Вы находитесь на странице: 1из 1

NOTE

ALL SITE CONDITIONS BUILDING AND FEATURES INDICATED ARE TO BE CHECKED ON SITE BEFORE WORK COMMENCE. DRAWING NOT TO BE SCALED. REFER TO DIMENSIONS AS SHOWN

DRAWING NO TO BE SCALED - REFER TO APPROX. DIMENSIONS AS SHOWN


EXISTING BUILDING TO BE DEMOLISHED ONLY AFTER COMPLETE OF CONSTRUCTION OF NEW BUILDINGS

EXISITING BUILDING REMAINS. NO WORK TO BE DONE

WALKWAY FROM THE LAST BUILDING

BOREHOLE POSITION

MINIMAL REPAIRS AND RENOVATIONS REQUIRED

MAJOR REPAIRS AND RENOVATIONS REQUIRED

DEMOLISH AN EXISTING BULDING AND REPLACE WITH NEW

REMAINS OF EXISTING DEMOSHED BULDING

SHEET SIZE

NAME

SIGNATURE

DATE

ELEVATED TANK

A1
DESIGNED X X SCALE DRAWN X X
AS SHOWN

VERIFIED

VALIDATED

STATUS LEGEND I = INFORMATION T = TENDER C = CONSTRUCTION AB = AS BUILT

CLIENT

PROVISIONAL FENCE CO ORDS.


EAST A B C D SOUTH

+ 62 221,42 + 62 089,74 + 62 158,22 + 62 265,38

+ 35 99147,63

+35 99185,62
+35 99338,81

IMPLEMENTING AGENT

TECHNICAL SUPPORT

+35 99295,16

SCHOOL COORDINATES
EAST SOUTH

MVULA TRUST 2 Norvia House Vincent East London

Tel: (043) 726-2255 Fax: (043) 726-5967


FP 2

UWP CONSULTING (PTY) LTD P.O. Box 19276 TECOMA 5214 Tel: (043) 721-0186 Fax: (043) 721-0288

+ 62 200

+ 35 99200

PROJECT

SCHOOL ENROLMENT SCHEDULE 2013

BOYS
150

GIRLS
124

EDUCATORS
12

TOT. LEARNERS
274

ACCELERATED SCHOOLS INFRASTRUCTURE DELIVERY INITIATIVE (ASIDI) CONSTRUCTION OF WATER INFRASTRUCTURE AT SCHOOLS IN THE EASTERN CAPE PROVINCE.
DRAWING TITLE

WALKWAY SCHEDULE
TOTAL LENGTH
WALKWAY FROM LAST BUILDING TO ABLUTIONS

SITE DEVELOPMENT PLAN CENTANE JUNIOR SECONDARY SCHOOL WATER AND SANITATION
DBE DRAWING NUMBER
EMS NUMBER

DRAWING NUMBER

STATUS

REVISION

000

Вам также может понравиться