Вы находитесь на странице: 1из 2

PT.

PETROKIMIA NUSANTARA INTERINDO

INSTRUMENT MAINTENANCE PROCEDURE


Calibration Procedure
Check Schenk Parameter

Procedure Number: IMP02/020/4/2001/00 Approval Name Signature

Revision: 0 Date

Prepared by

Herry R

Checked by

Bagus Hikmanto

25 August 2001

Approved by

Bambang Setyono

Preparation:

PT. PETROKIMIA NUSANTARA INTERINDO

1. 2. 3. 4. 5.

Cold Permit Standard PPE Standard Tools. Portable Schenk Multicont DCS Confirmation.

Job Plan
1. 2. Ensure Restore Position & Reset output/input overide panel Insert portable Schenk to JB plug schenk field / Main plant

3.

Press button

then display MO

FUNCTION WE 2 CALIBRATION

4.

Press Button

then display MO

FUNCTION WE 2 PROGRAMMING

5.

Enter with button

6.

Press button

then display to READ CONF. or READ PARAMETER .

7. 8.

Enter with button Display will appears P 00.01 Position Undef for Block Parameter

Press
6

for tne next block parameter.

9.

Press

to Display P 00.01 Position Undef for ADD Parameter


2

10. Press

or

for looks value of parameter

11. Inform to DCS Operator the job has finished

165719888.doc

2 of 2

Вам также может понравиться