Dear Sir,

This is with reference to the relocation of the Transformers for Tiger Profile &
Insulation. The location and the plan for the Transformer rooms were designed an
approved by our Civil Consultant M/s. . And to our best Knowledge it was also
approved by the ADDC.

We are having Asphalt road access to both transformer rooms as per our civil plan
which is being approved. It would be very harsh on us if we have to relocate our
second transformer room as the Electrical cabling has been carried out. If we have
to relocate the transformer room we have to carry out all the cabling from scratch
which would create lot of time loss in addition to which we shall also have
Production Losses and financial loss. It would be kind of you if you approve the
same design without relocating the transformer room.