
7,691.98

GLB
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD

1.00
1.00
1.00
1.00
1.00
1.00

1,040.33
5,753.68
537.61
97.39
8,368.83
701.62

1,040.33
5,753.68
537.61
97.39
8,368.83
701.62
16,499.46

SUB-TOTAL
E
64
65
66
67
68
69
70
71
72

MURO DE CONTENCION (L= 106 ML ; O.20*1.20 MT)


EXCAVACION MANUAL
DESALOJO DE MATERIAL SOBRANTE
RELLENO COMPACTADO CON LASTRE DE MEJORAMIENTO
HORMIGON SIMPLE REPLANTILLO F'C= 180 KG/CM2
HORMIGON SIMPLE PLINTO F'C= 210 KG/CM2
HORMIGON SIMPLE MURO F'C= 210 KG/CM2
HORMIGON SIMPLE RIOSTRA F'C= 210 KG/CM2
HORMIGON SIMPLE COLUMNA F'C= 210 KG/CM2
ACERO DE REFUERZO EN BARRAS FY= 4200 KG/CM2

F
73
74
75
76
77
78
79
80
81

CERRAMIENTO PERIMETRAL (L= 106 ML ; 0.15*1.0 MT)


HORMIGON SIMPLE COLUMNA F'C= 210 KG/CM2
HORMIGON SIMPLE MURO F'C= 210 KG/CM2
HORMIGON SIMPLE RIOSTRA F'C= 210 KG/CM2
HORMIGON SIMPLE VIGUETA F'C= 210 KG/CM2
ACERO DE REFUERZO EN BARRAS FY= 4200 KG/CM2
TUBO GALVANIZADO DE 2 PLG
ENMALLADO(TIPO MALLA)
PUERTA PEATONAL TUBO HG 1 1/2" Y MALLA (1*2 MT)
PUERTA PRINCIPAL VEHICULAR DE ACCESO A REACTOR

G
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

CUARTO DE ESTACION DE BOMBEO CON LOSETA DE Ho.Ao.(6.40*5.40 MT)


EXCAVACION MANUAL
DESALOJO DE MATERIAL SOBRANTE
RELLENO COMPACTADO CON LASTRE DE MEJORAMIENTO
HORMIGON SIMPLE REPLANTILLO F'C= 180 KG/CM2
HORMIGON SIMPLE PLINTO F'C= 210 KG/CM2
HORMIGON SIMPLE RIOSTRA F'C= 210 KG/CM2
HORMIGON SIMPLE COLUMNA F'C= 210 KG/CM2
HORMIGON SIMPLE LOSA F'C= 210 KG/CM2
ACERO DE REFUERZO EN BARRAS FY= 4200 KG/CM2
BLOQUE ALIVIANADO 0.40*0.20*0.10 MT
MAMPOSTERIA DE BLOQUE E= 7 CM
ENLUCIDO VERTICAL
FILOS
PUERTA PRINCIPAL
PUERTA DE HIERRO FORJADO(PROTECCION)
REJA DE HIERRO (PROTECCION CELOSIA)
EMPASTADO Y PINTURA

H
99
100
101
102
103
104

SISTEMA ELECTRICO
LINEA DE ALTA TENSION
TRANSFORMADOR
MONTAJE E INSTALACION DE LUMINARIAS
MONTAJE DE CAJA PARA MEDIDOR Y ACCESORIOS
BOMBA TRIFASICA 5 HP TDH= 10 M. Q= 270 GLN/MIN
TABLERO DE CONTROL (AMP. VOLTIM, RELE TERMICO)

SUB-TOTAL

SUB-TOTAL

SUB-TOTAL

SUB-TOTAL

SUB TOTAL
TOTAL
NOTA:

ESTOS PRECIOS NO INCLUYEN IVA

PRECIO TOTAL DE LA OFERTA:

TRECIENTOS OCHENTA Y DOS MIL TRECIENTOS VEINTE Y OCHO CON 72/100 DOLARES

Santa Rosa, 12 de Marzo del 2012

Ing. Rene Rodrigo Velepucha V.


OFERENTE

382,328.72

FORMULARIO No. 10
NOMBRE DEL OFERENTE: ING. RENE RODRIGO VELEPUCHA VELEPUCHA

COTO-GADMSR-001-2012

CRONOGRAMA VALORADO DE TRABAJOS


RUBRO

CANTIDAD

TRAZADO Y REPLANTEO DE LA RED

2,326.22

EXCAVACION MECANICA DE ZANJAS SUELO COMUN DE 0-2 MT

1,676.28

EXCAVACION MECANICA DE ZANJAS SUELO COMUN DE 2-4 MT

EXCAVACION MECANICA DE ZANJAS SUELO COMUN DE 4-6 MT

PRECIO

PRECIO

UNITARIO

TOTAL

0.96

HOJA 1 DE 6
TIEMPO EN DIAS
30

2,233.17

100%

3.92

6,571.02

50%

2,183.08

4.06

8,863.30

50%

110.72

4.19

463.92

50%

1,888.10

1.00

1,888.10

50%

34.56

23.64

817.00

50%

ENCAMADO FONDO DE ZANJA CON MATERIAL GRANULAR

188.81

19.96

3,768.65

50%

RELLENO ACOSTILLADO MATERIAL GRANULAR

167.48

18.64

3,121.83

50%

RELLENO INICIAL CON MATERIAL DE MEJORAMIENTO

699.40

17.75

12,414.35

50%

2,080.84

3.60

7,491.02

50%

565.86

18.36

10,389.19

50%

DESALOJO DE MATERIAL SOBRANTE

2,314.07

5.34

12,357.13

50%

SUMINISTRO E INSTALACION DE TUBERIA PERFILADA E/C D= 250 MM

1,582.67

22.59

35,752.52

50%

SUMINISTRO E INSTALACION DE TUBERIA PERFILADA E/C D= 315 MM

711.55

33.79

24,043.27

50%

SUMINISTRO E INSTALACION DE TUBERIA PERFILADA E/C D= 400 MM

60.00

60.43

3,625.80

50%

60

90

2,233.17
50%

3,285.51

3,285.51
50%

4,431.65

4,431.65
50%

231.96
RAZANTEO EN FONDO DE ZANJA

231.96
50%

944.05
RELLENO DE PIEDRA BOLA PARA BASE DE TUBERIA

944.05
50%

408.50

408.50
50%

1,884.33

1,884.33
50%

1,560.92

1,560.92
50%

6,207.18
RELLENO DE ZANJA CON MATERIAL DE EXCAVACION SELECCIONADO

6,207.18
50%

3,745.51
RELLENO DE ZANJA CON MATERIAL DE MEJORAMIENTO

3,745.51
50%

5,194.60

5,194.60
50%

6,178.57

6,178.57
50%

17,876.26

17,876.26
50%

12,021.64

12,021.64
50%

1,812.90

1,812.90

120

ENTIBADO METALICO

480.00

16.15

7,752.00

50%

50%

CONEXIN DE TUBERIA A POZO

60.00

14.07

844.20

100%

POZO DE REVISION PREFABRICADO DE 0-2 MT

20.00

119.11

2,382.20

100%

POZO DE REVISION PREFABRICADO DE 2-4 MT

10.00

187.62

1,876.20

100%

TAPA CIRCULAR DE H.F. D= 60 CM CON CERCO

30.00

165.27

4,958.10

100%

RECONECCION DE ACOMETIDA DE AA.PP

15.00

16.91

253.65

100%

RECONECCION DE TUBERIA PRINCIPAL DE AA.PP

5.00

50.77

253.85

100%

LETRERO IDENTIFICACION DE OBRA DOBLE CARA

2.00

508.47

1,016.94

100%

40.00

2.29

91.60

100%

TRAZADO Y REPLANTEO DE LA RED

505.25

0.96

485.04

100%

EXCAVACION MECANICA DE ZANJAS SUELO COMUN DE 0-2 MT

381.60

3.92

1,495.87

50%

RAZANTEO EN FONDO DE ZANJA

332.29

1.00

332.29

50%

ENCAMADO FONDO DE ZANJA CON MATERIAL GRANULAR

30.38

19.96

606.38

50%

RELLENO ACOSTILLADO MATERIAL GRANULAR

23.43

18.64

436.74

50%

RELLENO INICIAL CON MATERIAL DE MEJORAMIENTO

114.51

17.75

2,032.55

50%

RELLENO DE ZANJA CON MATERIAL DE EXCAVACION SELECCIONADO

182.23

3.60

656.03

50%

DESALOJO DE MATERIAL SOBRANTE

457.97

5.34

2,445.56

SUMINISTRO E INSTALACION DE TUBERIA PERFILADA E/C D= 200 MM

492.50

20.87

10,278.48

CAJAS DOMICILIARIAS HASTA 2 MT DE 50*50 CM INTERNO DOBLE MARCO METALICO CON TAPA HoAo.
51.00

160.16

8,168.16

50%

14.07

717.57

50%

3,876.00

3,876.00

844.20

2,382.20

1,876.20

4,958.10

253.65

253.85

1,016.94
BOMBEO

91.60

485.04
50%

747.94

747.94
50%

166.15

166.15
50%

303.19

303.19
50%

218.37

218.37
50%

1,016.28

1,016.28
50%

328.02

328.02
100%

2,445.56
50%

50%

5,139.24

5,139.24
50%

4,084.08
CONEXIN DE TUBERIA A POZO

51.00

4,084.08
50%

358.79
TRAZADO Y REPLANTEO DE LA RED

2,304.96

0.96

2,212.76

100%

EXCAVACION MECANICA DE ZANJAS SUELO COMUN DE 0-2 MT

1,673.39

3.92

6,559.69

50%

RAZANTEO EN FONDO DE ZANJA

1,521.27

1.00

1,521.27

50%

140.44

19.96

2,803.18

50%

90.96

18.64

1,695.49

50%

RELLENO INICIAL CON MATERIAL DE MEJORAMIENTO

512.23

17.75

9,092.08

50%

RELLENO DE ZANJA CON MATERIAL DE EXCAVACION SELECCIONADO

617.95

3.60

2,224.62

50%

DESALOJO DE MATERIAL SOBRANTE

268.95

5.34

1,436.19

50%

1,595.00

13.49

21,516.55

50%

CAJAS DOMICILIARIAS HASTA 2 MT DE 50*50 CM INTERNO DOBLE MARCO METALICO CON TAPA HoAo.
144.00

160.16

23,063.04

50%

358.79

2,212.76
50%

3,279.85

3,279.85
50%

760.64
ENCAMADO FONDO DE ZANJA CON MATERIAL GRANULAR

760.64
50%

1,401.59
RELLENO ACOSTILLADO MATERIAL GRANULAR

1,401.59
50%

847.75

847.75
50%

4,546.04

4,546.04
50%

1,112.31

1,112.31
50%

718.10
SUMINISTRO E INSTALACION TUBERIA PERFILADA E/C D= 160 MM

718.10
50%

10,758.28

11,531.52
EXCAVACION A MAQUINA

437.98

3.92

1,716.88

100%

DESALOJO DE MATERIAL DE EXCAVACION

437.98

5.34

2,338.81

100%

99.24

23.74

2,355.96

100%

116.76

19.29

2,252.30

100%

10.24

147.63

1,511.73

100%

130.00

207.74

27,006.20

16,900.00

2.07

34,983.00

SUMINISTRO E INSTALACION TUBO PVC PRESION U/Z 200 MM 1MPA

11.00

49.72

546.92

100%

SUMINISTRO E INSTALACION CODO PVC PRESION U/Z 200 MM 1MPA

6.00

84.92

509.52

100%

1,716.88

2,338.81
MEJORAMIENTO CON PIEDRA BOLA

2,355.96
RELLENO COMPACTADO CON LASTRE DE MEJORAMIENTO

2,252.30
HORMIGON SIMPLE REPLANTILLO F'C= 180 KG/CM2

1,511.73
HORMIGON SIMPLE (TOTAL) F'C= 210 KG/CM2

50%

50%

13,503.10
ACERO DE REFUERZO EN BARRAS FY= 4200 KG/CM2

20%

40%

6,996.60

13,503.10
40%

13,993.20

546.92

10,758.28
50%

13,993.20

11,531.52

509.52
SUMINISTRO E INSTALACION TUBERIA PERFILADA E/C D= 200 MM

105.00

20.87

2,191.35

100%

SUMINISTRO E INSTALACION TEE D= 200 MM

11.00

215.73

2,373.03

100%

SUMINISTRO E INSTALACION CODO D= 200 MM

11.00

107.49

1,182.39

100%

SUMINISTRO E INSTALACION TUBO PVC PRESION U/Z 110 MM 1MPA

9.00

12.96

116.64

100%

SUMINISTRO E INSTALACION CODO PVC PRESION U/Z 110 MM 1MPA

4.00

19.88

79.52

100%

POZOS DE REGISTRO

4.00

187.71

750.84

100%

VALVULAS DE HIERRO FUNDIDO TIPO COMPUERTA

6.00

517.22

3,103.32

100%

COMPUERTA CON VOLANTE

2.00

290.47

580.94

100%

REJILLA ATRAPA SOLIDOS

1.00

90.38

90.38

100%

EXCAVACION MANUAL

22.86

7.96

181.97

100%

DESALOJO DE MATERIAL SOBRANTE

22.86

5.34

122.07

100%

RELLENO COMPACTADO CON LASTRE DE MEJORAMIENTO

12.16

19.29

234.57

100%

HORMIGON SIMPLE REPLANTILLO F'C= 180 KG/CM2

0.93

147.63

137.30

100%

HORMIGON SIMPLE PLINTO F'C= 210 KG/CM2

4.66

174.68

814.01

100%

HORMIGON SIMPLE MURO F'C= 210 KG/CM2

19.68

196.82

3,873.42

100%

HORMIGON SIMPLE RIOSTRA F'C= 210 KG/CM2

3.94

207.89

819.09

100%

HORMIGON SIMPLE COLUMNA F'C= 210 KG/CM2

2.58

224.50

579.21

100%

1,460.00

2.07

3,022.20

2.47

224.50

554.52

2,191.35

2,373.03

1,182.39

116.64

79.52

750.84

3,103.32

580.94

90.38

181.97

122.07

234.57

137.30

814.01

3,873.42

819.09

579.21
ACERO DE REFUERZO EN BARRAS FY= 4200 KG/CM2

50%

50%

1,511.10
HORMIGON SIMPLE COLUMNA F'C= 210 KG/CM2

1,511.10
100%

554.52

HORMIGON SIMPLE MURO F'C= 210 KG/CM2

11.56

196.82

2,275.24

100%

HORMIGON SIMPLE RIOSTRA F'C= 210 KG/CM2

2.89

207.89

600.80

100%

HORMIGON SIMPLE VIGUETA F'C= 210 KG/CM2

1.91

203.47

388.63

100%

ACERO DE REFUERZO EN BARRAS FY= 4200 KG/CM2

961.00

2.07

1,989.27

100%

TUBO GALVANIZADO DE 2 PLG

330.72

7.05

2,331.58

100%

ENMALLADO(TIPO MALLA)

177.72

17.07

3,033.68

100%

PUERTA PEATONAL TUBO HG 1 1/2" Y MALLA (1*2 MT)

1.00

91.29

91.29

100%

PUERTA PRINCIPAL VEHICULAR DE ACCESO A REACTOR

9.00

43.35

390.15

100%

EXCAVACION MANUAL

15.22

7.96

121.15

100%

DESALOJO DE MATERIAL SOBRANTE

15.22

5.34

81.27

100%

RELLENO COMPACTADO CON LASTRE DE MEJORAMIENTO

12.98

19.29

250.38

100%

HORMIGON SIMPLE REPLANTILLO F'C= 180 KG/CM2

1.96

147.63

289.35

100%

HORMIGON SIMPLE PLINTO F'C= 210 KG/CM2

2.00

174.68

349.36

100%

HORMIGON SIMPLE RIOSTRA F'C= 210 KG/CM2

1.53

207.89

318.07

100%

HORMIGON SIMPLE COLUMNA F'C= 210 KG/CM2

1.43

224.50

321.04

100%

HORMIGON SIMPLE LOSA F'C= 210 KG/CM2

4.22

256.91

1,084.16

ACERO DE REFUERZO EN BARRAS FY= 4200 KG/CM2

750.00

2.07

1,552.50

BLOQUE ALIVIANADO 0.40*0.20*0.10 MT

125.00

0.81

101.25

100%

50.16

14.16

710.27

100%

148.04

6.86

1,015.55

100%

2,275.24

600.80

388.63

1,989.27

2,331.58

3,033.68

91.29

390.15

121.15

81.27

250.38

289.35

349.36

318.07

321.04
100%

1,084.16
50%

50%

776.25

776.25

101.25
MAMPOSTERIA DE BLOQUE E= 7 CM

710.27
ENLUCIDO VERTICAL

1,015.55
FILOS

126.00

3.01

379.26

100%

PUERTA PRINCIPAL

1.00

178.83

178.83

100%

PUERTA DE HIERRO FORJADO(PROTECCION)

1.80

90.20

162.36

100%

REJA DE HIERRO (PROTECCION CELOSIA)

6.75

30.92

208.71

100%

EMPASTADO Y PINTURA

148.04

3.84

568.47

100%

LINEA DE ALTA TENSION

1.00

1,040.33

1,040.33

100%

TRANSFORMADOR

1.00

5,753.68

5,753.68

100%

MONTAJE E INSTALACION DE LUMINARIAS

1.00

537.61

537.61

100%

MONTAJE DE CAJA PARA MEDIDOR Y ACCESORIOS

1.00

97.39

97.39

100%

BOMBA TRIFASICA 5 HP TDH= 10 M. Q= 270 GLN/MIN

1.00

8,368.83

8,368.83

100%

TABLERO DE CONTROL (AMP. VOLTIM, RELE TERMICO)

1.00

701.62

701.62

100%

379.26

178.83

162.36

208.71

568.47

1,040.33

5,753.68

537.61

97.39

8,368.83

701.62

382,328.72

90,173.57

118,593.59

113,963.12

59,598.44

INVERSION MENSUAL
AVANCE PARCIAL EN %

23.59%

INVERSION ACUMULADA

90,173.57

AVANCE ACUMULADO EN %

23.59%

Santa Rosa, 12 de Marzo del 2012

Ing. Rene Rodrigo Velepucha V.

31.02%

208,767.16

54.60%

29.81%

322,730.28

84.41%

15.59%

382,328.72

100.00%

OFERENTE