Академический Документы
Профессиональный Документы
Культура Документы
1.0 Boiler Running Hours per Day 2.0 DG Running Hours per Day 3.0 Storage tank selection 4.0 Fuel consumption of @1500 RPM
3.1 3.2 3.3 3.4 3.5
24 Hr. 8 Hr. 50000 Ltr. Liters/ hr. total ltr /hr. 260.0 0.0 208.0 0.0 157.0 0.0 132.4 264.8 130.0 0.0 108.3 541.5 94.8 0 79.4 0 67.0 0.0 60.1 0.0 54.7 0.0 49.2 0.0 45.6 0.0 41.3 0.0 36.5 0.0 30.9 0.0 27.5 0.0 22.7 0.0 17.5 0.0 15.8 0.0 806.3 #REF! 806.30 x 8 Liters/ hr. Liters/ hr.
1250 KVA DG Set 1000 KVA DG Set 750 KVA DG set 625 KVA DG set 600 KVA DG set 500 KVA DG Set 438 KVA DG Set 380 KVA DG set 320 KVA DG set 285 KVA DG set 250 KVA DG set 225 KVA DG set 200 KVA DG set 180 KVA DG set 160 KVA DG set 140 KVA DG set 125 KVA DG set 100 KVA DG set 75 KVA DG set 70 KVA DG set Total fuel consumption per hour at peak load.When all DG sets are running. HSD required for boiler Total fuel consumption per day at peak load when all DG Sets are runing. Total= Total fuel consumption per day at peak load when all Boiler are runing. Total= Total fuel Total number of day for which DG sets can run with the Installed HSD tank
6.0
Total=
#REF!
days
1.4 Domestic Consumption of water for a Day Hotel Block Office staff a) Soft Water b) 10% for cleaning Of floor & other services
19,899
2.0
50000 ltrs
50 M 100 M 150 M
3.0
210 Lter/min
4.0
Say=
12000
1 ltr water to temp riseat 100C 12000 ltr water to temp riseat 100C
4,012,800 KJ
HSD HSD calorific value per 1ltr = HSD requirment 85% if efficiency LPG LPG calorific value per 1kg = LPG requirment 85% if efficiency ELECTRICITY Electircity calorific value per 1kw KW Required HEAT PUMP
44,800
80.54 kg 94.75 kg
64.93
3600 KJ 1,114.67
6688
6Rs/kw