DM-1 :1) 1st floor left side bathroom pipe line licage.

2) 1st floor left side 1st bathroom jam 3) Ground floor left back side HDB inlet water vall not proper working. 4) Back side Butterfly vall problem. 5) 1st floor kitchen hall pipeline licage.

DM-3 :-

1) Ground floor R. no. 103 fan problem. 2) Ground floor left side bathroom alldrop not fitting. 3) Ground floor Right side bathroom door not fitting properly. 4)