Вы находитесь на странице: 1из 1

DETERMINACION DEL TIEMPO DE DURACION DE CADA PARTIDA EN LA EJECUCION DEL PROYECTO

01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
02.04
02.05

OBRAS PROVISIONALES
ALQUILER DE OFICINA ALMACEN Y CAMPAMENTO

UNID

METRADO

REND

M/R

CUADRILLA

M/C*R

DURACION

MES

6.00

1.00

6.00

1.00

6.00

FLETE TERRESTRE
KG
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTA
GLB
CARTEL DE IDENTIFICACION DE LA OBRA DE 8.50X3.60M
UND
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
M2
TRAZO NIVEL Y REPLANTEO
M2
TRAZO Y REPLANTEO DURANTE LA OBRA
M2
CERCO DE SEGURIDAD Y PROTECCION
M
NIVELACION DE LAS CAJAS DE AGUA
UND

863,703.39
1.00
1.00

1.00
1.00
2.00

863,703.39
1.00
0.50

12,300.00
1.00
1.00

70
1.00
0.50

6
70
1
1

7,749.78
7,749.78
7,749.78
3,001.17
74.00

160.00
500.00
840.00
450.00
7.00

48.44
15.50
9.23
6.67
10.57

5.00
1.00
1.00
1.00
1.00

9.69
15.50
9.23
6.67
10.57

10
16
10
7
11

02.06

NIVELACION DE LAS CAJAS DE DESAGUE

UND

70.80

7.00

10.11

1.00

10.11

11

02.07

NIVELACION DE BUZONES CORTE

UND

39.60

10.00

3.96

1.00

3.96

02.08

NIVELACION DE BUZONES EN GENERAL A NIVEL DE RASANTE UND

39.60

5.00

7.92

1.00

7.92

M3
M3

787.00
1,668.12

1.50
2.50

524.67
667.25

8.00
8.00

65.58
83.41

66

M3

707.82

240.00

2.95

1.00

2.95

03
03.011
03.021
03.03
03.04

MOVIMIENTO DE TIERRAS
CORTE DE TERRENO ROCOSO - MANUAL
CORTE DE TERRENO SEMI ROCOSO - MANUAL
RELLENO Y
COMP. MANUAL A
NIVEL DE SUB
ESCARIFICADO Y COMPACTADO A NIVEL DE SUB RAZANTE

83
3

M2

5,981.50

1,200.00

4.98

1.00

4.98

03.05

CONFORMACION DE BASE

M2

5,981.50

1,200.00

4.98

1.00

4.98

03.06

PERFILADO Y NIVELADO SUB RAZANTE DE VEREDA

M2

1,069.15

120.00

8.91

1.00

8.91

M2
M3
M2

1,069.15
4,200.37
110.92

140.00
240.00
16.00

7.64
17.50
6.93

1.00
1.00
1.00

7.64
17.50
6.93

8
18
7

M3
M2

412.74
1,089.34

14.00
16.00

29.48
68.08

2.00
4.00

14.74
17.02

15
17

KG

2,521.07

280.00

9.00

1.00

9.00

KG

770.99

280.00

2.75

1.00

2.75

KG

1,828.46

280.00

6.53

1.00

6.53

03.07
03.08
03.09
04
04.01
04.02
04.03
04.041
04.05

RELLENO Y CONFORMACION DE BASE PARA VEREDA e=10 CM


ELIMINACION DE MATERIAL EXCEDENTE D 10KM
DEMOLICION DE VEREDAS DE E=0.10 M.
PAVIMENTO RIGIDO
CONCRETO F'c=210 Kg/cm2 PARA PAVIMENTO
ENCOFRADO Y DESENCOFRADO DE PAVIMENTO
DOWELS DE
ACERO LISO EN
JUNTAS
DOWELS DE
ACERO LISO EN
JUNTAS
ACERO EN JUNTAS LONGITUDINALES DE CONTRACCION

9
3
7

04.06

JUNTAS DE CONTRACCION E=1/2" H=2"

791.65

150.00

5.28

1.00

5.28

04.07

JUNTAS DE DILATACION E=1/2" H=8"

270.88

150.00

1.81

1.00

1.81

04.08

SEALIZACION DE LAS MARCAS PARA TRANSITO PEATONAL

M2

209.40

30.00

6.98

1.00

6.98

05

GRADERIA

05.01

CONCRETO FC=175 KG/CM2 PARA GRADERIAS

M3

13.32

14.00

0.95

1.00

0.95

05.02

ENCOFRADO Y DESENCOFRADO DE GRADERIAS

M2

66.15

16.00

4.13

2.00

2.07

05.03

BRUAS DE 1CM

32.30

180.00

0.18

1.00

0.18

05.04

JUNTAS DE CONTRACCION E=1/2" H=2"

53.35

150.00

0.36

1.00

0.36

1
4

06

CUNETAS

06.01

CONCRETO FC=175 KG/CM2 PARA CUNETAS

M3

105.88

24.00

4.41

1.00

4.41

06.021

ACERO EN SARDINEL

KG

986.35

220.00

4.48

1.00

4.48

06.03

ENCOFRADO Y DESENC. PARA CUNETAS

M2

670.67

16.00

41.92

4.00

10.48

10

06.04

JUNTAS DE DILATACION E=1/2" H=8"

147.57

150.00

0.98

1.00

0.98

07

MURO DE CONTENCION

07.01

MOVIMIENTO DE TIERRAS

07.01.011

CORTE DE TERRENO ROCOSO - MANUAL

M3

257.93

1.50

171.95

5.00

34.39

34

07.01.021

CORTE DE TERRENO SEMI ROCOSO - MANUAL

M3

1,698.58

2.50

679.43

8.00

84.93

85

07.01.03

RELLENO CON MATERIAL PROPIO

M3

1,141.71

8.00

142.71

3.00

47.57

48

07.02

M3

66.44

24.00

2.77

1.00

2.77

07.02.02

OBRAS DE CONCRETO SIMPLE


CONCRETO
CICLOPEO
FC=140KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS

M2

195.27

10.00

19.53

2.00

9.77

10

07.03
07.03.01
07.03.02
07.03.03
07.03.04

OBRAS DE CONCRETO ARMADO


SOLADO E = 4" MEZCLA 1:12
M2
CONCRETO FC=175 KG/CM2 PARA MUROS REFORZADOS
M3
ENCOFRADO Y DESENCOF MUROS
M2
ACERO EN ZAPATAS Fy=4200 KG/CM2 EN MURO DE CONCRETOKG

501.93
644.27
2,975.65
33,865.57

60.00
6.00
10.00
250.00

8.37
107.38
297.57
135.46

3.00
5.00
5.00
5.00

2.79
21.48
59.51
27.09

3
21
60
27

07.03.05

JUNTAS DE DILATACION

288.43

34.00

8.48

1.00

8.48

M3
M2
KG

45.53
901.44
1,659.74

18.00
12.00
220.00

2.53
75.12
7.54

1.00
5.00
1.00

2.53
15.02
7.54

3
15
8

M3
M2
KG

242.73
444.60
1,070.04

14.00
16.00
220.00

17.34
27.79
4.86

2.00
3.00
1.00

8.67
9.26
4.86

9
9
5

07.02.01

08

SARDINELES

08.01
08.02
08.03
09
09.01
09.02
09.03

CONCRETO FC=175 KG/CM2 - PARA SARDNEL


ENCOFRADO Y DESENCOF SARDINEL
ACERO EN SARDINEL
VEREDAS
CONCRETO F'c=175 Kg/cm2 PARA VEREDA
ENCOFRADO Y DESENCOFRADO DE VEREDA
ACERO EN SARDINEL VEREDA

09.04

BRUAS DE 1CM

2,172.98

180.00

12.07

2.00

6.04

09.05

JUNTAS DE CONTRACCION E=1/2" H=2"

510.85

150.00

3.41

1.00

3.41

10

JARDINERIA

10.01

RELLENO CON MATERIAL AGRICOLA

M3

133.48

8.00

16.69

2.00

8.35

10.02

SUMINISTRO Y COLOCACION DE GRASS

M2

812.74

60.00

13.55

2.00

6.78

10.03

SUMINISTRO Y COLOCACION DE PLANTONES

UND

99.40

10.00

9.94

2.00

4.97

11

CURADO Y LIMPIEZA DE LOZA

11.01

CURADO DE LOSA DE CONCRETO CON ADITIVO

M2

2,680.12

200.00

13.40

1.00

13.40

13

11.02

LIMPIEZA DE PAVIMENTO

M2

4,448.40

100.00

44.48

4.00

11.12

11

Вам также может понравиться