Project Management

Feasibility Report of Wind Power Plant E-mail Etiquette Kosta Region

October 9, 2013

Project Management

INTRODUCTION
Wind Power Company established 1990 Project Installing wind power plant in Kosta Wind energy fastest growing renewable energy source Installed capacity of wind power in India 19564.95 MW (as on 31st Jan 2013) Best sites avg. Annual wind speed above 5.5 m/s (at std. Measurement height of 50 m above ground level) Largest power Plant By Suzlon India, Maharashtra (259 MW)
2

Project Management

PROJECT DESCRIPTION
Feasibility study to develop 50 MW wind power plant in Kosta, Andhra Pradesh Government regulatory body MNRE Area 92,906 sq. km & Population 3.4 crores

Project Management

PROJECT SITE : KOSTA


Kosta Coastal Region in Andhra Pradesh Wind potential at 30 meters high is average velocity of 6 to 7 meters per second Wind resources are in 4 to 5 power class Land Topographically flat Largest port in South India Industrial output has increased by 9% MNRE gross potential estimate 8275 MW technical estimate 2100 MW
4

Project Management

Project Management

TECHNICAL SPECIFICATIONS

6

Wind Turbine type: V100 Rotor Diameter: 100 m Hub Height: 94 m Maximum Capacity: 1.8 MW- 2.0 MW Wind Class: IEC4A Transformer Capacity: 20 kV Voltage: 220 V Frequency : 50 Hz

TRANSPORTATION

Project Management

TRANSPORTATION
Major Ports 1. Visakhapatnam 2. Kakinada

Project Management

TRANSPORTATION

Project Management

TRANSPORTATION

Project Management

10

TRANSPORTATION

Project Management

Transportation and logistics costs which now account for about 4-6 per cent
11

Project Management

12