LOAD CALCULATION
Subject:
References/results
Back Fill
Trench Condition
12.11.2.2
Bd
H
Ev
= SS.H.Ft
Ft
= Cd.Bd2
12.11.2.2.1-3
Fe
150
12.11.2.2.1-4
Bc
HBc
Compacted
= 1 - e -2ku' . H/Bd
Cd
Figure: 12.11.2.2.1-3
Fill
2ku'
ku'
Figure: 12.11.2.2.1-3
=
=
9.8
m/sec2
(acceleration of gravity)
22
kN/m3
Data
g
SS
Conduit
0.5x0.5
1.8x0.7
2x0.8
2.5x0.8
3x0.5
3.5x0.7
4x0.7
0.2
0.3
0.3
0.325
0.35
0.35
0.35
0.5
1.8
2.5
3.5
Bc (mm)
900
2400
2600
3150
3700
4200
4700
Bd (mm)
1200
2700
2900
3450
4000
4500
5000
H (mm)
3600
3600
3200
3000
1100
3000
3000
H/Bd
3.00
1.33
1.10
0.87
0.28
0.67
0.60
-2ku'
-0.3
-0.3
-0.3
-0.3
-0.3
-0.3
-0.3
-2ku'.H/Bd
Fill Height
0.41
0.67
0.72
0.77
0.92
0.82
0.84
Cd
1.98
1.10
0.94
0.77
0.26
0.60
0.55
Ft
0.88
0.93
0.95
0.96
1.0
0.97
0.97
Ft (used)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Ev
69.63
73.44
75.21
63.63
25.11
64.09
64.26
E v = SS.H.Ft (kN/m 2 )
Ev (used)
79.20
79.20
70.40
66.00
24.20
66.00
66.00