ALL SITE CONDITIONS BUILDING AND FEATURES INDICATED ARE TO BE CHECKED ON SITE BEFORE WORK COMMENCE. DRAWING NOT TO BE SCALED. REFER TO DIMENSIONS AS SHOWN
BOREHOLE POSITION
SHEET SIZE
NAME
SIGNATURE
DATE
ELEVATED TANK
A1
DESIGNED X X SCALE DRAWN X X
AS SHOWN
VERIFIED
VALIDATED
CLIENT
+ 35 99147,63
+35 99185,62
+35 99338,81
IMPLEMENTING AGENT
TECHNICAL SUPPORT
+35 99295,16
SCHOOL COORDINATES
EAST SOUTH
UWP CONSULTING (PTY) LTD P.O. Box 19276 TECOMA 5214 Tel: (043) 721-0186 Fax: (043) 721-0288
+ 62 200
+ 35 99200
PROJECT
BOYS
150
GIRLS
124
EDUCATORS
12
TOT. LEARNERS
274
ACCELERATED SCHOOLS INFRASTRUCTURE DELIVERY INITIATIVE (ASIDI) CONSTRUCTION OF WATER INFRASTRUCTURE AT SCHOOLS IN THE EASTERN CAPE PROVINCE.
DRAWING TITLE
WALKWAY SCHEDULE
TOTAL LENGTH
WALKWAY FROM LAST BUILDING TO ABLUTIONS
SITE DEVELOPMENT PLAN CENTANE JUNIOR SECONDARY SCHOOL WATER AND SANITATION
DBE DRAWING NUMBER
EMS NUMBER
DRAWING NUMBER
STATUS
REVISION
000