Вы находитесь на странице: 1из 10

COAL SAMPLE DISPATCH

PROJECT
CLIENT
WIUP
SITE
LOCATION
AREA
DATE

NO

SAMPLE NO.

: PT. ACMER
: IUP OP CV. KKD
: Tenggarong Seberang, Kab. KUKAR, Prov. Kaltim
:

LINE NO.

SAMPLE NO.
(SERTIFICATE)

SAMPLE INTERVAL
From
To

HOLE ID
WELL SITE
DATABASE
SUPERVISOR

SEAM THICK CORE LOSE SAMPLE


(m)
(m)
THICK (m)

SAMPLE
RECOVERY (%)

:
:
:
:

BAGS Qty

SEAM

REMARK

QUALITY ANALISIS

SEAM

REMARK

QUALITY ANALISIS

1
2
3
4
5
6
7
8
9
10
11
12

COAL SAMPLE DISPATCH


PROJECT
CLIENT
WIUP
SITE
LOCATION
AREA
DATE

NO
1
2
3
4
5
6
7
8
9
10
11
12

SAMPLE NO.

: PT. ACMER
: IUP OP CV. KKD
: Tenggarong Seberang, Kab. KUKAR, Prov. Kaltim
:

LINE NO.

SAMPLE NO.
(SERTIFICATE)

SAMPLE INTERVAL
From
To

HOLE ID
WELL SITE
DATABASE
SUPERVISOR

SEAM THICK CORE LOSE SAMPLE


(m)
(m)
THICK (m)

SAMPLE
RECOVERY (%)

:
:
:
:

BAGS Qty

COAL SAMPLE DISPATCH


CLG_08
PROJECT
CLIENT
LOCATION
SITE
DATE
AREA

NO

SAMPLE NO.

1
2
3
4
5

CLG_08-1/1
CLG_08-1/2
CLG_08-1/3
CLG_08-1/4
CLG_08-1/5

:
: Tamiang Layang
: 1 Mei 2012

LINE NO.

SAMPLE NO.
(SERTIFICATE)

GEOLOGIST
DATABSE
SUPERVISOR

SAMPLE INTERVAL
From

To

39.03
39.13
39.23
40.65
40.75

39.13
39.23
40.65
40.75
40.85

SEAM
CORE LOSE SAMPLE THICK
THICK (m)
(m)
(m)
0.10
0.10
1.42
0.10
0.10

0.10
0.10
1.42
0.10
0.10

SAMPLE
RECOVERY (%)

BAGS
Qty

100
100
100
100
100

1
1
1
1
1

SEAM

REMARK

YANG DI ANALISIS

Sedimen Roof
Coal Roof
Coal Body
Coal Floor
Sedimen Floor

TUNGGU KONFIRMASI
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD+CSN
PROXIMAT+TM+TS+CV+RD
TUNGGU KONFIRMASI

COAL SAMPLE DISPATCH


CLG_04
PROJECT
LOCATION
DATE

NO

SAMPLE NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

CLG_04-1/1
CLG_04-1/2
CLG_04-1/3
CLG_04-1/4
CLG_04-1/5
CLG_04-2/1
CLG_04-2/2
CLG_04-2/3
CLG_04-2/4
CLG_04-2/5
CLG04-3/1
CLG04-3/2
CLG04-3/3
CLG_04-4/1
CLG_04-4/2
CLG_04-4/3
CLG_04-4/4
CLG_04-4/5
CLG_04-5/1
CLG_04-5/2
CLG_04-5/3
CLG_04-5/4
CLG_04-5/5
CLG_04-6/1
CLG_04-6/2
CLG_04-6/3
CLG04-7/1
CLG04-7/2
CLG04-7/3
CLG04-7/4
CLG04-7/5
CLG04-8/1
CLG04-8/2
CLG04-8/3
CLG_04-9/1
CLG_04-9/2
CLG_04-9/3
CLG_04-9/4
CLG_04-9/5

:
: Tamiang Layang
: 1 Mei 2012

LINE NO.

SAMPLE NO.
(SERTIFICATE)

GEOLOGIST
DATABSE
SUPERVISOR

SAMPLE INTERVAL
From
To
50.10
50.20
50.20
50.30
50.30
50.91
50.91
51.01
51.01
51.11
51.09
51.19
51.19
51.29
51.29
51.60
51.60
51.70
51.70
51.80
52.37
52.47
52.47
52.61
52.61
52.71
59.61
59.71
59.71
59.81
59.81
60.24
60.24
60.34
60.34
60.44
60.59
60.69
60.69
60.79
60.79
62.00
62.00
62.10
62.10
62.20
73.53
73.63
73.63
73.75
73.75
73.85
74.67
74.77
74.77
74.87
74.87
75.42
75.52
75.42
75.52
75.62
76.01
76.11
76.11
76.18
76.18
76.28
76.37
76.47
76.62
76.72
76.72
76.95
76.95
77.05
77.26
77.16

SEAM THICK
(m)
0.10
0.10
0.61
0.10
0.10
0.10
0.10
0.31
0.10
0.10
0.14
0.10
0.10
0.43
0.10
0.10
0.10
0.10
1.21
0.10
0.10
0.10
0.12
0.10

0.55

0.07
0.10
0.10
0.23
0.10
0.10

CORE LOSE SAMPLE


(m)
THICK (m)
0.10
0.10
0.61
0.10
0.10
0.10
0.10
0.31
0.10
0.10
0.10
0.14
0.10
0.10
0.10
0.43
0.10
0.10
0.10
0.10
1.21
0.10
0.10
0.10
0.12
0.10
0.10
0.10
0.55
0.10
0.10
0.10
0.07
0.10
0.10
0.10
0.23
0.10
0.10

SAMPLE RECOVERY (%)

BAGS Qty

100
100
100
100
100
100
100
100
100
100

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

100
100
100
100
100
100
100
100
100
100
100
100
100
100

100

100
100
100
100
100
100

39

SEAM

DU

DL

CU

CL

BU

AL

Bags

REMARK

YANG DI ANALISIS

Sedimen Roof
Coal Roof
Coal Body
Coal Floor
Sedimen Floor
Sedimen Roof
Coal Roof
Coal Body
Coal Floor
Sedimen Floor
Sedimen Roof
Coal Body
Sedimen Floor
Sedimen Roof
Coal Roof
Coal Body
Coal Floor
Sedimaen Floor
Sedimen Roof
Coal Roof
Coal Body
Coal Floor
Sedimen Floor
Sedimen Roof
Coal Body
Sedimen Floor
Sedimen Roof
Coal Roof
Coal Body
Coal Floor
Sedimen Floor
Sedimen Roof
Coal Body
Sedimen Floor
Sedimen Roof
Coal Roof
Coal Body
Coal Floor
Sedimen Floor

TUNGGU KONFIRMASI
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD
TUNGGU KONFIRMASI
TUNGGU KONFIRMASI
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD
TUNGGU KONFIRMASI
No Analisa
TUNGGU KONFIRMASI
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD
TUNGGU KONFIRMASI
TUNGGU KONFIRMASI
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD+CSN
PROXIMAT+TM+TS+CV+RD
TUNGGU KONFIRMASI
TUNGGU KONFIRMASI

No Analisa

TUNGGU KONFIRMASI
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD
TUNGGU KONFIRMASI

COAL SAMPLE DISPATCH


CTM_16
PROJECT
CLIENT
LOCATION
SITE
DATE
AREA

NO

SAMPLE NO.

1
2
3
4

CTM16-1/1
CTM16-1/2
CTM16-1/3
CTM16-1/4

:
: Tamiang Layang
: 1 Mei 2012

LINE NO.

SAMPLE NO.
(SERTIFICATE)

GEOLOGIST
DATABSE
SUPERVISOR

SAMPLE INTERVAL
From
To
7.40
7.50
7.50
7.60
7.60
9.07
9.07
9.17

SEAM
CORE LOSE SAMPLE
SAMPLE
THICK (m)
(m)
THICK (m) RECOVERY (%)
0.10
0.10
100.00
0.10
0.10
100.00
1.47
0.3
1.17
79.59
0.10
0.10
100.00

BAGS
Qty
1
1
1
1

SEAM

REMARK
Sedimen Roof
Coal Roof
Coal Body
Coal Floor n sedimen floor (core loss)

No Analisa
(82 %)

COAL SAMPLE DISPATCH


CTM_17
PROJECT :
LOCATION : Tamiang Layang
: 1 Mei 2012
DATE

NO

SAMPLE NO.

1
2
3
4
5
6
7
8

TM_17-1/1
TM_17-1/2
TM_17-1/3
TM_17-2/1
TM_17-2/2
TM_17-2/3
TM_17-2/4
TM_17-2/5

LINE NO.

GEOLOGIST
DATABSE
SUPERVISOR

SAMPLE
NO.

SAMPLE INTERVAL
From
To
13.68
13.78
13.78
13.96
13.96
14.06
18.00
18.10
18.10
18.20
18.20
18.65
18.65
18.75
18.75
18.85

SEAM
CORE LOSE SAMPLE
THICK (m)
(m)
THICK (m)
0.10
0.10
0.18
0.09
0.10
0.10
0.10
0.10
0.10
0.10
0.45
0.10
0.35
0.10
0.10
0.00
0.10
0.10

CH

SAMPLE
BAGS Qty
RECOVERY
100.00
1
50.00
1
100.00
1
100.00
1
100.00
1
77.78
1
0.00
0
100.00
1

SEAM
K

REMARK
Sedimen Roof
Coal Body
Sedimen Floor
Sedimen Roof
Coal Roof
Coal Body
Coal Floor (core loss:0.10)
Sedimen Floor

COAL SAMPLE DISPATCH


CTM_17R
PROJECT:
LOCATION
: Tamiang Layang
DATE : 1 Mei 2012

NO

SAMPLE NO.

1
2
3
4
5

TM_17R-1/1
TM_17R-1/2
TM_17R-1/3
TM_17R-1/4
TM_17R-1/5

GEOLOGIST
DATABSE
SUPERVISOR

LINE NO.

SAMPLE
NO.

SAMPLE INTERVAL
From
To
19.00
19.10
19.10
19.20
19.20
19.70
19.70
19.80
19.80
19.90

SEAM
CORE LOSE SAMPLE
THICK (m)
(m)
THICK (m)
0.10
0.10
0.10
0.10
0.50
0.50
0.10
0.10
0.10
0.03
0.07

DISPATCH
R

SAMPLE
RECOVERY
100.00
100.00
100.00
100.00
70.00

BAGS Qty
1
1
1
1
1

SEAM

REMARK

YANG DI ANALISIS

Sedimen Roof
Coal Roof
Coal Body (parting 19.65-19.68=0.03)
Coal Floor
Sedimen Floor (core loss:0.03 m)

TUNGGU KONFIRMASI
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD
PROXIMAT+TM+TS+CV+RD
No analisa

COAL SAMPLE DISPATCH


CTM_25N
CLIENT
SITE
AREA

NO

SAMPLE NO.

1
2
3

CTM_25-1/1
CTM_25-1/2
CTM_25-1/3

: TUTUI BARA UTAMA


: Tamiang Layang-Kalteng
: Tamiang Layang-Kalteng

LINE NO.

SAMPLE
NO.

Geologist
Data Base
Supervisor
Date
SAMPLE INTERVAL
From
To
55.12
55.22
55.22
56.78
56.78
56.88

SEAM
CORE LOSE SAMPLE
SAMPLE
THICK (m)
(m)
THICK (m) RECOVERY
0.10
0.10
100
1.56
1.56
100
0.10
0.10
100

:
:
:
:

Uhya, Enno dan Nanto


Rendy Dan Amri
Taryoko
12 Juni 2012

BAGS Qty

SEAM

REMARK

Analisis

1
1
1

Sediment Roof
Coal Body
Sediment Floor

TUNGGU KONFIRMASI
PROXIMAT+TM+TS+CV+RD
TUNGGU KONFIRMASI

Вам также может понравиться