Month :

Probable Maximum Generation

Jul-2013
:

Water Level of Kaptai Lake at 06:00 AM


Sl.

Name of the Power Station

Fuel

Producer

QF-LDC-07
POWER GRID COMPANY OF BANGLADESH LTD.
SUMMARY OF DAILY ELECTRICITY GENERATION
Day :
Monday
Date :
15-Jul-13
(a) At Day Peak Hour :
MW
MW
(b) At Evening Peak Hour :
5543
6690
(a) Yesterday
ft :
ft
(b) Today:
ft
(c) Rule Curve:
77.74ft ft
77.17
86.24 ft
Instslled Capacity
Derated/
Actual Generation
Available Geneneration
Ev. Peak Gen.Shortage Plants under
Present
for Fuel for Plants S/D Shut down (Date) /
On 14-Jul-13
On 15-Jul-13
Capacity
Day Peak
Ev. Peak Day Peak Ev. Peak
Limitation or M/C prob. Remarks
MW
MW
MW
MW
MW
MW
MW
MW
2X55
110
78
80
85
85
78

1a

Ghorasal ST 1 & 2

Gas

PDB

1b

Ghorasal ST 3

Gas

PDB

1x210

210

180

160

160

160

160

1c

Ghorasal ST 4
Ghorasal ST 5
Ghorasal ST 6
Ghorashal 100 MW
Ghorashal 45 MW
Ghorashal MAX
Haripur SBU GT 1, 2 & 3
Haripur EGCB 360 MW
Haripur NEPC
Haripur P. Ltd CCPP
Meghnaghat P.Ltd CCPP
Meghnaghat IEL
Madanganj 102 MW
Keraniganj
Narshingdi
Siddhirgonj ST
Siddhirgonj GT-1, 2
Siddhirganj 100MW
Dutch Bangla 100 MW
DPA Power 50MW
Summit Power (Dhaka)
Gazipur RPCL
Tongi GT
Dhaka Area Total
Chittagong Raozan ST 1
Chittagong Raozan ST 2
Raozan 25 MW

Gas

PDB

1x210

Gas

PDB

1x210

210
210
210
100
45
78
96

180
190
190
100
45
78
60

110
360
450
100
102
100
22
210
210
96
100
50
146
52
105
3482
210
210

110
360
450
100
100
100
22
150
210
96
100
50
146
52
105
3252
180
180

230
60
150
55
98
102
100
22

220
40
150
53
98
102
100
22

1237
128
150
APSCL
1x150
150
APSCL
1x152
150
APSCL
2x56+34
146
APSCL
16x3.35
53
RPP 3yrs
15x4
55
RPP
82x1.1
80
RPP
14x4
53
QRPP 3yrs
72x1
70
PDB
6x8.92
52
PDB
1x106+1x57
163
SIPP,PDB
8X2.90
22
SIPP,REB
4X2.90
11
SIPP,PDB
4X8.73
33
SIPP,REB
3x3.67+2x6.97
25
1341
IPP
4X35+1x70
210
SIPP,PDB
8X2.90
22
232
PDB
2x32+1x33
97
PDB
2x35+1x35
104
RPP 15yrs
19X2.90
51
RPP
12x3.3+5x2
44
SIPP,REB
4X2.90
11
PDB
2X35
70
RPP 15yrs
32X2.90
86
RPP 3yrs
27X2.0
50
PDB
1x150+1x75
142
PDB
1X20
20
RPP 3yrs
29x1.95
50
RPP 15yrs
6X1.95
10
735
PDB
3X20
60
RPP 3yrs
2X8.5+2X6+2X1
105
PDB
1X110
110
PDB
1X60
60
IPP
19x6.5
110
IPP
7x17
115
PDB
8x6.89
54
PDB
16x6.98
109
RPP
9x5+9.5x6+9.2x
101
RPP
5x8
40
RPP 3yrs
50X0.80
40
QRPP 3yrs
71X0.85
55
959

1145
110
140
150
140
91
53
55
80
51
70
52
163
22
11
33
25
1246
197
22
219
90
104
51
44
11
70
86
50
142
20
50
10
728
46
105
55
30
110
115
54
109
101
40
40
55
860

180
190
0
104
46
78
40
0
98
353
450
100
62
84
22
110
68
83
92
0
92
52
0
2549
100
100
26
104
0
0
0
98
102
88
19
0
637
55
130
150
140
57
34
49
83
53
71
50
120
16
8
25
22
1063
133
20
153
80
90
45
39
6
63
73
48
0
20
42
8
514
30
18
56
0
108
115
48
100
5
40
40
47
607
0
0
28
33
61

180
190
0
100
45
59
40
0
50
309
451
100
63
85
22
110
0
80
83
0
114
43
0
2369
100
100
15
103
0
0
0
0
0
83
19
10
430
55
130
150
140
72
34
48
83
53
70
0
122
17
8
25
22
1029
134
20
154
77
92
45
39
6
63
74
48
143
20
42
9
658
0
0
55
0
17
115
0
0
5
40
38
44
314
0
0
0
26
26

180
190
0
100
45
78
40
0
110
353
450
100
62
92
22
110
68
87
92
50
110
43
0
2620
100
100
26
104
0
0
0
98
102
88
19
0
637
55
130
150
140
57
34
49
80
51
70
50
122
16
8
25
22
1059
133
20
153
80
90
45
39
6
63
73
48
142
20
42
8
656
30
26
55
0
110
115
48
100
5
40
40
55
624
0
0
28
33
61
68
80
42
0
70
50
42
40
147
46
20
13
8
626
93
90
93
17
17
37
254
6690
6053

1d
1e
2
3
4
5
6
7
8
9
10
11
12
13
14a
14b
15
16
17
18
19
20

1a
1b
2

Gas

PDB

1x210

Gas

QRPP 3yrs

128X0.85

Gas

QRPP 3yrs

50X0.85

Gas

RPP

4x19.6

Gas

SBU,PDB

Gas

EGCB

HFO

IPP

8x15

IPP

235+125

Gas
Gas

IPP

3X150

HFO

RPP

12x8.9

HFO

QRPP 3yrs

6x17.08

HFO

RPP

8x14.4

Gas

SIPP,REB

8X2.90

Gas

PDB

1x210

Gas

EGCB

2x120

HSD

QRPP 3yrs

96x1.2

HFO

RPP

12x8.9

HSD

QRPP 3yrs

100X0.5

Gas

SIPP,REB

HFO

IPP

6x8.9

Gas

PDB

1X 105

Gas

PDB

1x210

Gas

PDB

1x210

HFO

RPCL

Gas

PDB

1X60

Gas

PDB

1x150

HFO

RPP 3yrs

4X12.5+2X11.9

HFO

PDB

HFO

PDB

6x17

HFO

RPP

8x13.45

Gas

SIPP,PDB

8X2.90

3a Kaptai Hydro unit 1,2,3,4 & 5


4a
4b
5
6
7
8
9
10

1a
1b
1c
1d
1e
1f
2
3
4
5
6
7
8
9
10
11

1
2

1a
1b
2
3
4
5
6
7
8
9
10
11

1
2
3a
3b
4
5
6
7
8
9
10
11

1
2
3
4

1a
1b
2
3
4
5
6
7
8
9
10
11
12

Sikalbaha ST
Sikalbaha GT
Sikalbaha
Hathazari
Dohazari
Juldah
Barabkunda
Malancha,Ctg EPZ
Chittagong area Total
Ashuganj ST 1 & 2
Ashuganj ST 3
Ashuganj ST 4
Ashuganj ST 5
Ashuganj CCPP
Ashuganj 50 MW
Ashuganj
Ashuganj Aggrekko
Ashuganj UP-53 MW
Brahmanbaria 70MW
Daudkandi 50 MW
Chandpur CCPP
Feni
Mahipal,Feni
Jangalia
Summit Power (Comilla)
Comilla Area Total
RPCL CCPP,Mymensing
Tangail
Mymensing Area Total
Fenchugonj CCPP (old)
Fenchugonj CCPP (new)
Fenchugonj BEDL
Fenchuganj Prima 50 MW
Hobiganj
Shahjibazar GT 8,9
Shahjibazar 86 MW
Shahjibazar 50 MW
Sylhet 150 MW
Sylhet GT
Sylhet 50MW
Sylhet 11 MW
Sylhet Area Total
Bheramara GT 1, 2 & 3
Bheramara
Khulna ST 110MW
Khulna ST 60MW
KPCL ,Khulna.
KPCL ,Khulna.(new)
Faridpur
Gopalganj 110 MW
Noapara (105 MW) Quanta
Noapara (40 MW),KZA
Khulna 40 MW
Khulna 55 MW
Khulna Area Total
Barisal Diesel
Bhola Diesel
Barisal GT 1 & 2
Bhola
Barisal Area Total
Baghabari GT 1
Baghabari GT 2
Baghabari 50 MW
Baghabari Westmont
Bera 70 MW
Amnura 50 MW
Katakhali NPS 50 MW
Katakhali PPP 50 MW
Sirajganj 150 MW
Santahar 50 MW
Bogra GBB
Bogra 20MW
Summit Power (Ullapara)
Rajshahi Area Total

Barapukuria ST 1
Barapukuria ST 2
Rangpur GT
3 Sayadpur GT
4 Thakurgaon
Rangpur Area Total
Total

3x32

PDB

2X40+3X50

11x8.9

40
33
73

32
33
65

180
190
0
100
46
74
40
0
95
256
450
92
62
85
22
110
0
81
92
0
108
52
0
2375
100
100
26
108
0
0
0
0
0
84
19
0
437
55
130
150
140
57
34
41
72
43
69
42
122
16
8
25
22
1026
122
20
142
79
91
45
36
6
62
70
47
0
16
43
9
504
0
0
55
0
23
83
0
0
5
40
39
44
289
0
0
0
28
28

71
100
52
90
71
50
50
50
150
50
20
20
11
785

71
100
52
70
71
50
50
50
150
50
22
20
11
767

68
93
42
0
0
0
0
0
146
0
20
11
8
388

68
80
42
0
70
54
37
39
147
46
20
13
8
624

68
96
0
0
0
0
0
0
147
0
20
14
8
353

125
125
20
20
47
337
9181

100
100
20
20
47
287
8569

91
90
0
0
30
211
5400
4886

90
93
17
17
36
253
6461.0
5846

91
90
0
0
29
210
5543
5015

Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
FO
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Gas
HSD
HSD
FO
FO
HFO
HFO
FO
HFO
HFO
HFO
HSD
HSD

APSCL

2x64

APSCL

1x150

HSD

PDB

HSD

PDB

2X1.4+2X1.35

HSD

PDB

2X20

Gas

RPP 3yrs

1X34.50

Gas

SBU,PDB

1X71

Gas

SBU,PDB

1X100

HFO

PDB

6x8.9

Gas

IPP

2X45

HFO

PDB

9x8.29

HFO

RPP

7x7.79

HFO

RPP

6x8.92

HFO

PDB

6x8.7

Gas

NWPGCL

1x150

HFO

PDB

6x8.7

Gas

RPP 15yrs

6X4

Gas

RPP 3yrs

5x3.3+5x2

Gas

SIPP,REB

4X2.90

1a

Coal

PDB

1x125

1b

Coal

PDB

1x125

HSD

PDB

1X20

HSD

PDB

1X20

HSD

RPP 3yrs

20X1.5+21X1.1

MW
MW

Useable load at Substation end after deducting Auxiliary


use & Transmission loss
MW

190

Probable
Start up
Date

Unknown

#6(18/07/10)

Synchronized at 33KV

20

Unknown

#3(18/06/09)

On test

12
7

38
16

2 M/C
1 M/C
Synchronized at 33KV

40
142

1 M/C

13
8
50

10 M/C
1 M/C
Synchronized at 33KV, 100 M/C
Synchronized at 33KV

105
254
80
80

387

40
150

28/05/2013

Unknown

12/5/2013

Unknown

contract date expired 06/05/2013

12
3
350

18

15
55

16
19
6

43
6

1 M/C
Synchronized at 33KV, 1 M/C

#1(14/1/13)

Unknown

ST (17/04/13)

Unknown

5 M/C
1 M/C

2 M/C
Synchronized at 33KV, 1 M/C

18
64

8
3
156

Synchronized at 33KV, 1 M/C


Synchronized at 33KV, 1 M/C

2
2

Synchronized at 33KV

5
5

2 M/C

13

4 M/C

64
10
14

Synchronized at 33KV, 2 M/C

142

24

8
2
175
16
87

4 M/C

30

29/11/12

6
96

1 M/C

1 M/C
12 M/C

Unknown

1 M/C

11 M/C

Synchronized at 33KV, 9 M/C

235

20
10
70

1 M/C

13

1 M/C

#1(1/5/12),#2(24/4/13)

Unknown

1 M/C

Synchronized at 33KV

2 M/C
Synchronized at 33KV, 1 M/C

20

100

0
730

11
11
1081

8 M/C

MW

A.
1
2
3
4
5

7
8
9

10
B.
1
2
3
4
5

Sunday
11 Evening Peak Hour
:
12 Max. Demand (Generation end) at evening peak hour :
5400.0
MW at
13 Max. Demand (Substation end) at evening peak hour :
6461.0
MW at
14 Load Shed (Substation end) at evening peak hour
:
134.45
MKWHr
15. Area wise Demand ( S/S end), Supply( S/S end) &
By Oil:
32.00 MKWHr
Load Shed (S/S end) at Evening peak hour in MW :
By Hydro:
2.50
MKWHr Area
Demand
Supply
Loadshed (Duration)
MW
524
For Oil:
356
MW
Dhaka
2545
2505
40
(19:15-00:30)
MW
0
MW
Chittagong
630
611
19
(19:15-00:30)
For Water Shortage:
1081
MW
Khulna
720
672
48
(19:15-00:30)
For Plants S/D or M/C
prob:
MW
979.72
Total Gas Supplied :
Rajshahi
625
582
43
(19:15-00:30)
MMCFD
Taka 78234551
ii) Oil
: Taka
428877163 Comilla
Fuel Cost :
i) Gas :
420
385
35
(19:15-00:30)
Taka 17533512
Total
iii) Coal :
Taka 524645227 Mymensing
350
320
30
(19:15-00:30)
Export Through E-W Interconnectors :
11.201 MKWHr. Sylhet
339
325
14
(19:15-00:30)
i) Energy
360
MW at
ii) During Peak Demand :
20:00 hrs
Barisal
143
129
14
(19:15-00:30)
590
MW at
iii) Maximum :
5:00 hrs
Rangpur
335
317
18
(19:15-00:30)
Maximum Temperature in Dhaka was
31.4 C
Total
6107
5846
261
(Today)
15-Jul-13
32 C
Monday
Probable max. temperature in Dhaka
14-Jul-13 (Yesterday)
Highest Generation
:
Minimum Generation
:
Day peak Generation
:
Evening peak Generation :
Total Energy Generation :
By Gas:
95.67
MKWHr
By Coal:
4.28
MKWHr
Generation Shortfall : For Gas:

MW
6516.0

MW

at

4977.0

MW

at

Forecast
Maximum Demand (Generation end)
Maximum Generation (Generation end)
Shortage (Generation end)
Total Energy Generation
Actual Minimum Generation up to 8:00 hrs.

6800
6690
110
134
5134

22:00
7:00
12:00
20:00

MW
MW
MW
MKWHr
MW at

hrs
hrs
hrs
hrs

7:00

6 Total Load Shed forecast (Substation end) :


7 Area wise Load Shed forecast (Substation end) :
Dhaka Chittagong Khulna
Rajshahi Comilla
MW
MW
MW
MW
MW
0
23
25
25
15

100

20:00 hrs.
6750
MW
6107
MW
261
MW
16 Hourly Load Shed during
Evening Peak hours :
Time
Loadshed
Hour
MW
18:00
0
18:30
0
19:00
0
19:30
251
20:00
261
21:00
250
22:00
166
23:00
95

MW

Mymensing Sylhet
MW
MW
0
12

Barisal
MW

Deputy / Asstt. Manager

Manager

Network Operation Division

Network Operation Division

Rangpur
MW