Security Level:4

NSN SPECIFIC MOP


Dismantle BTS 3G Huawei
PROJECT NAME: NSN-HCPT NEPA Project

HCPT
PT Nokia Siemens Networks
Menara Mulia Building, 11th floor Jl. Jend. Gatot Subroto Kav. 9 - 11 Jakarta 12930 Switchboard: +62 21 3041 1000

HCPT Jakarta NOC 18 Floor of BRI II Building

Prepared by Checked by Approved by

Company NSN

Title -

Name Hena Tarigan

Contact Date C 0896224012 14.02.201 36 3

HCPT HCPT

Content of Document

2013-01-29

Page 1 of 8

Security Level:4

Purpose of Document General description of operation Dismantle schedule and description Verification Contact persons list Attachmen

Purpose of Document (Must include the details purpose, Who&Why request to do this activity.) This MOP is prepared for Dismantle 3G BTS Huawei on site 130113_Gayungan - Wonocolo

General description of operation: (Must include the network topology, before and after activity.):

BTS Type 3G Huawei

Config 1/1/1

Remark Dismantle Bts 3G Huawei and Accesories

Operation schedule and description (Must include the time for each step, script.): Based on Planning design, NSN team and partner will Dismantle Huawei 3G used Antenna Existing. Below is the the sequence: 1. Request Colo Application approval to Tower Owner to Installation 2. Request CR approval to MS Team and HCPT to Dismantle BTS 3G Huawei 3. Call NOC to check last status 4. Call and inform MS Team, if the activity Before and after Activity
2013-01-29 Page 2 of 8

Security Level:4

Contact persons list (Must confirm with the persons who will execute or support, Must include the supervisor name and contact number. if anything change, must inform auditor, CM Mgr and NOC before activity)

Na me

R e s p o n s i b i l i t y F i e l d M a n a g e r

Jair ulla h

Ah ma d Hu sni

S u p e r v i s e

2013-01-29

Page 3 of 8

Security Level:4

Attachment

End

2013-01-29

Page 4 of 8