Вы находитесь на странице: 1из 5

1,1

ANALISIS DE PRECIOS UNITARIOS


PROPONENTE:

FECHA

OBRAS MECANICAS

DESCRIPCION:
ITEM:

UNIDAD DE MEDIDA

UND

SUMINISTRO DE CUADRILLA 1A

1.1

1. EQUIPO
DESCRIPCION
MAQUINA DE SOLDAR
EQUIPO DE OXICORTE
VEHICULO
HERRAMIENTO MENOR
HERRAMIENTA ELECTRICA

TARIFA/HORA COL$

CANT.
1.0000
2.0000
1.0000
2.0000
1.0000

15,000.00
2,500.00
100,000.00
30,000.00
27,050.00

RENDIMIENTO
(HORAS/UND)
0.9020
0.8000
0.8020
0.9020
0.9200

SUBTOTAL
2. MATERIALES
DESCRIPCION
COMBUSTIBLE
SOLDADURA
DISCO DE 7" x 1/8"
ACETILENO
OXIGENO
GRATA PLANA 1/4"
MATERIALES VARIOS

UNIDAD
GAL
Kg
UND
Kg.
M3
Unidad
Global

VR. UNITARIO COL$


8,500.00
24,500.00
11,280.00
28,012.00
13,032.00
62,310.00
25,000.00

CANTIDAD
20.0000
7.0000
5.3000
0.7200
0.7400
0.7200
6.3918

SUBTOTAL

VR. PARCIAL COL$


13,530.00
4,000.00
80,200.00
54,120.00
24,886.00
176,736
VR. PARCIAL COL$
170,000.00
171,500.00
59,784.00
20,168.64
9,643.68
44,863.20
159,794.25
635,754

3. TRANSPORTES
DESCRIPCION

VOLUMEN O
PESO

DISTANCIA
PROMEDIO

VALOR POR M3 o
TON/KM COL$

VR. PARCIAL COL$

SUBTOTAL

4. MANO DE OBRA
CARGO
ESMERILADOR
SOLDADOR 1A
TUBERO IA
AYUDANTE TECNICO

CANT.
1.0000
1.0000
1.0000
1.0000

TARIFA / HORA COL$


15,650.00
56,500.00
28,500.00
14,500.00

HORAS
LABORADAS
8.0000
8.0000
8.0000
8.0000

SUBTOTAL
TOTAL COSTO DIRECTO

VR. PARCIAL COL$


125,200.00
452,000.00
228,000.00
116,000.00
921,200
1,733,690

ADMINISTRACION

( 17.00% )

294,727

IMPREVISTOS

( 3.00% )

52,011

UTILIDADES

( 5.00% )

PRECIO UNITARIO TOTAL

86,684
2,167,112

184222269.xlsx.ms_office.xls

1,1 (2)

ANALISIS DE PRECIOS UNITARIOS


PROPONENTE:

FECHA

OBRAS MECANICAS

DESCRIPCION:
ITEM:

UNIDAD DE MEDIDA

UND

SUMINISTRO DE PAILERIA 1

1.1

1. EQUIPO
DESCRIPCION
MAQUINA DE SOLDAR
EQUIPO DE OXICORTE
VEHICULO
HERRAMIENTO MENOR
HERRAMIENTA ELECTRICA

TARIFA/HORA COL$

CANT.
1.0000
2.0000
1.0000
2.0000
1.0000

15,000.00
2,500.00
100,000.00
30,000.00
27,050.00

RENDIMIENTO
(HORAS/UND)
0.9020
0.8000
0.8020
0.6020
0.9200

SUBTOTAL
2. MATERIALES
DESCRIPCION
COMBUSTIBLE
SOLDADURA
DISCO DE 7" x 1/8"
ACETILENO
OXIGENO
MATERIALES VARIOS

UNIDAD
GAL
Kg
UND
Kg.
M3
Global

VR. UNITARIO COL$


8,500.00
24,500.00
11,280.00
28,012.00
13,032.00
25,000.00

CANTIDAD
20.0000
10.5000
9.0000
0.7980
0.7615
10.0000

SUBTOTAL

VR. PARCIAL COL$


13,530.00
4,000.00
80,200.00
36,120.00
24,886.00
158,736
VR. PARCIAL COL$
170,000.00
257,250.00
101,520.00
22,353.58
9,924.00
250,000.00
811,048

3. TRANSPORTES
DESCRIPCION

VOLUMEN O
PESO

DISTANCIA
PROMEDIO

VALOR POR M3 o
TON/KM COL$

VR. PARCIAL COL$

SUBTOTAL

4. MANO DE OBRA
CARGO
PAILERO 1A
AYUDANTE TECNICO

CANT.
1.0000
2.0000

TARIFA / HORA COL$


18,881.00
14,500.00

HORAS
LABORADAS
8.0000
8.0000

SUBTOTAL
TOTAL COSTO DIRECTO

VR. PARCIAL COL$


151,048.00
232,000.00
383,048
1,352,832

ADMINISTRACION

( 17.00% )

229,981

IMPREVISTOS

( 3.00% )

40,585

UTILIDADES

( 5.00% )

PRECIO UNITARIO TOTAL

67,642
1,691,040

184222269.xlsx.ms_office.xls

1,1 (3)

ANALISIS DE PRECIOS UNITARIOS


PROPONENTE:

FECHA

OBRAS MECANICAS

DESCRIPCION:
ITEM:

UNIDAD DE MEDIDA

UND

SUMINISTRO DE PAILERIA 2

1.1

1. EQUIPO
DESCRIPCION
MAQUINA DE SOLDAR
EQUIPO DE OXICORTE
VEHICULO
HERRAMIENTO MENOR
HERRAMIENTA ELECTRICA

TARIFA/HORA COL$

CANT.
1.0000
2.0000
1.0000
2.0000
1.0000

15,000.00
2,500.00
100,000.00
30,000.00
27,050.00

RENDIMIENTO
(HORAS/UND)
0.9020
0.8000
0.8020
0.8020
0.8200

SUBTOTAL
2. MATERIALES
DESCRIPCION
COMBUSTIBLE
SOLDADURA
DISCO DE 7" x 1/8"
ACETILENO
OXIGENO
MATERIALES VARIOS

UNIDAD
GAL
Kg
UND
Kg.
M3
Global

VR. UNITARIO COL$


8,500.00
24,500.00
11,280.00
28,012.00
13,032.00
25,000.00

CANTIDAD
16.0000
8.6100
5.3108
0.6600
0.5665
14.6000

SUBTOTAL

VR. PARCIAL COL$


13,530.00
4,000.00
80,200.00
48,120.00
22,181.00
168,031
VR. PARCIAL COL$
136,000.00
210,945.00
59,905.82
18,487.92
7,382.63
365,000.00
797,721

3. TRANSPORTES
DESCRIPCION

VOLUMEN O
PESO

DISTANCIA
PROMEDIO

VALOR POR M3 o
TON/KM COL$

VR. PARCIAL COL$

SUBTOTAL

4. MANO DE OBRA
CARGO
PAILERO
AYUDANTE TECNICO

CANT.
1.0000
1.0000

TARIFA / HORA COL$


18,881.00
14,500.00

HORAS
LABORADAS
8.0000
8.0000

SUBTOTAL
TOTAL COSTO DIRECTO

VR. PARCIAL COL$


151,048.00
116,000.00
267,048
1,232,800

ADMINISTRACION

( 17.00% )

209,576

IMPREVISTOS

( 3.00% )

36,984

UTILIDADES

( 5.00% )

PRECIO UNITARIO TOTAL

61,640
1,541,000

184222269.xlsx.ms_office.xls

1,1 (4)

ANALISIS DE PRECIOS UNITARIOS


PROPONENTE:

FECHA

OBRAS MECANICAS

DESCRIPCION:
ITEM:

1.1

UNIDAD DE MEDIDA

UND

MOVILIZACION Y DESMOVILIZACION DE LA BASE CASMORA A CAMPO DE


TRABAJO

1. EQUIPO
DESCRIPCION

TARIFA/HORA COL$

CANT.

RENDIMIENTO
(HORAS/UND)

VR. PARCIAL COL$


-

SUBTOTAL
2. MATERIALES
DESCRIPCION
VEHICULO

UNIDAD
UND

VR. UNITARIO COL$


640,000.00

CANTIDAD
2.0000

VR. PARCIAL COL$


1,280,000.00

1,280,000

SUBTOTAL
3. TRANSPORTES
DESCRIPCION

VOLUMEN O
PESO

DISTANCIA
PROMEDIO

VALOR POR M3 o
TON/KM COL$

VR. PARCIAL COL$

SUBTOTAL

4. MANO DE OBRA
CARGO

CANT.

TARIFA / HORA COL$

HORAS
LABORADAS

VR. PARCIAL COL$


-

SUBTOTAL
TOTAL COSTO DIRECTO

1,280,000

ADMINISTRACION

( 17.00% )

217,600

IMPREVISTOS

( 3.00% )

38,400

UTILIDADES

( 5.00% )

PRECIO UNITARIO TOTAL

64,000
1,600,000

184222269.xlsx.ms_office.xls

1,1 (5)

ANALISIS DE PRECIOS UNITARIOS


PROPONENTE:

FECHA

OBRAS MECANICAS

DESCRIPCION:
ITEM:

UNIDAD DE MEDIDA

UND

MOVILIZACION ENTRE CAMPOS DE TRABAJO

1.1

1. EQUIPO
DESCRIPCION

TARIFA/HORA COL$

CANT.

RENDIMIENTO
(HORAS/UND)

VR. PARCIAL COL$


-

SUBTOTAL
2. MATERIALES
DESCRIPCION
VEHICULO

UNIDAD
GAL

VR. UNITARIO COL$


160,000.00

CANTIDAD
1.0000

SUBTOTAL

VR. PARCIAL COL$


160,000.00
160,000

3. TRANSPORTES
DESCRIPCION

VOLUMEN O
PESO

DISTANCIA
PROMEDIO

VALOR POR M3 o
TON/KM COL$

VR. PARCIAL COL$

SUBTOTAL

4. MANO DE OBRA
TARIFA / HORA COL$
CARGO

CANT.

HORAS
LABORADAS

VR. PARCIAL COL$


-

SUBTOTAL
TOTAL COSTO DIRECTO

160,000

ADMINISTRACION

( 17.00% )

27,200

IMPREVISTOS

( 3.00% )

4,800

UTILIDADES

( 5.00% )

PRECIO UNITARIO TOTAL

8,000
200,000