TASKRSRC

task_id
TASK__status_code
rsrc_id
role_id
acct_id
task__wbs_id
task__wbs_name
task__task_name
rsrc__rsrc_name
Activity ID (*)Activity Status
Resource IDRole ID
Cost Account
(*)WBS
ID
(*)WBS Name
(*)Activity Name
(*)Resource Name
711180C1000101
In Progress07.005/K-A NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Transportation
& Transport KM:34+200
of material- 34+800
from borP
711180C1000101
In Progress2200 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Excavation
& Transport KM:34+200 - 34+800 P
711180C1000101
In Progress2204 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Excavation
& Transportand
KM:34+200
use of unsuitable
- 34+800m
P
711180C1000101
In Progress2202 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Excavation
& Transportand
KM:34+200
use of material
- 34+800
from
P
711180C1000101
In Progress2240 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Cutting
& Transport
the trees
KM:34+200 - 34+800 P
711180C1000101
In Progress2240/1 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Removing
& Transport
the
KM:34+200
roots
- 34+800 P
711180C1000101
In Progress07.005/K-1 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Forwarding
& Transportthe
KM:34+200
soil to the- stock
34+800
areP
711180C1000102
Not Started07.005/K-A NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Transportation
& Transport KM:34+200
of material- 34+800
from borP
711180C1000102
Not Started2200 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Excavation
& Transport KM:34+200 - 34+800 P
711180C1000102
Not Started2204 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Excavation
& Transportand
KM:34+200
use of unsuitable
- 34+800m
P
711180C1000102
Not Started2202 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Excavation
& Transportand
KM:34+200
use of material
- 34+800
from
P
711180C1000102
Not Started2240 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Cutting
& Transport
the trees
KM:34+200 - 34+800 P
711180C1000102
Not Started2240/1 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Removing
& Transport
the
KM:34+200
roots
- 34+800 P
711180C1000102
Not Started07.005/K-1 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Forwarding
& Transportthe
KM:34+200
soil to the- stock
34+800
areP
711180C1000112
Not Started15.142-A NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+700
Loading
- 35+350
and Laying
Phase /w
3 machine
711180C1000112
Not Started07.005/K-R NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+700
Ropriz
- 35+350 Phase 3
711180C1000112
Not Started2209 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+700
Damping
- 35+350
down
Phase
and compacting
3
711180C1000112
Not Started15.052/5 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+700
Compacting
- 35+350 Phase 3
711180C1000112
Not Started07.004/K NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+700
transporting
- 35+350the
Phase
excav.
3 soil
711180C1000112
Not Started07.005/K NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+700
Traspor.
- 35+350
Of water
Phase 3
711180C1000120
Not Started2500/A NU
130525 GO-4.010.1.10.200.C.10
Earthworks Subgrade Preparation
Reglaj
KM:35+350 - 36+000
711180C1000120
Not Started2500/B NU
130525 GO-4.010.1.10.200.C.10
Earthworks Subgrade Preparation
Reglaj
KM:35+350 - 36+000
711180C1000120
Not Started2500/C NU
130525 GO-4.010.1.10.200.C.10
Earthworks Subgrade Preparation
Reglaj
KM:35+350 - 36+000
711180C1000121
Not Started2500/A NU
130525 GO-4.010.1.10.200.C.10
Earthworks Subgrade Preparation
Reglaj
KM:34+700 - 35+350
711180C1000121
Not Started2500/B NU
130525 GO-4.010.1.10.200.C.10
Earthworks Subgrade Preparation
Reglaj
KM:34+700 - 35+350
711180C1000121
Not Started2500/C NU
130525 GO-4.010.1.10.200.C.10
Earthworks Subgrade Preparation
Reglaj
KM:34+700 - 35+350
711180C1000110
In Progress15.142-A NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+350
Loading
- 36+000
and Laying
Phase /w
1 machine
711180C1000110
In Progress07.005/K-R NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+350
Ropriz
- 36+000 Phase 1
711180C1000110
In Progress2209 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+350
Damping
- 36+000
down
Phase
and compacting
1
711180C1000110
In Progress15.052/5 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+350
Compacting
- 36+000 Phase 1
711180C1000110
In Progress07.004/K NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+350
transporting
- 36+000the
Phase
excav.
1 soil
711180C1000110
In Progress07.005/K NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:34+350
Traspor.
- 36+000
Of water
Phase 1
711180C1000122
Not Started2500/A NU
130525 GO-4.010.1.10.200.C.10
Earthworks Subgrade Preparation
Reglaj
711180C1000122
Not Started2500/B NU
130525 GO-4.010.1.10.200.C.10
Earthworks Subgrade Preparation
Reglaj
711180C1000122
Not Started2500/C NU
130525 GO-4.010.1.10.200.C.10
Earthworks Subgrade Preparation
Reglaj
711180C1000092
In ProgressZEL - 8 Geo NU
130525 GO-4.010.1.10.200.C.10
Earthworks Rock Fill KM:
Krmata
34+820 hazrla
- 35+640
ser
711180C1000092
In Progress2202 Geo NU
130525 GO-4.010.1.10.200.C.10
Earthworks Rock Fill KM:
(New
34+820
Resource)
- 35+640
711180C1000092
In Progress2209 Geo NU
130525 GO-4.010.1.10.200.C.10
Earthworks Rock Fill KM:
(New
34+820
Resource)
- 35+640
711180C1000092
In Progress07.005/K-KD Geo NU
130525 GO-4.010.1.10.200.C.10
Earthworks Rock Fill KM:
Rock
34+820
Transport
- 35+640
711180C1000092
In Progress07.006/K-K Geo NU
130525 GO-4.010.1.10.200.C.10
Earthworks Rock Fill KM:
Krmata
34+820 Nakli
- 35+640
711180C1000111
Not Started15.142-A NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:35+350
Loading
- 36+000
and Laying
Phase /w
2 machine
711180C1000111
Not Started07.005/K-R NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:35+350
Ropriz
- 36+000 Phase 2
711180C1000111
Not Started2209 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:35+350
Damping
- 36+000
down
Phase
and compacting
2
711180C1000111
Not Started15.052/5 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:35+350
Compacting
- 36+000 Phase 2
711180C1000111
Not Started07.004/K NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:35+350
transporting
- 36+000the
Phase
excav.
2 soil
711180C1000111
Not Started07.005/K NU
130525 GO-4.010.1.10.200.C.10
Earthworks Fill KM:35+350
Traspor.
- 36+000
Of water
Phase 2
711180C1000100
In Progress07.005/K-A NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Transportation
& Transport KM:34+200
of material- 34+800
from borP
711180C1000100
In Progress2200 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Excavation
& Transport KM:34+200 - 34+800 P
711180C1000100
In Progress2204 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Excavation
& Transportand
KM:34+200
use of unsuitable
- 34+800m
P
711180C1000100
In Progress2202 NU
130525 GO-4.010.1.10.200.C.10
Earthworks Excavation Excavation
& Transportand
KM:34+200
use of material
- 34+800
from
P

Page 1

TASKRSRC

711180C1000100
In Progress2240 NU
711180C1000100
In Progress2240/1 NU
711180C1000100
In Progress07.005/K-1 NU
711180C9500306
Not StartedL2.2 DC NU
711180C5000260
In ProgressDisplacement NU
711180C5000265
Not StartedL2.2 DC NU
711180C5000265
Not StartedSW-3 NU
711180C5000266
Not StartedMiscellaneous NU
711180C4000220
Not Started2541 NU
711180C4000220
Not StartedPlanting Tree NU
711180C3010180
Not Started14.111 ss NU
711180C3010180
Not Started07.005/K-KN NU
711180C3010184
Not Started16.100/K-1-A ss NU
711180C3010184
Not Started3000B ss NU
711180C3010184
Not Started4470 ss NU
711180C3010184
Not Started07.006/K- ss NU
711180C3010184
Not Started07.006/K-B ss NU
711180C3010184
Not Started07.005/K-K ss NU
711180C3010184
Not Started07.005/K-OK-ss NU
711180C3010184
Not Started04.613/04 ss NU
711180C3010186
Not Started25.052 ss NU
711180C3010186
Not Started16.134/K-1-A ss NU
711180C3010186
Not Started3000B ss NU
711180C3010186
Not Started23.014/K ss NU
711180C3010186
Not Started23.015/K ss NU
711180C3010186
Not Started4470 ss NU
711180C3010186
Not Started09.012/K-A ss NU
711180C3010186
Not Started07.006/K- ss NU
711180C3010186
Not Started07.006/K-Dss NU
711180C3010186
Not Started07.006/K-B ss NU
711180C3010186
Not Started07.005/K-K ss NU
711180C3010186
Not Started07.005/K-OK-ss NU
711180C3010186
Not Started04.613/04 ss NU
711180C3010186
Not StartedB-18.501 ss NU
711180C3010187
Not Started25.052 ss NU
711180C3010187
Not Started16.134/K-1-A ss NU
711180C3010187
Not Started3000B ss NU
711180C3010187
Not Started23.014/K ss NU
711180C3010187
Not Started23.015/K ss NU
711180C3010187
Not Started4470 ss NU
711180C3010187
Not Started09.012/K-A ss NU
711180C3010187
Not Started07.006/K- ss NU
711180C3010187
Not Started07.006/K-Dss NU
711180C3010187
Not Started07.006/K-B ss NU
711180C3010187
Not Started07.005/K-K ss NU
711180C3010187
Not Started07.005/K-OK-ss NU
711180C3010187
Not Started04.613/04 ss NU
711180C3010187
Not StartedB-18.501 ss NU
711180C3010187
Not Started21.052 ss NU
711180C3010185
Not Started25.052 ss NU
711180C3010185
Not Started16.134/K-1-A ss NU
711180C3010185
Not Started3000B ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 2

GO-4.010.1.10.200.C.10
Earthworks Excavation Cutting
& Transport
the trees
KM:34+200 - 34+800 P
GO-4.010.1.10.200.C.10
Earthworks Excavation Removing
& Transport
the
KM:34+200
roots
- 34+800 P
GO-4.010.1.10.200.C.10
Earthworks Excavation Forwarding
& Transportthe
KM:34+200
soil to the- stock
34+800
areP
GO-4.010.1.10.200.C.95
Pavement &Other
Finishing
Works
Works
Direct
(Out Cost
of Scope)
GO-4.010.1.10.200.C.50
Ancillary and
Service
Other Displacements
Works
Displacement
GO-4.010.1.10.200.C.50
Ancillary and
Lighting
Other Works
(Out
Direct
of Scope)
Cost
GO-4.010.1.10.200.C.50
Ancillary and
Lighting
Other Works
(Out
Secondary
of Scope)Works
GO-4.010.1.10.200.C.50
Ancillary and
Miscellaneous
Other Works
Miscellaneous
GO-4.010.1.10.200.C.40
Recreation Landscape
Areas
Excavation
GO-4.010.1.10.200.C.40
Recreation Landscape
Areas
Plantting Tree
GO-4.010.1.10.200.C.30.1.1
Underpass Structural
KM: 035+206
Earthworks
Excavation
- (7.00x6.00)
& Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Structural
KM: 035+206
Earthworks
Soil- (7.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Lean
KM: 035+206
Concrete
Lean
- (7.00x6.00)
Concrete
GO-4.010.1.10.200.C.30.1.1
Underpass Lean
KM: 035+206
Concrete
Cement
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Lean
KM: 035+206
Concrete
Cement
- (7.00x6.00)
to silo
GO-4.010.1.10.200.C.30.1.1
Underpass Lean
KM: 035+206
Concrete
Cement
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Lean
KM: 035+206
Concrete
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Lean
KM: 035+206
Concrete
Stone
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Lean
KM: 035+206
Concrete
Concasor
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Lean
KM: 035+206
Concrete
Addmixer
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Tar- (7.00x6.00)
Painting
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Reinforced
- (7.00x6.00)
Concrete
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Cement
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Rebar
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Rebar
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Cement
- (7.00x6.00)
to silo
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Steel
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Cement
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Steel
- (7.00x6.00)
Trasnport
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Stone
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Concasor
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
Addmixer
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Elevation
KM: 035+206
PVC
- (7.00x6.00)
Water Stop
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Tar- (7.00x6.00)
Painting
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Reinforced
- (7.00x6.00)
Concrete
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Cement
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Rebar
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Rebar
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Cement
- (7.00x6.00)
to silo
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Steel
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Cement
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Steel
- (7.00x6.00)
Trasnport
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Stone
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Concasor
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Addmixer
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
PVC
- (7.00x6.00)
Water Stop
GO-4.010.1.10.200.C.30.1.1
Underpass Deck
KM: 035+206
Concrete
Scaffholding
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Tar
Concrete
- (7.00x6.00)
Painting
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Reinforced
Concrete
- (7.00x6.00)
Concrete
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Cement
Concrete
- (7.00x6.00)

TASKRSRC

711180C3010185
Not Started23.014/K ss NU
711180C3010185
Not Started23.015/K ss NU
711180C3010185
Not Started4470 ss NU
711180C3010185
Not Started09.012/K-A ss NU
711180C3010185
Not Started07.006/K- ss NU
711180C3010185
Not Started07.006/K-Dss NU
711180C3010185
Not Started07.006/K-B ss NU
711180C3010185
Not Started07.005/K-K ss NU
711180C3010185
Not Started07.005/K-OK-ss NU
711180C3010185
Not Started04.613/04 ss NU
711180C3010185
Not StartedB-18.501 ss NU
711180C3000186
In Progress25.052 ss NU
711180C3000186
In Progress16.134/K-1-A ss NU
711180C3000186
In Progress3000B ss NU
711180C3000186
In Progress23.014/K ss NU
711180C3000186
In Progress23.015/K ss NU
711180C3000186
In Progress4470 ss NU
711180C3000186
In Progress09.012/K-A ss NU
711180C3000186
In Progress07.006/K- ss NU
711180C3000186
In Progress07.006/K-Dss NU
711180C3000186
In Progress07.006/K-B ss NU
711180C3000186
In Progress07.005/K-K ss NU
711180C3000186
In Progress07.005/K-OK-ss NU
711180C3000186
In Progress04.613/04 ss NU
711180C3000186
In ProgressB-18.501 ss NU
711180C3000184
In Progress16.100/K-1-A ss NU
711180C3000184
In Progress3000B ss NU
711180C3000184
In Progress4470 ss NU
711180C3000184
In Progress07.006/K- ss NU
711180C3000184
In Progress07.006/K-B ss NU
711180C3000184
In Progress07.005/K-K ss NU
711180C3000184
In Progress07.005/K-OK-ss NU
711180C3000184
In Progress04.613/04 ss NU
711180C3000185
In Progress25.052 ss NU
711180C3000185
In Progress04.613/04 ss NU
711180C3000185
In ProgressB-18.501 ss NU
711180C3000185
In Progress16.134/K-1-A ss NU
711180C3000185
In Progress3000B ss NU
711180C3000185
In Progress23.014/K ss NU
711180C3000185
In Progress23.015/K ss NU
711180C3000185
In Progress4470 ss NU
711180C3000185
In Progress09.012/K-A ss NU
711180C3000185
In Progress07.006/K- ss NU
711180C3000185
In Progress07.006/K-Dss NU
711180C3000185
In Progress07.006/K-B ss NU
711180C3000185
In Progress07.005/K-K ss NU
711180C3000185
In Progress07.005/K-OK-ss NU
711180C3000180
Completed 14.111 ss NU
711180C3000180
Completed 07.005/K-KN NU
711180C3000187
In Progress25.052 ss NU
711180C3000187
In Progress16.134/K-1-A ss NU
711180C3000187
In Progress3000B ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 3

GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Rebar
Concrete
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Rebar
Concrete
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Cement
Concrete
- (7.00x6.00)
to silo
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Steel
Concrete
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Cement
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Steel
Concrete
- (7.00x6.00)
Trasnport
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Concrete
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Stone
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Concasor
Concrete
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
Addmixer
Concrete
- (7.00x6.00)
GO-4.010.1.10.200.C.30.1.1
Underpass Foundation
KM: 035+206
PVC
Concrete
- (7.00x6.00)
Water Stop
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Tar- (5.00x5.00)
Painting
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Reinforced
- (5.00x5.00)
Concrete
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Cement
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Rebar
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Rebar
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Cement
- (5.00x5.00)
to silo
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Steel
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Cement
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Steel
- (5.00x5.00)
Trasnport
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Stone
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Concasor
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
Addmixer
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Elevation
KM: 035+480
PVC
- (5.00x5.00)
Water Stop
GO-4.010.1.10.200.C.30.1.3
Underpass Lean
KM: 035+480
Concrete
Lean
- (5.00x5.00)
Concrete
GO-4.010.1.10.200.C.30.1.3
Underpass Lean
KM: 035+480
Concrete
Cement
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Lean
KM: 035+480
Concrete
Cement
- (5.00x5.00)
to silo
GO-4.010.1.10.200.C.30.1.3
Underpass Lean
KM: 035+480
Concrete
Cement
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Lean
KM: 035+480
Concrete
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Lean
KM: 035+480
Concrete
Stone
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Lean
KM: 035+480
Concrete
Concasor
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Lean
KM: 035+480
Concrete
Addmixer
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Tar
Concrete
- (5.00x5.00)
Painting
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Addmixer
Concrete
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
PVC
Concrete
- (5.00x5.00)
Water Stop
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Reinforced
Concrete
- (5.00x5.00)
Concrete
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Cement
Concrete
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Rebar
Concrete
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Rebar
Concrete
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Cement
Concrete
- (5.00x5.00)
to silo
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Steel
Concrete
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Cement
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Steel
Concrete
- (5.00x5.00)
Trasnport
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Concrete
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Stone
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Foundation
KM: 035+480
Concasor
Concrete
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Structural
KM: 035+480
Earthworks
Excavation
- (5.00x5.00)
& Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Structural
KM: 035+480
Earthworks
Soil- (5.00x5.00)
Trasnport
& Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Tar- (5.00x5.00)
Painting
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Reinforced
- (5.00x5.00)
Concrete
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Cement
- (5.00x5.00)

TASKRSRC

711180C3000187
In Progress23.014/K ss NU
711180C3000187
In Progress23.015/K ss NU
711180C3000187
In Progress4470 ss NU
711180C3000187
In Progress09.012/K-A ss NU
711180C3000187
In Progress07.006/K- ss NU
711180C3000187
In Progress07.006/K-Dss NU
711180C3000187
In Progress07.006/K-B ss NU
711180C3000187
In Progress07.005/K-K ss NU
711180C3000187
In Progress07.005/K-OK-ss NU
711180C3000187
In Progress04.613/04 ss NU
711180C3000187
In ProgressB-18.501 ss NU
711180C3000187
In Progress21.051 ss NU
711180C3020182
Not Started07.006/K-Dss NU
711180C3020182
Not Started25.052 ss NU
711180C3020182
Not Started21.051 ss NU
711180C3020182
Not Started14.111 ss NU
711180C3020182
Not Started07.005/K-KN ss NU
711180C3020182
Not Started16.100/K-1-A ss NU
711180C3020182
Not Started3000B ss NU
711180C3020182
Not Started4470 ss NU
711180C3020182
Not Started07.006/K- ss NU
711180C3020182
Not Started07.006/K-B ss NU
711180C3020182
Not Started07.005/K-K ss NU
711180C3020182
Not Started07.005/K-OK-ss NU
711180C3020182
Not Started04.613/04 ss NU
711180C3020182
Not Started16.134/K-1-A ss NU
711180C3020182
Not Started23.014/K ss NU
711180C3020182
Not Started23.015/K ss NU
711180C3020182
Not Started09.012/K-A ss NU
711180C3020182
Not Started07.006/K-D NU
711180C3020182
Not StartedB-18.501 ss NU
711180C3050185
In Progress25.052 ss NU
711180C3050185
In Progress16.134/K-1-A ss NU
711180C3050185
In Progress16.131/K-1-A ss NU
711180C3050185
In Progress3000B ss NU
711180C3050185
In Progress23.014/K ss NU
711180C3050185
In Progress23.015/K ss NU
711180C3050185
In Progress4470 ss NU
711180C3050185
In Progress09.012/K-A ss NU
711180C3050185
In Progress07.006/K- ss NU
711180C3050185
In Progress07.006/K-Dss NU
711180C3050185
In Progress07.006/K-B ss NU
711180C3050185
In Progress07.005/K-K ss NU
711180C3050185
In Progress07.005/K-OK-ss NU
711180C3050185
In Progress04.613/04 ss NU
711180C3050185
In ProgressB-18.501 ss NU
711180C3050186
In Progress25.052 ss NU
711180C3050186
In Progress21.051 ss NU
711180C3050186
In Progress21.052 ss NU
711180C3050186
In Progress16.131/K-1-A ss NU
711180C3050186
In Progress3000B ss NU
711180C3050186
In Progress23.014/K ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 4

GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Rebar
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Rebar
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Cement
- (5.00x5.00)
to silo
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Steel
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Cement
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Steel
- (5.00x5.00)
Trasnport
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Stone
- (5.00x5.00)
Transport
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Concasor
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Addmixer
- (5.00x5.00)
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
PVC
- (5.00x5.00)
Water Stop
GO-4.010.1.10.200.C.30.1.3
Underpass Deck
KM: 035+480
Concrete
Scaffholding
- (5.00x5.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Steel
KM:
- (1.50x2.00)
035+866
Trasnport- (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Tar
KM:
-Painting
(1.50x2.00)
035+866 - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Scaffholding
KM:
- (1.50x2.00)
035+866 - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Excavation
KM:
- (1.50x2.00)
035+866 - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Soil
KM:
- Trasnport
(1.50x2.00)
035+866 - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Lean
KM:
- (1.50x2.00)
035+866
Concrete - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Cement
KM:
- (1.50x2.00)
035+866 - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Cement
KM:
- (1.50x2.00)
035+866
to silo - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Cement
KM:
- (1.50x2.00)
035+866
Transport
- (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Concrete
KM:
- (1.50x2.00)
035+866
Transport
- (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Stone
KM:
- (1.50x2.00)
035+866
Transport
- (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Concasor
KM:
- (1.50x2.00)
035+866 - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Addmixer
KM:
- (1.50x2.00)
035+866 - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Reinforced
KM:
- (1.50x2.00)
035+866
Concrete
- (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Rebar
KM:
- (1.50x2.00)
035+866 - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Rebar
KM:
- (1.50x2.00)
035+866 - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Steel
KM:
- (1.50x2.00)
035+866 - (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
Steel
KM:
- (1.50x2.00)
035+866
Trasnport- (1.50x2.00)
GO-4.010.1.10.200.C.30.2.1
Box CulvertBox
KM:Culvert
035+866
PVC
KM:
- (1.50x2.00)
Water
035+866
Stop
- (1.50x2.00)
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Tar
Concrete
KM:
Painting
034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Reinforced
Concrete
KM: 034+750
Concrete
- 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Reinforced
Concrete
KM: 034+750
Concrete
- 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Rebar
Concrete
KM: 034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Rebar
Concrete
KM: 034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 034+750
to silo
- 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Steel
Concrete
KM: 034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 034+750
Transport- 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Steel
Concrete
KM:
Trasnport
034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Concrete
Concrete
KM: 034+750
Transport
- 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Stone
Concrete
KM:
Transport
034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Concasor
Concrete
KM: 034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
Addmixer
Concrete
KM: 034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Foundation
Channel
PVC
Concrete
KM:
Water
034+750
Stop - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Tar KM:
Painting
034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Scaffholding
KM: 034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Scaffholding
KM: 034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Reinforced
KM: 034+750
Concrete
- 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Cement
KM: 034+750 - 035+500
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Rebar
KM: 034+750 - 035+500

Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa
Sa

TASKRSRC

711180C3050186
In Progress23.015/K ss NU
711180C3050186
In Progress4470 ss NU
711180C3050186
In Progress09.012/K-A ss NU
711180C3050186
In Progress07.006/K- ss NU
711180C3050186
In Progress07.006/K-Dss NU
711180C3050186
In Progress07.006/K-B ss NU
711180C3050186
In Progress07.005/K-K ss NU
711180C3050186
In Progress07.005/K-OK-ss NU
711180C3050186
In Progress04.613/04 ss NU
711180C3050186
In ProgressB-18.501 ss NU
711180C3050184
In Progress16.100/K-1-A ss NU
711180C3050184
In Progress3000B ss NU
711180C3050184
In Progress4470 ss NU
711180C3050184
In Progress07.006/K- ss NU
711180C3050184
In Progress07.006/K-B ss NU
711180C3050184
In Progress07.005/K-K ss NU
711180C3050184
In Progress07.005/K-OK-ss NU
711180C3050184
In Progress04.613/04 ss NU
711180C3050180
In Progress14.110 ss NU
711180C3050180
In Progress14.111 ss NU
711180C3050180
In Progress07.005/K-KN NU
711180C3030180
Completed 07.005/K-KN ss NU
711180C3030180
Completed 07.005/K-KN NU
711180C3030180
Completed 14.111 ss NU
711180C3030184
In Progress16.100/K-1-A ss NU
711180C3030184
In Progress3000B ss NU
711180C3030184
In Progress4470 ss NU
711180C3030184
In Progress07.006/K- ss NU
711180C3030184
In Progress07.006/K-B ss NU
711180C3030184
In Progress07.005/K-K ss NU
711180C3030184
In Progress07.005/K-OK-ss NU
711180C3030184
In Progress04.613/04 ss NU
711180C3030186
In Progress25.052 ss NU
711180C3030186
In Progress16.131/K-1-A ss NU
711180C3030186
In Progress3000B ss NU
711180C3030186
In Progress23.014/K ss NU
711180C3030186
In Progress23.015/K ss NU
711180C3030186
In Progress4470 ss NU
711180C3030186
In Progress09.012/K-A ss NU
711180C3030186
In Progress07.006/K- ss NU
711180C3030186
In Progress07.006/K-Dss NU
711180C3030186
In Progress07.006/K-B ss NU
711180C3030186
In Progress07.005/K-K ss NU
711180C3030186
In Progress07.005/K-OK-ss NU
711180C3030186
In Progress04.613/04 ss NU
711180C3030186
In ProgressB-18.501 ss NU
711180C3030185
In Progress25.052 ss NU
711180C3030185
In Progress16.131/K-1-A ss NU
711180C3030185
In Progress3000B ss NU
711180C3030185
In Progress23.014/K ss NU
711180C3030185
In Progress23.015/K ss NU
711180C3030185
In Progress4470 ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 5

GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Rebar
KM: 034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Cement
KM: 034+750
to silo
- 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Steel
KM: 034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Cement
KM: 034+750
Transport- 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Steel
KM:
Trasnport
034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Concrete
KM: 034+750
Transport
- 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Stone
KM:
Transport
034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Concasor
KM: 034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
Addmixer
KM: 034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Elevation
Channel
PVCKM:
Water
034+750
Stop - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Lean Concrete
Channel
Lean
KM:
Concrete
034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Lean Concrete
Channel
Cement
KM: 034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Lean Concrete
Channel
Cement
KM: 034+750
to silo
- 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Lean Concrete
Channel
Cement
KM: 034+750
Transport- 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Lean Concrete
Channel
Concrete
KM: 034+750
Transport
- 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Lean Concrete
Channel
Stone
KM:
Transport
034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Lean Concrete
Channel
Concasor
KM: 034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Lean Concrete
Channel
Addmixer
KM: 034+750 - 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Structural
Channel
Earthworks
Excavation
KM: 034+750
& Transport
- 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Structural
Channel
Earthworks
Excavation
KM: 034+750
& Transport
- 035+500 Sa
GO-4.010.1.10.200.C.30.3.3
U Type Concrete
Structural
Channel
Earthworks
SoilKM:
Trasnport
034+750
& Transport
- 035+500 Sa
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Structural
Channel
Earthworks
SoilKM:
Trasnport
035+772
& Transport
- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Structural
Channel
Earthworks
SoilKM:
Trasnport
035+772
& Transport
- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Structural
Channel
Earthworks
Excavation
KM: 035+772
& Transport
- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Lean
KM:
Concrete
035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Cement
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Cement
KM: 035+772
to silo
- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Cement
KM: 035+772
Transport- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Concrete
KM: 035+772
Transport
- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Stone
KM:
Transport
035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Concasor
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Addmixer
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Tar KM:
Painting
035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Reinforced
KM: 035+772
Concrete
- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Cement
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Rebar
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Rebar
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Cement
KM: 035+772
to silo
- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Steel
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Cement
KM: 035+772
Transport- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Steel
KM:
Trasnport
035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Concrete
KM: 035+772
Transport
- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Stone
KM:
Transport
035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Concasor
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
Addmixer
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Elevation
Channel
PVCKM:
Water
035+772
Stop - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Tar
Concrete
KM:
Painting
035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Reinforced
Concrete
KM: 035+772
Concrete
- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Rebar
Concrete
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Rebar
Concrete
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 035+772
to silo
- (7.00x7.00)

TASKRSRC

711180C3030185
In Progress09.012/K-A ss NU
711180C3030185
In Progress07.006/K- ss NU
711180C3030185
In Progress07.006/K-Dss NU
711180C3030185
In Progress07.006/K-B ss NU
711180C3030185
In Progress07.005/K-K ss NU
711180C3030185
In Progress07.005/K-OK-ss NU
711180C3030185
In Progress04.613/04 ss NU
711180C3030185
In ProgressB-18.501 ss NU
711180C3040180
In Progress14.111 ss NU
711180C3040180
In Progress07.005/K-KN NU
711180C3040184
In Progress16.100/K-1-A ss NU
711180C3040184
In Progress3000B ss NU
711180C3040184
In Progress4470 ss NU
711180C3040184
In Progress07.006/K- ss NU
711180C3040184
In Progress07.006/K-B ss NU
711180C3040184
In Progress07.005/K-K ss NU
711180C3040184
In Progress07.005/K-OK-ss NU
711180C3040184
In Progress04.613/04 ss NU
711180C3040185
In Progress25.052 ss NU
711180C3040185
In Progress16.131/K-1-A ss NU
711180C3040185
In Progress3000B ss NU
711180C3040185
In Progress23.014/K ss NU
711180C3040185
In Progress23.015/K ss NU
711180C3040185
In Progress4470 ss NU
711180C3040185
In Progress09.012/K-A ss NU
711180C3040185
In Progress07.006/K- ss NU
711180C3040185
In Progress07.006/K-Dss NU
711180C3040185
In Progress07.006/K-B ss NU
711180C3040185
In Progress07.005/K-K ss NU
711180C3040185
In Progress07.005/K-OK-ss NU
711180C3040185
In Progress04.613/04 ss NU
711180C3040185
In ProgressB-18.501 ss NU
711180C3040186
In Progress25.052 ss NU
711180C3040186
In Progress16.131/K-1-A ss NU
711180C3040186
In Progress3000B ss NU
711180C3040186
In Progress23.014/K ss NU
711180C3040186
In Progress23.015/K ss NU
711180C3040186
In Progress4470 ss NU
711180C3040186
In Progress09.012/K-A ss NU
711180C3040186
In Progress07.006/K- ss NU
711180C3040186
In Progress07.006/K-Dss NU
711180C3040186
In Progress07.006/K-B ss NU
711180C3040186
In Progress07.005/K-K ss NU
711180C3040186
In Progress07.005/K-OK-ss NU
711180C3040186
In Progress04.613/04 ss NU
711180C3040186
In ProgressB-18.501 ss NU
711180C3020186
Not StartedB-18.501 ls NU
711180C3020186
Not Started23.014/K ls NU
711180C3020186
Not Started23.015/K ls NU
711180C3020186
Not Started16.132/K-2-A ls NU
711180C3020186
Not Started3000/ B ls NU
711180C3020186
Not Started4470 ls NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 6

GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Steel
Concrete
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 035+772
Transport- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Steel
Concrete
KM:
Trasnport
035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Concrete
Concrete
KM: 035+772
Transport
- (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Stone
Concrete
KM:
Transport
035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Concasor
Concrete
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
Addmixer
Concrete
KM: 035+772 - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.1
U Type Concrete
Foundation
Channel
PVC
Concrete
KM:
Water
035+772
Stop - (7.00x7.00)
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
Excavation
KM: 034+177
& Transport
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
SoilKM:
Trasnport
034+177
& Transport
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Lean Concrete
Channel
Lean
KM:
Concrete
034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Lean Concrete
Channel
Cement
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Lean Concrete
Channel
Cement
KM: 034+177
to silo
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Lean Concrete
Channel
Cement
KM: 034+177
Transport- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Lean Concrete
Channel
Concrete
KM: 034+177
Transport
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Lean Concrete
Channel
Stone
KM:
Transport
034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Lean Concrete
Channel
Concasor
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Lean Concrete
Channel
Addmixer
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Tar
Concrete
KM:
Painting
034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Reinforced
Concrete
KM: 034+177
Concrete
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Rebar
Concrete
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Rebar
Concrete
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 034+177
to silo
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Steel
Concrete
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 034+177
Transport- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Steel
Concrete
KM:
Trasnport
034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Concrete
Concrete
KM: 034+177
Transport
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Stone
Concrete
KM:
Transport
034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Concasor
Concrete
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Addmixer
Concrete
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
PVC
Concrete
KM:
Water
034+177
Stop - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Tar KM:
Painting
034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Reinforced
KM: 034+177
Concrete
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Cement
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Rebar
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Rebar
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Cement
KM: 034+177
to silo
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Steel
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Cement
KM: 034+177
Transport- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Steel
KM:
Trasnport
034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Concrete
KM: 034+177
Transport
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Stone
KM:
Transport
034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Concasor
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Addmixer
KM: 034+177 - 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
PVCKM:
Water
034+177
Stop - 035+660 Sol
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
PVC
- (12.00x6.00)
Water Stop
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Rebar
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Rebar
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Reinforced
- (12.00x6.00)
Concrete
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Cement
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Cement
- (12.00x6.00)
to silo

TASKRSRC

711180C3020186
Not Started09.012/K-A ls NU
711180C3020186
Not Started25.052 ls NU
711180C3020186
Not Started04.613/04 ls NU
711180C3020186
Not Started07.006/K-D ls NU
711180C3020186
Not Started07.005/K-O ls NU
711180C3020186
Not Started07.005/K-K ls NU
711180C3020186
Not Started07.006/K-B ls NU
711180C3020186
Not Started07.006/K- ls NU
711180C3020187
Not Started16.133/K-1-A ls NU
711180C3020187
Not StartedB-18.501 ls NU
711180C3020187
Not Started21.053 ls NU
711180C3020187
Not Started16.132/K-2-A ls NU
711180C3020187
Not Started23.014/K ls NU
711180C3020187
Not Started23.015/K ls NU
711180C3020187
Not Started09.012/K-A ls NU
711180C3020187
Not Started25.052 ls NU
711180C3020187
Not Started07.006/K-D ls NU
711180C3020187
Not Started3000/ B ls NU
711180C3020187
Not Started4470 ls NU
711180C3020187
Not Started04.613/04 ls NU
711180C3020187
Not Started07.006/K- ls NU
711180C3020187
Not Started07.006/K-B ls NU
711180C3020187
Not Started07.005/K-K ls NU
711180C3020187
Not Started07.005/K-O ls NU
711180C3020185
Not StartedB-18.501 ls NU
711180C3020185
Not Started16.132/K-2-A ls NU
711180C3020185
Not Started23.014/K ls NU
711180C3020185
Not Started23.015/K ls NU
711180C3020185
Not Started09.012/K-A ls NU
711180C3020185
Not Started25.052 ls NU
711180C3020185
Not Started07.006/K-D ls NU
711180C3020185
Not Started3000/ B ls NU
711180C3020185
Not Started4470 ls NU
711180C3020185
Not Started04.613/04 ls NU
711180C3020185
Not Started07.006/K- ls NU
711180C3020185
Not Started07.006/K-B ls NU
711180C3020185
Not Started07.005/K-K ls NU
711180C3020185
Not Started07.005/K-O ls NU
711180C3020184
Not Started16.101/K-1-A ls NU
711180C3020184
Not Started3000/ B ls NU
711180C3020184
Not Started4470 ls NU
711180C3020184
Not Started04.613/04 ls NU
711180C3020184
Not Started07.006/K- ls NU
711180C3020184
Not Started07.006/K-B ls NU
711180C3020184
Not Started07.005/K-K ls NU
711180C3020184
Not Started07.005/K-O ls NU
711180C3020180
Not Started14.113 ls NU
711180C3020180
Not Started07.005/K-KN ls NU
711210C4000220
Not Started2541 NU
711210C4000220
Not StartedPlanting Tree NU
711210C5000265
Not StartedSW-3 NU
711210C5000265
Not StartedL2.2 DC NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 7

GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Steel
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Tar- (12.00x6.00)
Painting
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
addmixer
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Steel
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Concrete
- (12.00x6.00)
Trasnport
GO-4.010.1.10.200.C.60.4
Underpass Elevation
KM: 034+818
Trasnport
- (12.00x6.00)
Cement
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Reinforced
- (12.00x6.00)
Concrete
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
PVC
- (12.00x6.00)
Water Stop
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Scaffholding
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Reinforced
- (12.00x6.00)
Concrete
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Rebar
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Rebar
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Steel
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Tar- (12.00x6.00)
Painting
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Steel
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Cement
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Cement
- (12.00x6.00)
to silo
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
addmixer
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Trasnport
- (12.00x6.00)
Cement
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Concrete
- (12.00x6.00)
Trasnport
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Deck
KM: 034+818
Concrete
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
PVC
Concrete
- (12.00x6.00)
Water Stop
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Reinforced
Concrete
- (12.00x6.00)
Concrete
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Rebar
Concrete
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Rebar
Concrete
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Steel
Concrete
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Tar
Concrete
- (12.00x6.00)
Painting
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Steel
Concrete
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Cement
Concrete
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Cement
Concrete
- (12.00x6.00)
to silo
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
addmixer
Concrete
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Trasnport
Concrete
- (12.00x6.00)
Cement
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Concrete
Concrete
- (12.00x6.00)
Trasnport
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Stone
Concrete
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Foundation
KM: 034+818
Stone
Concrete
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Lean
KM: 034+818
Concrete
Lean
- (12.00x6.00)
Concrete
GO-4.010.1.10.200.C.60.4
Underpass Lean
KM: 034+818
Concrete
Cement
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Lean
KM: 034+818
Concrete
Cement
- (12.00x6.00)
to silo
GO-4.010.1.10.200.C.60.4
Underpass Lean
KM: 034+818
Concrete
addmixer
- (12.00x6.00)
GO-4.010.1.10.200.C.60.4
Underpass Lean
KM: 034+818
Concrete
Trasnport
- (12.00x6.00)
Cement
GO-4.010.1.10.200.C.60.4
Underpass Lean
KM: 034+818
Concrete
Concrete
- (12.00x6.00)
Trasnport
GO-4.010.1.10.200.C.60.4
Underpass Lean
KM: 034+818
Concrete
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Lean
KM: 034+818
Concrete
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.200.C.60.4
Underpass Structural
KM: 034+818
Earthworks
Excavation
- (12.00x6.00)
& Transport
GO-4.010.1.10.200.C.60.4
Underpass Structural
KM: 034+818
Earthworks
Soil- (12.00x6.00)
Transport
& Transport
GO-4.010.1.10.230.C.40
Recreation Landscape
Areas
Excavation
GO-4.010.1.10.230.C.40
Recreation Landscape
Areas
Plantting Tree
GO-4.010.1.10.230.C.50
Ancillary and
Lighting
Other Works
(Out
Secondary
of Scope)Works
GO-4.010.1.10.230.C.50
Ancillary and
Lighting
Other Works
(Out
Direct
of Scope)
Cost

TASKRSRC

711210C5000266
Not StartedL2.2 DC NU
711210C5000266
Not StartedSW-3 NU
711210C5000266
Not StartedMiscellaneous NU
711210C5000260
In ProgressDisplacement NU
711210C1000101
Not Started07.005/K-A NU
711210C1000101
Not Started2200 NU
711210C1000101
Not Started2204 NU
711210C1000101
Not Started2202 NU
711210C1000101
Not Started2240 NU
711210C1000101
Not Started2240/1 NU
711210C1000101
Not Started07.005/K-1 NU
711210C1000111
Not Started15.142-A NU
711210C1000111
Not Started07.005/K-R NU
711210C1000111
Not Started2209 NU
711210C1000111
Not Started15.052/5 NU
711210C1000111
Not Started07.004/K NU
711210C1000111
Not Started07.005/K NU
711210C1000094
Not StartedWick-1 NU
711210C1000094
Not StartedWick-2 NU
711210C1000093
Not Started07.006/K- Geo NU
711210C1000093
Not Started07.006/K-B Geo NU
711210C1000093
Not Started07.005/K-O Geo NU
711210C1000093
Not Started07.005/K-KN Geo NU
711210C1000093
Not Started4470 Geo NU
711210C1000093
Not Started3000/ B Geo NU
711210C1000093
Not Started16.071/K-1 Geo NU
711210C1000093
Not Started07.006/K-K Geo NU
711210C1000092
Not StartedZEL - 8 Geo NU
711210C1000092
Not Started2202 Geo NU
711210C1000092
Not Started2209 Geo NU
711210C1000092
Not Started07.005/K-KD Geo NU
711210C1000092
Not Started07.006/K-K Geo NU
711210C1000110
Not Started15.142-A NU
711210C1000110
Not Started07.005/K-R NU
711210C1000110
Not Started2209 NU
711210C1000110
Not Started15.052/5 NU
711210C1000110
Not Started07.004/K NU
711210C1000110
Not Started07.005/K NU
711210C1000120
Not Started2500/A NU
711210C1000120
Not Started2500/B NU
711210C1000120
Not Started2500/C NU
711210C1000100
Not Started07.005/K-A NU
711210C1000100
Not Started2200 NU
711210C1000100
Not Started2204 NU
711210C1000100
Not Started2202 NU
711210C1000100
Not Started2240 NU
711210C1000100
Not Started2240/1 NU
711210C1000100
Not Started07.005/K-1 NU
711210C6010189
Not StartedB-18.501 ls NU
711210C6010189
Not Started21.053 ls NU
711210C6010189
Not Started16.133/K-1-A ls NU
711210C6010189
Not Started16.132/K-2-A ls NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 8

GO-4.010.1.10.230.C.50
Ancillary and
Miscellaneous
Other Works
Direct Cost
GO-4.010.1.10.230.C.50
Ancillary and
Miscellaneous
Other Works
Secondary Works
GO-4.010.1.10.230.C.50
Ancillary and
Miscellaneous
Other Works
Miscellaneous
GO-4.010.1.10.230.C.50
Ancillary and
Service
Other Displacements
Works
Displacement
GO-4.010.1.10.230.C.10
Earthworks Excavation Transportation
& Transport Phase
of material
2
from bor
GO-4.010.1.10.230.C.10
Earthworks Excavation Excavation
& Transport Phase 2
GO-4.010.1.10.230.C.10
Earthworks Excavation Excavation
& Transportand
Phase
use2of unsuitable m
GO-4.010.1.10.230.C.10
Earthworks Excavation Excavation
& Transportand
Phase
use2of material from
GO-4.010.1.10.230.C.10
Earthworks Excavation Cutting
& Transport
the trees
Phase 2
GO-4.010.1.10.230.C.10
Earthworks Excavation Removing
& Transport
the
Phase
roots 2
GO-4.010.1.10.230.C.10
Earthworks Excavation Forwarding
& Transportthe
Phase
soil to
2 the stock are
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
Loading
- 43+296
and Laying
Phase /w
2 machine
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
Ropriz
- 43+296 Phase 2
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
Damping
- 43+296
down
Phase
and compacting
2
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
Compacting
- 43+296 Phase 2
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
transporting
- 43+296the
Phase
excav.
2 soil
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
Traspor.
- 43+296
Of water
Phase 2
GO-4.010.1.10.230.C.10
Earthworks Wick Drain Wick
KM:41+300
Drain - 41+500
GO-4.010.1.10.230.C.10
Earthworks Wick Drain Wick
KM:41+300
Drain - 41+500
GO-4.010.1.10.230.C.10
Earthworks Unreinforced
Trasnport
ConcreteCement
Piles
GO-4.010.1.10.230.C.10
Earthworks Unreinforced
Concrete
Concrete
Trasnport
Piles
GO-4.010.1.10.230.C.10
Earthworks Unreinforced
Stone
Concrete
Transport
Piles
GO-4.010.1.10.230.C.10
Earthworks Unreinforced
Soil
Concrete
Transport
Piles
GO-4.010.1.10.230.C.10
Earthworks Unreinforced
Cement
Concrete
to silo
Piles
GO-4.010.1.10.230.C.10
Earthworks Unreinforced
Cement
Concrete Piles
GO-4.010.1.10.230.C.10
Earthworks Unreinforced
Pile
Concrete
80
Piles
GO-4.010.1.10.230.C.10
Earthworks Unreinforced
Krmata
ConcreteNakli
Piles
GO-4.010.1.10.230.C.10
Earthworks Rock Fill KM:40+300
Krmata -hazrla
42+460ser
GO-4.010.1.10.230.C.10
Earthworks Rock Fill KM:40+300
(New Resource)
- 42+460
GO-4.010.1.10.230.C.10
Earthworks Rock Fill KM:40+300
(New Resource)
- 42+460
GO-4.010.1.10.230.C.10
Earthworks Rock Fill KM:40+300
Rock Transport
- 42+460
GO-4.010.1.10.230.C.10
Earthworks Rock Fill KM:40+300
Krmata -Nakli
42+460
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
Loading
- 43+296
and Laying
Phase /w
1 machine
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
Ropriz
- 43+296 Phase 1
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
Damping
- 43+296
down
Phase
and compacting
1
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
Compacting
- 43+296 Phase 1
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
transporting
- 43+296the
Phase
excav.
1 soil
GO-4.010.1.10.230.C.10
Earthworks Fill KM:40+300
Traspor.
- 43+296
Of water
Phase 1
GO-4.010.1.10.230.C.10
Earthworks Subgrade Preparation
Reglaj
GO-4.010.1.10.230.C.10
Earthworks Subgrade Preparation
Reglaj
GO-4.010.1.10.230.C.10
Earthworks Subgrade Preparation
Reglaj
GO-4.010.1.10.230.C.10
Earthworks Excavation Transportation
& Transport Phase
of material
1
from bor
GO-4.010.1.10.230.C.10
Earthworks Excavation Excavation
& Transport Phase 1
GO-4.010.1.10.230.C.10
Earthworks Excavation Excavation
& Transportand
Phase
use1of unsuitable m
GO-4.010.1.10.230.C.10
Earthworks Excavation Excavation
& Transportand
Phase
use1of material from
GO-4.010.1.10.230.C.10
Earthworks Excavation Cutting
& Transport
the trees
Phase 1
GO-4.010.1.10.230.C.10
Earthworks Excavation Removing
& Transport
the
Phase
roots 1
GO-4.010.1.10.230.C.10
Earthworks Excavation Forwarding
& Transportthe
Phase
soil to
1 the stock are
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
PVC
- (13.00x5.50)
Water Stop
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Scaffholding
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Reinforced
- (13.00x5.50)
Concrete
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Reinforced
- (13.00x5.50)
Concrete

TASKRSRC

711210C6010189
Not Started23.014/K ls NU
711210C6010189
Not Started23.015/K ls NU
711210C6010189
Not Started09.012/K-A ls NU
711210C6010189
Not Started25.052 ls NU
711210C6010189
Not Started07.006/K-D ls NU
711210C6010189
Not Started3000/ B ls NU
711210C6010189
Not Started4470 ls NU
711210C6010189
Not Started04.613/04 ls NU
711210C6010189
Not Started07.006/K- ls NU
711210C6010189
Not Started07.006/K-B ls NU
711210C6010189
Not Started07.005/K-K ls NU
711210C6010189
Not Started07.005/K-O ls NU
711210C6010185
Not StartedB-18.501 ls NU
711210C6010185
Not Started16.132/K-2-A ls NU
711210C6010185
Not Started23.014/K ls NU
711210C6010185
Not Started23.015/K ls NU
711210C6010185
Not Started09.012/K-A ls NU
711210C6010185
Not Started25.052 ls NU
711210C6010185
Not Started07.006/K-D ls NU
711210C6010185
Not Started3000/ B ls NU
711210C6010185
Not Started4470 ls NU
711210C6010185
Not Started04.613/04 ls NU
711210C6010185
Not Started07.006/K- ls NU
711210C6010185
Not Started07.006/K-B ls NU
711210C6010185
Not Started07.005/K-K ls NU
711210C6010185
Not Started07.005/K-O ls NU
711210C6010186
Not StartedB-18.501 ls NU
711210C6010186
Not Started23.014/K ls NU
711210C6010186
Not Started23.015/K ls NU
711210C6010186
Not Started16.132/K-2-A ls NU
711210C6010186
Not Started3000/ B ls NU
711210C6010186
Not Started4470 ls NU
711210C6010186
Not Started09.012/K-A ls NU
711210C6010186
Not Started25.052 ls NU
711210C6010186
Not Started04.613/04 ls NU
711210C6010186
Not Started07.006/K-D ls NU
711210C6010186
Not Started07.005/K-O ls NU
711210C6010186
Not Started07.005/K-K ls NU
711210C6010186
Not Started07.006/K-B ls NU
711210C6010186
Not Started07.006/K- ls NU
711210C6010184
Not Started16.101/K-1-A ls NU
711210C6010184
Not Started3000/ B ls NU
711210C6010184
Not Started4470 ls NU
711210C6010184
Not Started04.613/04 ls NU
711210C6010184
Not Started07.006/K- ls NU
711210C6010184
Not Started07.006/K-B ls NU
711210C6010184
Not Started07.005/K-K ls NU
711210C6010184
Not Started07.005/K-O ls NU
711210C6010180
Not Started14.113 ls NU
711210C6010180
Not Started07.005/K-KN ls NU
711210C6000185
Not Started16.101/K-1-A ls NU
711210C6000185
Not Started3000/ B ls NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 9

GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Rebar
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Rebar
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Steel
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Tar- (13.00x5.50)
Painting
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Steel
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Cement
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Cement
- (13.00x5.50)
to silo
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
addmixer
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Trasnport
- (13.00x5.50)
Cement
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Concrete
- (13.00x5.50)
Trasnport
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Stone
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Deck
KM: 040+782
Concrete
Stone
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
PVC
Concrete
- (13.00x5.50)
Water Stop
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Reinforced
Concrete
- (13.00x5.50)
Concrete
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Rebar
Concrete
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Rebar
Concrete
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Steel
Concrete
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Tar
Concrete
- (13.00x5.50)
Painting
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Steel
Concrete
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Cement
Concrete
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Cement
Concrete
- (13.00x5.50)
to silo
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
addmixer
Concrete
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Trasnport
Concrete
- (13.00x5.50)
Cement
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Concrete
Concrete
- (13.00x5.50)
Trasnport
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Stone
Concrete
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Foundation
KM: 040+782
Stone
Concrete
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
PVC
- (13.00x5.50)
Water Stop
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Rebar
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Rebar
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Reinforced
- (13.00x5.50)
Concrete
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Cement
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Cement
- (13.00x5.50)
to silo
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Steel
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Tar- (13.00x5.50)
Painting
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
addmixer
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Steel
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Stone
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Stone
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Concrete
- (13.00x5.50)
Trasnport
GO-4.010.1.10.230.C.60.5
Underpass Elevation
KM: 040+782
Trasnport
- (13.00x5.50)
Cement
GO-4.010.1.10.230.C.60.5
Underpass Lean
KM: 040+782
Concrete
Lean
- (13.00x5.50)
Concrete
GO-4.010.1.10.230.C.60.5
Underpass Lean
KM: 040+782
Concrete
Cement
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Lean
KM: 040+782
Concrete
Cement
- (13.00x5.50)
to silo
GO-4.010.1.10.230.C.60.5
Underpass Lean
KM: 040+782
Concrete
addmixer
- (13.00x5.50)
GO-4.010.1.10.230.C.60.5
Underpass Lean
KM: 040+782
Concrete
Trasnport
- (13.00x5.50)
Cement
GO-4.010.1.10.230.C.60.5
Underpass Lean
KM: 040+782
Concrete
Concrete
- (13.00x5.50)
Trasnport
GO-4.010.1.10.230.C.60.5
Underpass Lean
KM: 040+782
Concrete
Stone
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Lean
KM: 040+782
Concrete
Stone
- (13.00x5.50)
Transport
GO-4.010.1.10.230.C.60.5
Underpass Structural
KM: 040+782
Earthworks
Excavation
- (13.00x5.50)
& Transport
GO-4.010.1.10.230.C.60.5
Underpass Structural
KM: 040+782
Earthworks
Soil- (13.00x5.50)
Transport
& Transport
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Lean
Concrete
Concrete
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Cement
Concrete

TASKRSRC

711210C6000185
Not Started4470 ls NU
711210C6000185
Not Started04.613/04 ls NU
711210C6000185
Not Started07.006/K- ls NU
711210C6000185
Not Started07.006/K-B ls NU
711210C6000185
Not Started07.005/K-K ls NU
711210C6000185
Not Started07.005/K-O ls NU
711210C6000185
Not Started16.132/K-2-A ls NU
711210C6000185
Not Started23.014/K ls NU
711210C6000185
Not Started23.015/K ls NU
711210C6000185
Not Started09.012/K-A ls NU
711210C6000185
Not Started25.052 ls NU
711210C6000185
Not Started07.006/K-D ls NU
711210C6000186
Not Started23.014/K ls NU
711210C6000186
Not Started23.015/K ls NU
711210C6000186
Not Started16.132/K-2-A ls NU
711210C6000186
Not Started3000/ B ls NU
711210C6000186
Not Started4470 ls NU
711210C6000186
Not Started09.012/K-A ls NU
711210C6000186
Not Started25.052 ls NU
711210C6000186
Not Started04.613/04 ls NU
711210C6000186
Not Started07.006/K-D ls NU
711210C6000186
Not Started07.005/K-O ls NU
711210C6000186
Not Started07.005/K-K ls NU
711210C6000186
Not Started07.006/K-B ls NU
711210C6000186
Not Started07.006/K- ls NU
711210C6000179
Not Started16.078/K-1B ls NU
711210C6000179
Not Started23.014/K ls NU
711210C6000179
Not Started23.015/K ls NU
711210C6000179
Not Started3000/ B ls NU
711210C6000179
Not Started4470 ls NU
711210C6000179
Not Started09.012/K-A ls NU
711210C6000179
Not Started07.006/K- ls NU
711210C6000179
Not Started07.006/K-B ls NU
711210C6000179
Not Started07.005/K-K ls NU
711210C6000179
Not Started07.005/K-O ls NU
711210C6000179
Not Started07.006/K-D ls NU
711210C6000179
Not Started07.005/K-KN ls NU
711210C6000187
Not Started3793/A ls NU
711210C6000187
Not Started16.137/K-1-A1 ls NU
711210C6000187
Not Started23.002/K-6 ls NU
711210C6000187
Not Started3792/1-A ls NU
711210C6000187
Not Started07.006/K- ls NU
711210C6000187
Not Started07.006/K-K ls NU
711210C6000187
Not Started23.014/K ls NU
711210C6000187
Not Started23.015/K ls NU
711210C6000187
Not Started3000/ B ls NU
711210C6000187
Not Started4470 ls NU
711210C6000187
Not Started04.613/04 ls NU
711210C6000187
Not Started09.012/K-A ls NU
711210C6000187
Not Started07.006/K-D ls NU
711210C6000187
Not Started07.005/K-O ls NU
711210C6000187
Not Started07.005/K-K ls NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 10

GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Cement
Concreteto silo
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
addmixer
Concrete
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Trasnport
Concrete Cement
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Concrete
Concrete Trasnport
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Stone
Concrete
Transport
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Stone
Concrete
Transport
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Reinforced
Concrete Concrete
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Rebar
Concrete
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Rebar
Concrete
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Steel
Concrete
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Tar
Concrete
Painting
GO-4.010.1.10.230.C.60.105
Nadir River Foundation
Bridge
Steel
Concrete
Transport
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Rebar
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Rebar
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Reinforced Concrete
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Cement
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Cement to silo
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Steel
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Tar Painting
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
addmixer
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Steel Transport
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Stone Transport
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Stone Transport
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Concrete Trasnport
GO-4.010.1.10.230.C.60.105
Nadir River Elevation
Bridge
Trasnport Cement
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Pile 120
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Rebar
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Rebar
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Cement
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Cement to silo
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Steel
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
T rasnport Cement
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Concrete Trasnport
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Stone Transport
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Stone Transport
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Steel Transport
GO-4.010.1.10.230.C.60.105
Nadir River Piling
BridgeWorks
Soil Transport
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Protection
of Girders
pipe
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Reinforced
of Girders
Concrete
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Pre.ofSteel
Girders
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Pre.ofSteel
Girders
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Pre.ofSteel
Girders
Transport
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Beam
of Girders
Transport
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Rebar
of Girders
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Rebar
of Girders
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Cement
of Girders
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Cement
of Girders
to silo
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
addmixer
of Girders
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Steel
of Girders
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Steel
of Transport
Girders
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Stone
of Girders
Transport
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Stone
of Girders
Transport

TASKRSRC

711210C6000187
Not Started07.006/K-B ls NU
711210C6000187
Not Started07.006/K- ls NU
711210C6000189
Not Started21.053 ls NU
711210C6000189
Not Started23.255 ls NU
711210C6000189
Not Started204-211 ls NU
711210C6000189
Not Started16.023/K-1-A1 ls NU
711210C6000189
Not Started3000/ B ls NU
711210C6000189
Not Started4470 ls NU
711210C6000189
Not Started23.014/K ls NU
711210C6000189
Not Started23.015/K ls NU
711210C6000189
Not Started28.010/K ls NU
711210C6000189
Not Started09.012/K-A ls NU
711210C6000189
Not Started19.022/K ls NU
711210C6000189
Not Started04.613/04 ls NU
711210C6000189
Not Started3786/A ls NU
711210C6000189
Not StartedZEL-4 ls NU
711210C6000189
Not Started07.006/K-D ls NU
711210C6000189
Not Started07.005/K-O ls NU
711210C6000189
Not Started07.005/K-K ls NU
711210C6000189
Not Started07.006/K-B ls NU
711210C6000189
Not Started07.006/K- ls NU
711210C6000188
Not Started16.136/K-1 ls NU
711210C6000188
Not Started3805 ls NU
711210C6000188
Not Started3793/A ls NU
711210C6000180
Not Started14.113 ls NU
711210C6000180
Not Started07.005/K-KN ls NU
711210C6000184
Not Started16.101/K-1-A ls NU
711210C6000184
Not Started3000/ B ls NU
711210C6000184
Not Started4470 ls NU
711210C6000184
Not Started04.613/04 ls NU
711210C6000184
Not Started07.006/K- ls NU
711210C6000184
Not Started07.006/K-B ls NU
711210C6000184
Not Started07.005/K-K ls NU
711210C6000184
Not Started07.005/K-O ls NU
711210C9500309
Not StartedL2.2 DC NU
711210C3060187
In Progress25.052 ss NU
711210C3060187
In Progress16.134/K-1-A ss NU
711210C3060187
In Progress3000B ss NU
711210C3060187
In Progress23.014/K ss NU
711210C3060187
In Progress23.015/K ss NU
711210C3060187
In Progress4470 ss NU
711210C3060187
In Progress09.012/K-A ss NU
711210C3060187
In Progress07.006/K- ss NU
711210C3060187
In Progress07.006/K-Dss NU
711210C3060187
In Progress07.006/K-B ss NU
711210C3060187
In Progress07.005/K-K ss NU
711210C3060187
In Progress07.005/K-OK-ss NU
711210C3060187
In Progress04.613/04 ss NU
711210C3060187
In ProgressB-18.501 ss NU
711210C3060187
In Progress21.051 ss NU
711210C3060180
In Progress14.111 ss NU
711210C3060180
In Progress07.005/K-KN NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 11

GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Concrete
of Girders
Trasnport
GO-4.010.1.10.230.C.60.105
Nadir River Manufacturing
Bridge
Trasnport
of Girders
Cement
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Scaffholding
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Garguy
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
PVC Pipe
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Reinforced Concrete
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Cement
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Cement to silo
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Rebar
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Rebar
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Exp. Joint
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Steel
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Water Proofing
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
addmixer
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Handrail
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Precast Panel
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Steel Transport
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Stone Transport
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Stone Transport
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Concrete Trasnport
GO-4.010.1.10.230.C.60.105
Nadir River Deck
BridgeConcrete
Trasnport Cement
GO-4.010.1.10.230.C.60.105
Nadir River Installation
Bridge
of
Pre.
Girders
Cast. Beam
GO-4.010.1.10.230.C.60.105
Nadir River Installation
Bridge
of
Neopren
Girders
GO-4.010.1.10.230.C.60.105
Nadir River Installation
Bridge
of
Protection
Girders pipe
GO-4.010.1.10.230.C.60.105
Nadir River Structural
Bridge
Earthworks
Excavation& Transport
GO-4.010.1.10.230.C.60.105
Nadir River Structural
Bridge
Earthworks
Soil Transport
& Transport
GO-4.010.1.10.230.C.60.105
Nadir River Lean
Bridge
Concrete
Lean Concrete
GO-4.010.1.10.230.C.60.105
Nadir River Lean
Bridge
Concrete
Cement
GO-4.010.1.10.230.C.60.105
Nadir River Lean
Bridge
Concrete
Cement to silo
GO-4.010.1.10.230.C.60.105
Nadir River Lean
Bridge
Concrete
addmixer
GO-4.010.1.10.230.C.60.105
Nadir River Lean
Bridge
Concrete
Trasnport Cement
GO-4.010.1.10.230.C.60.105
Nadir River Lean
Bridge
Concrete
Concrete Trasnport
GO-4.010.1.10.230.C.60.105
Nadir River Lean
Bridge
Concrete
Stone Transport
GO-4.010.1.10.230.C.60.105
Nadir River Lean
Bridge
Concrete
Stone Transport
GO-4.010.1.10.230.C.95
Pavement &Other
Finishing
Works
Works
Direct
(Out Cost
of Scope)
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Tar-Painting
(1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Reinforced
- (1.50x2.00)
Concrete
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Cement
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Rebar
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Rebar
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Cement
- (1.50x2.00)
to silo
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Steel
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Cement
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Steel
- (1.50x2.00)
Trasnport
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Stone
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Concasor
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Addmixer
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
PVC
- (1.50x2.00)
Water Stop
GO-4.010.1.10.230.C.30.2.1
Box CulvertDeck
KM: 041+712
Concrete
Scaffholding
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertStructural
KM: 041+712
Earthworks
Excavation
- (1.50x2.00)
& Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertStructural
KM: 041+712
Earthworks
Soil- Trasnport
(1.50x2.00)
& Transport

TASKRSRC

711210C3060185
In Progress25.052 ss NU
711210C3060185
In Progress16.134/K-1-A ss NU
711210C3060185
In Progress3000B ss NU
711210C3060185
In Progress23.014/K ss NU
711210C3060185
In Progress23.015/K ss NU
711210C3060185
In Progress4470 ss NU
711210C3060185
In Progress09.012/K-A ss NU
711210C3060185
In Progress07.006/K- ss NU
711210C3060185
In Progress07.006/K-Dss NU
711210C3060185
In Progress07.006/K-B ss NU
711210C3060185
In Progress07.005/K-K ss NU
711210C3060185
In Progress07.005/K-OK-ss NU
711210C3060185
In Progress04.613/04 ss NU
711210C3060185
In ProgressB-18.501 ss NU
711210C3060186
In Progress25.052 ss NU
711210C3060186
In Progress16.134/K-1-A ss NU
711210C3060186
In Progress3000B ss NU
711210C3060186
In Progress23.014/K ss NU
711210C3060186
In Progress23.015/K ss NU
711210C3060186
In Progress4470 ss NU
711210C3060186
In Progress09.012/K-A ss NU
711210C3060186
In Progress07.006/K- ss NU
711210C3060186
In Progress07.006/K-Dss NU
711210C3060186
In Progress07.006/K-B ss NU
711210C3060186
In Progress07.005/K-K ss NU
711210C3060186
In Progress07.005/K-OK-ss NU
711210C3060186
In Progress04.613/04 ss NU
711210C3060186
In ProgressB-18.501 ss NU
711210C3060184
In Progress16.100/K-1-A ss NU
711210C3060184
In Progress3000B ss NU
711210C3060184
In Progress4470 ss NU
711210C3060184
In Progress07.006/K- ss NU
711210C3060184
In Progress07.006/K-B ss NU
711210C3060184
In Progress07.005/K-K ss NU
711210C3060184
In Progress07.005/K-OK-ss NU
711210C3060184
In Progress04.613/04 ss NU
711210C3080182
Not Started25.052 ss NU
711210C3080182
Not Started14.111 ss NU
711210C3080182
Not Started07.005/K-KN ss NU
711210C3080182
Not Started16.100/K-1-A ss NU
711210C3080182
Not Started3000B ss NU
711210C3080182
Not Started4470 ss NU
711210C3080182
Not Started07.006/K- ss NU
711210C3080182
Not Started07.006/K-B ss NU
711210C3080182
Not Started07.005/K-K ss NU
711210C3080182
Not Started07.005/K-OK-ss NU
711210C3080182
Not Started04.613/04 ss NU
711210C3080182
Not Started16.134/K-1-A ss NU
711210C3080182
Not Started23.014/K ss NU
711210C3080182
Not Started23.015/K ss NU
711210C3080182
Not Started09.012/K-A ss NU
711210C3080182
Not Started07.006/K-D NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 12

GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Tar
Concrete
-Painting
(1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Reinforced
Concrete
- (1.50x2.00)
Concrete
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Cement
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Rebar
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Rebar
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Cement
Concrete
- (1.50x2.00)
to silo
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Steel
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Cement
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Steel
Concrete
- (1.50x2.00)
Trasnport
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Concrete
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Stone
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Concasor
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
Addmixer
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertFoundation
KM: 041+712
PVC
Concrete
- (1.50x2.00)
Water Stop
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Tar-Painting
(1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Reinforced
- (1.50x2.00)
Concrete
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Cement
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Rebar
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Rebar
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Cement
- (1.50x2.00)
to silo
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Steel
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Cement
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Steel
- (1.50x2.00)
Trasnport
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Stone
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Concasor
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
Addmixer
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertElevation
KM: 041+712
PVC
- (1.50x2.00)
Water Stop
GO-4.010.1.10.230.C.30.2.1
Box CulvertLean
KM: 041+712
Concrete
Lean
- (1.50x2.00)
Concrete
GO-4.010.1.10.230.C.30.2.1
Box CulvertLean
KM: 041+712
Concrete
Cement
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertLean
KM: 041+712
Concrete
Cement
- (1.50x2.00)
to silo
GO-4.010.1.10.230.C.30.2.1
Box CulvertLean
KM: 041+712
Concrete
Cement
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertLean
KM: 041+712
Concrete
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertLean
KM: 041+712
Concrete
Stone
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertLean
KM: 041+712
Concrete
Concasor
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.1
Box CulvertLean
KM: 041+712
Concrete
Addmixer
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Tar
KM:
-Painting
(2.00x2.00)
042+603 - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Excavation
KM:
- (2.00x2.00)
042+603 - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Soil
KM:
- Trasnport
(2.00x2.00)
042+603 - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Lean
KM:
- (2.00x2.00)
042+603
Concrete - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Cement
KM:
- (2.00x2.00)
042+603 - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Cement
KM:
- (2.00x2.00)
042+603
to silo - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Cement
KM:
- (2.00x2.00)
042+603
Transport
- (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Concrete
KM:
- (2.00x2.00)
042+603
Transport
- (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Stone
KM:
- (2.00x2.00)
042+603
Transport
- (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Concasor
KM:
- (2.00x2.00)
042+603 - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Addmixer
KM:
- (2.00x2.00)
042+603 - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Reinforced
KM:
- (2.00x2.00)
042+603
Concrete
- (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Rebar
KM:
- (2.00x2.00)
042+603 - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Rebar
KM:
- (2.00x2.00)
042+603 - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Steel
KM:
- (2.00x2.00)
042+603 - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Steel
KM:
- (2.00x2.00)
042+603
Trasnport- (2.00x2.00)

TASKRSRC

711210C3080182
Not StartedB-18.501 ss NU
711210C3080182
Not Started21.051 ss NU
711210C3070180
In Progress14.111 ss NU
711210C3070180
In Progress07.005/K-KN NU
711210C3070185
In Progress25.052 ss NU
711210C3070185
In Progress16.134/K-1-A ss NU
711210C3070185
In Progress3000B ss NU
711210C3070185
In Progress23.014/K ss NU
711210C3070185
In Progress23.015/K ss NU
711210C3070185
In Progress4470 ss NU
711210C3070185
In Progress09.012/K-A ss NU
711210C3070185
In Progress07.006/K- ss NU
711210C3070185
In Progress07.006/K-Dss NU
711210C3070185
In Progress07.006/K-B ss NU
711210C3070185
In Progress07.005/K-K ss NU
711210C3070185
In Progress07.005/K-OK-ss NU
711210C3070185
In Progress04.613/04 ss NU
711210C3070185
In ProgressB-18.501 ss NU
711210C3070186
In Progress25.052 ss NU
711210C3070186
In Progress16.134/K-1-A ss NU
711210C3070186
In Progress3000B ss NU
711210C3070186
In Progress23.014/K ss NU
711210C3070186
In Progress23.015/K ss NU
711210C3070186
In Progress4470 ss NU
711210C3070186
In Progress09.012/K-A ss NU
711210C3070186
In Progress07.006/K- ss NU
711210C3070186
In Progress07.006/K-Dss NU
711210C3070186
In Progress07.006/K-B ss NU
711210C3070186
In Progress07.005/K-K ss NU
711210C3070186
In Progress07.005/K-OK-ss NU
711210C3070186
In Progress04.613/04 ss NU
711210C3070186
In ProgressB-18.501 ss NU
711210C3070184
In Progress16.100/K-1-A ss NU
711210C3070184
In Progress3000B ss NU
711210C3070184
In Progress4470 ss NU
711210C3070184
In Progress07.006/K- ss NU
711210C3070184
In Progress07.006/K-B ss NU
711210C3070184
In Progress07.005/K-K ss NU
711210C3070184
In Progress07.005/K-OK-ss NU
711210C3070184
In Progress04.613/04 ss NU
711210C3070187
In Progress25.052 ss NU
711210C3070187
In Progress16.134/K-1-A ss NU
711210C3070187
In Progress3000B ss NU
711210C3070187
In Progress23.014/K ss NU
711210C3070187
In Progress23.015/K ss NU
711210C3070187
In Progress4470 ss NU
711210C3070187
In Progress09.012/K-A ss NU
711210C3070187
In Progress07.006/K- ss NU
711210C3070187
In Progress07.006/K-Dss NU
711210C3070187
In Progress07.006/K-B ss NU
711210C3070187
In Progress07.005/K-K ss NU
711210C3070187
In Progress07.005/K-OK-ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 13

GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
PVC
KM:
- (2.00x2.00)
Water
042+603
Stop
- (2.00x2.00)
GO-4.010.1.10.230.C.30.2.3
Box CulvertBox
KM:Culvert
042+603
Scaffholding
KM:
- (2.00x2.00)
042+603 - (2.00x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertStructural
KM: 042+191
Earthworks
Excavation
- (1.50x2.00)
& Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertStructural
KM: 042+191
Earthworks
Soil- Trasnport
(1.50x2.00)
& Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Tar
Concrete
-Painting
(1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Reinforced
Concrete
- (1.50x2.00)
Concrete
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Cement
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Rebar
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Rebar
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Cement
Concrete
- (1.50x2.00)
to silo
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Steel
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Cement
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Steel
Concrete
- (1.50x2.00)
Trasnport
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Concrete
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Stone
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Concasor
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
Addmixer
Concrete
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertFoundation
KM: 042+191
PVC
Concrete
- (1.50x2.00)
Water Stop
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Tar-Painting
(1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Reinforced
- (1.50x2.00)
Concrete
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Cement
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Rebar
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Rebar
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Cement
- (1.50x2.00)
to silo
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Steel
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Cement
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Steel
- (1.50x2.00)
Trasnport
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Stone
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Concasor
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
Addmixer
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertElevation
KM: 042+191
PVC
- (1.50x2.00)
Water Stop
GO-4.010.1.10.230.C.30.2.2
Box CulvertLean
KM: 042+191
Concrete
Lean
- (1.50x2.00)
Concrete
GO-4.010.1.10.230.C.30.2.2
Box CulvertLean
KM: 042+191
Concrete
Cement
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertLean
KM: 042+191
Concrete
Cement
- (1.50x2.00)
to silo
GO-4.010.1.10.230.C.30.2.2
Box CulvertLean
KM: 042+191
Concrete
Cement
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertLean
KM: 042+191
Concrete
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertLean
KM: 042+191
Concrete
Stone
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertLean
KM: 042+191
Concrete
Concasor
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertLean
KM: 042+191
Concrete
Addmixer
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Tar-Painting
(1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Reinforced
- (1.50x2.00)
Concrete
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Cement
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Rebar
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Rebar
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Cement
- (1.50x2.00)
to silo
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Steel
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Cement
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Steel
- (1.50x2.00)
Trasnport
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Concrete
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Stone
- (1.50x2.00)
Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Concasor
- (1.50x2.00)

TASKRSRC

711210C3070187
In Progress04.613/04 ss NU
711210C3070187
In ProgressB-18.501 ss NU
711210C3070187
In Progress21.051 ss NU
711210C3090182
Not Started25.052 ss NU
711210C3090182
Not StartedLandscape NU
711210C3090182
Not Started04.613/04 ss NU
711210C3090182
Not Started3000B ss NU
711210C3090182
Not Started4470 ss NU
711210C3090182
Not Started07.006/K- ss NU
711210C3090182
Not Started07.005/K-OK-ss NU
711210C3090182
Not Started07.006/K-B ss NU
711210C3090182
Not Started14.111 ss NU
711210C3090182
Not Started16.100/K-1-A ss NU
711210C3090182
Not StartedB-18.501 ss NU
711210C3090182
Not Started23.014/K ss NU
711210C3090182
Not Started23.015/K ss NU
711210C3090182
Not Started16.134/K-1-A ss NU
711210C3090182
Not Started07.005/K-KN ss NU
711210C3090182
Not Started09.012/K-A ss NU
711210C3090182
Not Started07.006/K-D NU
711210C3090182
Not Started07.005/K-K ss NU
711210C3020184
Not Started16.100/K-1-A ss NU
711210C3020184
Not Started3000B ss NU
711210C3020184
Not Started4470 ss NU
711210C3020184
Not Started07.006/K- ss NU
711210C3020184
Not Started07.006/K-B ss NU
711210C3020184
Not Started07.005/K-K ss NU
711210C3020184
Not Started07.005/K-OK-ss NU
711210C3020184
Not Started04.613/04 ss NU
711210C3020185
Not Started25.052 ss NU
711210C3020185
Not Started16.134/K-1-A ss NU
711210C3020185
Not Started3000B ss NU
711210C3020185
Not Started23.014/K ss NU
711210C3020185
Not Started23.015/K ss NU
711210C3020185
Not Started4470 ss NU
711210C3020185
Not Started09.012/K-A ss NU
711210C3020185
Not Started07.006/K- ss NU
711210C3020185
Not Started07.006/K-Dss NU
711210C3020185
Not Started07.006/K-B ss NU
711210C3020185
Not Started07.005/K-K ss NU
711210C3020185
Not Started07.005/K-OK-ss NU
711210C3020185
Not Started04.613/04 ss NU
711210C3020185
Not StartedB-18.501 ss NU
711210C3020186
Not Started25.052 ss NU
711210C3020186
Not Started16.134/K-1-A ss NU
711210C3020186
Not Started3000B ss NU
711210C3020186
Not Started23.014/K ss NU
711210C3020186
Not Started23.015/K ss NU
711210C3020186
Not Started4470 ss NU
711210C3020186
Not Started09.012/K-A ss NU
711210C3020186
Not Started07.006/K- ss NU
711210C3020186
Not Started07.006/K-Dss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 14

GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Addmixer
- (1.50x2.00)
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
PVC
- (1.50x2.00)
Water Stop
GO-4.010.1.10.230.C.30.2.2
Box CulvertDeck
KM: 042+191
Concrete
Scaffholding
- (1.50x2.00)
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Tar KM:
Painting
41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Landscape
KM: 41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Addmixer
KM: 41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Cement
KM: 41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Cement
KM: 41+300
to silo
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Cement
KM: 41+300
Transport
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Concasor
KM: 41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Concrete
KM: 41+300
Transport
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Excavation
KM: 41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Lean
KM:
Concrete
41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
PVCKM:
Water
41+300
Stop
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Rebar
KM: 41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Rebar
KM: 41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Reinforced
KM: 41+300
Concrete
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
SoilKM:
Trasnport
41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Steel
KM: 41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Steel
KM:
Trasnport
41+300
GO-4.010.1.10.230.C.30.3.1
Retaining Wall
Retaining
KM: 41+300
Wall
Stone
KM:
Transport
41+300
GO-4.010.1.10.230.C.30.1.1
Underpass Lean
KM: 040+570
Concrete
Lean
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.1
Underpass Lean
KM: 040+570
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Lean
KM: 040+570
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.1
Underpass Lean
KM: 040+570
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Lean
KM: 040+570
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Lean
KM: 040+570
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Lean
KM: 040+570
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Lean
KM: 040+570
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Tar
Concrete
- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Reinforced
Concrete
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Cement
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Cement
Concrete
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Steel
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Cement
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Steel
Concrete
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Stone
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Concasor
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
Addmixer
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Foundation
KM: 040+570
PVC
Concrete
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Steel
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Steel
- (10.00x6.00)
Trasnport

TASKRSRC

711210C3020186
Not Started07.006/K-B ss NU
711210C3020186
Not Started07.005/K-K ss NU
711210C3020186
Not Started07.005/K-OK-ss NU
711210C3020186
Not Started04.613/04 ss NU
711210C3020186
Not StartedB-18.501 ss NU
711210C3020187
Not Started25.052 ss NU
711210C3020187
Not Started16.134/K-1-A ss NU
711210C3020187
Not Started3000B ss NU
711210C3020187
Not Started23.014/K ss NU
711210C3020187
Not Started23.015/K ss NU
711210C3020187
Not Started4470 ss NU
711210C3020187
Not Started09.012/K-A ss NU
711210C3020187
Not Started07.006/K- ss NU
711210C3020187
Not Started07.006/K-Dss NU
711210C3020187
Not Started07.006/K-B ss NU
711210C3020187
Not Started07.005/K-K ss NU
711210C3020187
Not Started07.005/K-OK-ss NU
711210C3020187
Not Started04.613/04 ss NU
711210C3020187
Not StartedB-18.501 ss NU
711210C3020187
Not Started21.052 ss NU
711210C3020180
Not Started14.111 ss NU
711210C3020180
Not Started07.005/K-KN NU
711210C3040186
Not Started25.052 ss NU
711210C3040186
Not Started16.134/K-1-A ss NU
711210C3040186
Not Started3000B ss NU
711210C3040186
Not Started23.014/K ss NU
711210C3040186
Not Started23.015/K ss NU
711210C3040186
Not Started4470 ss NU
711210C3040186
Not Started09.012/K-A ss NU
711210C3040186
Not Started07.006/K- ss NU
711210C3040186
Not Started07.006/K-Dss NU
711210C3040186
Not Started07.006/K-B ss NU
711210C3040186
Not Started07.005/K-K ss NU
711210C3040186
Not Started07.005/K-OK-ss NU
711210C3040186
Not Started04.613/04 ss NU
711210C3040186
Not StartedB-18.501 ss NU
711210C3040187
Not Started25.052 ss NU
711210C3040187
Not Started16.134/K-1-A ss NU
711210C3040187
Not Started3000B ss NU
711210C3040187
Not Started23.014/K ss NU
711210C3040187
Not Started23.015/K ss NU
711210C3040187
Not Started09.012/K-A ss NU
711210C3040187
Not Started07.006/K- ss NU
711210C3040187
Not Started07.006/K-Dss NU
711210C3040187
Not Started07.006/K-B ss NU
711210C3040187
Not Started07.005/K-K ss NU
711210C3040187
Not Started07.005/K-OK-ss NU
711210C3040187
Not Started04.613/04 ss NU
711210C3040187
Not StartedB-18.501 ss NU
711210C3040187
Not Started4470 ss NU
711210C3040187
Not Started21.052 ss NU
711210C3040184
Not Started16.100/K-1-A ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 15

GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Elevation
KM: 040+570
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Steel
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.1
Underpass Deck
KM: 040+570
Concrete
Scaffholding
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.1
Underpass Structural
KM: 040+570
Earthworks
Excavation
- (10.00x6.00)
& Transport
GO-4.010.1.10.230.C.30.1.1
Underpass Structural
KM: 040+570
Earthworks
Soil- (10.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Steel
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Elevation
KM: 042+435
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Steel
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.5
Underpass Deck
KM: 042+435
Concrete
Scaffholding
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Lean
KM: 042+435
Concrete
Lean
- (10.00x6.00)
Concrete

TASKRSRC

711210C3040184
Not Started3000B ss NU
711210C3040184
Not Started4470 ss NU
711210C3040184
Not Started07.006/K- ss NU
711210C3040184
Not Started07.006/K-B ss NU
711210C3040184
Not Started07.005/K-K ss NU
711210C3040184
Not Started07.005/K-OK-ss NU
711210C3040184
Not Started04.613/04 ss NU
711210C3040185
Not Started25.052 ss NU
711210C3040185
Not Started16.134/K-1-A ss NU
711210C3040185
Not Started3000B ss NU
711210C3040185
Not Started23.014/K ss NU
711210C3040185
Not Started23.015/K ss NU
711210C3040185
Not Started4470 ss NU
711210C3040185
Not Started09.012/K-A ss NU
711210C3040185
Not Started07.006/K- ss NU
711210C3040185
Not Started07.006/K-Dss NU
711210C3040185
Not Started07.006/K-B ss NU
711210C3040185
Not Started07.005/K-K ss NU
711210C3040185
Not Started07.005/K-OK-ss NU
711210C3040185
Not Started04.613/04 ss NU
711210C3040185
Not StartedB-18.501 ss NU
711210C3040180
Not Started14.111 ss NU
711210C3040180
Not Started07.005/K-KN NU
711210C3000185
In Progress25.052 ss NU
711210C3000185
In Progress16.134/K-1-A ss NU
711210C3000185
In Progress3000B ss NU
711210C3000185
In Progress23.014/K ss NU
711210C3000185
In Progress23.015/K ss NU
711210C3000185
In Progress4470 ss NU
711210C3000185
In Progress09.012/K-A ss NU
711210C3000185
In Progress07.006/K- ss NU
711210C3000185
In Progress07.006/K-Dss NU
711210C3000185
In Progress07.006/K-B ss NU
711210C3000185
In Progress07.005/K-K ss NU
711210C3000185
In Progress07.005/K-OK-ss NU
711210C3000185
In Progress04.613/04 ss NU
711210C3000185
In ProgressB-18.501 ss NU
711210C3000187
In Progress25.052 ss NU
711210C3000187
In Progress16.134/K-1-A ss NU
711210C3000187
In Progress3000B ss NU
711210C3000187
In Progress23.014/K ss NU
711210C3000187
In Progress23.015/K ss NU
711210C3000187
In Progress4470 ss NU
711210C3000187
In Progress09.012/K-A ss NU
711210C3000187
In Progress07.006/K- ss NU
711210C3000187
In Progress07.006/K-Dss NU
711210C3000187
In Progress07.006/K-B ss NU
711210C3000187
In Progress07.005/K-K ss NU
711210C3000187
In Progress07.005/K-OK-ss NU
711210C3000187
In Progress04.613/04 ss NU
711210C3000187
In ProgressB-18.501 ss NU
711210C3000187
In Progress21.052 ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 16

GO-4.010.1.10.230.C.30.1.5
Underpass Lean
KM: 042+435
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Lean
KM: 042+435
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.5
Underpass Lean
KM: 042+435
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Lean
KM: 042+435
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Lean
KM: 042+435
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Lean
KM: 042+435
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Lean
KM: 042+435
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Tar
Concrete
- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Reinforced
Concrete
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Cement
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Cement
Concrete
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Steel
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Cement
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Steel
Concrete
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Stone
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Concasor
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
Addmixer
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.5
Underpass Foundation
KM: 042+435
PVC
Concrete
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.5
Underpass Structural
KM: 042+435
Earthworks
Excavation
- (10.00x6.00)
& Transport
GO-4.010.1.10.230.C.30.1.5
Underpass Structural
KM: 042+435
Earthworks
Soil- (10.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Tar
Concrete
- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Reinforced
Concrete
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Cement
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Cement
Concrete
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Steel
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Cement
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Steel
Concrete
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Stone
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Concasor
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
Addmixer
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Foundation
KM: 043+120
PVC
Concrete
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Steel
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.3
Underpass Deck
KM: 043+120
Concrete
Scaffholding
- (10.00x6.00)

TASKRSRC

711210C3000180
In Progress14.111 ss NU
711210C3000180
In Progress07.005/K-KN NU
711210C3000184
In Progress3000B ss NU
711210C3000184
In Progress4470 ss NU
711210C3000184
In Progress07.006/K- ss NU
711210C3000184
In Progress07.006/K-B ss NU
711210C3000184
In Progress07.005/K-K ss NU
711210C3000184
In Progress07.005/K-OK-ss NU
711210C3000184
In Progress04.613/04 ss NU
711210C3000184
In Progress16.100/K-1-A ss NU
711210C3000186
In Progress25.052 ss NU
711210C3000186
In Progress16.134/K-1-A ss NU
711210C3000186
In Progress3000B ss NU
711210C3000186
In Progress23.014/K ss NU
711210C3000186
In Progress23.015/K ss NU
711210C3000186
In Progress4470 ss NU
711210C3000186
In Progress09.012/K-A ss NU
711210C3000186
In Progress07.006/K- ss NU
711210C3000186
In Progress07.006/K-Dss NU
711210C3000186
In Progress07.006/K-B ss NU
711210C3000186
In Progress07.005/K-K ss NU
711210C3000186
In Progress07.005/K-OK-ss NU
711210C3000186
In Progress04.613/04 ss NU
711210C3000186
In ProgressB-18.501 ss NU
711210C3050185
Not Started25.052 ss NU
711210C3050185
Not Started16.134/K-1-A ss NU
711210C3050185
Not Started3000B ss NU
711210C3050185
Not Started23.014/K ss NU
711210C3050185
Not Started23.015/K ss NU
711210C3050185
Not Started4470 ss NU
711210C3050185
Not Started09.012/K-A ss NU
711210C3050185
Not Started07.006/K- ss NU
711210C3050185
Not Started07.006/K-Dss NU
711210C3050185
Not Started07.006/K-B ss NU
711210C3050185
Not Started07.005/K-K ss NU
711210C3050185
Not Started07.005/K-OK-ss NU
711210C3050185
Not Started04.613/04 ss NU
711210C3050185
Not StartedB-18.501 ss NU
711210C3050180
Not Started14.111 ss NU
711210C3050180
Not Started07.005/K-KN NU
711210C3050186
Not Started25.052 ss NU
711210C3050186
Not Started16.134/K-1-A ss NU
711210C3050186
Not Started3000B ss NU
711210C3050186
Not Started23.014/K ss NU
711210C3050186
Not Started23.015/K ss NU
711210C3050186
Not Started4470 ss NU
711210C3050186
Not Started09.012/K-A ss NU
711210C3050186
Not Started07.006/K- ss NU
711210C3050186
Not Started07.006/K-Dss NU
711210C3050186
Not Started07.006/K-B ss NU
711210C3050186
Not Started07.005/K-K ss NU
711210C3050186
Not Started07.005/K-OK-ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 17

GO-4.010.1.10.230.C.30.1.3
Underpass Structural
KM: 043+120
Earthworks
Excavation
- (10.00x6.00)
& Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Structural
KM: 043+120
Earthworks
Soil- (10.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Lean
KM: 043+120
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Lean
KM: 043+120
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.3
Underpass Lean
KM: 043+120
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Lean
KM: 043+120
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Lean
KM: 043+120
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Lean
KM: 043+120
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Lean
KM: 043+120
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Lean
KM: 043+120
Concrete
Lean
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Steel
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.3
Underpass Elevation
KM: 043+120
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Tar
Concrete
- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Reinforced
Concrete
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Cement
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Cement
Concrete
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Steel
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Cement
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Steel
Concrete
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Stone
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Concasor
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
Addmixer
Concrete
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Foundation
KM: 041+862
PVC
Concrete
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.6
Underpass Structural
KM: 041+862
Earthworks
Excavation
- (10.00x6.00)
& Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Structural
KM: 041+862
Earthworks
Soil- (10.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Steel
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Concasor
- (10.00x6.00)

TASKRSRC

711210C3050186
Not Started04.613/04 ss NU
711210C3050186
Not StartedB-18.501 ss NU
711210C3050184
Not Started16.100/K-1-A ss NU
711210C3050184
Not Started3000B ss NU
711210C3050184
Not Started4470 ss NU
711210C3050184
Not Started07.006/K- ss NU
711210C3050184
Not Started07.006/K-B ss NU
711210C3050184
Not Started07.005/K-K ss NU
711210C3050184
Not Started07.005/K-OK-ss NU
711210C3050184
Not Started04.613/04 ss NU
711210C3050187
Not Started25.052 ss NU
711210C3050187
Not Started16.134/K-1-A ss NU
711210C3050187
Not Started3000B ss NU
711210C3050187
Not Started23.014/K ss NU
711210C3050187
Not Started23.015/K ss NU
711210C3050187
Not Started4470 ss NU
711210C3050187
Not Started09.012/K-A ss NU
711210C3050187
Not Started07.006/K- ss NU
711210C3050187
Not Started07.006/K-Dss NU
711210C3050187
Not Started07.006/K-B ss NU
711210C3050187
Not Started07.005/K-K ss NU
711210C3050187
Not Started07.005/K-OK-ss NU
711210C3050187
Not Started04.613/04 ss NU
711210C3050187
Not StartedB-18.501 ss NU
711210C3050187
Not Started21.052 ss NU
711210C3030184
Not Started16.100/K-1-A ss NU
711210C3030184
Not Started3000B ss NU
711210C3030184
Not Started4470 ss NU
711210C3030184
Not Started07.006/K- ss NU
711210C3030184
Not Started07.006/K-B ss NU
711210C3030184
Not Started07.005/K-K ss NU
711210C3030184
Not Started07.005/K-OK-ss NU
711210C3030184
Not Started04.613/04 ss NU
711210C3030185
Not Started25.052 ss NU
711210C3030185
Not Started16.134/K-1-A ss NU
711210C3030185
Not Started3000B ss NU
711210C3030185
Not Started23.014/K ss NU
711210C3030185
Not Started23.015/K ss NU
711210C3030185
Not Started4470 ss NU
711210C3030185
Not Started09.012/K-A ss NU
711210C3030185
Not Started07.006/K- ss NU
711210C3030185
Not Started07.006/K-Dss NU
711210C3030185
Not Started07.006/K-B ss NU
711210C3030185
Not Started07.005/K-K ss NU
711210C3030185
Not Started07.005/K-OK-ss NU
711210C3030185
Not Started04.613/04 ss NU
711210C3030185
Not StartedB-18.501 ss NU
711210C3030186
Not Started25.052 ss NU
711210C3030186
Not Started16.134/K-1-A ss NU
711210C3030186
Not Started3000B ss NU
711210C3030186
Not Started23.014/K ss NU
711210C3030186
Not Started23.015/K ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 18

GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Elevation
KM: 041+862
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.6
Underpass Lean
KM: 041+862
Concrete
Lean
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.6
Underpass Lean
KM: 041+862
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Lean
KM: 041+862
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.6
Underpass Lean
KM: 041+862
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Lean
KM: 041+862
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Lean
KM: 041+862
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Lean
KM: 041+862
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Lean
KM: 041+862
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Steel
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.230.C.30.1.6
Underpass Deck
KM: 041+862
Concrete
Scaffholding
- (10.00x6.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Lean
KM: 041+205
Concrete
Lean
- (5.00x5.00)
Concrete
GO-4.010.1.10.230.C.30.1.4
Underpass Lean
KM: 041+205
Concrete
Cement
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Lean
KM: 041+205
Concrete
Cement
- (5.00x5.00)
to silo
GO-4.010.1.10.230.C.30.1.4
Underpass Lean
KM: 041+205
Concrete
Cement
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Lean
KM: 041+205
Concrete
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Lean
KM: 041+205
Concrete
Stone
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Lean
KM: 041+205
Concrete
Concasor
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Lean
KM: 041+205
Concrete
Addmixer
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Tar
Concrete
- (5.00x5.00)
Painting
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Reinforced
Concrete
- (5.00x5.00)
Concrete
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Cement
Concrete
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Rebar
Concrete
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Rebar
Concrete
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Cement
Concrete
- (5.00x5.00)
to silo
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Steel
Concrete
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Cement
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Steel
Concrete
- (5.00x5.00)
Trasnport
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Concrete
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Stone
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Concasor
Concrete
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
Addmixer
Concrete
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Foundation
KM: 041+205
PVC
Concrete
- (5.00x5.00)
Water Stop
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Tar- (5.00x5.00)
Painting
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Reinforced
- (5.00x5.00)
Concrete
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Cement
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Rebar
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Rebar
- (5.00x5.00)

TASKRSRC

711210C3030186
Not Started4470 ss NU
711210C3030186
Not Started09.012/K-A ss NU
711210C3030186
Not Started07.006/K- ss NU
711210C3030186
Not Started07.006/K-Dss NU
711210C3030186
Not Started07.006/K-B ss NU
711210C3030186
Not Started07.005/K-K ss NU
711210C3030186
Not Started07.005/K-OK-ss NU
711210C3030186
Not Started04.613/04 ss NU
711210C3030186
Not StartedB-18.501 ss NU
711210C3030187
Not Started25.052 ss NU
711210C3030187
Not Started16.134/K-1-A ss NU
711210C3030187
Not Started3000B ss NU
711210C3030187
Not Started23.014/K ss NU
711210C3030187
Not Started23.015/K ss NU
711210C3030187
Not Started4470 ss NU
711210C3030187
Not Started09.012/K-A ss NU
711210C3030187
Not Started07.006/K- ss NU
711210C3030187
Not Started07.006/K-Dss NU
711210C3030187
Not Started07.006/K-B ss NU
711210C3030187
Not Started07.005/K-K ss NU
711210C3030187
Not Started07.005/K-OK-ss NU
711210C3030187
Not Started04.613/04 ss NU
711210C3030187
Not StartedB-18.501 ss NU
711210C3030187
Not Started21.051 ss NU
711210C3030180
Not Started14.111 ss NU
711210C3030180
Not Started07.005/K-KN NU
711200C5000262
Not StartedTool Gate NU
711200C5000263
Not StartedTool Gate NU
711200C4000220
Not Started2541 NU
711200C4000220
Not StartedPlanting Tree NU
711200C3020185
Not StartedB-18.501 ls NU
711200C3020185
Not Started16.132/K-2-A ls NU
711200C3020185
Not Started23.014/K ls NU
711200C3020185
Not Started23.015/K ls NU
711200C3020185
Not Started09.012/K-A ls NU
711200C3020185
Not Started25.052 ls NU
711200C3020185
Not Started07.006/K-D ls NU
711200C3020185
Not Started3000/ B ls NU
711200C3020185
Not Started4470 ls NU
711200C3020185
Not Started04.613/04 ls NU
711200C3020185
Not Started07.006/K- ls NU
711200C3020185
Not Started07.006/K-B ls NU
711200C3020185
Not Started07.005/K-K ls NU
711200C3020185
Not Started07.005/K-O ls NU
711200C3020184
Not Started16.101/K-1-A ls NU
711200C3020184
Not Started3000/ B ls NU
711200C3020184
Not Started4470 ls NU
711200C3020184
Not Started04.613/04 ls NU
711200C3020184
Not Started07.006/K- ls NU
711200C3020184
Not Started07.006/K-B ls NU
711200C3020184
Not Started07.005/K-K ls NU
711200C3020184
Not Started07.005/K-O ls NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 19

GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Cement
- (5.00x5.00)
to silo
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Steel
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Cement
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Steel
- (5.00x5.00)
Trasnport
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Stone
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Concasor
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
Addmixer
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Elevation
KM: 041+205
PVC
- (5.00x5.00)
Water Stop
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Tar- (5.00x5.00)
Painting
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Reinforced
- (5.00x5.00)
Concrete
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Cement
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Rebar
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Rebar
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Cement
- (5.00x5.00)
to silo
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Steel
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Cement
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Steel
- (5.00x5.00)
Trasnport
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Stone
- (5.00x5.00)
Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Concasor
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Addmixer
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
PVC
- (5.00x5.00)
Water Stop
GO-4.010.1.10.230.C.30.1.4
Underpass Deck
KM: 041+205
Concrete
Scaffholding
- (5.00x5.00)
GO-4.010.1.10.230.C.30.1.4
Underpass Structural
KM: 041+205
Earthworks
Excavation
- (5.00x5.00)
& Transport
GO-4.010.1.10.230.C.30.1.4
Underpass Structural
KM: 041+205
Earthworks
Soil- (5.00x5.00)
Trasnport
& Transport
GO-4.010.1.10.220.C.43
Toll Collection
Toll Collection
Tool
Center
Gate
GO-4.010.1.10.220.C.43
Toll Collection
Toll Collection
Tool
System
Gate
GO-4.010.1.10.220.C.40
Recreation Landscape
Areas
Excavation
GO-4.010.1.10.220.C.40
Recreation Landscape
Areas
Plantting Tree
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
PVC
Concrete
- (12.00x6.00)
Water Stop
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Reinforced
Concrete
- (12.00x6.00)
Concrete
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Rebar
Concrete
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Rebar
Concrete
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Steel
Concrete
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Tar
Concrete
- (12.00x6.00)
Painting
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Steel
Concrete
- (12.00x6.00)
Transport
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Cement
Concrete
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Cement
Concrete
- (12.00x6.00)
to silo
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
addmixer
Concrete
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Trasnport
Concrete
- (12.00x6.00)
Cement
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Concrete
Concrete
- (12.00x6.00)
Trasnport
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Stone
Concrete
- (12.00x6.00)
Transport
GO-4.010.1.10.220.C.60.4
Underpass Foundation
KM: 038+527
Stone
Concrete
- (12.00x6.00)
Transport
GO-4.010.1.10.220.C.60.4
Underpass Lean
KM: 038+527
Concrete
Lean
- (12.00x6.00)
Concrete
GO-4.010.1.10.220.C.60.4
Underpass Lean
KM: 038+527
Concrete
Cement
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Lean
KM: 038+527
Concrete
Cement
- (12.00x6.00)
to silo
GO-4.010.1.10.220.C.60.4
Underpass Lean
KM: 038+527
Concrete
addmixer
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Lean
KM: 038+527
Concrete
Trasnport
- (12.00x6.00)
Cement
GO-4.010.1.10.220.C.60.4
Underpass Lean
KM: 038+527
Concrete
Concrete
- (12.00x6.00)
Trasnport
GO-4.010.1.10.220.C.60.4
Underpass Lean
KM: 038+527
Concrete
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.220.C.60.4
Underpass Lean
KM: 038+527
Concrete
Stone
- (12.00x6.00)
Transport

TASKRSRC

711200C3020186
Not StartedB-18.501 ls NU
711200C3020186
Not Started23.014/K ls NU
711200C3020186
Not Started23.015/K ls NU
711200C3020186
Not Started16.132/K-2-A ls NU
711200C3020186
Not Started3000/ B ls NU
711200C3020186
Not Started4470 ls NU
711200C3020186
Not Started09.012/K-A ls NU
711200C3020186
Not Started25.052 ls NU
711200C3020186
Not Started04.613/04 ls NU
711200C3020186
Not Started07.006/K-D ls NU
711200C3020186
Not Started07.005/K-O ls NU
711200C3020186
Not Started07.005/K-K ls NU
711200C3020186
Not Started07.006/K-B ls NU
711200C3020186
Not Started07.006/K- ls NU
711200C3020187
Not StartedB-18.501 ls NU
711200C3020187
Not Started16.132/K-2-A ls NU
711200C3020187
Not Started23.014/K ls NU
711200C3020187
Not Started23.015/K ls NU
711200C3020187
Not Started09.012/K-A ls NU
711200C3020187
Not Started25.052 ls NU
711200C3020187
Not Started07.006/K-D ls NU
711200C3020187
Not Started3000/ B ls NU
711200C3020187
Not Started4470 ls NU
711200C3020187
Not Started04.613/04 ls NU
711200C3020187
Not Started07.006/K- ls NU
711200C3020187
Not Started07.006/K-B ls NU
711200C3020187
Not Started07.005/K-K ls NU
711200C3020187
Not Started07.005/K-O ls NU
711200C3020180
Not Started14.113 ls NU
711200C3020180
Not Started07.005/K-KN ls NU
711200C5000312
Not StartedPark Area NU
711205C1500179
Completed 23.014/K ls NU
711205C1500179
Completed 23.015/K ls NU
711205C1500179
Completed 3000/ B ls NU
711205C1500179
Completed 4470 ls NU
711205C1500179
Completed 09.012/K-A ls NU
711205C1500179
Completed 16.077/K-1B ls NU
711205C1500179
Completed 07.006/K- ls NU
711205C1500179
Completed 07.006/K-B ls NU
711205C1500179
Completed 07.005/K-K ls NU
711205C1500179
Completed 07.005/K-O ls NU
711205C1500179
Completed 07.006/K-D ls NU
711205C1500179
Completed 07.005/K-KN ls NU
711205C1500180
Completed 14.113 ls NU
711205C1500180
Completed 07.005/K-KN ls NU
711205C1500186
Completed 23.014/K ls NU
711205C1500186
Completed 23.015/K ls NU
711205C1500186
Completed 16.132/K-2-A ls NU
711205C1500186
Completed 3000/ B ls NU
711205C1500186
Completed 4470 ls NU
711205C1500186
Completed 25.052 ls NU
711205C1500186
Completed 04.613/04 ls NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 20

GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
PVC
- (12.00x6.00)
Water Stop
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Rebar
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Rebar
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Reinforced
- (12.00x6.00)
Concrete
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Cement
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Cement
- (12.00x6.00)
to silo
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Steel
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Tar- (12.00x6.00)
Painting
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
addmixer
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Steel
- (12.00x6.00)
Transport
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Concrete
- (12.00x6.00)
Trasnport
GO-4.010.1.10.220.C.60.4
Underpass Elevation
KM: 038+527
Trasnport
- (12.00x6.00)
Cement
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
PVC
- (12.00x6.00)
Water Stop
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Reinforced
- (12.00x6.00)
Concrete
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Rebar
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Rebar
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Steel
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Tar- (12.00x6.00)
Painting
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Steel
- (12.00x6.00)
Transport
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Cement
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Cement
- (12.00x6.00)
to silo
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
addmixer
- (12.00x6.00)
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Trasnport
- (12.00x6.00)
Cement
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Concrete
- (12.00x6.00)
Trasnport
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.220.C.60.4
Underpass Deck
KM: 038+527
Concrete
Stone
- (12.00x6.00)
Transport
GO-4.010.1.10.220.C.60.4
Underpass Structural
KM: 038+527
Earthworks
Excavation
- (12.00x6.00)
& Transport
GO-4.010.1.10.220.C.60.4
Underpass Structural
KM: 038+527
Earthworks
Soil- (12.00x6.00)
Transport
& Transport
GO-4.010.1.10.220.C.45
Service & Park
Parking
Areas
Area
Parking Area
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Rebar
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Rebar
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Cement
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Cement
- 39+897
to silo
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Steel
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Pile -120
39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
T rasnport
- 39+897
Cement
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Concrete
- 39+897
Trasnport
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Stone
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Stone
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Steel
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Piling
BridgeWorks
39+867
Soil -Transport
39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Structural
Bridge 39+867
Earthworks
Excavation
- 39+897
& Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Structural
Bridge 39+867
Earthworks
Soil -Transport
39+897
& Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Rebar
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Rebar
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Reinforced
- 39+897
Concrete
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Cement
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Cement
- 39+897
to silo
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Tar -Painting
39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
addmixer
- 39+897

TASKRSRC

711205C1500186
Completed 07.006/K-D ls NU
711205C1500186
Completed 07.005/K-O ls NU
711205C1500186
Completed 07.005/K-K ls NU
711205C1500186
Completed 07.006/K-B ls NU
711205C1500186
Completed 07.006/K- ls NU
711205C1500186
Completed 09.012/K-A ls NU
711205C1500187
Not Started3793/A ls NU
711205C1500187
Not Started16.137/K-1-A1 ls NU
711205C1500187
Not Started23.002/K-6 ls NU
711205C1500187
Not Started3792/1-A ls NU
711205C1500187
Not Started07.006/K-K ls NU
711205C1500187
Not Started23.014/K ls NU
711205C1500187
Not Started23.015/K ls NU
711205C1500187
Not Started3000/ B ls NU
711205C1500187
Not Started4470 ls NU
711205C1500187
Not Started04.613/04 ls NU
711205C1500187
Not Started09.012/K-A ls NU
711205C1500187
Not Started07.006/K-D ls NU
711205C1500187
Not Started07.005/K-O ls NU
711205C1500187
Not Started07.005/K-K ls NU
711205C1500187
Not Started07.006/K-B ls NU
711205C1500187
Not Started07.006/K- ls NU
711205C1500187
Not Started07.006/K- ls NU
711205C1500189
Not Started21.053 ls NU
711205C1500189
Not Started204-211 ls NU
711205C1500189
Not Started16.023/K-1-A1 ls NU
711205C1500189
Not Started3000/ B ls NU
711205C1500189
Not Started4470 ls NU
711205C1500189
Not Started23.014/K ls NU
711205C1500189
Not Started23.015/K ls NU
711205C1500189
Not Started28.010/K ls NU
711205C1500189
Not Started09.012/K-A ls NU
711205C1500189
Not Started19.022/K ls NU
711205C1500189
Not Started04.613/04 ls NU
711205C1500189
Not Started3786/A ls NU
711205C1500189
Not StartedZEL-4 ls NU
711205C1500189
Not Started07.006/K-D ls NU
711205C1500189
Not Started07.005/K-O ls NU
711205C1500189
Not Started07.005/K-K ls NU
711205C1500189
Not Started07.006/K-B ls NU
711205C1500189
Not Started07.006/K- ls NU
711205C1500185
Completed 16.101/K-1-A ls NU
711205C1500185
Completed 3000/ B ls NU
711205C1500185
Completed 04.613/04 ls NU
711205C1500185
Completed 07.006/K- ls NU
711205C1500185
Completed 07.006/K-B ls NU
711205C1500185
Completed 07.005/K-K ls NU
711205C1500185
Completed 07.005/K-O ls NU
711205C1500185
Completed 16.132/K-2-A ls NU
711205C1500185
Completed 23.014/K ls NU
711205C1500185
Completed 23.015/K ls NU
711205C1500185
Completed 09.012/K-A ls NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 21

GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Steel
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Stone
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Stone
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Concrete
- 39+897
Trasnport
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Trasnport
- 39+897
Cement
GO-4.010.1.10.220.C.96.105.20
Underpass Elevation
Bridge 39+867
Steel
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Protection
of
- 39+897
Girders
pipe
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Reinforced
of
- 39+897
Girders
Concrete
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Pre.of
- Steel
39+897
Girders
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Pre.of
- Steel
39+897
Girders
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Beam
of
- 39+897
Girders
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Rebar
of
- 39+897
Girders
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Rebar
of
- 39+897
Girders
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Cement
of
- 39+897
Girders
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Cement
of
- 39+897
Girders
to silo
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
addmixer
of
- 39+897
Girders
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Steel
of
- 39+897
Girders
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Steel
of
- 39+897
Transport
Girders
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Stone
of
- 39+897
Girders
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Stone
of
- 39+897
Girders
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Concrete
of
- 39+897
Girders
Trasnport
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Trasnport
of
- 39+897
Girders
Cement
GO-4.010.1.10.220.C.96.105.20
Underpass Manufacturing
Bridge 39+867
Pre.of
- Steel
39+897
Girders
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Scaffholding
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
PVC- Pipe
39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Reinforced
- 39+897
Concrete
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Cement
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Cement
- 39+897
to silo
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Rebar
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Rebar
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Exp.- Joint
39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Steel
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Water
- 39+897
Proofing
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
addmixer
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Handrail
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Precast
- 39+897
Panel
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Steel
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Stone
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Stone
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Concrete
- 39+897
Trasnport
GO-4.010.1.10.220.C.96.105.20
Underpass Deck
BridgeConcrete
39+867
Trasnport
- 39+897
Cement
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Lean
Concrete
- 39+897
Concrete
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Cement
Concrete
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
addmixer
Concrete
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Trasnport
Concrete
- 39+897
Cement
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Concrete
Concrete
- 39+897
Trasnport
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Stone
Concrete
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Stone
Concrete
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Reinforced
Concrete
- 39+897
Concrete
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Rebar
Concrete
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Rebar
Concrete
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Steel
Concrete
- 39+897

TASKRSRC

711205C1500185
Completed 25.052 ls NU
711205C1500185
Completed 07.006/K-D ls NU
711205C1500185
Completed 4470 ls NU
711205C1500188
Not Started16.136/K-1 ls NU
711205C1500188
Not Started3805 ls NU
711205C1500188
Not Started3793/A ls NU
711205C1500184
Completed 16.101/K-1-A ls NU
711205C1500184
Completed 3000/ B ls NU
711205C1500184
Completed 4470 ls NU
711205C1500184
Completed 04.613/04 ls NU
711205C1500184
Completed 07.006/K- ls NU
711205C1500184
Completed 07.006/K-B ls NU
711205C1500184
Completed 07.005/K-K ls NU
711205C1500184
Completed 07.005/K-O ls NU
711205C0100110
In Progress15.142-A NU
711205C0100110
In Progress07.005/K-R NU
711205C0100110
In Progress2209 NU
711205C0100110
In Progress15.052/5 NU
711205C0100110
In Progress07.004/K NU
711205C0100110
In Progress07.005/K NU
711205C0100100
Completed 07.005/K-A NU
711205C0100100
Completed L2.2 DC NU
711205C0100100
Completed E-10 NU
711205C0100100
Completed 2200 NU
711205C0100100
Completed 2204 NU
711205C0100100
Completed 2202 NU
711205C0100100
Completed 2240 NU
711205C0100100
Completed 2240/1 NU
711205C0100100
Completed 07.005/K-1 NU
711205C0100101
In Progress07.005/K-A NU
711205C0100101
In Progress2200 NU
711205C0100101
In Progress2204 NU
711205C0100101
In Progress2202 NU
711205C0100101
In Progress2240 NU
711205C0100101
In Progress2240/1 NU
711205C0100101
In Progress07.005/K-1 NU
711205C0100111
Not Started15.142-A NU
711205C0100111
Not Started07.005/K-R NU
711205C0100111
Not Started07.005/K NU
711205C0100111
Not Started2209 NU
711205C0100111
Not Started15.052/5 NU
711205C0100111
Not Started07.004/K NU
711205C0100120
Not Started2500/A NU
711205C0100120
Not Started2500/B NU
711205C0100120
Not Started2500/C NU
711205C9800306
Not StartedF-8 NU
711205C9800306
Not StartedPM-3 NU
711205C9800306
Not StartedL2.2 DC NU
711205C9800266
Not StartedL2.2 DC NU
711205C9800266
Not StartedSW-3 NU
711205C9800266
Not StartedMiscellaneous NU
711205C9800262
Not StartedL2.2 DC NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 22

GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Tar
Concrete
-Painting
39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Steel
Concrete
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Foundation
Bridge 39+867
Cement
Concrete
- 39+897
to silo
GO-4.010.1.10.220.C.96.105.20
Underpass Installation
Bridge 39+867
of
Pre.
Girders
- Cast.
39+897
Beam
GO-4.010.1.10.220.C.96.105.20
Underpass Installation
Bridge 39+867
of
Neopren
Girders
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Installation
Bridge 39+867
of
Protection
Girders
- 39+897
pipe
GO-4.010.1.10.220.C.96.105.20
Underpass Lean
BridgeConcrete
39+867
Lean- 39+897
Concrete
GO-4.010.1.10.220.C.96.105.20
Underpass Lean
BridgeConcrete
39+867
Cement
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Lean
BridgeConcrete
39+867
Cement
- 39+897
to silo
GO-4.010.1.10.220.C.96.105.20
Underpass Lean
BridgeConcrete
39+867
addmixer
- 39+897
GO-4.010.1.10.220.C.96.105.20
Underpass Lean
BridgeConcrete
39+867
Trasnport
- 39+897
Cement
GO-4.010.1.10.220.C.96.105.20
Underpass Lean
BridgeConcrete
39+867
Concrete
- 39+897
Trasnport
GO-4.010.1.10.220.C.96.105.20
Underpass Lean
BridgeConcrete
39+867
Stone
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.20
Underpass Lean
BridgeConcrete
39+867
Stone
- 39+897
Transport
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 1Loading and Laying /w machine
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 1Ropriz
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 1Damping down and compacting
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 1Compacting
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 1transporting the excav. soil
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 1Traspor. Of water
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Transportation
& Transport Phase
of material
1
from bor
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Direct
& Transport
Cost Phase 1
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation EW
& Transport
Excavation
Phase
/ Kaz
1
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Excavation
& Transport Phase 1
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Excavation
& Transportand
Phase
use1of unsuitable m
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Excavation
& Transportand
Phase
use1of material from
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Cutting
& Transport
the trees
Phase 1
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Removing
& Transport
the
Phase
roots 1
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Forwarding
& Transportthe
Phase
soil to
1 the stock are
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Transportation
& Transport Phase
of material
2
from bor
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Excavation
& Transport Phase 2
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Excavation
& Transportand
Phase
use2of unsuitable m
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Excavation
& Transportand
Phase
use2of material from
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Cutting
& Transport
the trees
Phase 2
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Removing
& Transport
the
Phase
roots 2
GO-4.010.1.10.220.C.96.105.10
Earthworks Excavation Forwarding
& Transportthe
Phase
soil to
2 the stock are
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 2Loading and Laying /w machine
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 2Ropriz
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 2Traspor. Of water
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 2Damping down and compacting
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 2Compacting
GO-4.010.1.10.220.C.96.105.10
Earthworks Fill Phase 2transporting the excav. soil
GO-4.010.1.10.220.C.96.105.10
Earthworks Subgrade Preparation
Reglaj
GO-4.010.1.10.220.C.96.105.10
Earthworks Subgrade Preparation
Reglaj
GO-4.010.1.10.220.C.96.105.10
Earthworks Subgrade Preparation
Reglaj
GO-4.010.1.10.220.C.96.105.95
Pavement &Other
Finishing
Works
Works
Topsoil
(Out ofonScope)
Slopes / evlerde Neba
GO-4.010.1.10.220.C.96.105.95
Pavement &Other
Finishing
Works
Works
Planting
(Out ofMaintenance
Scope)
/ Bakm Tes
GO-4.010.1.10.220.C.96.105.95
Pavement &Other
Finishing
Works
Works
Direct
(Out Cost
of Scope)
GO-4.010.1.10.220.C.96.105.50
Ancillary and
Miscellaneous
Other Works
Direct Cost
GO-4.010.1.10.220.C.96.105.50
Ancillary and
Miscellaneous
Other Works
Secondary Works
GO-4.010.1.10.220.C.96.105.50
Ancillary and
Miscellaneous
Other Works
Miscellaneous
GO-4.010.1.10.220.C.96.105.50
Ancillary and
Lighting
Other Works
(Out
Direct
of Scope)
Cost

TASKRSRC

711205C9800262
Not StartedSW-3 NU
711205C9800260
In ProgressDisplacement NU
711205C3000186
In Progress25.052 ss NU
711205C3000186
In Progress16.134/K-1-A ss NU
711205C3000186
In Progress3000B ss NU
711205C3000186
In Progress23.014/K ss NU
711205C3000186
In Progress23.015/K ss NU
711205C3000186
In Progress4470 ss NU
711205C3000186
In Progress09.012/K-A ss NU
711205C3000186
In Progress07.006/K- ss NU
711205C3000186
In Progress07.006/K-Dss NU
711205C3000186
In Progress07.005/K-K ss NU
711205C3000186
In Progress07.005/K-OK-ss NU
711205C3000186
In Progress04.613/04 ss NU
711205C3000186
In ProgressB-18.501 ss NU
711205C3000186
In Progress07.006/K-B ss NU
711205C3000180
Completed 14.111 ss NU
711205C3000180
Completed 07.005/K-KN NU
711205C3000184
In Progress16.100/K-1-A ss NU
711205C3000184
In Progress3000B ss NU
711205C3000184
In Progress4470 ss NU
711205C3000184
In Progress07.006/K- ss NU
711205C3000184
In Progress07.006/K-B ss NU
711205C3000184
In Progress07.005/K-K ss NU
711205C3000184
In Progress07.005/K-OK-ss NU
711205C3000184
In Progress04.613/04 ss NU
711205C3000185
In Progress25.052 ss NU
711205C3000185
In Progress16.134/K-1-A ss NU
711205C3000185
In Progress3000B ss NU
711205C3000185
In Progress23.014/K ss NU
711205C3000185
In Progress23.015/K ss NU
711205C3000185
In Progress4470 ss NU
711205C3000185
In Progress09.012/K-A ss NU
711205C3000185
In Progress07.006/K- ss NU
711205C3000185
In Progress07.006/K-Dss NU
711205C3000185
In Progress07.006/K-B ss NU
711205C3000185
In Progress07.005/K-K ss NU
711205C3000185
In Progress07.005/K-OK-ss NU
711205C3000185
In Progress04.613/04 ss NU
711205C3000185
In ProgressB-18.501 ss NU
711205C3000187
In Progress25.052 ss NU
711205C3000187
In Progress16.134/K-1-A ss NU
711205C3000187
In Progress3000B ss NU
711205C3000187
In Progress23.014/K ss NU
711205C3000187
In Progress4470 ss NU
711205C3000187
In Progress09.012/K-A ss NU
711205C3000187
In Progress07.006/K- ss NU
711205C3000187
In Progress07.006/K-Dss NU
711205C3000187
In Progress07.006/K-B ss NU
711205C3000187
In Progress07.005/K-K ss NU
711205C3000187
In Progress07.005/K-OK-ss NU
711205C3000187
In Progress04.613/04 ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 23

GO-4.010.1.10.220.C.96.105.50
Ancillary and
Lighting
Other Works
(Out
Secondary
of Scope)Works
GO-4.010.1.10.220.C.96.105.50
Ancillary and
Service
Other Displacements
Works
Displacement
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Tar
- (10.00x6.00)
Painting
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Cement
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Rebar
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Rebar
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Steel
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Concasor
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Addmixer
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Elevation
KM: 0+575 Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Structural
KM: 0+575Earthworks
Excavation
- (10.00x6.00)
& Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Structural
KM: 0+575Earthworks
Soil
- (10.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Lean
KM: 0+575
Concrete
Lean
- (10.00x6.00)
Concrete
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Lean
KM: 0+575
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Lean
KM: 0+575
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Lean
KM: 0+575
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Lean
KM: 0+575
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Lean
KM: 0+575
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Lean
KM: 0+575
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Lean
KM: 0+575
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Tar
-Concrete
(10.00x6.00)
Painting
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Reinforced
-Concrete
(10.00x6.00)
Concrete
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Cement
-Concrete
(10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Rebar
-Concrete
(10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Rebar
-Concrete
(10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Cement
-Concrete
(10.00x6.00)
to silo
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Steel
-Concrete
(10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Cement
-Concrete
(10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Steel
-Concrete
(10.00x6.00)
Trasnport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Concrete
-Concrete
(10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Stone
-Concrete
(10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Concasor
-Concrete
(10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 Addmixer
-Concrete
(10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Foundation
KM: 0+575 PVC
-Concrete
(10.00x6.00)
Water Stop
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Tar
- (10.00x6.00)
Painting
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Steel
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Addmixer
- (10.00x6.00)

TASKRSRC

711205C3000187
In ProgressB-18.501 ss NU
711205C3000187
In Progress21.052 ss NU
711205C3000187
In Progress23.015/K ss NU
711205C3050182
Not Started14.111 ss NU
711205C3050182
Not Started07.005/K-KN ss NU
711205C3050182
Not Started16.100/K-1-A ss NU
711205C3050182
Not Started3000B ss NU
711205C3050182
Not Started4470 ss NU
711205C3050182
Not Started07.006/K- ss NU
711205C3050182
Not Started07.006/K-B ss NU
711205C3050182
Not Started07.005/K-K ss NU
711205C3050182
Not Started07.005/K-OK-ss NU
711205C3050182
Not Started04.613/04 ss NU
711205C3050182
Not Started16.134/K-1-A ss NU
711205C3050182
Not Started23.014/K ss NU
711205C3050182
Not Started23.015/K ss NU
711205C3050182
Not Started09.012/K-A ss NU
711205C3050182
Not Started07.006/K-D NU
711205C3050182
Not Started07.006/K-K ss NU
711205C3050182
Not StartedB-18.501 ss NU
711205C3050182
Not Started21.051 ss NU
711205C3020182
In Progress25.052 ss NU
711205C3020182
In Progress14.111 ss NU
711205C3020182
In Progress07.005/K-KN ss NU
711205C3020182
In Progress16.100/K-1-A ss NU
711205C3020182
In Progress4470 ss NU
711205C3020182
In Progress07.006/K- ss NU
711205C3020182
In Progress07.006/K-B ss NU
711205C3020182
In Progress07.005/K-K ss NU
711205C3020182
In Progress07.005/K-OK-ss NU
711205C3020182
In Progress04.613/04 ss NU
711205C3020182
In Progress16.134/K-1-A ss NU
711205C3020182
In Progress23.014/K ss NU
711205C3020182
In Progress23.015/K ss NU
711205C3020182
In Progress09.012/K-A ss NU
711205C3020182
In Progress07.006/K-D NU
711205C3020182
In ProgressB-18.501 ss NU
711205C3020182
In Progress21.051 ss NU
711205C3020182
In Progress3000B ss NU
711205C3030182
Not Started14.111 ss NU
711205C3030182
Not Started07.005/K-KN ss NU
711205C3030182
Not Started16.100/K-1-A ss NU
711205C3030182
Not Started3000B ss NU
711205C3030182
Not Started4470 ss NU
711205C3030182
Not Started07.006/K- ss NU
711205C3030182
Not Started07.006/K-B ss NU
711205C3030182
Not Started07.005/K-K ss NU
711205C3030182
Not Started07.005/K-OK-ss NU
711205C3030182
Not Started04.613/04 ss NU
711205C3030182
Not Started16.134/K-1-A ss NU
711205C3030182
Not Started23.014/K ss NU
711205C3030182
Not Started23.015/K ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 24

GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Scaffholding
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.1.3
Underpass Deck
KM: 0+575
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Excavation
Box
KM:Culvert
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Soil
Box
KM:Trasnport
Culvert
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Lean
Box
KM:Culvert
Concrete
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Cement
Box
KM:Culvert
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Cement
Box
KM:Culvert
0+515
to silo
KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Cement
Box
KM:Culvert
0+515
Transport
KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Concrete
Box
KM:Culvert
0+515
Transport
KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Stone
Box
KM:Culvert
0+515
Transport
KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Concasor
Box
KM:Culvert
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Addmixer
Box
KM:Culvert
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Reinforced
Box
KM:Culvert
0+515Concrete
KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Rebar
Box
KM:Culvert
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Rebar
Box
KM:Culvert
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Steel
Box
KM:Culvert
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Steel
Box
KM:Culvert
Trasnport
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Stone
Box
KM:Culvert
0+515
Trasnport
KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road PVC
Box
KM:Culvert
Water
0+515Stop
KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.4
State Road State
Box Culvert
Road Scaffholding
Box
KM:Culvert
0+515 KM:
- (1.30x1.30)
0+515 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Tar
KM:
- (2.00x2.00)
Painting
0+500 - (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Excavation
KM:
- (2.00x2.00)
0+500 - (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Soil
KM:
- (2.00x2.00)
Trasnport
0+500 - (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Lean
KM:
- (2.00x2.00)
0+500
Concrete
- (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Cement
KM:
- (2.00x2.00)
0+500
to silo
- (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Cement
KM:
- (2.00x2.00)
0+500
Transport
- (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Concrete
KM:
- (2.00x2.00)
0+500
Transport
- (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Stone
KM:
- (2.00x2.00)
0+500
Transport
- (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Concasor
KM:
- (2.00x2.00)
0+500 - (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Addmixer
KM:
- (2.00x2.00)
0+500 - (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Reinforced
KM:
- (2.00x2.00)
0+500Concrete
- (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Rebar
KM:
- (2.00x2.00)
0+500 - (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Rebar
KM:
- (2.00x2.00)
0+500 - (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Steel
KM:
- (2.00x2.00)
0+500 - (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Steel
KM:
- (2.00x2.00)
0+500
Trasnport
- (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500PVC
KM:
- (2.00x2.00)
Water
0+500 Stop
- (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Scaffholding
KM:
- (2.00x2.00)
0+500 - (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Cement
KM:
- (2.00x2.00)
0+500 - (2.00x2.00)
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Excavation
Box
KM:Culvert
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Soil
Box
KM:Trasnport
Culvert
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Lean
Box
KM:Culvert
Concrete
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Cement
Box
KM:Culvert
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Cement
Box
KM:Culvert
0+249
to silo
KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Cement
Box
KM:Culvert
0+249
Transport
KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Concrete
Box
KM:Culvert
0+249
Transport
KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Stone
Box
KM:Culvert
0+249
Transport
KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Concasor
Box
KM:Culvert
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Addmixer
Box
KM:Culvert
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Reinforced
Box
KM:Culvert
0+249Concrete
KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Rebar
Box
KM:Culvert
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Rebar
Box
KM:Culvert
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5

TASKRSRC

711205C3030182
Not Started09.012/K-A ss NU
711205C3030182
Not Started07.006/K-D NU
711205C3030182
Not Started07.006/K-K ss NU
711205C3030182
Not StartedB-18.501 ss NU
711205C3030182
Not Started21.051 ss NU
711205C3040182
Not Started07.005/K-KN ss NU
711205C3040182
Not Started16.100/K-1-A ss NU
711205C3040182
Not Started3000B ss NU
711205C3040182
Not Started4470 ss NU
711205C3040182
Not Started07.006/K- ss NU
711205C3040182
Not Started07.006/K-B ss NU
711205C3040182
Not Started07.005/K-K ss NU
711205C3040182
Not Started07.005/K-OK-ss NU
711205C3040182
Not Started04.613/04 ss NU
711205C3040182
Not Started16.134/K-1-A ss NU
711205C3040182
Not Started23.014/K ss NU
711205C3040182
Not Started23.015/K ss NU
711205C3040182
Not Started09.012/K-A ss NU
711205C3040182
Not Started07.006/K-D NU
711205C3040182
Not Started07.006/K-K ss NU
711205C3040182
Not StartedB-18.501 ss NU
711205C3040182
Not Started21.051 ss NU
711205C3040182
Not Started14.111 ss NU
711205C3010182
In Progress14.111 ss NU
711205C3010182
In Progress07.005/K-KN ss NU
711205C3010182
In Progress16.100/K-1-A ss NU
711205C3010182
In Progress3000B ss NU
711205C3010182
In Progress4470 ss NU
711205C3010182
In Progress07.006/K- ss NU
711205C3010182
In Progress07.006/K-B ss NU
711205C3010182
In Progress07.005/K-K ss NU
711205C3010182
In Progress07.005/K-OK-ss NU
711205C3010182
In Progress04.613/04 ss NU
711205C3010182
In Progress16.134/K-1-A ss NU
711205C3010182
In Progress23.014/K ss NU
711205C3010182
In Progress23.015/K ss NU
711205C3010182
In Progress09.012/K-A ss NU
711205C3010182
In Progress07.006/K-D NU
711205C3010182
In Progress07.006/K-K ss NU
711205C3010182
In ProgressB-18.501 ss NU
711205C3010182
In Progress21.051 ss NU
711200C9500306
Not StartedL2.2 DC NU
711200C3020182
In Progress14.111 ss NU
711200C3020182
In Progress07.005/K-KN ss NU
711200C3020182
In Progress16.100/K-1-A ss NU
711200C3020182
In Progress3000B ss NU
711200C3020182
In Progress4470 ss NU
711200C3020182
In Progress07.006/K- ss NU
711200C3020182
In Progress07.006/K-B ss NU
711200C3020182
In Progress07.005/K-K ss NU
711200C3020182
In Progress07.005/K-OK-ss NU
711200C3020182
In Progress04.613/04 ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 25

GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Steel
Box
KM:Culvert
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Steel
Box
KM:Culvert
Trasnport
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Stone
Box
KM:Culvert
0+249
Trasnport
KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road PVC
Box
KM:Culvert
Water
0+249Stop
KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.2
State Road State
Box Culvert
Road Scaffholding
Box
KM:Culvert
0+249 KM:
- (3.40x1.50)
0+249 - (3.40x1.5
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Soil
Box
KM:Trasnport
Culvert
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Lean
Box
KM:Culvert
Concrete
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Cement
Box
KM:Culvert
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Cement
Box
KM:Culvert
0+393
to silo
KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Cement
Box
KM:Culvert
0+393
Transport
KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Concrete
Box
KM:Culvert
0+393
Transport
KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Stone
Box
KM:Culvert
0+393
Transport
KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Concasor
Box
KM:Culvert
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Addmixer
Box
KM:Culvert
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Reinforced
Box
KM:Culvert
0+393Concrete
KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Rebar
Box
KM:Culvert
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Rebar
Box
KM:Culvert
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Steel
Box
KM:Culvert
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Steel
Box
KM:Culvert
Trasnport
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Stone
Box
KM:Culvert
0+393
Trasnport
KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road PVC
Box
KM:Culvert
Water
0+393Stop
KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Scaffholding
Box
KM:Culvert
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.3
State Road State
Box Culvert
Road Excavation
Box
KM:Culvert
0+393 KM:
- (1.30x1.30)
0+393 - (1.30x1.3
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Excavation
KM:
- (1.50x2.00)
0+705 - (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Soil
KM:
- (1.50x2.00)
Trasnport
0+705 - (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Lean
KM:
- (1.50x2.00)
0+705
Concrete
- (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Cement
KM:
- (1.50x2.00)
0+705 - (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Cement
KM:
- (1.50x2.00)
0+705
to silo
- (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Cement
KM:
- (1.50x2.00)
0+705
Transport
- (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Concrete
KM:
- (1.50x2.00)
0+705
Transport
- (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Stone
KM:
- (1.50x2.00)
0+705
Transport
- (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Concasor
KM:
- (1.50x2.00)
0+705 - (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Addmixer
KM:
- (1.50x2.00)
0+705 - (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Reinforced
KM:
- (1.50x2.00)
0+705Concrete
- (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Rebar
KM:
- (1.50x2.00)
0+705 - (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Rebar
KM:
- (1.50x2.00)
0+705 - (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Steel
KM:
- (1.50x2.00)
0+705 - (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Steel
KM:
- (1.50x2.00)
0+705
Trasnport
- (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Stone
KM:
- (1.50x2.00)
0+705
Trasnport
- (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705PVC
KM:
- (1.50x2.00)
Water
0+705 Stop
- (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Scaffholding
KM:
- (1.50x2.00)
0+705 - (1.50x2.00)
GO-4.010.1.10.220.C.95
Pavement &Other
Finishing
Works
Works
Direct
(Out Cost
of Scope)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Excavation
KM:
- 2x(3.00x3.00)
040+130 - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Soil
KM:
- Trasnport
2x(3.00x3.00)
040+130 - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Lean
KM:
- 2x(3.00x3.00)
040+130
Concrete - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Cement
KM:
- 2x(3.00x3.00)
040+130 - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Cement
KM:
- 2x(3.00x3.00)
040+130
to silo - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Cement
KM:
- 2x(3.00x3.00)
040+130
Transport
- 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Concrete
KM:
- 2x(3.00x3.00)
040+130
Transport
- 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Stone
KM:
- 2x(3.00x3.00)
040+130
Transport
- 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Concasor
KM:
- 2x(3.00x3.00)
040+130 - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Addmixer
KM:
- 2x(3.00x3.00)
040+130 - 2x(3.00x3.00)

TASKRSRC

711200C3020182
In Progress16.134/K-1-A ss NU
711200C3020182
In Progress23.014/K ss NU
711200C3020182
In Progress23.015/K ss NU
711200C3020182
In Progress09.012/K-A ss NU
711200C3020182
In Progress07.006/K-D NU
711200C3020182
In Progress07.006/K-K ss NU
711200C3020182
In ProgressB-18.501 ss NU
711200C3020182
In Progress21.051 ss NU
711200C3020182
In Progress25.052 ss NU
711200C3030182
Not Started14.111 ss NU
711200C3030182
Not Started07.005/K-KN ss NU
711200C3030182
Not Started16.100/K-1-A ss NU
711200C3030182
Not Started3000B ss NU
711200C3030182
Not Started4470 ss NU
711200C3030182
Not Started07.006/K- ss NU
711200C3030182
Not Started07.006/K-B ss NU
711200C3030182
Not Started07.005/K-K ss NU
711200C3030182
Not Started07.005/K-OK-ss NU
711200C3030182
Not Started04.613/04 ss NU
711200C3030182
Not Started16.134/K-1-A ss NU
711200C3030182
Not Started23.014/K ss NU
711200C3030182
Not Started23.015/K ss NU
711200C3030182
Not Started09.012/K-A ss NU
711200C3030182
Not Started07.006/K-D NU
711200C3030182
Not StartedB-18.501 ss NU
711200C3030182
Not Started21.051 ss NU
711200C3030182
Not Started25.052 ss NU
711200C3010180
Completed 14.111 ss NU
711200C3010180
Completed 07.005/K-KN NU
711200C3010184
In Progress16.100/K-1-A ss NU
711200C3010184
In Progress3000B ss NU
711200C3010184
In Progress4470 ss NU
711200C3010184
In Progress07.006/K- ss NU
711200C3010184
In Progress07.006/K-B ss NU
711200C3010184
In Progress07.005/K-K ss NU
711200C3010184
In Progress07.005/K-OK-ss NU
711200C3010184
In Progress04.613/04 ss NU
711200C3010186
In Progress16.134/K-1-A ss NU
711200C3010186
In Progress3000B ss NU
711200C3010186
In Progress23.014/K ss NU
711200C3010186
In Progress23.015/K ss NU
711200C3010186
In Progress4470 ss NU
711200C3010186
In Progress09.012/K-A ss NU
711200C3010186
In Progress07.006/K- ss NU
711200C3010186
In Progress07.006/K-Dss NU
711200C3010186
In Progress07.006/K-B ss NU
711200C3010186
In Progress07.005/K-K ss NU
711200C3010186
In Progress07.005/K-OK-ss NU
711200C3010186
In Progress04.613/04 ss NU
711200C3010186
In ProgressB-18.501 ss NU
711200C3010186
In Progress25.052 ss NU
711200C3010187
In Progress16.134/K-1-A ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 26

GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Reinforced
KM:
- 2x(3.00x3.00)
040+130
Concrete
- 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Rebar
KM:
- 2x(3.00x3.00)
040+130 - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Rebar
KM:
- 2x(3.00x3.00)
040+130 - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Steel
KM:
- 2x(3.00x3.00)
040+130 - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Steel
KM:
- 2x(3.00x3.00)
040+130
Trasnport- 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Stone
KM:
- 2x(3.00x3.00)
040+130
Trasnport
- 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
PVC
KM:
- 2x(3.00x3.00)
Water
040+130
Stop
- 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Scaffholding
KM:
- 2x(3.00x3.00)
040+130 - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Tar
KM:
-Painting
2x(3.00x3.00)
040+130 - 2x(3.00x3.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Excavation
KM:
- (2.00x2.00)
040+030 - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Soil
KM:
- Trasnport
(2.00x2.00)
040+030 - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Lean
KM:
- (2.00x2.00)
040+030
Concrete - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Cement
KM:
- (2.00x2.00)
040+030 - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Cement
KM:
- (2.00x2.00)
040+030
to silo - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Cement
KM:
- (2.00x2.00)
040+030
Transport
- (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Concrete
KM:
- (2.00x2.00)
040+030
Transport
- (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Stone
KM:
- (2.00x2.00)
040+030
Transport
- (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Concasor
KM:
- (2.00x2.00)
040+030 - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Addmixer
KM:
- (2.00x2.00)
040+030 - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Reinforced
KM:
- (2.00x2.00)
040+030
Concrete
- (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Rebar
KM:
- (2.00x2.00)
040+030 - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Rebar
KM:
- (2.00x2.00)
040+030 - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Steel
KM:
- (2.00x2.00)
040+030 - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Steel
KM:
- (2.00x2.00)
040+030
Trasnport- (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
PVC
KM:
- (2.00x2.00)
Water
040+030
Stop
- (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Scaffholding
KM:
- (2.00x2.00)
040+030 - (2.00x2.00)
GO-4.010.1.10.220.C.30.2.2
Box CulvertBox
KM:Culvert
040+030
Tar
KM:
-Painting
(2.00x2.00)
040+030 - (2.00x2.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Structural
KM: 039+030
Earthworks
Excavation
- (7.00x6.00)
& Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Structural
KM: 039+030
Earthworks
Soil- (7.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Lean
KM: 039+030
Concrete
Lean
- (7.00x6.00)
Concrete
GO-4.010.1.10.220.C.30.1.2
Underpass Lean
KM: 039+030
Concrete
Cement
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Lean
KM: 039+030
Concrete
Cement
- (7.00x6.00)
to silo
GO-4.010.1.10.220.C.30.1.2
Underpass Lean
KM: 039+030
Concrete
Cement
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Lean
KM: 039+030
Concrete
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Lean
KM: 039+030
Concrete
Stone
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Lean
KM: 039+030
Concrete
Concasor
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Lean
KM: 039+030
Concrete
Addmixer
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Reinforced
- (7.00x6.00)
Concrete
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Cement
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Rebar
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Rebar
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Cement
- (7.00x6.00)
to silo
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Steel
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Cement
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Steel
- (7.00x6.00)
Trasnport
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Stone
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Concasor
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Addmixer
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
PVC
- (7.00x6.00)
Water Stop
GO-4.010.1.10.220.C.30.1.2
Underpass Elevation
KM: 039+030
Tar- (7.00x6.00)
Painting
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Reinforced
- (7.00x6.00)
Concrete

TASKRSRC

711200C3010187
In Progress3000B ss NU
711200C3010187
In Progress23.014/K ss NU
711200C3010187
In Progress23.015/K ss NU
711200C3010187
In Progress4470 ss NU
711200C3010187
In Progress09.012/K-A ss NU
711200C3010187
In Progress07.006/K- ss NU
711200C3010187
In Progress07.006/K-Dss NU
711200C3010187
In Progress07.006/K-B ss NU
711200C3010187
In Progress07.005/K-K ss NU
711200C3010187
In Progress07.005/K-OK-ss NU
711200C3010187
In Progress04.613/04 ss NU
711200C3010187
In ProgressB-18.501 ss NU
711200C3010187
In Progress21.052 ss NU
711200C3010187
In Progress25.052 ss NU
711200C3010185
In Progress16.134/K-1-A ss NU
711200C3010185
In Progress3000B ss NU
711200C3010185
In Progress23.014/K ss NU
711200C3010185
In Progress23.015/K ss NU
711200C3010185
In Progress4470 ss NU
711200C3010185
In Progress09.012/K-A ss NU
711200C3010185
In Progress07.006/K- ss NU
711200C3010185
In Progress07.006/K-Dss NU
711200C3010185
In Progress07.006/K-B ss NU
711200C3010185
In Progress07.005/K-K ss NU
711200C3010185
In Progress07.005/K-OK-ss NU
711200C3010185
In Progress04.613/04 ss NU
711200C3010185
In ProgressB-18.501 ss NU
711200C3010185
In Progress25.052 ss NU
711200C3000185
In Progress16.134/K-1-A ss NU
711200C3000185
In Progress3000B ss NU
711200C3000185
In Progress23.014/K ss NU
711200C3000185
In Progress23.015/K ss NU
711200C3000185
In Progress4470 ss NU
711200C3000185
In Progress09.012/K-A ss NU
711200C3000185
In Progress07.006/K- ss NU
711200C3000185
In Progress07.006/K-Dss NU
711200C3000185
In Progress07.006/K-B ss NU
711200C3000185
In Progress07.005/K-K ss NU
711200C3000185
In Progress07.005/K-OK-ss NU
711200C3000185
In Progress04.613/04 ss NU
711200C3000185
In ProgressB-18.501 ss NU
711200C3000185
In Progress25.052 ss NU
711200C3000180
In Progress14.111 ss NU
711200C3000180
In Progress07.005/K-KN NU
711200C3000184
In Progress16.100/K-1-A ss NU
711200C3000184
In Progress3000B ss NU
711200C3000184
In Progress4470 ss NU
711200C3000184
In Progress07.006/K- ss NU
711200C3000184
In Progress07.006/K-B ss NU
711200C3000184
In Progress07.005/K-K ss NU
711200C3000184
In Progress07.005/K-OK-ss NU
711200C3000184
In Progress04.613/04 ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 27

GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Cement
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Rebar
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Rebar
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Cement
- (7.00x6.00)
to silo
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Steel
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Cement
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Steel
- (7.00x6.00)
Trasnport
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Stone
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Concasor
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Addmixer
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
PVC
- (7.00x6.00)
Water Stop
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Scaffholding
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Deck
KM: 039+030
Concrete
Tar- (7.00x6.00)
Painting
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Reinforced
Concrete
- (7.00x6.00)
Concrete
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Cement
Concrete
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Rebar
Concrete
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Rebar
Concrete
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Cement
Concrete
- (7.00x6.00)
to silo
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Steel
Concrete
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Cement
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Steel
Concrete
- (7.00x6.00)
Trasnport
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Concrete
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Stone
Concrete
- (7.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Concasor
Concrete
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Addmixer
Concrete
- (7.00x6.00)
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
PVC
Concrete
- (7.00x6.00)
Water Stop
GO-4.010.1.10.220.C.30.1.2
Underpass Foundation
KM: 039+030
Tar
Concrete
- (7.00x6.00)
Painting
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Reinforced
Concrete
- (10.00x6.00)
Concrete
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Cement
Concrete
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Cement
Concrete
- (10.00x6.00)
to silo
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Steel
Concrete
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Cement
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Steel
Concrete
- (10.00x6.00)
Trasnport
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Stone
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Concasor
Concrete
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Addmixer
Concrete
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
PVC
Concrete
- (10.00x6.00)
Water Stop
GO-4.010.1.10.220.C.30.1.1
Underpass Foundation
KM: 040+055
Tar
Concrete
- (10.00x6.00)
Painting
GO-4.010.1.10.220.C.30.1.1
Underpass Structural
KM: 040+055
Earthworks
Excavation
- (10.00x6.00)
& Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Structural
KM: 040+055
Earthworks
Soil- (10.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Lean
KM: 040+055
Concrete
Lean
- (10.00x6.00)
Concrete
GO-4.010.1.10.220.C.30.1.1
Underpass Lean
KM: 040+055
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Lean
KM: 040+055
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.220.C.30.1.1
Underpass Lean
KM: 040+055
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Lean
KM: 040+055
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Lean
KM: 040+055
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Lean
KM: 040+055
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Lean
KM: 040+055
Concrete
Addmixer
- (10.00x6.00)

TASKRSRC

711200C3000186
In Progress16.134/K-1-A ss NU
711200C3000186
In Progress3000B ss NU
711200C3000186
In Progress23.014/K ss NU
711200C3000186
In Progress23.015/K ss NU
711200C3000186
In Progress4470 ss NU
711200C3000186
In Progress09.012/K-A ss NU
711200C3000186
In Progress07.006/K- ss NU
711200C3000186
In Progress07.006/K-Dss NU
711200C3000186
In Progress07.006/K-B ss NU
711200C3000186
In Progress07.005/K-K ss NU
711200C3000186
In Progress07.005/K-OK-ss NU
711200C3000186
In Progress04.613/04 ss NU
711200C3000186
In ProgressB-18.501 ss NU
711200C3000186
In Progress25.052 ss NU
711200C3000187
In Progress07.005/K-OK-ss NU
711200C3000187
In Progress04.613/04 ss NU
711200C3000187
In ProgressB-18.501 ss NU
711200C3000187
In Progress16.134/K-1-A ss NU
711200C3000187
In Progress3000B ss NU
711200C3000187
In Progress23.014/K ss NU
711200C3000187
In Progress23.015/K ss NU
711200C3000187
In Progress4470 ss NU
711200C3000187
In Progress09.012/K-A ss NU
711200C3000187
In Progress07.006/K- ss NU
711200C3000187
In Progress07.006/K-Dss NU
711200C3000187
In Progress07.006/K-B ss NU
711200C3000187
In Progress07.005/K-K ss NU
711200C3000187
In Progress21.052 ss NU
711200C3000187
In Progress25.052 ss NU
711200C1000112
Not Started15.142-A NU
711200C1000112
Not Started07.005/K-R NU
711200C1000112
Not Started2209 NU
711200C1000112
Not Started15.052/5 NU
711200C1000112
Not Started07.004/K NU
711200C1000112
Not Started07.005/K NU
711200C1000111
Not Started15.142-A NU
711200C1000111
Not Started07.005/K-R NU
711200C1000111
Not Started2209 NU
711200C1000111
Not Started15.052/5 NU
711200C1000111
Not Started07.004/K NU
711200C1000111
Not Started07.005/K NU
711200C1000120
Not Started2500/A NU
711200C1000120
Not Started2500/B NU
711200C1000120
Not Started2500/C NU
711200C1000121
Not Started2500/A NU
711200C1000121
Not Started2500/B NU
711200C1000121
Not Started2500/C NU
711200C1000110
In Progress15.142-A NU
711200C1000110
In Progress07.005/K-R NU
711200C1000110
In Progress2209 NU
711200C1000110
In Progress15.052/5 NU
711200C1000110
In Progress07.004/K NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 28

GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Cement
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Rebar
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Rebar
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Steel
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Concasor
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Addmixer
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.220.C.30.1.1
Underpass Elevation
KM: 040+055
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Steel
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Scaffholding
- (10.00x6.00)
GO-4.010.1.10.220.C.30.1.1
Underpass Deck
KM: 040+055
Concrete
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+000
Loading
- 38+800
and Laying
Phase /w
3 machine
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+000
Ropriz
- 38+800 Phase 3
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+000
Damping
- 38+800
down
Phase
and compacting
3
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+000
Compacting
- 38+800 Phase 3
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+000
transporting
- 38+800the
Phase
excav.
3 soil
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+000
Traspor.
- 38+800
Of water
Phase 3
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
Loading
- 40+300
and Laying
Phase /w
2 machine
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
Ropriz
- 40+300 Phase 2
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
Damping
- 40+300
down
Phase
and compacting
2
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
Compacting
- 40+300 Phase 2
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
transporting
- 40+300the
Phase
excav.
2 soil
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
Traspor.
- 40+300
Of water
Phase 2
GO-4.010.1.10.220.C.10
Earthworks Subgrade Preparation
Reglaj
KM:38+800 - 40+300
GO-4.010.1.10.220.C.10
Earthworks Subgrade Preparation
Reglaj
KM:38+800 - 40+300
GO-4.010.1.10.220.C.10
Earthworks Subgrade Preparation
Reglaj
KM:38+800 - 40+300
GO-4.010.1.10.220.C.10
Earthworks Subgrade Preparation
Reglaj
KM:38+300 - 38+800
GO-4.010.1.10.220.C.10
Earthworks Subgrade Preparation
Reglaj
KM:38+300 - 38+800
GO-4.010.1.10.220.C.10
Earthworks Subgrade Preparation
Reglaj
KM:38+300 - 38+800
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
Loading
- 40+300
and Laying
Phase /w
1 machine
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
Ropriz
- 40+300 Phase 1
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
Damping
- 40+300
down
Phase
and compacting
1
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
Compacting
- 40+300 Phase 1
GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
transporting
- 40+300the
Phase
excav.
1 soil

TASKRSRC

711200C1000110
In Progress07.005/K NU
711200C1000092
In ProgressZEL - 8 Geo NU
711200C1000092
In Progress2202 Geo NU
711200C1000092
In Progress2209 Geo NU
711200C1000092
In Progress07.005/K-KD Geo NU
711200C1000092
In Progress07.006/K-K Geo NU
711200C1000100
In Progress07.005/K-A NU
711200C1000100
In Progress2200 NU
711200C1000100
In Progress2204 NU
711200C1000100
In Progress2202 NU
711200C1000100
In Progress2240 NU
711200C1000100
In Progress2240/1 NU
711200C1000100
In Progress07.005/K-1 NU
711200C5000266
Not StartedL2.2 DC NU
711200C5000266
Not StartedSW-3 NU
711200C5000266
Not StartedMiscellaneous NU
711200C5000260
In ProgressDisplacement NU
711190C1000112
Not Started15.142-A NU
711190C1000112
Not Started07.005/K-R NU
711190C1000112
Not Started2209 NU
711190C1000112
Not Started15.052/5 NU
711190C1000112
Not Started07.004/K NU
711190C1000112
Not Started07.005/K NU
711190C1000113
Not Started15.142-A NU
711190C1000113
Not Started07.005/K-R NU
711190C1000113
Not Started2209 NU
711190C1000113
Not Started15.052/5 NU
711190C1000113
Not Started07.004/K NU
711190C1000113
Not Started07.005/K NU
711190C1000121
Not Started2500/A NU
711190C1000121
Not Started2500/B NU
711190C1000121
Not Started2500/C NU
711190C1000110
In Progress15.142-A NU
711190C1000110
In Progress07.005/K-R NU
711190C1000110
In Progress2209 NU
711190C1000110
In Progress15.052/5 NU
711190C1000110
In Progress07.004/K NU
711190C1000110
In Progress07.005/K NU
711190C1000122
Not Started2500/A NU
711190C1000122
Not Started2500/B NU
711190C1000122
Not Started2500/C NU
711190C1000100
In Progress07.005/K-A NU
711190C1000100
In Progress2200 NU
711190C1000100
In Progress2204 NU
711190C1000100
In Progress2202 NU
711190C1000100
In Progress2240 NU
711190C1000100
In Progress2240/1 NU
711190C1000100
In Progress07.005/K-1 NU
711190C1000101
In Progress07.005/K-A NU
711190C1000101
In Progress2200 NU
711190C1000101
In Progress2204 NU
711190C1000101
In Progress2202 NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 29

GO-4.010.1.10.220.C.10
Earthworks Fill KM:38+800
Traspor.
- 40+300
Of water
Phase 1
GO-4.010.1.10.220.C.10
Earthworks Rock Fill KM:
Krmata
40+075 hazrla
- 40+300
ser
GO-4.010.1.10.220.C.10
Earthworks Rock Fill KM:
(New
40+075
Resource)
- 40+300
GO-4.010.1.10.220.C.10
Earthworks Rock Fill KM:
(New
40+075
Resource)
- 40+300
GO-4.010.1.10.220.C.10
Earthworks Rock Fill KM:
Rock
40+075
Transport
- 40+300
GO-4.010.1.10.220.C.10
Earthworks Rock Fill KM:
Krmata
40+075 Nakli
- 40+300
GO-4.010.1.10.220.C.10
Earthworks Excavation Transportation
& Transport of material from bor
GO-4.010.1.10.220.C.10
Earthworks Excavation Excavation
& Transport
GO-4.010.1.10.220.C.10
Earthworks Excavation Excavation
& Transportand use of unsuitable m
GO-4.010.1.10.220.C.10
Earthworks Excavation Excavation
& Transportand use of material from
GO-4.010.1.10.220.C.10
Earthworks Excavation Cutting
& Transport
the trees
GO-4.010.1.10.220.C.10
Earthworks Excavation Removing
& Transport
the roots
GO-4.010.1.10.220.C.10
Earthworks Excavation Forwarding
& Transportthe soil to the stock are
GO-4.010.1.10.220.C.50
Ancillary and
Miscellaneous
Other Works
Direct Cost
GO-4.010.1.10.220.C.50
Ancillary and
Miscellaneous
Other Works
Secondary Works
GO-4.010.1.10.220.C.50
Ancillary and
Miscellaneous
Other Works
Miscellaneous
GO-4.010.1.10.220.C.50
Ancillary and
Service
Other Displacements
Works
Displacement
GO-4.010.1.10.210.C.10
Earthworks Fill KM:37+000
Loading
- 38+000
and Laying
Phase /w
4 machine
GO-4.010.1.10.210.C.10
Earthworks Fill KM:37+000
Ropriz
- 38+000 Phase 4
GO-4.010.1.10.210.C.10
Earthworks Fill KM:37+000
Damping
- 38+000
down
Phase
and compacting
4
GO-4.010.1.10.210.C.10
Earthworks Fill KM:37+000
Compacting
- 38+000 Phase 4
GO-4.010.1.10.210.C.10
Earthworks Fill KM:37+000
transporting
- 38+000the
Phase
excav.
4 soil
GO-4.010.1.10.210.C.10
Earthworks Fill KM:37+000
Traspor.
- 38+000
Of water
Phase 4
GO-4.010.1.10.210.C.10
Earthworks Fill KM:38+000
Loading
- 38+300
and Laying
Phase /w
3 machine
GO-4.010.1.10.210.C.10
Earthworks Fill KM:38+000
Ropriz
- 38+300 Phase 3
GO-4.010.1.10.210.C.10
Earthworks Fill KM:38+000
Damping
- 38+300
down
Phase
and compacting
3
GO-4.010.1.10.210.C.10
Earthworks Fill KM:38+000
Compacting
- 38+300 Phase 3
GO-4.010.1.10.210.C.10
Earthworks Fill KM:38+000
transporting
- 38+300the
Phase
excav.
3 soil
GO-4.010.1.10.210.C.10
Earthworks Fill KM:38+000
Traspor.
- 38+300
Of water
Phase 3
GO-4.010.1.10.210.C.10
Earthworks Subgrade Preparation
Reglaj
KM:38+000 - 38+300
GO-4.010.1.10.210.C.10
Earthworks Subgrade Preparation
Reglaj
KM:38+000 - 38+300
GO-4.010.1.10.210.C.10
Earthworks Subgrade Preparation
Reglaj
KM:38+000 - 38+300
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
Loading
- 38+300
and Laying
Phase /w
1 machine
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
Ropriz
- 38+300 Phase 1
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
Damping
- 38+300
down
Phase
and compacting
1
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
Compacting
- 38+300 Phase 1
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
transporting
- 38+300the
Phase
excav.
1 soil
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
Traspor.
- 38+300
Of water
Phase 1
GO-4.010.1.10.210.C.10
Earthworks Subgrade Preparation
Reglaj
GO-4.010.1.10.210.C.10
Earthworks Subgrade Preparation
Reglaj
GO-4.010.1.10.210.C.10
Earthworks Subgrade Preparation
Reglaj
GO-4.010.1.10.210.C.10
Earthworks Excavation Transportation
& Transport Phase
of material
1
from bor
GO-4.010.1.10.210.C.10
Earthworks Excavation Excavation
& Transport Phase 1
GO-4.010.1.10.210.C.10
Earthworks Excavation Excavation
& Transportand
Phase
use1of unsuitable m
GO-4.010.1.10.210.C.10
Earthworks Excavation Excavation
& Transportand
Phase
use1of material from
GO-4.010.1.10.210.C.10
Earthworks Excavation Cutting
& Transport
the trees
Phase 1
GO-4.010.1.10.210.C.10
Earthworks Excavation Removing
& Transport
the
Phase
roots 1
GO-4.010.1.10.210.C.10
Earthworks Excavation Forwarding
& Transportthe
Phase
soil to
1 the stock are
GO-4.010.1.10.210.C.10
Earthworks Excavation Transportation
& Transport Phase
of material
2
from bor
GO-4.010.1.10.210.C.10
Earthworks Excavation Excavation
& Transport Phase 2
GO-4.010.1.10.210.C.10
Earthworks Excavation Excavation
& Transportand
Phase
use2of unsuitable m
GO-4.010.1.10.210.C.10
Earthworks Excavation Excavation
& Transportand
Phase
use2of material from

TASKRSRC

711190C1000101
In Progress2240 NU
711190C1000101
In Progress2240/1 NU
711190C1000101
In Progress07.005/K-1 NU
711190C1000102
In Progress07.005/K-A NU
711190C1000102
In Progress2200 NU
711190C1000102
In Progress2204 NU
711190C1000102
In Progress2202 NU
711190C1000102
In Progress2240 NU
711190C1000102
In Progress2240/1 NU
711190C1000102
In Progress07.005/K-1 NU
711190C1000120
Not Started2500/A NU
711190C1000120
Not Started2500/B NU
711190C1000120
Not Started2500/C NU
711190C1000111
Not Started15.142-A NU
711190C1000111
Not Started07.005/K-R NU
711190C1000111
Not Started2209 NU
711190C1000111
Not Started15.052/5 NU
711190C1000111
Not Started07.004/K NU
711190C1000111
Not Started07.005/K NU
711190C4000220
Not Started2541 NU
711190C4000220
Not StartedPlanting Tree NU
711190C4500241
Not StartedPark Area NU
711190C4500240
Not StartedPark Area NU
711190C5000266
Not StartedL2.2 DC NU
711190C5000266
Not StartedSW-3 NU
711190C5000266
Not StartedMiscellaneous NU
711190C5000260
In ProgressDisplacement NU
711190C9500306
Not StartedL2.2 DC NU
711190C3010187
Not Started21.051 ss NU
711190C3010187
Not Started21.052 ss NU
711190C3010187
Not Started25.052 ss NU
711190C3010187
Not Started16.134/K-1-A ss NU
711190C3010187
Not Started3000B ss NU
711190C3010187
Not Started23.014/K ss NU
711190C3010187
Not Started4470 ss NU
711190C3010187
Not Started09.012/K-A ss NU
711190C3010187
Not Started07.006/K- ss NU
711190C3010187
Not Started07.006/K-Dss NU
711190C3010187
Not Started07.006/K-B ss NU
711190C3010187
Not Started07.005/K-K ss NU
711190C3010187
Not Started07.005/K-OK-ss NU
711190C3010187
Not Started04.613/04 ss NU
711190C3010187
Not StartedB-18.501 ss NU
711190C3010187
Not Started23.015/K ss NU
711190C3010180
Not Started14.111 ss NU
711190C3010180
Not Started07.005/K-KN NU
711190C3010184
Not Started16.100/K-1-A ss NU
711190C3010184
Not Started3000B ss NU
711190C3010184
Not Started4470 ss NU
711190C3010184
Not Started07.006/K- ss NU
711190C3010184
Not Started07.006/K-B ss NU
711190C3010184
Not Started07.005/K-K ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 30

GO-4.010.1.10.210.C.10
Earthworks Excavation Cutting
& Transport
the trees
Phase 2
GO-4.010.1.10.210.C.10
Earthworks Excavation Removing
& Transport
the
Phase
roots 2
GO-4.010.1.10.210.C.10
Earthworks Excavation Forwarding
& Transportthe
Phase
soil to
2 the stock are
GO-4.010.1.10.210.C.10
Earthworks Excavation Transportation
& Transport Phase
of material
3
from bor
GO-4.010.1.10.210.C.10
Earthworks Excavation Excavation
& Transport Phase 3
GO-4.010.1.10.210.C.10
Earthworks Excavation Excavation
& Transportand
Phase
use3of unsuitable m
GO-4.010.1.10.210.C.10
Earthworks Excavation Excavation
& Transportand
Phase
use3of material from
GO-4.010.1.10.210.C.10
Earthworks Excavation Cutting
& Transport
the trees
Phase 3
GO-4.010.1.10.210.C.10
Earthworks Excavation Removing
& Transport
the
Phase
roots 3
GO-4.010.1.10.210.C.10
Earthworks Excavation Forwarding
& Transportthe
Phase
soil to
3 the stock are
GO-4.010.1.10.210.C.10
Earthworks Subgrade Preparation
Reglaj
KM:36+000 - 37+000
GO-4.010.1.10.210.C.10
Earthworks Subgrade Preparation
Reglaj
KM:36+000 - 37+000
GO-4.010.1.10.210.C.10
Earthworks Subgrade Preparation
Reglaj
KM:36+000 - 37+000
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
Loading
- 37+000
and Laying
Phase /w
2 machine
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
Ropriz
- 37+000 Phase 2
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
Damping
- 37+000
down
Phase
and compacting
2
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
Compacting
- 37+000 Phase 2
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
transporting
- 37+000the
Phase
excav.
2 soil
GO-4.010.1.10.210.C.10
Earthworks Fill KM:36+000
Traspor.
- 37+000
Of water
Phase 2
GO-4.010.1.10.210.C.40
Recreation Landscape
Areas
Excavation
GO-4.010.1.10.210.C.40
Recreation Landscape
Areas
Plantting Tree
GO-4.010.1.10.210.C.45
Service & Park
Parking
Areas
Area
Parking Area
GO-4.010.1.10.210.C.45
Service & Park
Service
Areas
Area
Parking Area
GO-4.010.1.10.210.C.50
Ancillary and
Miscellaneous
Other Works
Direct Cost
GO-4.010.1.10.210.C.50
Ancillary and
Miscellaneous
Other Works
Secondary Works
GO-4.010.1.10.210.C.50
Ancillary and
Miscellaneous
Other Works
Miscellaneous
GO-4.010.1.10.210.C.50
Ancillary and
Service
Other Displacements
Works
Displacement
GO-4.010.1.10.210.C.95
Pavement &Other
Finishing
Works
Works
Direct
(Out Cost
of Scope)
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Scaffholding
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Scaffholding
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Steel
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.210.C.30.1.2
Underpass Deck
KM: 036+615
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Structural
KM: 036+615
Earthworks
Excavation
- (10.00x6.00)
& Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Structural
KM: 036+615
Earthworks
Soil- (10.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Lean
KM: 036+615
Concrete
Lean
- (10.00x6.00)
Concrete
GO-4.010.1.10.210.C.30.1.2
Underpass Lean
KM: 036+615
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Lean
KM: 036+615
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.210.C.30.1.2
Underpass Lean
KM: 036+615
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Lean
KM: 036+615
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Lean
KM: 036+615
Concrete
Stone
- (10.00x6.00)
Transport

TASKRSRC

711190C3010184
Not Started07.005/K-OK-ss NU
711190C3010184
Not Started04.613/04 ss NU
711190C3010185
Not Started25.052 ss NU
711190C3010185
Not Started16.134/K-1-A ss NU
711190C3010185
Not Started3000B ss NU
711190C3010185
Not Started23.014/K ss NU
711190C3010185
Not Started23.015/K ss NU
711190C3010185
Not Started4470 ss NU
711190C3010185
Not Started09.012/K-A ss NU
711190C3010185
Not Started07.006/K- ss NU
711190C3010185
Not Started07.006/K-Dss NU
711190C3010185
Not Started07.006/K-B ss NU
711190C3010185
Not Started07.005/K-K ss NU
711190C3010185
Not Started07.005/K-OK-ss NU
711190C3010185
Not Started04.613/04 ss NU
711190C3010185
Not StartedB-18.501 ss NU
711190C3010186
Not Started25.052 ss NU
711190C3010186
Not Started16.134/K-1-A ss NU
711190C3010186
Not Started3000B ss NU
711190C3010186
Not Started23.014/K ss NU
711190C3010186
Not Started23.015/K ss NU
711190C3010186
Not Started4470 ss NU
711190C3010186
Not Started09.012/K-A ss NU
711190C3010186
Not Started07.006/K- ss NU
711190C3010186
Not Started07.006/K-Dss NU
711190C3010186
Not Started07.006/K-B ss NU
711190C3010186
Not Started07.005/K-K ss NU
711190C3010186
Not Started07.005/K-OK-ss NU
711190C3010186
Not Started04.613/04 ss NU
711190C3010186
Not StartedB-18.501 ss NU
711190C3000187
In Progress25.052 ss NU
711190C3000187
In Progress16.134/K-1-A ss NU
711190C3000187
In Progress3000B ss NU
711190C3000187
In Progress23.014/K ss NU
711190C3000187
In Progress23.015/K ss NU
711190C3000187
In Progress4470 ss NU
711190C3000187
In Progress09.012/K-A ss NU
711190C3000187
In Progress07.006/K- ss NU
711190C3000187
In Progress07.006/K-Dss NU
711190C3000187
In Progress07.006/K-B ss NU
711190C3000187
In Progress07.005/K-K ss NU
711190C3000187
In Progress07.005/K-OK-ss NU
711190C3000187
In Progress04.613/04 ss NU
711190C3000187
In ProgressB-18.501 ss NU
711190C3000187
In Progress21.051 ss NU
711190C3000180
In Progress14.110 ss NU
711190C3000180
In Progress14.111 ss NU
711190C3000180
In Progress07.005/K-KN NU
711190C3000184
In Progress16.100/K-1-A ss NU
711190C3000184
In Progress3000B ss NU
711190C3000184
In Progress4470 ss NU
711190C3000184
In Progress07.006/K- ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 31

GO-4.010.1.10.210.C.30.1.2
Underpass Lean
KM: 036+615
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Lean
KM: 036+615
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Tar
Concrete
- (10.00x6.00)
Painting
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Reinforced
Concrete
- (10.00x6.00)
Concrete
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Cement
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Cement
Concrete
- (10.00x6.00)
to silo
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Steel
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Cement
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Steel
Concrete
- (10.00x6.00)
Trasnport
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Stone
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Concasor
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
Addmixer
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Foundation
KM: 036+615
PVC
Concrete
- (10.00x6.00)
Water Stop
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Cement
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Rebar
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Rebar
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Steel
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Concasor
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
Addmixer
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.2
Underpass Elevation
KM: 036+615
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Tar- (5.00x5.00)
Painting
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Reinforced
- (5.00x5.00)
Concrete
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Cement
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Rebar
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Rebar
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Cement
- (5.00x5.00)
to silo
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Steel
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Cement
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Steel
- (5.00x5.00)
Trasnport
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Stone
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Concasor
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Addmixer
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
PVC
- (5.00x5.00)
Water Stop
GO-4.010.1.10.210.C.30.1.3
Underpass Deck
KM: 036+160
Concrete
Scaffholding
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Structural
KM: 036+160
Earthworks
Excavation
- (5.00x5.00)
& Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Structural
KM: 036+160
Earthworks
Excavation
- (5.00x5.00)
& Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Structural
KM: 036+160
Earthworks
Soil- (5.00x5.00)
Trasnport
& Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Lean
KM: 036+160
Concrete
Lean
- (5.00x5.00)
Concrete
GO-4.010.1.10.210.C.30.1.3
Underpass Lean
KM: 036+160
Concrete
Cement
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Lean
KM: 036+160
Concrete
Cement
- (5.00x5.00)
to silo
GO-4.010.1.10.210.C.30.1.3
Underpass Lean
KM: 036+160
Concrete
Cement
- (5.00x5.00)
Transport

TASKRSRC

711190C3000184
In Progress07.006/K-B ss NU
711190C3000184
In Progress07.005/K-K ss NU
711190C3000184
In Progress07.005/K-OK-ss NU
711190C3000184
In Progress04.613/04 ss NU
711190C3000185
In Progress25.052 ss NU
711190C3000185
In Progress16.134/K-1-A ss NU
711190C3000185
In Progress3000B ss NU
711190C3000185
In Progress23.014/K ss NU
711190C3000185
In Progress23.015/K ss NU
711190C3000185
In Progress4470 ss NU
711190C3000185
In Progress09.012/K-A ss NU
711190C3000185
In Progress07.006/K- ss NU
711190C3000185
In Progress07.006/K-Dss NU
711190C3000185
In Progress07.006/K-B ss NU
711190C3000185
In Progress07.005/K-K ss NU
711190C3000185
In Progress07.005/K-OK-ss NU
711190C3000185
In Progress04.613/04 ss NU
711190C3000185
In ProgressB-18.501 ss NU
711190C3000186
In Progress25.052 ss NU
711190C3000186
In Progress16.134/K-1-A ss NU
711190C3000186
In Progress3000B ss NU
711190C3000186
In Progress23.014/K ss NU
711190C3000186
In Progress23.015/K ss NU
711190C3000186
In Progress4470 ss NU
711190C3000186
In Progress09.012/K-A ss NU
711190C3000186
In Progress07.006/K- ss NU
711190C3000186
In Progress07.006/K-Dss NU
711190C3000186
In Progress07.006/K-B ss NU
711190C3000186
In Progress07.005/K-K ss NU
711190C3000186
In Progress07.005/K-OK-ss NU
711190C3000186
In Progress04.613/04 ss NU
711190C3000186
In ProgressB-18.501 ss NU
711190C3020187
Not Started25.052 ss NU
711190C3020187
Not Started16.134/K-1-A ss NU
711190C3020187
Not Started3000B ss NU
711190C3020187
Not Started23.014/K ss NU
711190C3020187
Not Started23.015/K ss NU
711190C3020187
Not Started4470 ss NU
711190C3020187
Not Started09.012/K-A ss NU
711190C3020187
Not Started07.006/K- ss NU
711190C3020187
Not Started07.006/K-Dss NU
711190C3020187
Not Started07.006/K-B ss NU
711190C3020187
Not Started07.005/K-K ss NU
711190C3020187
Not Started07.005/K-OK-ss NU
711190C3020187
Not Started04.613/04 ss NU
711190C3020187
Not StartedB-18.501 ss NU
711190C3020187
Not Started21.052 ss NU
711190C3020180
Not Started14.111 ss NU
711190C3020180
Not Started07.005/K-KN NU
711190C3020186
Not Started25.052 ss NU
711190C3020186
Not Started07.006/K- ss NU
711190C3020186
Not Started07.006/K-Dss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 32

GO-4.010.1.10.210.C.30.1.3
Underpass Lean
KM: 036+160
Concrete
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Lean
KM: 036+160
Concrete
Stone
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Lean
KM: 036+160
Concrete
Concasor
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Lean
KM: 036+160
Concrete
Addmixer
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Tar
Concrete
- (5.00x5.00)
Painting
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Reinforced
Concrete
- (5.00x5.00)
Concrete
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Cement
Concrete
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Rebar
Concrete
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Rebar
Concrete
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Cement
Concrete
- (5.00x5.00)
to silo
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Steel
Concrete
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Cement
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Steel
Concrete
- (5.00x5.00)
Trasnport
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Concrete
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Stone
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Concasor
Concrete
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
Addmixer
Concrete
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Foundation
KM: 036+160
PVC
Concrete
- (5.00x5.00)
Water Stop
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Tar- (5.00x5.00)
Painting
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Reinforced
- (5.00x5.00)
Concrete
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Cement
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Rebar
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Rebar
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Cement
- (5.00x5.00)
to silo
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Steel
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Cement
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Steel
- (5.00x5.00)
Trasnport
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Concrete
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Stone
- (5.00x5.00)
Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Concasor
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
Addmixer
- (5.00x5.00)
GO-4.010.1.10.210.C.30.1.3
Underpass Elevation
KM: 036+160
PVC
- (5.00x5.00)
Water Stop
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Rebar
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Steel
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Steel
- (10.00x6.00)
Trasnport
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.210.C.30.1.4
Underpass Deck
KM: 037+906
Concrete
Scaffholding
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Structural
KM: 037+906
Earthworks
Excavation
- (10.00x6.00)
& Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Structural
KM: 037+906
Earthworks
Soil- (10.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Tar- (10.00x6.00)
Painting
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Steel
- (10.00x6.00)
Trasnport

TASKRSRC

711190C3020186
Not Started07.006/K-B ss NU
711190C3020186
Not Started07.005/K-K ss NU
711190C3020186
Not Started07.005/K-OK-ss NU
711190C3020186
Not Started04.613/04 ss NU
711190C3020186
Not StartedB-18.501 ss NU
711190C3020186
Not Started16.134/K-1-A ss NU
711190C3020186
Not Started3000B ss NU
711190C3020186
Not Started23.014/K ss NU
711190C3020186
Not Started23.015/K ss NU
711190C3020186
Not Started4470 ss NU
711190C3020186
Not Started09.012/K-A ss NU
711190C3020184
Not Started16.100/K-1-A ss NU
711190C3020184
Not Started3000B ss NU
711190C3020184
Not Started4470 ss NU
711190C3020184
Not Started07.006/K- ss NU
711190C3020184
Not Started07.006/K-B ss NU
711190C3020184
Not Started07.005/K-K ss NU
711190C3020184
Not Started07.005/K-OK-ss NU
711190C3020184
Not Started04.613/04 ss NU
711190C3020185
Not Started25.052 ss NU
711190C3020185
Not Started16.134/K-1-A ss NU
711190C3020185
Not Started3000B ss NU
711190C3020185
Not Started23.014/K ss NU
711190C3020185
Not Started23.015/K ss NU
711190C3020185
Not Started4470 ss NU
711190C3020185
Not Started09.012/K-A ss NU
711190C3020185
Not Started07.006/K- ss NU
711190C3020185
Not Started07.006/K-Dss NU
711190C3020185
Not Started07.006/K-B ss NU
711190C3020185
Not Started07.005/K-K ss NU
711190C3020185
Not Started07.005/K-OK-ss NU
711190C3020185
Not Started04.613/04 ss NU
711190C3020185
Not StartedB-18.501 ss NU
711190C3070185
In Progress25.052 ss NU
711190C3070185
In Progress16.131/K-1-A ss NU
711190C3070185
In Progress3000B ss NU
711190C3070185
In Progress23.014/K ss NU
711190C3070185
In Progress23.015/K ss NU
711190C3070185
In Progress4470 ss NU
711190C3070185
In Progress09.012/K-A ss NU
711190C3070185
In Progress07.006/K- ss NU
711190C3070185
In Progress07.006/K-Dss NU
711190C3070185
In Progress07.006/K-B ss NU
711190C3070185
In Progress07.005/K-K ss NU
711190C3070185
In Progress07.005/K-OK-ss NU
711190C3070185
In Progress04.613/04 ss NU
711190C3070185
In ProgressB-18.501 ss NU
711190C3070184
In Progress16.100/K-1-A ss NU
711190C3070184
In Progress3000B ss NU
711190C3070184
In Progress4470 ss NU
711190C3070184
In Progress07.006/K- ss NU
711190C3070184
In Progress07.006/K-B ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 33

GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Concasor
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Addmixer
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
PVC
- (10.00x6.00)
Water Stop
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Reinforced
- (10.00x6.00)
Concrete
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Cement
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Rebar
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Rebar
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.210.C.30.1.4
Underpass Elevation
KM: 037+906
Steel
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Lean
KM: 037+906
Concrete
Lean
- (10.00x6.00)
Concrete
GO-4.010.1.10.210.C.30.1.4
Underpass Lean
KM: 037+906
Concrete
Cement
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Lean
KM: 037+906
Concrete
Cement
- (10.00x6.00)
to silo
GO-4.010.1.10.210.C.30.1.4
Underpass Lean
KM: 037+906
Concrete
Cement
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Lean
KM: 037+906
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Lean
KM: 037+906
Concrete
Stone
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Lean
KM: 037+906
Concrete
Concasor
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Lean
KM: 037+906
Concrete
Addmixer
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Tar
Concrete
- (10.00x6.00)
Painting
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Reinforced
Concrete
- (10.00x6.00)
Concrete
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Cement
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Rebar
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Cement
Concrete
- (10.00x6.00)
to silo
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Steel
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Cement
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Steel
Concrete
- (10.00x6.00)
Trasnport
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Concrete
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Stone
Concrete
- (10.00x6.00)
Transport
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Concasor
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
Addmixer
Concrete
- (10.00x6.00)
GO-4.010.1.10.210.C.30.1.4
Underpass Foundation
KM: 037+906
PVC
Concrete
- (10.00x6.00)
Water Stop
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Tar
Concrete
KM:
Painting
036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Reinforced
Concrete
KM: 036+300
Concrete
- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Rebar
Concrete
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Rebar
Concrete
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 036+300
to silo
- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Steel
Concrete
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Cement
Concrete
KM: 036+300
Transport- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Steel
Concrete
KM:
Trasnport
036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Concrete
Concrete
KM: 036+300
Transport
- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Stone
Concrete
KM:
Transport
036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Concasor
Concrete
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
Addmixer
Concrete
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Foundation
Channel
PVC
Concrete
KM:
Water
036+300
Stop - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Lean
KM:
Concrete
036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Cement
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Cement
KM: 036+300
to silo
- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Cement
KM: 036+300
Transport- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Concrete
KM: 036+300
Transport
- (7.00x7.00)

TASKRSRC

711190C3070184
In Progress07.005/K-K ss NU
711190C3070184
In Progress07.005/K-OK-ss NU
711190C3070184
In Progress04.613/04 ss NU
711190C3070186
In Progress25.052 ss NU
711190C3070186
In Progress16.131/K-1-A ss NU
711190C3070186
In Progress3000B ss NU
711190C3070186
In Progress23.014/K ss NU
711190C3070186
In Progress23.015/K ss NU
711190C3070186
In Progress4470 ss NU
711190C3070186
In Progress09.012/K-A ss NU
711190C3070186
In Progress07.006/K- ss NU
711190C3070186
In Progress07.006/K-B ss NU
711190C3070186
In Progress07.005/K-K ss NU
711190C3070186
In Progress07.005/K-OK-ss NU
711190C3070186
In Progress04.613/04 ss NU
711190C3070186
In ProgressB-18.501 ss NU
711190C3070186
In Progress07.006/K-Dss NU
711190C3070180
In Progress14.111 ss NU
711190C3070180
In Progress07.005/K-KN NU
711190C3050182
Not Started25.052 ss NU
711190C3050182
Not Started07.005/K-KN ss NU
711190C3050182
Not Started16.100/K-1-A ss NU
711190C3050182
Not Started3000B ss NU
711190C3050182
Not Started4470 ss NU
711190C3050182
Not Started07.006/K- ss NU
711190C3050182
Not Started07.006/K-B ss NU
711190C3050182
Not Started07.005/K-K ss NU
711190C3050182
Not Started07.005/K-OK-ss NU
711190C3050182
Not Started04.613/04 ss NU
711190C3050182
Not Started16.134/K-1-A ss NU
711190C3050182
Not Started23.014/K ss NU
711190C3050182
Not Started23.015/K ss NU
711190C3050182
Not Started09.012/K-A ss NU
711190C3050182
Not Started07.006/K-D NU
711190C3050182
Not StartedB-18.501 ss NU
711190C3050182
Not Started21.051 ss NU
711190C3050182
Not Started14.111 ss NU
711190C3060182
Not Started25.052 ss NU
711190C3060182
Not Started14.111 ss NU
711190C3060182
Not Started07.005/K-KN ss NU
711190C3060182
Not Started16.100/K-1-A ss NU
711190C3060182
Not Started4470 ss NU
711190C3060182
Not Started07.006/K- ss NU
711190C3060182
Not Started07.006/K-B ss NU
711190C3060182
Not Started07.005/K-K ss NU
711190C3060182
Not Started07.005/K-OK-ss NU
711190C3060182
Not Started04.613/04 ss NU
711190C3060182
Not Started16.134/K-1-A ss NU
711190C3060182
Not Started23.014/K ss NU
711190C3060182
Not Started23.015/K ss NU
711190C3060182
Not Started09.012/K-A ss NU
711190C3060182
Not Started07.006/K-D NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 34

GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Stone
KM:
Transport
036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Concasor
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Lean Concrete
Channel
Addmixer
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Tar KM:
Painting
036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Reinforced
KM: 036+300
Concrete
- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Cement
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Rebar
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Rebar
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Cement
KM: 036+300
to silo
- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Steel
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Cement
KM: 036+300
Transport- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Concrete
KM: 036+300
Transport
- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Stone
KM:
Transport
036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Concasor
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Addmixer
KM: 036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
PVCKM:
Water
036+300
Stop - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Elevation
Channel
Steel
KM:
Trasnport
036+300 - (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Structural
Channel
Earthworks
Excavation
KM: 036+300
& Transport
- (7.00x7.00)
GO-4.010.1.10.210.C.30.3.1
U Type Concrete
Structural
Channel
Earthworks
SoilKM:
Trasnport
036+300
& Transport
- (7.00x7.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Tar
KM:
-Painting
(1.50x2.00)
037+100 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Soil
KM:
- Trasnport
(1.50x2.00)
037+100 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Lean
KM:
- (1.50x2.00)
037+100
Concrete - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Cement
KM:
- (1.50x2.00)
037+100 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Cement
KM:
- (1.50x2.00)
037+100
to silo - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Cement
KM:
- (1.50x2.00)
037+100
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Concrete
KM:
- (1.50x2.00)
037+100
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Stone
KM:
- (1.50x2.00)
037+100
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Concasor
KM:
- (1.50x2.00)
037+100 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Addmixer
KM:
- (1.50x2.00)
037+100 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Reinforced
KM:
- (1.50x2.00)
037+100
Concrete
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Rebar
KM:
- (1.50x2.00)
037+100 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Rebar
KM:
- (1.50x2.00)
037+100 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Steel
KM:
- (1.50x2.00)
037+100 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Steel
KM:
- (1.50x2.00)
037+100
Trasnport- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
PVC
KM:
- (1.50x2.00)
Water
037+100
Stop
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Scaffholding
KM:
- (1.50x2.00)
037+100 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.3
Box CulvertBox
KM:Culvert
037+100
Excavation
KM:
- (1.50x2.00)
037+100 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Tar
KM:
-Painting
(1.50x2.00)
037+800 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Excavation
KM:
- (1.50x2.00)
037+800 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Soil
KM:
- Trasnport
(1.50x2.00)
037+800 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Lean
KM:
- (1.50x2.00)
037+800
Concrete - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Cement
KM:
- (1.50x2.00)
037+800
to silo - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Cement
KM:
- (1.50x2.00)
037+800
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Concrete
KM:
- (1.50x2.00)
037+800
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Stone
KM:
- (1.50x2.00)
037+800
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Concasor
KM:
- (1.50x2.00)
037+800 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Addmixer
KM:
- (1.50x2.00)
037+800 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Reinforced
KM:
- (1.50x2.00)
037+800
Concrete
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Rebar
KM:
- (1.50x2.00)
037+800 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Rebar
KM:
- (1.50x2.00)
037+800 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Steel
KM:
- (1.50x2.00)
037+800 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Steel
KM:
- (1.50x2.00)
037+800
Trasnport- (1.50x2.00)

TASKRSRC

711190C3060182
Not StartedB-18.501 ss NU
711190C3060182
Not Started21.051 ss NU
711190C3060182
Not Started3000B ss NU
711190C3040182
In Progress25.052 ss NU
711190C3040182
In Progress14.111 ss NU
711190C3040182
In Progress07.005/K-KN ss NU
711190C3040182
In Progress16.100/K-1-A ss NU
711190C3040182
In Progress3000B ss NU
711190C3040182
In Progress4470 ss NU
711190C3040182
In Progress07.006/K- ss NU
711190C3040182
In Progress07.006/K-B ss NU
711190C3040182
In Progress07.005/K-K ss NU
711190C3040182
In Progress07.005/K-OK-ss NU
711190C3040182
In Progress04.613/04 ss NU
711190C3040182
In Progress16.134/K-1-A ss NU
711190C3040182
In Progress23.014/K ss NU
711190C3040182
In Progress23.015/K ss NU
711190C3040182
In Progress09.012/K-A ss NU
711190C3040182
In Progress07.006/K-D NU
711190C3040182
In ProgressB-18.501 ss NU
711190C3040182
In Progress21.051 ss NU
711190C3030182
In Progress25.052 ss NU
711190C3030182
In Progress14.111 ss NU
711190C3030182
In Progress07.005/K-KN ss NU
711190C3030182
In Progress16.100/K-1-A ss NU
711190C3030182
In Progress3000B ss NU
711190C3030182
In Progress4470 ss NU
711190C3030182
In Progress07.006/K- ss NU
711190C3030182
In Progress07.006/K-B ss NU
711190C3030182
In Progress07.005/K-K ss NU
711190C3030182
In Progress07.005/K-OK-ss NU
711190C3030182
In Progress04.613/04 ss NU
711190C3030182
In Progress16.134/K-1-A ss NU
711190C3030182
In Progress23.014/K ss NU
711190C3030182
In Progress23.015/K ss NU
711190C3030182
In Progress09.012/K-A ss NU
711190C3030182
In ProgressB-18.501 ss NU
711190C3030182
In Progress21.051 ss NU
711190C3030182
In Progress07.006/K-D NU
711190C6000182
Completed 23.014/K ls NU
711190C6000182
Completed 23.015/K ls NU
711190C6000182
Completed 16.132/K-2-A ls NU
711190C6000182
Completed 3000/ B ls NU
711190C6000182
Completed 4470 ls NU
711190C6000182
Completed 09.012/K-A ls NU
711190C6000182
Completed 25.052 ls NU
711190C6000182
Completed 04.613/04 ls NU
711190C6000182
Completed 07.006/K-D ls NU
711190C6000182
Completed 07.005/K-O ls NU
711190C6000182
Completed 07.005/K-K ls NU
711190C6000182
Completed 07.006/K-B ls NU
711190C6000182
Completed 07.006/K- ls NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 35

GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
PVC
KM:
- (1.50x2.00)
Water
037+800
Stop
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Scaffholding
KM:
- (1.50x2.00)
037+800 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.4
Box CulvertBox
KM:Culvert
037+800
Cement
KM:
- (1.50x2.00)
037+800 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Tar
KM:
-Painting
(1.50x2.00)
036+861 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Excavation
KM:
- (1.50x2.00)
036+861 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Soil
KM:
- Trasnport
(1.50x2.00)
036+861 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Lean
KM:
- (1.50x2.00)
036+861
Concrete - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Cement
KM:
- (1.50x2.00)
036+861 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Cement
KM:
- (1.50x2.00)
036+861
to silo - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Cement
KM:
- (1.50x2.00)
036+861
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Concrete
KM:
- (1.50x2.00)
036+861
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Stone
KM:
- (1.50x2.00)
036+861
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Concasor
KM:
- (1.50x2.00)
036+861 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Addmixer
KM:
- (1.50x2.00)
036+861 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Reinforced
KM:
- (1.50x2.00)
036+861
Concrete
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Rebar
KM:
- (1.50x2.00)
036+861 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Rebar
KM:
- (1.50x2.00)
036+861 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Steel
KM:
- (1.50x2.00)
036+861 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Steel
KM:
- (1.50x2.00)
036+861
Trasnport- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
PVC
KM:
- (1.50x2.00)
Water
036+861
Stop
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.2
Box CulvertBox
KM:Culvert
036+861
Scaffholding
KM:
- (1.50x2.00)
036+861 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Tar
KM:
-Painting
(1.50x2.00)
036+340 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Excavation
KM:
- (1.50x2.00)
036+340 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Soil
KM:
- Trasnport
(1.50x2.00)
036+340 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Lean
KM:
- (1.50x2.00)
036+340
Concrete - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Cement
KM:
- (1.50x2.00)
036+340 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Cement
KM:
- (1.50x2.00)
036+340
to silo - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Cement
KM:
- (1.50x2.00)
036+340
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Concrete
KM:
- (1.50x2.00)
036+340
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Stone
KM:
- (1.50x2.00)
036+340
Transport
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Concasor
KM:
- (1.50x2.00)
036+340 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Addmixer
KM:
- (1.50x2.00)
036+340 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Reinforced
KM:
- (1.50x2.00)
036+340
Concrete
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Rebar
KM:
- (1.50x2.00)
036+340 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Rebar
KM:
- (1.50x2.00)
036+340 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Steel
KM:
- (1.50x2.00)
036+340 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
PVC
KM:
- (1.50x2.00)
Water
036+340
Stop
- (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Scaffholding
KM:
- (1.50x2.00)
036+340 - (1.50x2.00)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Steel
KM:
- (1.50x2.00)
036+340
Trasnport- (1.50x2.00)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Rebar
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Rebar
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Reinforced
037+560Concrete
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Cement
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Cement
037+560
to silo
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Steel
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Tar037+560
Painting - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
addmixer
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Steel
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Stone
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Stone
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Concrete
037+560
Trasnport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
Trasnport
037+560
Cement
- (48,40m)

TASKRSRC

711190C6000182
Completed B-18.501 ls NU
711190C6000155
Completed 16.132/K-2-A ls NU
711190C6000155
Completed 23.014/K ls NU
711190C6000155
Completed 23.015/K ls NU
711190C6000155
Completed 09.012/K-A ls NU
711190C6000155
Completed 25.052 ls NU
711190C6000155
Completed 07.006/K-D ls NU
711190C6000155
Completed 3000/ B ls NU
711190C6000155
Completed 4470 ls NU
711190C6000155
Completed 04.613/04 ls NU
711190C6000155
Completed 07.006/K- ls NU
711190C6000155
Completed 07.006/K-B ls NU
711190C6000155
Completed 07.005/K-K ls NU
711190C6000155
Completed 07.005/K-O ls NU
711190C6000155
Completed 16.133/K-1-A ls NU
711190C6000155
Completed B-18.501 ls NU
711190C6000155
Completed 21.053 ls NU
711190C6000143
Completed 16.132/K-2-A ls NU
711190C6000143
Completed 23.014/K ls NU
711190C6000143
Completed 23.015/K ls NU
711190C6000143
Completed 09.012/K-A ls NU
711190C6000143
Completed 25.052 ls NU
711190C6000143
Completed 07.006/K-D ls NU
711190C6000143
Completed 3000/ B ls NU
711190C6000143
Completed 4470 ls NU
711190C6000143
Completed 04.613/04 ls NU
711190C6000143
Completed 07.006/K- ls NU
711190C6000143
Completed 07.006/K-B ls NU
711190C6000143
Completed 07.005/K-K ls NU
711190C6000143
Completed 07.005/K-O ls NU
711190C6000143
Completed B-18.501 ls NU
711190C6000122
Completed 16.101/K-1-A ls NU
711190C6000122
Completed 3000/ B ls NU
711190C6000122
Completed 4470 ls NU
711190C6000122
Completed 04.613/04 ls NU
711190C6000122
Completed 07.006/K- ls NU
711190C6000122
Completed 07.006/K-B ls NU
711190C6000122
Completed 07.005/K-K ls NU
711190C6000122
Completed 07.005/K-O ls NU
711190C6000130
Completed 14.113 ls NU
711190C6000130
Completed 07.005/K-KN ls NU
711190C3030182
In ProgressZEL - 8 ss NU
711190C3030182
In Progress07.006/K-K ss NU
711205C3010182
In ProgressZEL - 8 ss NU
711205C3020182
In Progress16.131/K-1-A ss NU
711180C3040185
In Progress16.134/K-1-A ss NU
711180C3040186
In Progress16.134/K-1-A ss NU
711180C3040186
In Progress21.052 ss NU
711180C3040180
In Progress3605/A ss NU
711180C3040180
In Progress07.006/K-K ss NU
711180C3040180
In Progress2200 ss NU
711180C3040180
In ProgressZEL - 8 ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 36

GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Elevation KM:
PVC
037+560
Water Stop
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Reinforced
037+560Concrete
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Rebar
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Rebar
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Steel
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Tar037+560
Painting - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Steel
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Cement
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Cement
037+560
to silo
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
addmixer
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Trasnport
037+560
Cement
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Concrete
037+560
Trasnport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Stone
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Stone
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Reinforced
037+560Concrete
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
PVC
037+560
Water Stop
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Deck Concrete
KM:
Scaffholding
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Reinforced
Concrete
037+560Concrete
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Rebar
Concrete
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Rebar
Concrete
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Steel
Concrete
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Tar
Concrete
037+560
Painting - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Steel
Concrete
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Cement
Concrete
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Cement
Concrete
037+560
to silo
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
addmixer
Concrete
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Trasnport
Concrete
037+560
Cement
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Concrete
Concrete
037+560
Trasnport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Stone
Concrete
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
Stone
Concrete
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
FoundationKM:
PVC
Concrete
037+560
Water Stop
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Lean Concrete
KM:
Lean
037+560
Concrete
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Lean Concrete
KM:
Cement
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Lean Concrete
KM:
Cement
037+560
to silo
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Lean Concrete
KM:
addmixer
037+560 - (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Lean Concrete
KM:
Trasnport
037+560
Cement
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Lean Concrete
KM:
Concrete
037+560
Trasnport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Lean Concrete
KM:
Stone
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Lean Concrete
KM:
Stone
037+560
Transport
- (48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Structural KM:
Earthworks
Excavation
037+560
& -Transport
(48,40m)
GO-4.010.1.10.210.C.60.10
Pedestrian Overpass
Structural KM:
Earthworks
Soil037+560
Transport
& -Transport
(48,40m)
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Krmata
KM:
- (1.50x2.00)
036+340
hazrla
- (1.50x2.00)
ser
GO-4.010.1.10.210.C.30.2.1
Box CulvertBox
KM:Culvert
036+340
Stone
KM:
- (1.50x2.00)
036+340
Trasnport
- (1.50x2.00)
GO-4.010.1.10.220.C.96.105.30.2.6
Box CulvertBox
KM:Culvert
0+705Krmata
KM:
- (1.50x2.00)
0+705
hazrla
- (1.50x2.00)
ser
GO-4.010.1.10.220.C.96.105.30.2.1
Box CulvertBox
KM:Culvert
0+500Reinforced
KM:
- (2.00x2.00)
0+500Concrete
- (2.00x2.00)
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Foundation
Channel
Reinforced
Concrete
KM: 034+177
Concrete
- 035+660
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Reinforced
KM: 034+177
Concrete
- 035+660
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Elevation
Channel
Scaffholding
KM: 034+177 - 035+660
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
PipeKM: 034+177
& Transport
- 035+660
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
Stone
KM:
Trasnport
034+177
& Transport
- 035+660
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
Excavation
KM: 034+177
& Transport
- 035+660
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
Krmata
KM: 034+177
hazrla
& Transport
-ser
035+660

Sol
Sol
Sol
Sol
Sol
Sol
Sol

TASKRSRC

711180C3040180
In ProgressZEL - 10 ss NU
711180C3040180
In ProgressZEL - 11 ss NU
711180C3040180
In Progress07.005/K-1 ss NU
711180C3040180
In Progress23.011/B-1 ss NU
711190C3000180
In Progress07.006/K-K ss NU
711190C3000180
In ProgressZEL - 8 ss NU
711200C3020182
In ProgressZEL - 8 ss NU
711210C3060180
In Progress07.006/K-K ss NU
711210C3060180
In ProgressZEL - 8 ss NU
711210C3070180
In Progress07.006/K-K ss NU
711210C3070180
In ProgressZEL - 8 ss NU
711200C3010180
Completed 07.006/K-K ss NU
711200C3010180
Completed ZEL - 8 ss NU
711180C3040180
In Progress14.120 ss NU
711180C3040180
In Progress2641/A ss NU
711180C3040180
In Progress3605/B ss NU
711180C3040180
In Progress2209 ss NU

130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525
130525

Page 37

GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
Q800
KM:
mm
034+177
B.A.
& Transport
Boru
- 035+660
Denmesi
Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
B.A.KM:
Boru
034+177
Tanmas
& Transport
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
Forwarding
KM: 034+177
&the
Transport
soil
- 035+660
to the stock
Solare
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
B.A.KM:
Borularda
034+177
& Transport
Hasr
- 035+660
elik Sol
GO-4.010.1.10.210.C.30.1.3
Underpass Structural
KM: 036+160
Earthworks
Stone
- (5.00x5.00)
Trasnport
& Transport
GO-4.010.1.10.210.C.30.1.3
Underpass Structural
KM: 036+160
Earthworks
Krmata
- (5.00x5.00)
hazrla
& Transport
ser
GO-4.010.1.10.220.C.30.2.1
Box CulvertBox
KM:Culvert
040+130
Krmata
KM:
- 2x(3.00x3.00)
040+130
hazrla
- 2x(3.00x3.00)
ser
GO-4.010.1.10.230.C.30.2.1
Box CulvertStructural
KM: 041+712
Earthworks
Stone
- (1.50x2.00)
Trasnport
& Transport
GO-4.010.1.10.230.C.30.2.1
Box CulvertStructural
KM: 041+712
Earthworks
Krmata
- (1.50x2.00)
hazrla
& Transport
ser
GO-4.010.1.10.230.C.30.2.2
Box CulvertStructural
KM: 042+191
Earthworks
Stone
- (1.50x2.00)
Trasnport
& Transport
GO-4.010.1.10.230.C.30.2.2
Box CulvertStructural
KM: 042+191
Earthworks
Krmata
- (1.50x2.00)
hazrla
& Transport
ser
GO-4.010.1.10.220.C.30.1.2
Underpass Structural
KM: 039+030
Earthworks
Stone
- (7.00x6.00)
Trasnport
& Transport
GO-4.010.1.10.220.C.30.1.2
Underpass Structural
KM: 039+030
Earthworks
Krmata
- (7.00x6.00)
hazrla
& Transport
ser
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
Excavation
KM: 034+177
& Transport
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
Filling
KM: 034+177
& Transport
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
PipeKM: 034+177
& Transport
- 035+660 Sol
GO-4.010.1.10.200.C.30.3.2
U Type Concrete
Structural
Channel
Earthworks
Damping
KM: 034+177
down
& Transport
and
- 035+660
compacting
Sol

TASKRSRC

target_qty act_qty
rsrc_type start_date end_date delete_record_flag
Budgeted Units(h)
Actual Units(h)
(*)Resource(*)Start
Type
(*)Finish Delete This Row
313641.3 122511.02 Material
9/1/2012 5/25/2013 4:00:00 PM
108242.1 0
Material
9/1/2012 5/25/2013 4:00:00 PM
63997.34 11294.06 Material
9/1/2012 5/25/2013 4:00:00 PM
318048.6 130921.86 Material
9/1/2012 5/25/2013 4:00:00 PM
0
0
Material
9/1/2012 5/25/2013 4:00:00 PM
0
0
Material
9/1/2012 5/25/2013 4:00:00 PM
66938.34 11294.06 Material
9/1/2012 5/25/2013 4:00:00 PM
432656.5 0
Material
5/26/2013 8:00:00
12/31/2013
AM 4:00:00 PM
149316
0
Material
5/26/2013 8:00:00
12/31/2013
AM 4:00:00 PM
88281.94 0
Material
5/26/2013 8:00:00
12/31/2013
AM 4:00:00 PM
438736.2 0
Material
5/26/2013 8:00:00
12/31/2013
AM 4:00:00 PM
0
0
Material
5/26/2013 8:00:00
12/31/2013
AM 4:00:00 PM
0
0
Material
5/26/2013 8:00:00
12/31/2013
AM 4:00:00 PM
92338.94 0
Material
5/26/2013 8:00:00
12/31/2013
AM 4:00:00 PM
21057.58 0
Material
7/10/2013 8:00:00
12/31/2013
AM 4:00:00 PM
21057.58 0
Material
7/10/2013 8:00:00
12/31/2013
AM 4:00:00 PM
537465.4 0
Material
7/10/2013 8:00:00
12/31/2013
AM 4:00:00 PM
0
0
Material
7/10/2013 8:00:00
12/31/2013
AM 4:00:00 PM
104615.7 0
Material
7/10/2013 8:00:00
12/31/2013
AM 4:00:00 PM
0
0
Material
7/10/2013 8:00:00
12/31/2013
AM 4:00:00 PM
0.65
0
Material
8/1/2013 8:00:00
8/15/2013
AM 4:00:00 PM
0
0
Material
8/1/2013 8:00:00
8/15/2013
AM 4:00:00 PM
0
0
Material
8/1/2013 8:00:00
8/15/2013
AM 4:00:00 PM
0.65
0
Material
1/1/2014 8:00:00
1/15/2014
AM 4:00:00 PM
0
0
Material
1/1/2014 8:00:00
1/15/2014
AM 4:00:00 PM
0
0
Material
1/1/2014 8:00:00
1/15/2014
AM 4:00:00 PM
17809.22 12875.58 Material
9/16/2012 8:00:00
2/10/2013
AM4:00:00 PM
17809.22 12875.58 Material
9/16/2012 8:00:00
2/10/2013
AM4:00:00 PM
454555.45 328631.31 Material
9/16/2012 8:00:00
2/10/2013
AM4:00:00 PM
0
0
Material
9/16/2012 8:00:00
2/10/2013
AM4:00:00 PM
88477.6
63966.91 Material
9/16/2012 8:00:00
2/10/2013
AM4:00:00 PM
0
0
Material
9/16/2012 8:00:00
2/10/2013
AM4:00:00 PM
0.35
0
Material
4/23/2014 8:00:00
5/22/2014
AM4:00:00 PM
0
0
Material
4/23/2014 8:00:00
5/22/2014
AM4:00:00 PM
0
0
Material
4/23/2014 8:00:00
5/22/2014
AM4:00:00 PM
6346.79
1957.08
Material
9/16/2012 8:00:00
8/28/2013
AM4:00:00 PM
135838.23 41886.72 Material
9/16/2012 8:00:00
8/28/2013
AM4:00:00 PM
149422.05 46075.39 Material
9/16/2012 8:00:00
8/28/2013
AM4:00:00 PM
135838.23 41886.72 Material
9/16/2012 8:00:00
8/28/2013
AM4:00:00 PM
6346.79
1957.08
Material
9/16/2012 8:00:00
8/28/2013
AM4:00:00 PM
17928.48 0
Material
2/11/2013 8:00:00
7/9/2013
AM
4:00:00 PM
17928.48 0
Material
2/11/2013 8:00:00
7/9/2013
AM
4:00:00 PM
457599.4 0
Material
2/11/2013 8:00:00
7/9/2013
AM
4:00:00 PM
0
0
Material
2/11/2013 8:00:00
7/9/2013
AM
4:00:00 PM
89070.08 0
Material
2/11/2013 8:00:00
7/9/2013
AM
4:00:00 PM
0
0
Material
2/11/2013 8:00:00
7/9/2013
AM
4:00:00 PM
320146.6 320146.6 Material
8/6/2012 8:00:00
5/28/2013
AM 4:00:00 PM
110487.2 0
Material
8/6/2012 8:00:00
5/28/2013
AM 4:00:00 PM
65324.72 65324.72 Material
8/6/2012 8:00:00
5/28/2013
AM 4:00:00 PM
324645.3 324645.3 Material
8/6/2012 8:00:00
5/28/2013
AM 4:00:00 PM

Page 38

TASKRSRC

0
0
0
0
65324.72 65324.72
0
0
1581759.75973880.25
0
0
0
0
480
0
11500
0
185062.5 0
2007.56
0
602.27
0
110.19
0
27.55
0
27.55
0
27.55
0
110.19
0
137.74
0
122.43
0
275.48
0
1106.92
0
951.68
0
266.47
0
2.6
0
69.69
0
266.47
0
75.9
0
266.47
0
75.9
0
951.68
0
1151.54
0
1023.59
0
2398.25
0
109.54
0
442.77
0
380.67
0
106.59
0
1.04
0
27.88
0
106.59
0
30.36
0
106.59
0
30.36
0
380.67
0
460.62
0
409.44
0
959.3
0
43.82
0
1606.05
0
664.15
0
571.01
0
159.88
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

8/6/2012 8:00:00
1/1/2013
AM8:00:00 AM
8/6/2012 8:00:00
1/1/2013
AM8:00:00 AM
8/6/2012 8:00:00
5/28/2013
AM 4:00:00 PM
1/9/2015 8:00:00
2/7/2015
AM4:00:00 PM
3/1/2012 8:00:00
7/10/2013
AM 4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
8/21/2014 8:00:00
12/18/2014
AM 4:00:00 PM
8/21/2014 8:00:00
12/18/2014
AM 4:00:00 PM
6/22/2013 8:00:00
6/23/2013
AM4:00:00 PM
6/22/2013 8:00:00
6/23/2013
AM4:00:00 PM
6/24/2013 8:00:00
6/24/2013
AM4:00:00 PM
6/24/2013 8:00:00
6/24/2013
AM4:00:00 PM
6/24/2013 8:00:00
6/24/2013
AM4:00:00 PM
6/24/2013 8:00:00
6/24/2013
AM4:00:00 PM
6/24/2013 8:00:00
6/24/2013
AM4:00:00 PM
6/24/2013 8:00:00
6/24/2013
AM4:00:00 PM
6/24/2013 8:00:00
6/24/2013
AM4:00:00 PM
6/24/2013 8:00:00
6/24/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
6/30/2013 8:00:00
7/26/2013
AM4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
7/27/2013 8:00:00
8/7/2013
AM
4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM

Page 39

TASKRSRC

1.56
41.81
159.88
45.54
159.88
45.54
571.01
690.92
614.15
1438.95
65.72
0
1222.63
342.34
1.94
111.5
342.34
119.11
342.34
119.11
1222.63
1479.38
1315.01
3081.03
222.74
116
29
29
29
116
145
128.89
290
0
1848.62
133.65
733.55
205.4
1.17
66.9
205.4
71.47
205.4
71.47
733.58
887.63
789
0
0
0
489.05
136.94

0
0
0
0
0
0
0
0
0
0
0
0
1222.63
342.34
1.94
111.5
342.34
119.11
342.34
119.11
1222.63
1479.38
1315.01
3081.03
222.74
89.64
22.41
22.41
22.41
89.64
112.05
99.6
224.1
0
1848.62
133.65
733.58
205.4
1.17
66.9
205.4
71.47
205.4
71.47
733.58
887.63
789
0
0
0
489.05
136.94

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
6/25/2013 8:00:00
6/29/2013
AM4:00:00 PM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
11/13/2012 1/1/2013 8:00:00 AM
10/26/2012 5/2/2013 4:00:00 PM
10/26/2012 5/2/2013 4:00:00 PM
10/26/2012 5/2/2013 4:00:00 PM
10/26/2012 5/2/2013 4:00:00 PM
10/26/2012 5/2/2013 4:00:00 PM
10/26/2012 5/2/2013 4:00:00 PM
10/26/2012 5/2/2013 4:00:00 PM
10/26/2012 5/2/2013 4:00:00 PM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/31/2012 1/1/2013 8:00:00 AM
10/17/2012 10/25/2012
10/17/2012 10/25/2012
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM

Page 40

TASKRSRC

0.78
44.6
136.94
47.65
136.94
47.65
489.05
591.75
526
1232.41
89.1
3230.91
7.7
513.77
92.6
131.38
39.41
17.48
49.5
49.5
49.5
178.66
216.88
192.78
449.88
161.19
15.16
0
16.97
16.97
71.49
480
309.22
1692.9
474.01
23.15
100.48
474.01
129.81
474.01
129.81
1692.9
2048.41
1820.81
5045.35
608.5
720
598.04
2000
2539.35
711.02
34.73

0.78
44.6
136.94
47.65
136.94
47.65
489.05
591.75
526
1232.41
89.1
3230.91
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
59.29
16.6
1.6
3.6
16.6
5.47
16.6
5.47
59.29
71.74
63.77
149.4
0
0
0
0
88.93
24.9
2.4

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

12/27/2012 1/1/2013 8:00:00 AM


12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
12/27/2012 1/1/2013 8:00:00 AM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
4/7/2013
AM4:00:00 PM
4/1/2013 8:00:00
4/7/2013
AM4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
4/1/2013 8:00:00
5/21/2013
AM 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/24/2012 3/6/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM

Page 41

TASKRSRC

150.72
711.02
194.72
711.02
194.72
2539.35
3072.62
2731.22
7568.02
912.74
332.44
83.11
83.11
83.11
332.44
415.55
369.38
831.1
747.55
2913.94
1098.45
2425.48
0
8084.92
294.48
73.62
73.62
73.62
294.48
368.1
327.2
736.2
2913.08
3376.04
945.29
26.55
261.84
945.29
302.81
945.29
302.81
3376.04
4085.01
3631.12
8507.62
911.56
1942.06
2250.69
630.19
17.7
174.56
630.19

5.41
24.9
8.2
24.9
8.2
88.93
107.6
95.65
224.1
0
12.27
3.07
3.07
3.07
12.27
15.34
13.64
30.68
0
0
0
2425.48
0
8084.92
292.25
73.06
73.06
73.06
292.25
365.31
324.72
730.62
2910.36
3374.14
944.76
25.1
253.32
944.76
292.35
944.76
292.35
3374.14
4082.71
3629.07
8502.83
518.62
1940.24
2249.43
629.84
16.73
168.88
629.84

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

12/27/2012 3/16/2013 4:00:00 PM


12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/27/2012 3/16/2013 4:00:00 PM
12/20/2012 2/24/2013 4:00:00 PM
12/20/2012 2/24/2013 4:00:00 PM
12/20/2012 2/24/2013 4:00:00 PM
12/20/2012 2/24/2013 4:00:00 PM
12/20/2012 2/24/2013 4:00:00 PM
12/20/2012 2/24/2013 4:00:00 PM
12/20/2012 2/24/2013 4:00:00 PM
12/20/2012 2/24/2013 4:00:00 PM
12/1/2012 6/9/2013 4:00:00 PM
12/1/2012 6/9/2013 4:00:00 PM
12/1/2012 6/9/2013 4:00:00 PM
8/15/2012 8:00:00
9/24/2012
AM4:00:00 PM
8/15/2012 8:00:00
9/23/2012
AM4:00:00 PM
8/15/2012 8:00:00
9/24/2012
AM4:00:00 PM
8/19/2012 8:00:00
1/1/2013
AM
10:33:00 AM
8/19/2012 8:00:00
1/1/2013
AM
10:33:00 AM
8/19/2012 8:00:00
1/1/2013
AM
10:33:00 AM
8/19/2012 8:00:00
1/1/2013
AM
10:33:00 AM
8/19/2012 8:00:00
1/1/2013
AM
10:33:00 AM
8/19/2012 8:00:00
1/1/2013
AM
10:33:00 AM
8/19/2012 8:00:00
1/1/2013
AM
10:33:00 AM
8/19/2012 8:00:00
1/1/2013
AM
10:33:00 AM
8/27/2012 8:00:00
1/1/2013
AM
8:23:00 AM
8/27/2012 8:00:00
1/1/2013
AM
8:14:00 AM
8/27/2012 8:00:00
1/1/2013
AM
8:14:00 AM
8/27/2012 8:00:00
1/3/2013
AM
2:43:00 PM
8/27/2012 8:00:00
1/2/2013
AM
1:32:00 PM
8/27/2012 8:00:00
1/1/2013
AM
8:14:00 AM
8/27/2012 8:00:00
1/2/2013
AM
2:22:00 PM
8/27/2012 8:00:00
1/1/2013
AM
8:14:00 AM
8/27/2012 8:00:00
1/2/2013
AM
2:22:00 PM
8/27/2012 8:00:00
1/1/2013
AM
8:14:00 AM
8/27/2012 8:00:00
1/1/2013
AM
8:14:00 AM
8/27/2012 8:00:00
1/1/2013
AM
8:14:00 AM
8/27/2012 8:00:00
1/1/2013
AM
8:14:00 AM
8/27/2012 8:00:00
1/23/2013
AM11:19:00 AM
8/22/2012 8:00:00
1/1/2013
AM
8:19:00 AM
8/22/2012 8:00:00
1/1/2013
AM
8:11:00 AM
8/22/2012 8:00:00
1/1/2013
AM
8:11:00 AM
8/22/2012 8:00:00
1/3/2013
AM
10:25:00 AM
8/22/2012 8:00:00
1/2/2013
AM
10:56:00 AM
8/22/2012 8:00:00
1/1/2013
AM
8:11:00 AM

Page 42

TASKRSRC

201.87
630.19
201.87
2250.69
2723.34
2420.74
5671.75
607.71
12105.02
6934.75
178.85
44.71
44.71
44.71
178.85
223.56
198.72
447.13
2286.7
2420.81
677.83
21.35
167.32
677.83
196.35
677.83
196.35
2420.81
2929.18
2603.71
6100.43
309.07
3430.06
3631.21
1016.74
32.65
265.08
1016.74
312.61
1016.74
312.61
3631.21
4393.76
3905.57
9150.65
463.6
150.43
1.76
88.64
994.52
278.47
278.47

194.9
629.84
194.9
2249.43
2721.8
2419.38
5668.55
345.74
5562.46
5690.92
178.49
44.62
44.62
44.62
178.49
223.11
198.32
446.22
0
1302.08
392.89
10.7
88.91
392.89
104.6
392.89
104.6
1403.19
1697.86
1509.21
3536.03
285.73
0
1953.12
589.34
16.05
133.37
589.34
156.9
589.34
156.9
2104.78
2546.78
2263.81
5304.04
428.59
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

8/22/2012 8:00:00
1/2/2013
AM
11:36:00 AM
8/22/2012 8:00:00
1/1/2013
AM
8:11:00 AM
8/22/2012 8:00:00
1/2/2013
AM
11:36:00 AM
8/22/2012 8:00:00
1/1/2013
AM
8:11:00 AM
8/22/2012 8:00:00
1/1/2013
AM
8:11:00 AM
8/22/2012 8:00:00
1/1/2013
AM
8:11:00 AM
8/22/2012 8:00:00
1/1/2013
AM
8:11:00 AM
8/22/2012 8:00:00
1/19/2013
AM8:51:00 AM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/31/2013
8:00:00 AM
3:57:00 PM
11/15/2012 8/31/2013
8:00:00 AM
3:51:00 PM
11/15/2012 8/31/2013
8:00:00 AM
3:51:00 PM
11/15/2012 8/31/2013
8:00:00 AM
3:51:00 PM
11/15/2012 8/31/2013
8:00:00 AM
3:57:00 PM
11/15/2012 9/1/2013
8:00:00 AM
8:01:00 AM
11/15/2012 9/1/2013
8:00:00 AM
8:01:00 AM
11/15/2012 8/31/2013
8:00:00 AM
3:59:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM3:59:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
12/25/2012 10/31/2013
8:00:00 AM8:15:00 AM
12/25/2012 10/31/2013
8:00:00 AM8:01:00 AM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
12/25/2012 10/31/2013
8:00:00 AM8:01:00 AM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
12/25/2012 10/31/2013
8:00:00 AM8:01:00 AM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM

Page 43

TASKRSRC

94.92
869.11
2506.19
94.92
1069.66
1203.37
994.52
278.47
577.36
60.17
1274.9
397.81
0.7
35.46
37.97
347.64
37.97
111.39
111.39
1002.48
111.39
397.81
481.35
427.87
90.25
596.71
1.06
53.19
56.95
521.46
56.95
167.08
167.08
1503.71
167.08
596.71
722.02
641.8
107.58
26.89
26.89
268.95
26.89
107.58
134.47
119.53
2176.32
652.9
11500
185062.5
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
6/12/2013 8:00:00
7/6/2013
AM
4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/15/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/11/2013
AM 4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/22/2013 8:00:00
5/30/2013
AM4:00:00 PM
5/22/2013 8:00:00
5/30/2013
AM4:00:00 PM
1/21/2015 8:00:00
5/20/2015
AM4:00:00 PM
1/21/2015 8:00:00
5/20/2015
AM4:00:00 PM
4/13/2015 8:00:00
6/11/2015
AM4:00:00 PM
4/13/2015 8:00:00
6/11/2015
AM4:00:00 PM

Page 44

TASKRSRC

0
0
0
0
480
0
1581759.75973880.25
507864.5 0
0
0
110237.5 0
515001
0
0
0
0
0
116171
0
19949.05 0
19949.05 0
509171.2 0
0
0
0
0
0
0
36000
0
12000
0
1561.43
0
5036.88
0
4477.23
0
4590.06
0
1561.43
0
1561.43
0
4062
0
5036.88
0
12693.58 0
271676.46 0
298844.1 0
271676.46 0
12693.58 0
20838.23 0
20838.23 0
531865.8 0
0
0
0
0
0
0
3
0
0
0
0
0
518746.6 0
0
0
112599.5 0
526036
0
0
0
0
0
118660.3 0
120
0
2500
0
950
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

4/13/2015 8:00:00
6/11/2015
AM4:00:00 PM
4/13/2015 8:00:00
6/11/2015
AM4:00:00 PM
4/13/2015 8:00:00
6/11/2015
AM4:00:00 PM
3/1/2012 8:00:00
7/10/2013
AM 4:00:00 PM
9/30/2013 8:00:00
12/31/2013
AM 4:00:00 PM
9/30/2013 8:00:00
12/31/2013
AM 4:00:00 PM
9/30/2013 8:00:00
12/31/2013
AM 4:00:00 PM
9/30/2013 8:00:00
12/31/2013
AM 4:00:00 PM
9/30/2013 8:00:00
12/31/2013
AM 4:00:00 PM
9/30/2013 8:00:00
12/31/2013
AM 4:00:00 PM
9/30/2013 8:00:00
12/31/2013
AM 4:00:00 PM
10/31/2013 1/28/2014
8:00:00 AM
4:00:00 PM
10/31/2013 1/28/2014
8:00:00 AM
4:00:00 PM
10/31/2013 1/28/2014
8:00:00 AM
4:00:00 PM
10/31/2013 1/28/2014
8:00:00 AM
4:00:00 PM
10/31/2013 1/28/2014
8:00:00 AM
4:00:00 PM
10/31/2013 1/28/2014
8:00:00 AM
4:00:00 PM
6/15/2013 8:00:00
7/31/2013
AM4:00:00 PM
6/15/2013 8:00:00
7/31/2013
AM4:00:00 PM
6/7/2013 8:00:00
7/21/2013
AM 4:00:00 PM
6/7/2013 8:00:00
7/21/2013
AM 4:00:00 PM
6/7/2013 8:00:00
7/21/2013
AM 4:00:00 PM
6/7/2013 8:00:00
7/21/2013
AM 4:00:00 PM
6/7/2013 8:00:00
7/21/2013
AM 4:00:00 PM
6/7/2013 8:00:00
7/21/2013
AM 4:00:00 PM
6/7/2013 8:00:00
7/21/2013
AM 4:00:00 PM
6/7/2013 8:00:00
7/21/2013
AM 4:00:00 PM
7/17/2013 8:00:00
11/13/2013
AM 4:00:00 PM
7/17/2013 8:00:00
11/13/2013
AM 4:00:00 PM
7/17/2013 8:00:00
11/13/2013
AM 4:00:00 PM
7/17/2013 8:00:00
11/13/2013
AM 4:00:00 PM
7/17/2013 8:00:00
11/13/2013
AM 4:00:00 PM
7/1/2013 8:00:00
10/2/2013
AM 4:00:00 PM
7/1/2013 8:00:00
10/2/2013
AM 4:00:00 PM
7/1/2013 8:00:00
10/2/2013
AM 4:00:00 PM
7/1/2013 8:00:00
10/2/2013
AM 4:00:00 PM
7/1/2013 8:00:00
10/2/2013
AM 4:00:00 PM
7/1/2013 8:00:00
10/2/2013
AM 4:00:00 PM
4/23/2014 8:00:00
5/22/2014
AM4:00:00 PM
4/23/2014 8:00:00
5/22/2014
AM4:00:00 PM
4/23/2014 8:00:00
5/22/2014
AM4:00:00 PM
6/27/2013 8:00:00
9/29/2013
AM4:00:00 PM
6/27/2013 8:00:00
9/29/2013
AM4:00:00 PM
6/27/2013 8:00:00
9/29/2013
AM4:00:00 PM
6/27/2013 8:00:00
9/29/2013
AM4:00:00 PM
6/27/2013 8:00:00
9/29/2013
AM4:00:00 PM
6/27/2013 8:00:00
9/29/2013
AM4:00:00 PM
6/27/2013 8:00:00
9/29/2013
AM4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM

Page 45

TASKRSRC

1.3
60
84.93
700
84.93
294.5
223.2
2945
294.5
950
1149.5
1021.78
180
993.55
1.95
90
88.82
1050
88.82
308
334.8
3080
308
993.55
1202.19
1068.62
300
3.25
150
1656.45
513.5
558
148.08
1750
5135
148.08
1781.61
2004.31
1656.45
513.5
160
40
40
400
40
160
200
177.78
3125
937.5
0
299.57

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
12/1/2013 8:00:00
12/10/2013
AM 4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/17/2013 8:00:00
7/23/2013
AM4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/12/2013
AM 4:00:00 PM
7/16/2013 8:00:00
7/16/2013
AM4:00:00 PM
7/16/2013 8:00:00
7/16/2013
AM4:00:00 PM
7/16/2013 8:00:00
7/16/2013
AM4:00:00 PM
7/16/2013 8:00:00
7/16/2013
AM4:00:00 PM
7/16/2013 8:00:00
7/16/2013
AM4:00:00 PM
7/16/2013 8:00:00
7/16/2013
AM4:00:00 PM
7/16/2013 8:00:00
7/16/2013
AM4:00:00 PM
7/16/2013 8:00:00
7/16/2013
AM4:00:00 PM
7/15/2013 8:00:00
7/15/2013
AM4:00:00 PM
7/15/2013 8:00:00
7/15/2013
AM10:24:00 AM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM

Page 46

TASKRSRC

299.57
2995.68
299.57
966.35
1169.28
1039.36
966.35
56.18
265.45
337.71
1000
337.71
93.63
442.42
1610.58
499.28
499.28
562.86
600
4992.8
562.86
1732.27
1948.8
1610.58
499.28
1596
29.74
246.54
613.5
613.5
290.09
613.5
1979.04
2394
2128
290.09
1803.48
2812.11
425.75
46.51
51.16
51.16
1021.81
93.24
26.31
183.07
183.07
1319.84
125.53
125.53
457.92
515.16

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/18/2013 8:00:00
6/30/2013
AM4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
7/1/2013 8:00:00
7/20/2013
AM 4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/1/2013 8:00:00
6/7/2013
AM4:00:00 PM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM

Page 47

TASKRSRC

425.75
183.07
2112
1030.77
264
208.93
64.77
64.77
12.15
57.4
72
73.02
1540
647.67
5154
176
73.02
224.71
252.8
208.93
64.77
1021.81
240
0
6043.54
1813.06
38.64
9.66
9.66
96.59
9.66
38.64
48.3
42.93
0
105.1
33.84
9.47
3.41
0
9.47
3.58
9.47
3.58
33.84
40.94
36.39
85.27
9.47
525.48
394.46
118.34

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
114.32
35.22
9.86
3.31
0
9.86
3.48
9.86
3.48
35.22
42.61
37.88
88.74
9.47
210.27
266.48
79.94

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
6/12/2013 8:00:00
7/7/2013
AM
8:00:00 AM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
9/6/2013 8:00:00
9/30/2013
AM 4:00:00 PM
7/28/2013 8:00:00
9/5/2013
AM
4:00:00 PM
7/28/2013 8:00:00
9/5/2013
AM
4:00:00 PM
7/28/2013 8:00:00
9/5/2013
AM
4:00:00 PM
6/8/2013 8:00:00
6/12/2013
AM 4:00:00 PM
6/8/2013 8:00:00
6/12/2013
AM 4:00:00 PM
6/13/2013 8:00:00
6/17/2013
AM4:00:00 PM
6/13/2013 8:00:00
6/17/2013
AM4:00:00 PM
6/13/2013 8:00:00
6/17/2013
AM4:00:00 PM
6/13/2013 8:00:00
6/17/2013
AM4:00:00 PM
6/13/2013 8:00:00
6/17/2013
AM4:00:00 PM
6/13/2013 8:00:00
6/17/2013
AM4:00:00 PM
6/13/2013 8:00:00
6/17/2013
AM4:00:00 PM
6/13/2013 8:00:00
6/17/2013
AM4:00:00 PM
4/13/2015 8:00:00
5/12/2015
AM4:00:00 PM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/6/2013
AM
3:13:00 PM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/6/2013
AM
3:14:00 PM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/6/2013
AM
3:14:00 PM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/6/2013
AM
10:43:00 AM
8/19/2012 8:00:00
1/18/2013
AM10:42:00 AM
5/15/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/15/2012 8:00:00
1/3/2013
AM
3:22:00 PM

Page 48

TASKRSRC

157.64
50.57
14.21
5.12
0
14.21
5.37
14.21
5.37
50.75
61.41
54.59
127.9
14.21
262.74
84.59
23.68
8.53
0
23.68
8.95
23.68
8.95
84.59
102.36
90.98
213.17
23.68
22.05
5.51
5.51
5.51
22.05
27.56
24.49
55.11
840
173.5
52.05
17.5
94.78
94.78
94.78
340.38
412.55
366.71
857.39
322.88
4.2
14
19.11
19.11

171.48
52.82
14.79
4.97
0
14.79
5.22
14.79
5.22
52.82
63.92
56.81
133.11
14.21
285.8
88.04
24.65
8.29
0
24.65
8.7
24.65
8.7
88.04
106.53
94.69
221.86
23.68
22.66
5.67
5.67
5.67
22.66
28.33
25.18
56.65
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/27/2012 8:00:00
1/4/2013
AM
12:01:00 PM
5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/27/2012 8:00:00
1/4/2013
AM
11:52:00 AM
5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/27/2012 8:00:00
1/4/2013
AM
11:52:00 AM
5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/27/2012 8:00:00
1/3/2013
AM
3:22:00 PM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
6/16/2012 8:00:00
1/6/2013
AM
10:43:00 AM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
6/16/2012 8:00:00
1/6/2013
AM
10:23:00 AM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
6/16/2012 8:00:00
1/6/2013
AM
10:23:00 AM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
6/16/2012 8:00:00
1/4/2013
AM
12:01:00 PM
5/24/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/24/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/24/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/24/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/24/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/24/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/24/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/24/2012 8:00:00
1/3/2013
AM
3:22:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
8/10/2013
AM 12:48:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM

Page 49

TASKRSRC

37.48
255.5
443.87
133.16
221.53
71.51
20.02
6.3
1.95
20.02
8.67
20.02
8.67
71.51
86.53
76.91
180.2
21.45
369.22
119.18
33.37
10.51
3.25
33.37
14.45
33.37
14.45
119.18
144.21
128.19
300.33
35.75
29.14
7.28
7.28
7.28
29.14
36.42
32.37
72.84
147.69
47.67
13.35
4.2
1.3
13.35
5.78
13.35
5.78
47.67
57.68
51.27

0
0
443.87
133.16
169.62
54.42
15.24
4.44
1.44
15.24
6.18
15.24
6.18
54.42
65.84
58.53
137.13
21.45
282.7
90.69
25.39
7.4
2.4
25.39
10.29
25.39
10.29
90.69
109.74
97.54
228.54
35.75
23.24
5.81
5.81
5.81
23.24
29.05
25.82
58.11
113.08
36.28
10.16
2.96
0.96
10.16
4.12
10.16
4.12
36.28
43.9
39.02

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
5/23/2012 8:00:00
1/1/2013
AM
8:00:00 AM
5/23/2012 8:00:00
1/1/2013
AM
8:00:00 AM
6/6/2012 8:00:00
1/7/2013
AM2:58:00 PM
6/6/2012 8:00:00
1/7/2013
AM3:55:00 PM
6/6/2012 8:00:00
1/7/2013
AM3:54:00 PM
6/6/2012 8:00:00
1/9/2013
AM11:05:00 AM
6/6/2012 8:00:00
1/8/2013
AM12:31:00 PM
6/6/2012 8:00:00
1/7/2013
AM3:54:00 PM
6/6/2012 8:00:00
1/9/2013
AM9:39:00 AM
6/6/2012 8:00:00
1/7/2013
AM3:54:00 PM
6/6/2012 8:00:00
1/9/2013
AM9:39:00 AM
6/6/2012 8:00:00
1/7/2013
AM3:55:00 PM
6/6/2012 8:00:00
1/7/2013
AM3:55:00 PM
6/6/2012 8:00:00
1/7/2013
AM3:54:00 PM
6/6/2012 8:00:00
1/7/2013
AM3:54:00 PM
6/6/2012 8:00:00
1/2/2013
AM8:08:00 AM
7/1/2012 8:00:00
2/1/2013
AM2:34:00 PM
7/1/2012 8:00:00
2/2/2013
AM10:19:00 AM
7/1/2012 8:00:00
2/2/2013
AM10:18:00 AM
7/1/2012 8:00:00
2/7/2013
AM3:35:00 PM
7/1/2012 8:00:00
2/4/2013
AM12:48:00 PM
7/1/2012 8:00:00
2/2/2013
AM10:18:00 AM
7/1/2012 8:00:00
2/7/2013
AM9:20:00 AM
7/1/2012 8:00:00
2/2/2013
AM10:18:00 AM
7/1/2012 8:00:00
2/7/2013
AM9:20:00 AM
7/1/2012 8:00:00
2/2/2013
AM10:19:00 AM
7/1/2012 8:00:00
2/2/2013
AM10:19:00 AM
7/1/2012 8:00:00
2/2/2013
AM10:20:00 AM
7/1/2012 8:00:00
2/2/2013
AM10:18:00 AM
7/1/2012 8:00:00
1/9/2013
AM11:10:00 AM
6/1/2012 8:00:00
1/2/2013
AM8:06:00 AM
6/1/2012 8:00:00
1/2/2013
AM8:04:00 AM
6/1/2012 8:00:00
1/2/2013
AM8:04:00 AM
6/1/2012 8:00:00
1/2/2013
AM8:04:00 AM
6/1/2012 8:00:00
1/2/2013
AM8:06:00 AM
6/1/2012 8:00:00
1/2/2013
AM8:05:00 AM
6/1/2012 8:00:00
1/2/2013
AM8:05:00 AM
6/1/2012 8:00:00
1/2/2013
AM8:06:00 AM
10/9/2012 8:00:00
2/20/2013
AM2:42:00 PM
10/9/2012 8:00:00
2/21/2013
AM8:45:00 AM
10/9/2012 8:00:00
2/21/2013
AM8:49:00 AM
10/9/2012 8:00:00
2/24/2013
AM9:23:00 AM
10/9/2012 8:00:00
2/22/2013
AM11:00:00 AM
10/9/2012 8:00:00
2/21/2013
AM8:49:00 AM
10/9/2012 8:00:00
2/23/2013
AM2:15:00 PM
10/9/2012 8:00:00
2/21/2013
AM8:49:00 AM
10/9/2012 8:00:00
2/23/2013
AM2:15:00 PM
10/9/2012 8:00:00
2/21/2013
AM8:45:00 AM
10/9/2012 8:00:00
2/21/2013
AM8:44:00 AM
10/9/2012 8:00:00
2/21/2013
AM8:44:00 AM

Page 50

TASKRSRC

120.13
14.3
393.92
466
240
1617.02
178.53
178.53
178.53
691.96
642
400
41
79
0.72
39.32
601
120
42.04
42.04
778.46
132.84
33.21
33.21
33.21
132.84
166.05
147.6
332.11
808.99
700.46
196.13
0.84
59.57
196.13
63.43
196.13
63.43
700.46
847.55
753.38
1765.15
80.3
1348.32
1167.43
326.88
1.4
99.28
326.88
105.71
326.88
105.71

91.42
14.3
203.8
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

10/9/2012 8:00:00
2/21/2013
AM8:45:00 AM
10/9/2012 8:00:00
2/7/2013
AM
3:39:00 PM
10/9/2012 8:00:00
3/6/2013
AM
11:56:00 AM
6/21/2013 8:00:00
7/20/2013
AM4:00:00 PM
6/21/2013 8:00:00
8/4/2013
AM
4:00:00 PM
6/21/2013 8:00:00
8/4/2013
AM
4:00:00 PM
6/21/2013 8:00:00
7/26/2013
AM1:39:00 PM
6/21/2013 8:00:00
7/26/2013
AM1:39:00 PM
6/21/2013 8:00:00
7/26/2013
AM1:39:00 PM
6/21/2013 8:00:00
8/4/2013
AM
4:00:00 PM
6/21/2013 8:00:00
8/4/2013
AM
4:00:00 PM
6/21/2013 8:00:00
8/4/2013
AM
4:00:00 PM
6/21/2013 8:00:00
6/29/2013
AM9:36:00 AM
6/21/2013 8:00:00
7/6/2013
AM
2:24:00 PM
6/21/2013 8:00:00
6/21/2013
AM9:09:00 AM
6/21/2013 8:00:00
6/28/2013
AM2:55:00 PM
6/21/2013 8:00:00
8/4/2013
AM
4:00:00 PM
6/21/2013 8:00:00
7/14/2013
AM4:00:00 PM
6/21/2013 8:00:00
6/29/2013
AM11:16:00 AM
6/21/2013 8:00:00
6/29/2013
AM11:16:00 AM
6/21/2013 8:00:00
8/4/2013
AM
4:00:00 PM
7/23/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/23/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/23/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/23/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/23/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/23/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/23/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/23/2013 8:00:00
7/23/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
7/24/2013 8:00:00
7/31/2013
AM4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM

Page 51

TASKRSRC

1167.43
1412.59
1255.64
2941.93
133.84
539.33
466.97
130.75
0.56
39.71
130.75
42.29
130.75
42.29
466.97
565.04
502.25
1176.77
53.53
3873.45
4841.81
1452.54
949.72
1010.45
282.92
0.97
56.15
282.92
59.98
282.92
59.98
1010.45
1222.64
1086.79
2546.32
137.31
379.89
404.18
113.17
0.39
22.46
23.99
113.17
23.99
404.18
489.06
434.72
1018.53
54.92
113.17
3056.1
85.84

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/1/2013 8:00:00
8/20/2013
AM 4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
8/21/2013 8:00:00
9/1/2013
AM
4:00:00 PM
7/22/2013 8:00:00
7/22/2013
AM4:00:00 PM
7/22/2013 8:00:00
7/22/2013
AM10:24:00 AM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/8/2013 8:00:00
10/22/2013
AM 4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/23/2013 10/30/2013
8:00:00 AM4:00:00 PM
10/2/2013 8:00:00
10/2/2013
AM4:00:00 PM

Page 52

TASKRSRC

21.46
21.46
21.46
85.84
107.31
95.38
214.61
569.83
606.27
169.75
0.58
33.69
169.75
35.99
169.75
35.99
606.27
733.58
652.07
1527.79
82.39
3820.13
1146.04
566.69
630.57
176.56
0.81
52.7
176.56
56.18
176.56
56.18
630.57
762.99
678.21
1589.04
41.08
377.79
420.38
117.71
0.54
35.13
117.71
37.45
117.71
37.45
420.38
508.66
452.14
1059.36
27.39
2957.15

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
574.97
160.99
0.53
56.94
160.99
60.34
160.99
60.34
574.97
695.71
618.41
1448.91
41.08
0
383.31
107.33
0.35
37.96
107.33
40.23
107.33
40.23
383.31
463.81
412.27
965.94
27.39
2988.09

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

10/2/2013
10/2/2013
10/2/2013
10/2/2013
10/2/2013
10/2/2013
10/2/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/3/2013
10/1/2013
10/1/2013
5/28/2012
5/28/2012
5/28/2012
5/28/2012
5/28/2012
5/28/2012
5/28/2012
5/28/2012
5/28/2012
5/28/2012
5/28/2012
5/28/2012
5/28/2012
5/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012
9/28/2012

8:00:00
10/2/2013
AM4:00:00 PM
8:00:00
10/2/2013
AM4:00:00 PM
8:00:00
10/2/2013
AM4:00:00 PM
8:00:00
10/2/2013
AM4:00:00 PM
8:00:00
10/2/2013
AM4:00:00 PM
8:00:00
10/2/2013
AM4:00:00 PM
8:00:00
10/2/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/7/2013
AM4:00:00 PM
8:00:00
10/1/2013
AM4:00:00 PM
8:00:00
10/1/2013
AM10:24:00 AM
1/3/2013 4:00:00 PM
1/1/2013 10:07:00 AM
1/1/2013 10:07:00 AM
1/2/2013 8:18:00 AM
1/1/2013 8:00:00 AM
1/1/2013 10:07:00 AM
1/1/2013 8:00:00 AM
1/1/2013 10:07:00 AM
1/1/2013 8:00:00 AM
1/1/2013 10:07:00 AM
1/1/2013 10:07:00 AM
1/1/2013 10:07:00 AM
1/1/2013 10:07:00 AM
1/1/2013 8:00:00 AM
1/13/2013 4:00:00 PM
1/11/2013 10:07:00 AM
1/11/2013 10:07:00 AM
1/12/2013 8:19:00 AM
1/11/2013 8:00:00 AM
1/11/2013 10:07:00 AM
1/11/2013 8:00:00 AM
1/11/2013 10:07:00 AM
1/11/2013 8:00:00 AM
1/11/2013 10:07:00 AM
1/11/2013 10:07:00 AM
1/11/2013 10:07:00 AM
1/11/2013 10:07:00 AM
1/11/2013 8:00:00 AM
1/11/2013 8:00:00 AM

Page 53

TASKRSRC

1622.98
486.89
21.27
21.27
21.27
85.09
106.36
94.55
212.73
85.09
944.49
1050.95
294.27
1.34
87.83
294.27
93.63
294.27
93.63
1050.95
1271.65
1130.35
2648.39
68.46
60558
355.01
99.4
1.38
38.49
99.4
41.86
99.4
41.86
355.01
429.56
381.83
894.63
80.07
3297.31
989.19
100931
591.68
165.67
2.29
64.16
165.67
69.77
165.67
69.77
591.68
715.94
636.39

1622.98
486.89
23.27
23.27
23.27
93.07
116.34
103.41
232.68
93.07
0
958.28
268.32
0.88
94.9
268.32
100.57
268.32
100.57
958.28
1159.51
1030.68
2414.85
68.46
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

5/16/2012 1/1/2013 8:00:00 AM


5/16/2012 1/1/2013 8:00:00 AM
5/23/2012 1/1/2013 8:00:00 AM
5/23/2012 1/1/2013 8:00:00 AM
5/23/2012 1/1/2013 8:00:00 AM
5/23/2012 1/1/2013 8:00:00 AM
5/23/2012 1/1/2013 8:00:00 AM
5/23/2012 1/1/2013 8:00:00 AM
5/23/2012 1/1/2013 8:00:00 AM
5/23/2012 1/1/2013 8:00:00 AM
7/8/2012 1/10/2013 4:00:00 PM
7/8/2012 1/4/2013 12:56:00 PM
7/8/2012 1/4/2013 12:56:00 PM
7/8/2012 1/6/2013 11:06:00 AM
7/8/2012 1/4/2013 8:00:00 AM
7/8/2012 1/4/2013 12:56:00 PM
7/8/2012 1/4/2013 8:00:00 AM
7/8/2012 1/4/2013 12:56:00 PM
7/8/2012 1/4/2013 8:00:00 AM
7/8/2012 1/4/2013 12:56:00 PM
7/8/2012 1/4/2013 12:56:00 PM
7/8/2012 1/4/2013 12:56:00 PM
7/8/2012 1/4/2013 12:56:00 PM
7/8/2012 1/4/2013 8:00:00 AM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/3/2013 8:00:00
9/7/2013
AM4:00:00 PM
9/1/2013 8:00:00
9/1/2013
AM4:00:00 PM
9/1/2013 8:00:00
9/1/2013
AM10:24:00 AM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM

Page 54

TASKRSRC

1491.05
133.45
92.31
23.08
23.08
23.08
92.31
115.39
102.57
230.78
40372
236.67
66.27
0.92
25.66
66.27
27.91
66.27
27.91
236.67
286.38
254.56
596.42
53.38
2637.85
77.37
19.34
19.34
19.34
77.37
96.71
85.97
193.42
435.04
296.31
82.97
2.9
25.3
82.97
29.61
82.97
29.61
296.31
358.53
318.69
746.7
50.56
725.06
493.85
138.28
4.83
42.17

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/8/2013 8:00:00
9/22/2013
AM 4:00:00 PM
9/2/2013 8:00:00
9/2/2013
AM4:00:00 PM
9/2/2013 8:00:00
9/2/2013
AM4:00:00 PM
9/2/2013 8:00:00
9/2/2013
AM4:00:00 PM
9/2/2013 8:00:00
9/2/2013
AM4:00:00 PM
9/2/2013 8:00:00
9/2/2013
AM4:00:00 PM
9/2/2013 8:00:00
9/2/2013
AM4:00:00 PM
9/2/2013 8:00:00
9/2/2013
AM4:00:00 PM
9/2/2013 8:00:00
9/2/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
9/23/2013 8:00:00
9/30/2013
AM4:00:00 PM
7/2/2013 8:00:00
7/6/2013
AM4:00:00 PM
7/2/2013 8:00:00
7/6/2013
AM4:00:00 PM
7/2/2013 8:00:00
7/6/2013
AM4:00:00 PM
7/2/2013 8:00:00
7/6/2013
AM4:00:00 PM
7/2/2013 8:00:00
7/6/2013
AM4:00:00 PM
7/2/2013 8:00:00
7/6/2013
AM4:00:00 PM
7/2/2013 8:00:00
7/6/2013
AM4:00:00 PM
7/2/2013 8:00:00
7/6/2013
AM4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
7/7/2013 8:00:00
7/31/2013
AM 4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM

Page 55

TASKRSRC

138.28
49.35
138.28
49.35
493.85
597.55
531.16
1244.49
84.28
290.02
197.54
55.31
1.93
16.87
55.31
19.74
55.31
19.74
197.54
239.02
212.46
497.8
33.71
1352.4
1690.5
507.15
395347
197674
11500
185062.5
46.01
726
1.99
62.87
68.09
611.19
68.09
203.28
203.28
1829.53
203.28
726
878.46
780.86
140.01
35
35
350.02
35
140.01
175.01
155.57

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
8/1/2013 8:00:00
9/9/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
9/10/2013 8:00:00
10/1/2013
AM4:00:00 PM
7/1/2013 8:00:00
7/1/2013
AM4:00:00 PM
7/1/2013 8:00:00
7/1/2013
AM4:00:00 PM
6/20/2013 8:00:00
11/16/2013
AM 4:00:00 PM
8/19/2013 8:00:00
12/16/2013
AM 4:00:00 PM
10/20/2014 2/16/2015
8:00:00 AM
4:00:00 PM
10/20/2014 2/16/2015
8:00:00 AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/22/2013 8:00:00
7/2/2013
AM
4:00:00 PM
6/19/2013 8:00:00
6/21/2013
AM4:00:00 PM
6/19/2013 8:00:00
6/21/2013
AM4:00:00 PM
6/19/2013 8:00:00
6/21/2013
AM4:00:00 PM
6/19/2013 8:00:00
6/21/2013
AM4:00:00 PM
6/19/2013 8:00:00
6/21/2013
AM4:00:00 PM
6/19/2013 8:00:00
6/21/2013
AM4:00:00 PM
6/19/2013 8:00:00
6/21/2013
AM4:00:00 PM
6/19/2013 8:00:00
6/21/2013
AM4:00:00 PM

Page 56

TASKRSRC

76.67
3.31
104.78
1210
338.8
338.8
113.49
1018.65
3049.21
113.49
1301.43
1464.1
1210
338.8
30.67
484
1.32
41.91
45.4
407.46
45.4
135.52
135.52
1219.68
135.52
484
585.64
520.57
72
21.6
164728
14.49
138.06
345.96
345.96
160.18
900
345.96
1116
1350
1200
160.18
1017
2884.51
865.35
88.88
453.14
1589.76
492.82
492.82
650
4928.25

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
14.49
138.06
345.96
345.96
160.18
900
345.96
1116
1350
1200
160.18
1017
2884.51
865.35
88.88
453.14
1589.76
492.82
492.82
650
4928.25

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
7/3/2013 8:00:00
8/16/2013
AM 4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
8/17/2013 8:00:00
8/31/2013
AM4:00:00 PM
6/16/2013 8:00:00
6/18/2013
AM4:00:00 PM
6/16/2013 8:00:00
6/16/2013
AM3:12:00 PM
9/3/2013 8:00:00
11/16/2013
AM 4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/15/2012 8:00:00
5/29/2012
AM4:00:00 PM
5/30/2012 8:00:00
6/8/2012
AM
4:00:00 PM
5/30/2012 8:00:00
6/8/2012
AM
4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM

Page 57

TASKRSRC

569.12
1709.87
1923.61
1589.76
492.82
569.12
6414.44
971.15
54.26
59.68
2330.76
212.68
60.02
417.59
417.59
3010.56
286.33
286.33
1044.52
1175.09
971.15
417.59
59.68
2112
264
208.93
64.77
64.77
11.7
59.63
72
74.9
1540
647.67
5087
176
74.9
224.71
252.8
208.93
64.77
0
295.69
2956.95
295.69
953.86
1154.16
1025.92
953.86
53.33
271.88
341.47

569.12
1709.87
1923.61
1589.76
492.82
569.12
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
295.69
2956.95
295.69
953.86
1154.16
1025.92
953.86
53.33
271.88
341.47

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/4/2012 8:00:00
8/12/2012
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
7/7/2013 8:00:00
8/15/2013
AM 4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
10/6/2013 8:00:00
11/4/2013
AM4:00:00 PM
6/14/2012 8:00:00
1/1/2013
AM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM

Page 58

TASKRSRC

1000
341.47
295.69
2330.76
240
0
83.25
20.81
20.81
208.13
20.81
83.25
104.06
92.5
7329.75
7329.5
187081.3
0
738
0
183539.4
0
0
962.75
53253
186118.5
0
0
58299
183539.4
962.75
53253
186118.5
0
0
58299
7329.75
7329.75
0
187081.3
0
738
0
3
5
0
0
0
0
0
480
0

1000
341.47
295.69
0
0
0
83.25
20.81
20.81
208.13
20.81
83.25
104.06
92.5
6442.46
6442.24
164434.62
0
648.66
0
183539.4
0
0
962.75
53253
186118.5
0
0
58299
53465.83
280.45
15512.83
54217.13
0
0
16982.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
6/14/2012 8:00:00
7/3/2012
AM
4:00:00 PM
9/6/2013 8:00:00
10/5/2013
AM 4:00:00 PM
9/6/2013 8:00:00
10/5/2013
AM 4:00:00 PM
9/6/2013 8:00:00
10/5/2013
AM 4:00:00 PM
6/9/2012 8:00:00
6/13/2012
AM 4:00:00 PM
6/9/2012 8:00:00
6/13/2012
AM 4:00:00 PM
6/9/2012 8:00:00
6/13/2012
AM 4:00:00 PM
6/9/2012 8:00:00
6/13/2012
AM 4:00:00 PM
6/9/2012 8:00:00
6/13/2012
AM 4:00:00 PM
6/9/2012 8:00:00
6/13/2012
AM 4:00:00 PM
6/9/2012 8:00:00
6/13/2012
AM 4:00:00 PM
6/9/2012 8:00:00
6/13/2012
AM 4:00:00 PM
7/18/2012 8:00:00
1/23/2013
AM4:00:00 PM
7/18/2012 8:00:00
1/23/2013
AM4:00:00 PM
7/18/2012 8:00:00
1/23/2013
AM4:00:00 PM
7/18/2012 8:00:00
1/23/2013
AM4:00:00 PM
7/18/2012 8:00:00
1/23/2013
AM4:00:00 PM
7/18/2012 8:00:00
1/23/2013
AM4:00:00 PM
3/20/2012 8:00:00
10/25/2012
AM 4:00:00 PM
3/20/2012 8:00:00
10/25/2012
AM 4:00:00 PM
3/20/2012 8:00:00
4/7/2012
AM
4:00:00 PM
3/20/2012 8:00:00
10/25/2012
AM 4:00:00 PM
3/20/2012 8:00:00
10/25/2012
AM 4:00:00 PM
3/20/2012 8:00:00
10/25/2012
AM 4:00:00 PM
3/20/2012 8:00:00
10/25/2012
AM 4:00:00 PM
3/20/2012 8:00:00
10/25/2012
AM 4:00:00 PM
3/20/2012 8:00:00
10/25/2012
AM 4:00:00 PM
10/26/2012 6/12/2013
8:00:00 AM
4:00:00 PM
10/26/2012 6/12/2013
8:00:00 AM
4:00:00 PM
10/26/2012 6/12/2013
8:00:00 AM
4:00:00 PM
10/26/2012 6/12/2013
8:00:00 AM
4:00:00 PM
10/26/2012 6/12/2013
8:00:00 AM
4:00:00 PM
10/26/2012 6/12/2013
8:00:00 AM
4:00:00 PM
10/26/2012 6/12/2013
8:00:00 AM
4:00:00 PM
1/24/2013 8:00:00
8/1/2013
AM
4:00:00 PM
1/24/2013 8:00:00
8/1/2013
AM
4:00:00 PM
1/24/2013 8:00:00
8/1/2013
AM
4:00:00 PM
1/24/2013 8:00:00
8/1/2013
AM
4:00:00 PM
1/24/2013 8:00:00
8/1/2013
AM
4:00:00 PM
1/24/2013 8:00:00
8/1/2013
AM
4:00:00 PM
10/21/2013 11/4/2013
8:00:00 AM
4:00:00 PM
10/21/2013 11/4/2013
8:00:00 AM
4:00:00 PM
10/21/2013 11/4/2013
8:00:00 AM
4:00:00 PM
1/9/2015 8:00:00
1/12/2015
AM 4:00:00 PM
1/9/2015 8:00:00
1/12/2015
AM 4:00:00 PM
1/9/2015 8:00:00
2/7/2015
AM4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
1/9/2015 8:00:00
1/28/2015
AM 4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM

Page 59

TASKRSRC

0
1000000
943.08
580.71
162.6
1.1
57.05
162.6
61.07
162.6
61.07
702.65
624.58
1463.38
66.92
580.71
1617.57
485.27
73.5
18.38
18.38
18.38
73.5
91.88
81.67
183.75
565.85
348.42
97.56
0.66
34.23
97.56
36.64
97.56
36.64
348.42
421.59
374.75
878.03
40.15
377.23
232.28
65.04
0.44
65.04
24.43
65.04
24.43
232.28
281.06
249.83
585.35

0
700201.21
0
536.28
150.16
1.48
43.15
150.16
46.86
150.16
46.86
648.9
576.8
1351.42
51.04
536.28
1617.57
485.27
70.42
17.6
17.6
17.6
70.42
88.02
78.24
176.04
0
321.77
90.09
0.89
25.89
90.09
28.12
90.09
28.12
321.77
389.34
346.08
810.85
30.63
0
214.51
60.06
0.59
60.06
18.75
60.06
18.75
214.51
259.56
230.72
540.57

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

1/9/2015 8:00:00
2/12/2015
AM 4:00:00 PM
1/19/2012 8:00:00
5/29/2013
AM4:00:00 PM
6/19/2012 8:00:00
2/25/2013
AM9:01:00 AM
6/19/2012 8:00:00
1/5/2013
AM
10:41:00 AM
6/19/2012 8:00:00
1/5/2013
AM
10:41:00 AM
6/19/2012 8:00:00
1/1/2013
AM
9:01:00 AM
6/19/2012 8:00:00
1/14/2013
AM12:12:00 PM
6/19/2012 8:00:00
1/5/2013
AM
10:41:00 AM
6/19/2012 8:00:00
1/13/2013
AM3:22:00 PM
6/19/2012 8:00:00
1/5/2013
AM
10:41:00 AM
6/19/2012 8:00:00
1/13/2013
AM3:22:00 PM
6/19/2012 8:00:00
1/5/2013
AM
10:41:00 AM
6/19/2012 8:00:00
1/5/2013
AM
10:41:00 AM
6/19/2012 8:00:00
1/5/2013
AM
10:41:00 AM
6/19/2012 8:00:00
1/14/2013
AM9:24:00 AM
6/19/2012 8:00:00
1/5/2013
AM
10:41:00 AM
4/30/2012 5/25/2012 4:00:00 PM
4/30/2012 5/25/2012 4:00:00 PM
5/26/2012 8:00:00
1/1/2013
AM
9:00:00 AM
5/26/2012 8:00:00
1/1/2013
AM
9:01:00 AM
5/26/2012 8:00:00
1/1/2013
AM
9:01:00 AM
5/26/2012 8:00:00
1/1/2013
AM
9:01:00 AM
5/26/2012 8:00:00
1/1/2013
AM
9:00:00 AM
5/26/2012 8:00:00
1/1/2013
AM
9:00:00 AM
5/26/2012 8:00:00
1/1/2013
AM
9:00:00 AM
5/26/2012 8:00:00
1/1/2013
AM
9:00:00 AM
5/29/2012 8:00:00
1/22/2013
AM9:01:00 AM
5/29/2012 8:00:00
1/2/2013
AM
1:52:00 PM
5/29/2012 8:00:00
1/2/2013
AM
1:52:00 PM
5/29/2012 8:00:00
1/1/2013
AM
9:01:00 AM
5/29/2012 8:00:00
1/6/2013
AM
9:57:00 AM
5/29/2012 8:00:00
1/2/2013
AM
1:52:00 PM
5/29/2012 8:00:00
1/6/2013
AM
8:06:00 AM
5/29/2012 8:00:00
1/2/2013
AM
1:52:00 PM
5/29/2012 8:00:00
1/6/2013
AM
8:06:00 AM
5/29/2012 8:00:00
1/1/2013
AM
10:18:00 AM
5/29/2012 8:00:00
1/2/2013
AM
1:52:00 PM
5/29/2012 8:00:00
1/2/2013
AM
1:52:00 PM
5/29/2012 8:00:00
1/2/2013
AM
1:52:00 PM
5/29/2012 8:00:00
1/6/2013
AM
8:52:00 AM
8/13/2012 8:00:00
1/26/2013
AM9:01:00 AM
8/13/2012 8:00:00
1/3/2013
AM
8:19:00 AM
8/13/2012 8:00:00
1/3/2013
AM
8:19:00 AM
8/13/2012 8:00:00
1/1/2013
AM
9:01:00 AM
8/13/2012 8:00:00
1/3/2013
AM
8:19:00 AM
8/13/2012 8:00:00
1/6/2013
AM
3:33:00 PM
8/13/2012 8:00:00
1/3/2013
AM
8:19:00 AM
8/13/2012 8:00:00
1/6/2013
AM
3:33:00 PM
8/13/2012 8:00:00
1/3/2013
AM
8:19:00 AM
8/13/2012 8:00:00
1/3/2013
AM
8:19:00 AM
8/13/2012 8:00:00
1/3/2013
AM
8:19:00 AM
8/13/2012 8:00:00
1/3/2013
AM
8:19:00 AM

Page 60

TASKRSRC

26.77
1888.53
22.82
129.11
38.73
6.53
15.68
15.68
15.68
56.7
68.87
61.21
142.75
50.17
1.47
0
1.55
1.55
63
0
0
388.18
507.14
152.14
113.84
163.1
163.1
594.71
431.07
383.17
1496.4
329.34
42.51
8.36
53.41
53.41
180.21
189.73
163.1
258.22
77.47
13.07
31.36
31.36
31.36
113.4
137.73
122.43
285.5
100.33
2.95
0

20.42
1888.53
17.26
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
296.78
89.03
39.7
93.91
93.91
301.78
412.58
366.73
855.15
262.08
25.62
2.28
29.3
29.3
101.45
0
93.91
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

8/13/2012 8:00:00
1/7/2013
AM
8:29:00 AM
8/13/2012 8:00:00
1/1/2013
AM
9:01:00 AM
8/13/2012 8:00:00
1/16/2013
AM9:01:00 AM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/1/2013 8:00:00
11/30/2013
AM 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM

Page 61

TASKRSRC

3.1
3.1
125.99
0
0
38.73
6.53
15.68
15.68
15.68
56.7
68.87
61.21
142.75
50.17
1.47
0
1.55
1.55
63
0
0
129.11
516.44
154.93
26.13
62.72
62.72
62.72
226.79
275.46
244.85
570.99
200.66
5.89
0
6.19
6.19
251.98
0
0
0
1577.95
473.38
75.68
316
316
316
1136.69
1378.42
1225.26
2862.94

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
516.44
154.93
26.13
16.41
16.41
16.41
61.4
75.34
66.97
154.21
35.27
2.85
0
2.99
2.99
251.98
0
0
0
1577.95
473.38
82.08
314.86
314.86
314.86
1133.3
1374.58
1221.84
2854.27

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
9/1/2013 8:00:00
10/1/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
10/2/2013 8:00:00
10/31/2013
AM 4:00:00 PM
8/15/2012 8:00:00
1/12/2013
AM8:02:00 AM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/12/2013
AM8:02:00 AM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM3:59:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
1/9/2015 8:00:00
2/7/2015
AM4:00:00 PM
5/15/2012 8:00:00
1/1/2013
AM
8:00:00 AM
5/15/2012 8:00:00
1/1/2013
AM
8:00:00 AM
5/15/2012 8:00:00
1/1/2013
AM
8:00:00 AM
5/15/2012 8:00:00
1/1/2013
AM
10:36:00 AM
5/15/2012 8:00:00
1/1/2013
AM
10:36:00 AM
5/15/2012 8:00:00
1/1/2013
AM
10:36:00 AM
5/15/2012 8:00:00
1/1/2013
AM
10:09:00 AM
5/15/2012 8:00:00
1/1/2013
AM
10:00:00 AM
5/15/2012 8:00:00
1/1/2013
AM
10:00:00 AM
5/15/2012 8:00:00
1/1/2013
AM
10:11:00 AM

Page 62

TASKRSRC

1061.01
42.34
51.87
98.92
98.92
512
245.36
1871.1
1419.45
247.85
74.36
25
135.4
135.4
135.4
486.25
589.36
523.88
1224.85
461.25
6
20
27.3
27.3
53.54
365
1200
1223.54
367.06
76.66
19.17
19.17
19.17
76.66
95.83
85.18
191.66
643.29
180.12
2.06
51.08
180.12
55.79
180.12
55.79
643.29
778.39
691.9
1621.1
108
1003.14
257.32

1051.22
32.68
50.14
86.97
86.97
295.7
181.46
1487.79
1426.34
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1223.54
367.06
66.59
16.65
16.65
16.65
66.59
83.24
73.99
166.49
455.87
127.64
0.74
41.11
127.64
43.94
127.64
43.94
455.87
551.61
490.32
1148.8
108.38
0
182.35

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

5/15/2012 8:00:00
1/1/2013
AM
2:39:00 PM
5/15/2012 8:00:00
1/21/2013
AM12:12:00 PM
5/15/2012 8:00:00
1/4/2013
AM
8:01:00 AM
5/15/2012 8:00:00
1/11/2013
AM3:01:00 PM
5/15/2012 8:00:00
1/11/2013
AM3:01:00 PM
5/15/2012 8:00:00
2/8/2013
AM
8:10:00 AM
5/15/2012 8:00:00
1/24/2013
AM11:30:00 AM
5/15/2012 8:00:00
1/19/2013
AM11:30:00 AM
5/15/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
9/24/2013
AM3:12:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
9/18/2013 8:00:00
10/8/2013
AM4:00:00 PM
6/15/2012 8:00:00
6/29/2012
AM4:00:00 PM
6/15/2012 8:00:00
6/29/2012
AM4:00:00 PM
6/30/2012 8:00:00
1/1/2013
AM
11:09:00 AM
6/30/2012 8:00:00
1/1/2013
AM
11:09:00 AM
6/30/2012 8:00:00
1/1/2013
AM
11:09:00 AM
6/30/2012 8:00:00
1/1/2013
AM
11:09:00 AM
6/30/2012 8:00:00
1/1/2013
AM
11:09:00 AM
6/30/2012 8:00:00
1/1/2013
AM
11:09:00 AM
6/30/2012 8:00:00
1/1/2013
AM
11:09:00 AM
6/30/2012 8:00:00
1/1/2013
AM
11:09:00 AM
7/18/2012 8:00:00
1/29/2013
AM12:02:00 PM
7/18/2012 8:00:00
1/29/2013
AM12:02:00 PM
7/18/2012 8:00:00
2/14/2013
AM9:50:00 AM
7/18/2012 8:00:00
1/25/2013
AM9:25:00 AM
7/18/2012 8:00:00
1/29/2013
AM12:02:00 PM
7/18/2012 8:00:00
1/25/2013
AM3:37:00 PM
7/18/2012 8:00:00
1/29/2013
AM12:02:00 PM
7/18/2012 8:00:00
1/25/2013
AM3:37:00 PM
7/18/2012 8:00:00
1/29/2013
AM12:02:00 PM
7/18/2012 8:00:00
1/29/2013
AM12:02:00 PM
7/18/2012 8:00:00
1/29/2013
AM12:02:00 PM
7/18/2012 8:00:00
1/29/2013
AM12:02:00 PM
7/18/2012 8:00:00
1/16/2013
AM11:09:00 AM
7/18/2012 8:00:00
3/2/2013
AM
11:09:00 AM
9/1/2012 8:00:00
3/7/2013
AM1:06:00 PM

Page 63

TASKRSRC

72.05
0.82
20.43
72.05
22.32
72.05
22.32
257.32
311.36
276.76
648.44
43.2
1294.32
401.26
385.98
108.07
1.24
30.64
108.07
33.48
108.07
33.48
385.98
467.03
415.14
972.66
64.8
601.89
873.05
244.45
0.7
56.49
244.45
60.05
244.45
60.05
873.05
1056.39
939.01
2200.08
81.92
809.9
2882.91
864.87
112.65
28.16
28.16
28.16
112.65
140.81
125.17
281.63

51.06
0.3
16.44
51.06
17.58
51.06
17.58
182.35
220.64
196.13
459.52
43.35
1791.14
0
273.52
76.59
0.45
24.66
76.59
26.36
76.59
26.36
273.52
330.96
294.19
689.28
65.03
0
833.9
233.49
0.73
64.81
233.49
68.82
233.49
68.82
833.9
1009.02
896.9
2101.42
82.15
0
2882.91
864.87
125.12
31.28
31.28
31.28
125.12
156.4
139.02
312.79

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

9/1/2012 8:00:00
3/7/2013
AM1:06:00 PM
9/1/2012 8:00:00
3/13/2013
AM 2:28:00 PM
9/1/2012 8:00:00
3/5/2013
AM3:16:00 PM
9/1/2012 8:00:00
3/7/2013
AM1:06:00 PM
9/1/2012 8:00:00
3/6/2013
AM9:44:00 AM
9/1/2012 8:00:00
3/7/2013
AM1:06:00 PM
9/1/2012 8:00:00
3/6/2013
AM9:44:00 AM
9/1/2012 8:00:00
3/7/2013
AM1:06:00 PM
9/1/2012 8:00:00
3/7/2013
AM1:06:00 PM
9/1/2012 8:00:00
3/7/2013
AM1:06:00 PM
9/1/2012 8:00:00
3/7/2013
AM1:06:00 PM
9/1/2012 8:00:00
3/2/2013
AM11:09:00 AM
9/1/2012 8:00:00
3/2/2013
AM11:09:00 AM
9/1/2012 8:00:00
3/20/2013
AM 11:09:00 AM
7/3/2012 8:00:00
1/5/2013
AM2:07:00 PM
7/3/2012 8:00:00
1/5/2013
AM2:06:00 PM
7/3/2012 8:00:00
1/10/2013
AM 3:36:00 PM
7/3/2012 8:00:00
1/4/2013
AM10:34:00 AM
7/3/2012 8:00:00
1/5/2013
AM2:06:00 PM
7/3/2012 8:00:00
1/4/2013
AM12:40:00 PM
7/3/2012 8:00:00
1/5/2013
AM2:06:00 PM
7/3/2012 8:00:00
1/4/2013
AM12:40:00 PM
7/3/2012 8:00:00
1/5/2013
AM2:07:00 PM
7/3/2012 8:00:00
1/5/2013
AM2:07:00 PM
7/3/2012 8:00:00
1/5/2013
AM2:07:00 PM
7/3/2012 8:00:00
1/5/2013
AM2:07:00 PM
7/3/2012 8:00:00
1/1/2013
AM11:09:00 AM
7/3/2012 8:00:00
1/16/2013
AM 11:09:00 AM
5/25/2012 1/1/2013 9:48:00 AM
5/25/2012 1/1/2013 9:48:00 AM
5/25/2012 1/1/2013 8:00:00 AM
5/25/2012 1/1/2013 8:00:00 AM
5/25/2012 1/1/2013 9:48:00 AM
5/25/2012 1/1/2013 8:00:00 AM
5/25/2012 1/1/2013 9:48:00 AM
5/25/2012 1/1/2013 8:00:00 AM
5/25/2012 1/1/2013 9:48:00 AM
5/25/2012 1/1/2013 9:48:00 AM
5/25/2012 1/1/2013 9:48:00 AM
5/25/2012 1/1/2013 9:48:00 AM
5/25/2012 1/1/2013 8:00:00 AM
5/25/2012 1/5/2013 4:00:00 PM
5/4/2012 1/1/2013 8:00:00 AM
5/4/2012 1/1/2013 8:00:00 AM
5/13/2012 1/1/2013 8:00:00 AM
5/13/2012 1/1/2013 8:00:00 AM
5/13/2012 1/1/2013 8:00:00 AM
5/13/2012 1/1/2013 8:00:00 AM
5/13/2012 1/1/2013 8:00:00 AM
5/13/2012 1/1/2013 8:00:00 AM
5/13/2012 1/1/2013 8:00:00 AM
5/13/2012 1/1/2013 8:00:00 AM

Page 64

TASKRSRC

1455.08
407.42
1.18
94.14
407.42
100.09
407.42
100.09
1455.08
1760.64
1565.02
3666.8
136.54
1349.83
626.01
1466.72
54.62
582.03
162.97
0.47
37.66
162.97
40.03
162.97
40.03
582.03
704.26
4191.35
539.93
2945.4
2945.4
75177.08
0
23348.23
0
5794.86
5794.86
147905.7
0
45936.02
0
1
0
0
1
0
0
26789.24
26789.24
683757.7
0
212359

1389.83
389.15
1.22
108.02
389.15
114.7
389.15
114.7
1389.83
1681.7
1494.84
3502.37
136.92
0
597.94
1400.95
54.77
555.93
155.66
0.49
43.21
155.66
45.88
155.66
45.88
555.93
672.68
4614.82
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
19379.45
19379.45
494633.23
0
153621.4

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

7/5/2012 1/6/2013 11:35:00 AM


7/5/2012 1/6/2013 11:35:00 AM
7/5/2012 1/6/2013 8:00:00 AM
7/5/2012 1/6/2013 8:00:00 AM
7/5/2012 1/6/2013 11:35:00 AM
7/5/2012 1/6/2013 8:00:00 AM
7/5/2012 1/6/2013 11:35:00 AM
7/5/2012 1/6/2013 8:00:00 AM
7/5/2012 1/6/2013 11:35:00 AM
7/5/2012 1/6/2013 11:35:00 AM
7/5/2012 1/6/2013 11:35:00 AM
7/5/2012 1/6/2013 11:35:00 AM
7/5/2012 1/6/2013 8:00:00 AM
7/5/2012 1/15/2013 4:00:00 PM
10/18/2012 3/17/2013 10:49:00 AM
10/18/2012 3/17/2013 10:49:00 AM
10/18/2012 3/17/2013 9:01:00 AM
10/18/2012 3/17/2013 10:49:00 AM
10/18/2012 3/17/2013 10:49:00 AM
10/18/2012 3/17/2013 9:01:00 AM
10/18/2012 3/17/2013 9:01:00 AM
10/18/2012 3/17/2013 10:49:00 AM
10/18/2012 3/17/2013 9:01:00 AM
10/18/2012 3/17/2013 10:49:00 AM
10/18/2012 3/17/2013 9:01:00 AM
10/18/2012 3/17/2013 10:49:00 AM
10/18/2012 3/17/2013 10:49:00 AM
10/18/2012 3/17/2013 9:01:00 AM
10/18/2012 3/22/2013 9:01:00 AM
5/20/2013 8:00:00
6/19/2013
AM4:00:00 PM
5/20/2013 8:00:00
6/19/2013
AM4:00:00 PM
5/20/2013 8:00:00
6/19/2013
AM4:00:00 PM
5/20/2013 8:00:00
6/19/2013
AM4:00:00 PM
5/20/2013 8:00:00
6/19/2013
AM4:00:00 PM
5/20/2013 8:00:00
6/19/2013
AM4:00:00 PM
3/20/2013 8:00:00
5/19/2013
AM4:00:00 PM
3/20/2013 8:00:00
5/19/2013
AM4:00:00 PM
3/20/2013 8:00:00
5/19/2013
AM4:00:00 PM
3/20/2013 8:00:00
5/19/2013
AM4:00:00 PM
3/20/2013 8:00:00
5/19/2013
AM4:00:00 PM
3/20/2013 8:00:00
5/19/2013
AM4:00:00 PM
3/12/2014 8:00:00
3/26/2014
AM4:00:00 PM
3/12/2014 8:00:00
3/26/2014
AM4:00:00 PM
3/12/2014 8:00:00
3/26/2014
AM4:00:00 PM
3/27/2014 8:00:00
4/10/2014
AM4:00:00 PM
3/27/2014 8:00:00
4/10/2014
AM4:00:00 PM
3/27/2014 8:00:00
4/10/2014
AM4:00:00 PM
6/11/2012 8:00:00
3/19/2013
AM4:00:00 PM
6/11/2012 8:00:00
3/19/2013
AM4:00:00 PM
6/11/2012 8:00:00
3/19/2013
AM4:00:00 PM
6/11/2012 8:00:00
3/19/2013
AM4:00:00 PM
6/11/2012 8:00:00
3/19/2013
AM4:00:00 PM

Page 65

TASKRSRC

0
2115.6
45279.41
49807.35
45279.41
2115.6
531961.88
367403.5
138458
539437
0
0
148458
0
0
480
581759.75
36785.76
36785.76
938903.91
0
57375.24
0
10376.6
10376.6
264847.9
0
16184.52
100
0.6
0
0
23920.89
23920.89
610546.5
0
37309.73
0
1.1
0
0
565239
49496.37
64144.91
573181.7
0
0
66901.91
664878.5
58221.51
75452.29
674221.3

0
1002.13
21448.14
23592.96
21448.14
1002.13
0
54997.52
0
0
0
0
0
0
0
0
358186.08
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
21889.87
21889.87
558707.65
0
34141.92
0
0
0
0
565239
49496.37
64144.91
0
0
0
66901.91
0
58221.51
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

6/11/2012 8:00:00
3/19/2013
AM4:00:00 PM
8/10/2012 8:00:00
6/9/2013
AM
4:00:00 PM
8/10/2012 8:00:00
6/9/2013
AM
4:00:00 PM
8/10/2012 8:00:00
6/9/2013
AM
4:00:00 PM
8/10/2012 8:00:00
6/9/2013
AM
4:00:00 PM
8/10/2012 8:00:00
6/9/2013
AM
4:00:00 PM
6/22/2012 6/4/2013 4:00:00 PM
6/22/2012 6/4/2013 4:00:00 PM
6/22/2012 6/4/2013 4:00:00 PM
6/22/2012 6/4/2013 4:00:00 PM
6/22/2012 6/4/2013 4:00:00 PM
6/22/2012 6/4/2013 4:00:00 PM
6/22/2012 6/4/2013 4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
3/1/2012 8:00:00
7/10/2013
AM 4:00:00 PM
5/20/2013 8:00:00
4/10/2014
AM4:00:00 PM
5/20/2013 8:00:00
4/10/2014
AM4:00:00 PM
5/20/2013 8:00:00
4/10/2014
AM4:00:00 PM
5/20/2013 8:00:00
4/10/2014
AM4:00:00 PM
5/20/2013 8:00:00
4/10/2014
AM4:00:00 PM
5/20/2013 8:00:00
4/10/2014
AM4:00:00 PM
5/20/2013 8:00:00
8/19/2013
AM4:00:00 PM
5/20/2013 8:00:00
8/19/2013
AM4:00:00 PM
5/20/2013 8:00:00
8/19/2013
AM4:00:00 PM
5/20/2013 8:00:00
8/19/2013
AM4:00:00 PM
5/20/2013 8:00:00
8/19/2013
AM4:00:00 PM
5/20/2013 8:00:00
8/19/2013
AM4:00:00 PM
8/20/2013 8:00:00
9/3/2013
AM
4:00:00 PM
8/20/2013 8:00:00
9/3/2013
AM
4:00:00 PM
8/20/2013 8:00:00
9/3/2013
AM
4:00:00 PM
6/21/2012 8:00:00
1/18/2013
AM4:00:00 PM
6/21/2012 8:00:00
1/18/2013
AM4:00:00 PM
6/21/2012 8:00:00
1/18/2013
AM4:00:00 PM
6/21/2012 8:00:00
1/18/2013
AM4:00:00 PM
6/21/2012 8:00:00
1/18/2013
AM4:00:00 PM
6/21/2012 8:00:00
1/18/2013
AM4:00:00 PM
3/12/2014 8:00:00
4/10/2014
AM4:00:00 PM
3/12/2014 8:00:00
4/10/2014
AM4:00:00 PM
3/12/2014 8:00:00
4/10/2014
AM4:00:00 PM
6/22/2012 1/10/2013 4:00:00 PM
6/22/2012 1/10/2013 4:00:00 PM
6/22/2012 1/10/2013 4:00:00 PM
6/22/2012 1/10/2013 4:00:00 PM
6/22/2012 1/10/2013 4:00:00 PM
6/22/2012 1/10/2013 4:00:00 PM
6/22/2012 1/10/2013 4:00:00 PM
7/3/2012 8/15/2013 4:00:00 PM
7/3/2012 8/15/2013 4:00:00 PM
7/3/2012 8/15/2013 4:00:00 PM
7/3/2012 8/15/2013 4:00:00 PM

Page 66

TASKRSRC

0
0
0
0
78695.29 0
820078.3 0
71811.92 2522.1
93064.8
0
831602
0
0
0
0
0
97064.8
0
0.6
0
0
0
0
0
17153.16 0
17153.16 0
437809.8 0
0
0
26754.01 0
0
0
11500
0
185062.5 0
164728
0
164728
0
0
0
0
0
480
0
1581759.75973880.25
0
0
3017.38
0
0
0
424.26
0
436.75
0
122.29
0
0.53
0
122.29
0
39.25
0
122.29
0
39.25
0
436.75
0
528.47
0
469.75
0
1100.61
0
52.92
0
36.85
0
3771.72
0
1131.52
0
92.21
0
23.05
0
23.05
0
23.05
0
92.21
0
115.27
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

7/3/2012 8/15/2013 4:00:00 PM


7/3/2012 8/15/2013 4:00:00 PM
7/3/2012 8/15/2013 4:00:00 PM
11/15/2012 7/19/2013 4:00:00 PM
11/15/2012 7/19/2013 4:00:00 PM
11/15/2012 7/19/2013 4:00:00 PM
11/15/2012 7/19/2013 4:00:00 PM
11/15/2012 7/19/2013 4:00:00 PM
11/15/2012 7/19/2013 4:00:00 PM
11/15/2012 7/19/2013 4:00:00 PM
6/20/2013 8:00:00
7/4/2013
AM
4:00:00 PM
6/20/2013 8:00:00
7/4/2013
AM
4:00:00 PM
6/20/2013 8:00:00
7/4/2013
AM
4:00:00 PM
1/19/2013 8:00:00
6/19/2013
AM4:00:00 PM
1/19/2013 8:00:00
6/19/2013
AM4:00:00 PM
1/19/2013 8:00:00
6/19/2013
AM4:00:00 PM
1/19/2013 8:00:00
6/19/2013
AM4:00:00 PM
1/19/2013 8:00:00
6/19/2013
AM4:00:00 PM
1/19/2013 8:00:00
6/19/2013
AM4:00:00 PM
10/15/2014 2/11/2015
8:00:00 AM
4:00:00 PM
10/15/2014 2/11/2015
8:00:00 AM
4:00:00 PM
10/6/2013 8:00:00
3/17/2014
AM4:00:00 PM
5/20/2013 8:00:00
10/5/2013
AM4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
1/9/2015 8:00:00
3/9/2015
AM4:00:00 PM
3/1/2012 8:00:00
7/10/2013
AM 4:00:00 PM
1/9/2015 8:00:00
2/7/2015
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
6/30/2013
AM4:00:00 PM
4/16/2013 8:00:00
4/18/2013
AM4:00:00 PM
4/16/2013 8:00:00
4/16/2013
AM3:12:00 PM
4/19/2013 8:00:00
4/21/2013
AM4:00:00 PM
4/19/2013 8:00:00
4/21/2013
AM4:00:00 PM
4/19/2013 8:00:00
4/21/2013
AM4:00:00 PM
4/19/2013 8:00:00
4/21/2013
AM4:00:00 PM
4/19/2013 8:00:00
4/21/2013
AM4:00:00 PM
4/19/2013 8:00:00
4/21/2013
AM4:00:00 PM

Page 67

TASKRSRC

102.46
230.53
636.39
655.13
183.44
0.8
55.28
183.44
58.88
183.44
58.88
655.13
792.7
704.63
1650.92
79.38
1060.65
1091.88
305.73
1.33
92.13
305.73
98.13
305.73
98.13
1091.88
1321.17
1174.37
2751.53
132.29
279.82
189.84
53.15
3.29
14.89
53.15
19.09
53.15
19.09
189.84
229.7
204.18
478.39
34.02
1237.25
246.66
1607.98
556.99
58.62
14.65
14.65
14.65

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
191.12
53.51
2.62
14.88
53.51
18.38
53.51
18.38
191.12
231.26
205.56
481.63
33.94
1238.72
246.66
1607.98
556.39
64.41
16.1
16.1
16.1

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

4/19/2013 8:00:00
4/21/2013
AM4:00:00 PM
4/19/2013 8:00:00
4/21/2013
AM4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
4/22/2013 8:00:00
5/1/2013
AM
4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
5/2/2013 8:00:00
6/14/2013
AM 4:00:00 PM
8/14/2012 8:00:00
2/27/2013
AM8:05:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:05:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:05:00 AM
8/14/2012 8:00:00
2/17/2013
AM11:38:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:09:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:05:00 AM
8/14/2012 8:00:00
2/15/2013
AM11:39:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:05:00 AM
8/14/2012 8:00:00
2/15/2013
AM11:39:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:05:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:05:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:05:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:05:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:19:00 AM
8/14/2012 8:00:00
2/15/2013
AM8:05:00 AM
6/15/2012 8:00:00
1/1/2013
AM
8:00:00 AM
6/15/2012 8:00:00
1/1/2013
AM
8:00:00 AM
6/15/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/24/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/24/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/24/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/24/2012 8:00:00
1/1/2013
AM
8:05:00 AM

Page 68

TASKRSRC

58.62
73.27
65.13
146.54
419.72
284.75
79.73
4.93
22.33
79.73
28.63
79.73
28.63
284.75
344.55
306.27
717.58
51.03
699.54
474.59
132.88
8.22
37.22
132.88
47.71
132.88
47.71
474.59
574.25
510.45
1195.97
85.05
541.05
580.27
162.48
0.74
45.21
162.48
48.25
162.48
48.25
580.27
702.13
624.12
1462.29
41.89
4066.82
5083.53
1502.42
1352.63
406.19
120.62

64.41
80.51
71.56
161.02
0
286.69
80.27
3.93
22.33
80.27
27.57
80.27
27.57
286.69
346.89
308.35
722.45
50.91
0
477.81
133.79
6.56
37.21
133.79
45.96
133.79
45.96
477.81
578.15
513.91
1204.08
84.85
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

6/24/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/24/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/24/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/24/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/30/2012 8:00:00
1/10/2013
AM8:05:00 AM
6/30/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/30/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/30/2012 8:00:00
1/2/2013
AM
2:41:00 PM
6/30/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/30/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/30/2012 8:00:00
1/1/2013
AM
10:45:00 AM
6/30/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/30/2012 8:00:00
1/1/2013
AM
10:45:00 AM
6/30/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/30/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/30/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/30/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/30/2012 8:00:00
1/1/2013
AM
8:15:00 AM
7/9/2012 8:00:00
2/15/2013
AM 8:05:00 AM
7/9/2012 8:00:00
1/10/2013
AM 8:05:00 AM
7/9/2012 8:00:00
1/10/2013
AM 8:05:00 AM
7/9/2012 8:00:00
1/17/2013
AM 10:15:00 AM
7/9/2012 8:00:00
1/10/2013
AM 8:10:00 AM
7/9/2012 8:00:00
1/10/2013
AM 8:05:00 AM
7/9/2012 8:00:00
1/11/2013
AM 10:39:00 AM
7/9/2012 8:00:00
1/10/2013
AM 8:05:00 AM
7/9/2012 8:00:00
1/11/2013
AM 10:39:00 AM
7/9/2012 8:00:00
1/10/2013
AM 8:05:00 AM
7/9/2012 8:00:00
1/10/2013
AM 8:05:00 AM
7/9/2012 8:00:00
1/10/2013
AM 8:05:00 AM
7/9/2012 8:00:00
1/10/2013
AM 8:05:00 AM
7/9/2012 8:00:00
1/10/2013
AM 8:46:00 AM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
8/7/2013 8:00:00
8/21/2013
AM 4:00:00 PM
5/22/2013 8:00:00
5/30/2013
AM4:00:00 PM
5/22/2013 8:00:00
5/30/2013
AM4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM

Page 69

TASKRSRC

1450.68
1755.32
1560.29
3655.72
104.73
1450.68
406.19
1.84
113.03
406.19
120.62
115.24
28.81
28.81
28.81
115.24
144.05
128.04
288.1
811.58
870.41
243.71
1.1
67.82
243.71
72.37
243.71
72.37
870.41
1053.19
936.17
2193.43
62.84
0
2499.8
699.94
18.92
203.75
699.94
233.81
699.94
233.81
2499.8
3024.76
2688.68
6299.5
398.94
349.23
87.31
87.31
87.31
349.23

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2499.8
699.94
18.53
186.27
699.94
215.04
699.94
215.04
2499.8
3024.76
2688.67
6299.5
398.94
313.54
78.39
78.39
78.39
313.54

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
6/15/2013 8:00:00
8/6/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
5/31/2013 8:00:00
6/4/2013
AM
4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
6/5/2013 8:00:00
6/14/2013
AM 4:00:00 PM
9/26/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/26/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/26/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/26/2012 8:00:00
1/1/2013
AM
2:56:00 PM
9/26/2012 8:00:00
1/4/2013
AM
12:50:00 PM
9/26/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/26/2012 8:00:00
1/4/2013
AM
10:58:00 AM
9/26/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/26/2012 8:00:00
1/4/2013
AM
10:58:00 AM
9/26/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/26/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/26/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/26/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/26/2012 8:00:00
1/1/2013
AM
8:00:00 AM
9/21/2012 8:00:00
1/5/2013
AM
8:42:00 AM
9/21/2012 8:00:00
1/5/2013
AM
8:42:00 AM
9/21/2012 8:00:00
1/5/2013
AM
8:42:00 AM
9/21/2012 8:00:00
1/5/2013
AM
8:42:00 AM
9/21/2012 8:00:00
1/5/2013
AM
8:42:00 AM

Page 70

TASKRSRC

436.54
388.03
873.08
0
3749.7
1049.92
28.39
305.62
1049.92
350.71
1049.92
3749.7
4537.14
4033.01
9449.25
598.4
350.71
8652.11
2713.97
704
93.38
28
88.4
88.4
88.4
318.8
386.9
343.91
802.8
290
4.63
28.18
34.45
34.45
67.27
249
311.25
775
342.5
102.75
31
97.07
97.07
350
424.74
377.55
881.38
319
5.1
21
27.41
27.41

391.93
348.38
783.86
0
3749.7
1049.92
27.79
279.41
1049.92
322.56
1049.92
3749.7
4537.14
4033.01
9449.25
598.4
322.56
7555.44
2266.63
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

9/21/2012
9/21/2012
9/21/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/29/2012
9/15/2012
9/15/2012
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
8/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013
9/16/2013

8:00:00
1/5/2013
AM
8:42:00 AM
8:00:00
1/5/2013
AM
8:42:00 AM
8:00:00
1/5/2013
AM
8:42:00 AM
8:00:00
1/1/2013
AM
8:00:00 AM
8:00:00
1/1/2013
AM
8:00:00 AM
8:00:00
1/1/2013
AM
8:00:00 AM
8:00:00
1/2/2013
AM
9:08:00 AM
8:00:00
1/5/2013
AM
1:03:00 PM
8:00:00
1/1/2013
AM
8:00:00 AM
8:00:00
1/5/2013
AM
10:41:00 AM
8:00:00
1/1/2013
AM
8:00:00 AM
8:00:00
1/1/2013
AM
8:00:00 AM
8:00:00
1/1/2013
AM
8:00:00 AM
8:00:00
1/1/2013
AM
8:00:00 AM
8:00:00
1/1/2013
AM
8:00:00 AM
8:00:00
1/1/2013
AM
8:00:00 AM
8:00:00
1/5/2013
AM
10:41:00 AM
8:00:00
1/6/2013
AM
9:35:00 AM
8:00:00
1/7/2013
AM
2:04:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
8/25/2013
AM10:24:00 AM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
9/15/2013
AM4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
9/24/2013
AM4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM
8:00:00
10/15/2013
AM 4:00:00 PM

Page 71

TASKRSRC

74
274
97.07
931.94
180.31
54.09
38.72
116.99
116.99
116.99
421.96
512.12
455.22
1062.56
383.24
6.24
25.69
33.53
33.53
74.58
329.94
742.27
332.12
99.64
25.09
76.83
76.83
76.83
277.09
336.28
298.91
697.76
252
5.13
3.19
8.74
24.27
228.24
8.74
1.76
88.64
994.52
278.47
278.47
94.92
869.11
2506.19
94.92
1069.66
1203.37
994.52
278.47

0
0
0
0
180.31
54.09
32.86
40.96
40.96
40.96
149.8
182.57
162.29
376.84
116.94
9.94
6.21
16.96
16.96
0
0
0
332.12
99.64
24.64
55.54
55.54
55.54
201
244.19
217.06
506.02
176.36
10.85
7.54
19.31
0
0
19.31
1.76
88.64
994.52
278.47
278.47
94.92
869.11
2506.19
94.92
1069.66
1203.37
994.52
278.47

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

9/16/2013 8:00:00
10/15/2013
AM 4:00:00 PM
9/16/2013 8:00:00
10/15/2013
AM 4:00:00 PM
9/16/2013 8:00:00
10/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
1/1/2013
AM8:00:00 AM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
9/5/2012 8:00:00
8/15/2013
AM 4:00:00 PM
11/15/2012 3/26/2013
8:00:00 AM
8:10:00 AM
11/15/2012 2/22/2013
8:00:00 AM
8:10:00 AM
11/15/2012 2/22/2013
8:00:00 AM
8:10:00 AM
11/15/2012 2/22/2013
8:00:00 AM
12:45:00 PM
11/15/2012 3/2/2013
8:00:00 AM
3:06:00 PM
11/15/2012 3/2/2013
8:00:00 AM
3:06:00 PM
11/15/2012 3/2/2013
8:00:00 AM
3:06:00 PM
11/15/2012 3/2/2013
8:00:00 AM
2:28:00 PM
11/15/2012 3/2/2013
8:00:00 AM
2:16:00 PM
11/15/2012 3/2/2013
8:00:00 AM
2:16:00 PM
11/15/2012 3/2/2013
8:00:00 AM
2:31:00 PM
11/15/2012 3/3/2013
8:00:00 AM
1:01:00 PM
11/15/2012 2/22/2013
8:00:00 AM
8:10:00 AM
11/15/2012 2/22/2013
8:00:00 AM
8:10:00 AM
11/15/2012 2/22/2013
8:00:00 AM
8:10:00 AM
11/15/2012 3/26/2013
8:00:00 AM
8:10:00 AM
11/15/2012 3/26/2013
8:00:00 AM
8:10:00 AM
11/15/2012 2/22/2013
8:00:00 AM
8:10:00 AM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM

Page 72

TASKRSRC

150.43
397.81
0.7
35.46
37.97
347.64
37.97
111.39
111.39
1002.48
111.39
397.81
481.35
427.87
577.36
60.17
1274.9
596.71
1.06
53.19
56.95
521.46
56.95
167.08
167.08
1503.71
167.08
596.71
722.02
641.8
90.25
107.58
26.89
26.89
268.95
26.89
107.58
134.47
119.53
1250
375
41.34
41.34
251.98
151.54
2400
2480
1000
405.75
7912.5
6287.63
5271.94

150.43
397.81
0.7
35.46
37.97
347.64
37.97
111.39
111.39
1002.48
111.39
397.81
481.35
427.87
577.36
60.17
1274.9
596.71
1.06
53.19
56.95
521.46
56.95
167.08
167.08
1503.71
167.08
596.71
722.02
641.8
90.25
107.58
26.89
26.89
268.95
26.89
107.58
134.47
119.53
1250
375
41.34
41.34
251.98
37.88
101.11
151.66
429.67
405.75
7912.5
6287.63
5271.94

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

12/15/2011 2/22/2012
8:00:00 AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
2/23/2012 8:00:00
3/2/2012
AM
4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/6/2011 8:00:00
12/14/2011
AM 4:00:00 PM
12/1/2011 8:00:00
12/5/2011
AM4:00:00 PM
12/1/2011 8:00:00
12/5/2011
AM4:00:00 PM
12/1/2011 8:00:00
12/5/2011
AM4:00:00 PM
12/1/2011 8:00:00
12/5/2011
AM4:00:00 PM
12/1/2011 8:00:00
12/5/2011
AM4:00:00 PM
12/1/2011 8:00:00
12/5/2011
AM4:00:00 PM
12/1/2011 8:00:00
12/5/2011
AM4:00:00 PM
12/1/2011 8:00:00
12/5/2011
AM4:00:00 PM
11/22/2011 11/30/2011
8:00:00 AM4:00:00 PM
11/22/2011 11/30/2011
8:00:00 AM4:00:00 PM
11/15/2012 2/22/2013
8:00:00 AM
8:10:00 AM
11/15/2012 2/22/2013
8:00:00 AM
8:10:00 AM
8/15/2012 8:00:00
1/11/2013
AM4:00:00 PM
11/15/2012 6/30/2013 4:00:00 PM
12/5/2012 8:00:00
9/30/2013
AM4:00:00 PM
12/25/2012 10/30/2013
8:00:00 AM4:00:00 PM
12/25/2012 10/31/2013
8:00:00 AM8:15:00 AM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM

Page 73

TASKRSRC

936.91
658.18
6287.63
8.43
246.66
246.66
295.7
191.81
191.81
243.5
243.5
58.06
58.06
4022.18
2640.56
1902.9
657.48

936.91
658.18
6287.63
8.43
246.66
246.66
295.7
191.81
191.81
243.5
243.5
58.06
58.06
4022.18
2640.56
1902.9
657.48

Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material

11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
6/15/2012 8:00:00
1/1/2013
AM
8:05:00 AM
6/15/2012 8:00:00
1/1/2013
AM
8:05:00 AM
5/15/2012 8:00:00
2/8/2013
AM
8:10:00 AM
5/15/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/15/2012 8:00:00
1/3/2013
AM
3:22:00 PM
5/23/2012 8:00:00
1/1/2013
AM
8:00:00 AM
5/23/2012 8:00:00
1/1/2013
AM
8:00:00 AM
6/15/2012 8:00:00
6/29/2012
AM4:00:00 PM
6/15/2012 8:00:00
6/29/2012
AM4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM
11/15/2012 8/21/2013
8:00:00 AM
4:00:00 PM

Page 74

USERDATA

user_data
UserSettings Do Not Edit
DurationQtyType=QT_DayShowAsPercentage=0SmallScaleQtyType=QT_HourDateFormat=dd'-'mmm'-'yyCurrencyFormat=US

Page 75

USERDATA

t=dd'-'mmm'-'yyCurrencyFormat=USD Dollar

Page 76