MUNICIPALIDAD PROVINCIAL DE CAJAMARCA

GERENCIA DE DESARROLLO URBANO Y ACONDICIONAMIENTO TERRITORIAL


DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

PROYECTO:

CONSTRUCCION Y MEJORAMIENTO
TROCHA CARROZABLE CASERIOS C.P. CHAMIS

UBICACIN:

PROV.: CAJAMARCA

FECHA:
ELABOR.:

DICIEMBRE 2003
DEP/2003

MODALIDAD:

ADM. DIRECTA

DIST.: CAJAMARCA

METRADOS
01.00.00 TRABAJOS PRELIMINARES:
01.01.00 CARTEL DE OBRA (1.8x3.6m)

1.00 UND

01.02.00 TRAZO Y REPLANTEO

ESTACA

6,000.00 m2

DISTANCIA
PARCIAL
(m)

ANCHO
CARRETERA
(m)
6.00

AREA

460.00

6.00

2,760.00

Km 00 - Km 01

Km 01 - Km 02

6.00
540.00

TOTAL

(m2)

6.00

1,000.00

3,240.00

6,000.00

02.00.00 MOVIMIENTO DE TIERRAS:


02.01.00 CORTE SUPERFICIAL A NIVEL DE SUBRASANTE
DISTANCIA

300.00 m3

(m)

SECCION
CORTE
(m2)

RELLENO
(m2)

460.00

0.30

0.00

138.00

0.00

540.00

0.30
0.30

0.00
0.00

162.00

0.00
0.00

300.00

0.00

ESTACA

VOLUMEN
CORTE
RELLENO
(m3)
(m3)

Km 00 - Km 01

Km 01 - Km 02

TOTAL

1,000.00

MUNICIPALIDAD PROVINCIAL DE CAJAMARCA


GERENCIA DE DESARROLLO URBANO Y ACONDICIONAMIENTO TERRITORIAL
DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

PROYECTO:

CONSTRUCCION Y MEJORAMIENTO
TROCHA CARROZABLE CASERIOS C.P. CHAMIS

UBICACIN:

PROV.: CAJAMARCA

FECHA:
ELABOR.:

DICIEMBRE 2003
DEP/2003

MODALIDAD:

ADM. DIRECTA

DIST.: CAJAMARCA

METRADOS

02.02.00 ENSANCHE DE CUNETAS

ESTACA

200.34 m3

DISTANCIA
PARCIAL
(m)

SECCION
CUNETA
(m2)

SECCION
ENSANCHE
(m2)

VOLUMEN

940.00

0.09

0.063

59.22

1,000.00

0.09

0.063

63.00

980.00

0.09

0.063

61.74

260.00

0.09

0.063

16.38

(m3)

Km 00 - Km 01

Km 01 - Km 02

Km 02 - Km 03

Km 03 - Km 04

TOTAL

3,180.00

200.34

03.00.00 CONFORMACION BASE AFIRMADO e=0.10m.


03.01.00 EXTRACCION Y APILAMIENTO DE MATERIAL
ESPESOR (m)
0.10
TOTAL

AREA (m2)
6,000.00

750.00 m3

COEFICIENTE VOLUMEN (m3)


1.25
750.00
750.00

03.02.00 CARGUIO

750.00 m3

03.03.00 TRANSPORTE A LA OBRA (DISTANCIA PROMEDIO 0.5Km)

750.00 m3

03.04.00 CONFORMACION DE BASE AFIRMADO (LASTRADO e=0.10m.)

6,000.00 m2

S10
M.P.C. DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

Pgina : 1.00

Presupuesto
Obra

0902005

CONSTRUCCION Y MEJORAMIENTO
TROCHA CARROZABLE CASERIOS C.P. CHAMIS

Frmula
01
Cliente
MUNICIPALIDAD PROVINCIAL DE CAJAMARCA
Tarjeta
0001
17/09/2003
Departamento
CAJAMARCA
ProvinciaCAJAMARCADistrito CAJAMARCA

Item

Descripcin

Unidad

Metrado

Precio

Parcial Subtotal

1.00
6,000.00

278.44
0.27

278.44
1,620.00

1,898.44

01.00.00
01.01.00
01.02.00

TRABAJOS PRELIMINARES
CARTEL DE OBRA (1.8x3.6m)
TRAZO Y REPLANTEO **

02.00.00
02.01.00
02.02.00

MOVIMIENTO DE TIERRAS
CORTE SUPERFICIAL A NIVEL DE SUBRASANTE
ENSANCHE DE CUNETAS

M3
M3

300.00
200.34

3.04
8.24

912.00
1,650.80

03.00.00
03.01.00
03.02.00
03.03.00
03.04.00

CONFORMACION BASE AFIRMADO e=0.10m.


M3
EXTRACCION Y APILAMIENTO DE MATERIAL
CARGUIO
M3
TRANSPORTE A LA OBRA
M3
CONFORMACION DE BASE AFIRMADO (LASTRADO e=0.10m.) M2

750.00
750.00
750.00
6,000.00

2.92
2.60
4.92
1.33

2,190.00
1,950.00
3,690.00
7,980.00

UND
M2

2,562.80

15,810.00

COSTO DIRECTO
GASTOS GENERALES (8% C.D.)
PRESUPUESTO TOTAL

SON :

Total

VEINTIUN MIL OCHOCIENTOS NOVENTIDOS Y 94/100 NUEVOS SOLES

20,271.24
1,621.70
21,892.94

S10

Pgina :

M.P.C. DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

Anlisis de precios unitarios


CONSTRUCCION Y MEJORAMIENTO
TROCHA CARROZABLE CASERIOS C.P. CHAMIS

Obra

Frmula

01

Partida

01.01.00

Rendimiento
Cdigo

Descripcin Insumo

Fecha 17/09/2003
CARTEL DE OBRA (1.8x3.6m)
10 UND/DIA
Costo unitario directo por : UND

278.44

Unidad Cuadrilla Cantidad

Precio

Parcial
4.95

Mano de Obra
470103

OFICIAL

HH

1.00

0.80

6.19

470104

PEON

HH

4.00

3.20

5.54

17.73
22.68

Materiales
399301

CARTEL DE OBRA

UND

1.00

255.08

255.08
255.08

Equipos
370101

HERRAMIENTAS MANUALES

%MO

3.00

22.68

0.68
0.68

Partida

01.02.00

Rendimiento
Cdigo

Descripcin Insumo

TRAZO Y REPLANTEO **
1400 M2/DIA
Costo unitario directo por : M2

0.27

Unidad Cuadrilla Cantidad

Precio

Parcial

Mano de Obra
470032

TOPOGRAFO

HH

1.00

0.01

8.29

0.05

470103

OFICIAL

HH

1.00

0.01

6.19

0.04

470104

PEON

HH

2.00

0.01

5.54

0.06
0.15

Materiales
030202

ACERO CORRUGADO 3/8"

KG

0.00

290317
541116

1.70

0.01

YESO DE 20 Kg

BLS

ESMALTE

GLN

0.00

7.10

0.01

0.00

35.60

0.01
0.03

Equipos
370101

HERRAMIENTAS MANUALES

%MO

370248

JALONES, MIRAS

HE

375411

TEODOLITO

HE

491903

NIVEL

HE

3.00

0.15

0.00

1.25

0.01

1.70

0.01

1.00

0.01

5.10

0.03

2.00

0.01

4.30

0.05
0.09

Partida

02.01.00

Rendimiento
Cdigo

Descripcin Insumo

CORTE SUPERFICIAL A NIVEL DE SUBRASANTE


450 M3/DIA
Costo unitario directo por : M3

3.04

Unidad Cuadrilla Cantidad

Precio

Parcial
0.01

Mano de Obra
470101

CAPATAZ

HH

0.10

0.00

7.60

470104

PEON

HH

2.00

0.04

5.54

0.20
0.21

Equipos
370101

HERRAMIENTAS MANUALES

490895

TRACTOR D7

%MO
HM

1.00

3.00

0.21

0.01

0.02

188.50

3.36
2.83

Partida

02.02.00

Rendimiento
Cdigo

Descripcin Insumo

ENSANCHE DE CUNETAS
180 M3/DIA
Costo unitario directo por : M3

8.24

Unidad Cuadrilla Cantidad

Precio

Parcial

Mano de Obra
470101

CAPATAZ

HH

0.10

0.00

7.60

0.03

470104

PEON

HH

4.00

0.18

5.54

0.99
1.02

Equipos
370101

HERRAMIENTAS MANUALES

490630

RETROEXCAVADORA 225 H.P.

%MO
HM

1.00

3.00

1.02

0.04

161.90

0.03
7.19
7.22

Partida

03.01.00

Rendimiento
Cdigo

Descripcin Insumo

EXTRACCION Y APILAMIENTO DE MATERIAL


550 M3/DIA
Costo unitario directo por : M3

2.92

Unidad Cuadrilla Cantidad

Precio

Parcial
0.02

Mano de Obra
470101

CAPATAZ

HH

0.20

0.00

7.60

470104

PEON

HH

2.00

0.03

5.54

0.16
0.18

Equipos
370101

HERRAMIENTAS MANUALES

490895

TRACTOR D7

%MO
HM

1.00

3.00

0.18

0.01

188.50

0.01
2.73
2.74

Partida

03.02.00

Rendimiento
Cdigo

Descripcin Insumo

CARGUIO
550 M3/DIA
Costo unitario directo por : M3

2.60

Unidad Cuadrilla Cantidad

Precio

Parcial

Mano de Obra
470101

CAPATAZ

HH

0.50

0.01

7.60

0.06
0.06

Equipos
370101

HERRAMIENTAS MANUALES

490491

CARGADOR FRONTAL CAT-950

%MO
HM

1.00

3.00

0.06

0.01

174.90

0.00
2.54
2.54

Partida

03.03.00

Rendimiento
Cdigo

Descripcin Insumo

TRANSPORTE A LA OBRA
120 M3/DIA
Costo unitario directo por : M3

4.92

Unidad Cuadrilla Cantidad

Precio

Parcial

7.60

0.10

Mano de Obra
470101

CAPATAZ

HH

0.20

0.01

0.10
Equipos
370101

HERRAMIENTAS MANUALES

481103

VOLQUETE DE 8 M3

%MO
HM

1.00

3.00

0.10

0.00

0.07

72.30

4.82

4.82

Partida

03.04.00

Rendimiento
Cdigo

CONFORMACION DE BASE AFIRMADO (LASTRADO e=0.10m.)


2400 M2/DIA
Costo unitario directo por : M2

1.33

Unidad Cuadrilla Cantidad

Precio

Parcial

Descripcin Insumo
Mano de Obra

470101

CAPATAZ

HH

0.20

0.00

7.60

0.01

470102

OPERARIO

HH

1.00

0.00

6.91

0.02

470104

PEON

HH

3.00

0.01

5.54

0.06
0.09

Materiales
050100

AFIRMADO

M3

0.13

0.00

0.00
0.00

Equipos
370101

HERRAMIENTAS MANUALES

%MO

3.00

481202

CAMION CISTERNA 4X2 (AGUA) 2,000 GAL.

HM

0.90

490900

MOTONIVELADORA DE 125 HP

HM

1.00

491110

RODILLO LISO VIBRATORIO AUT. CA-25

HM

1.00

0.09

0.00

0.00

91.40

0.27

0.00

162.70

0.54

0.00

129.90

0.43
1.24

MUNICIPALIDAD PROVINCIAL DE CAJAMARCA


GERENCIA DE DESARROLLO URBANO Y ACONDICIONAMIENTO TERRITORIAL
DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

CONSTRUCCION Y MEJORAMIENTO
TROCHA CARROZABLE CASERIOS C.P. CHAMIS
UBICACION :PROV: Cajamarca
Modalidad : ADM. DIRECTA
DIST. : Cajamarca
Fecha:
DICIEMBRE 2003
PROYECTO :

COSTO DIRECTO DE OBRA


Tiempo de ejecucin
GASTOS GENERALES DE OBRA

30 das calendarios

S/.
20,271.24
1.0 meses
S/.
1,621.70
%
8.00

DESAGREGADO
PROPUESTA DE GASTOS GENERALES

N
MESES

DESAGREGADO

COEF.
PARTICIP.

MONTO
PARCIAL
(S/.)

MONTO
TOTAL
(S/.)

1.0 GASTOS GENERALES FIJOS:


1.1 ALMACEN Y GUARDIANIA
ALMACEN Y GUARDIANIA
1.2 MOVILIDAD
2.0 GASTOS GENERALES VARIABLES
2.1 PERSONAL TECNICO, ADMINISTRATIVO Y AUXILIAR
INGENIERO SUPERVISOR DE OBRA
INGENIERO RESIDENTE DE OBRA
ADMINISTRADOR - CONTADOR
ALMACENERO
GUARDIAN

1.0

1,400.00

1,400.00

1.0

150.00

150.00

UTILES DE OFICINA Y DIBUJO


1.0
SERV. PUBLICOS (agua, desague, telfono) durante Ejec. De Obra

21.70

21.70

50.00

50.00

2.2 EQUIPOS NO INCLUIDOS EN LOS COSTOS DIRECTOS

EQUIPOS VARIOS

2.3 GASTOS VARIOS

2.4 GASTO SEDE CENTRAL

CONTAB., LIQ. DE OBRA Y OTROS

1.0
TOTAL

1,621.70

MUNICIPALIDAD PROVINCIAL DE CAJAMARCA


GERENCIA DE DESARROLLO URBANO Y ACONDICIONAMIENTO TERRITORIAL
DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

RELACION DE EQUIPO MECANICO MINIMO


PROYECTO :

CONSTRUCCION Y MEJORAMIENTO
TROCHA CARROZABLE CASERIOS C.P. CHAMIS

UBICACION:

PROV, DIST. : CAJAMARCA

ITEM

1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9

DESCRIPCION DE
MAQUINARIA Y/O EQUIPOS

TRACTOR D7
RETROEXCAVADORA 225 H.P.
VOLQUETE DE 8 M3
CARGADOR FRONTAL CAT-950
CAMION CISTERNA 4X2 (AGUA) 2,000 GAL.
MOTONIVELADORA DE 125 HP
RODILLO LISO VIBRATORIO AUT. CA-25
JALONES, MIRAS
TEODOLITO
NIVEL
TOTAL

DICIEMBRE 2003

CANTIDAD
HORAS MAQUINA

32.44
8.90
72.38
15.52
18.00
19.80
19.80
42.60
34.20
68.40
332.04

CRONOGRAMA DE AVANCE DE OBRA


PROYECTO

NOMBRE DEL PROYECTO: CONST. Y MEJ. TROCHA CARROZABLE CASERIOS C.P. CHAMIS

FECHA

DIC. 2003

MONTO TOTAL PRESUPUESTADO S/.

Descripcin

1.00

TRABAJOS PRELIMINARES

1.01

CARTEL DE OBRA (1.8x3.6m)

1.02

TRAZO Y REPLANTEO **

2.00

MOVIMIENTO DE TIERRAS

2.01

Parcial

1 MES

S/.

AV.FISICO AV.FINAN. AV.FISICO AV.FINAN. AV.FISICO AV.FINAN. AV.FISICO AV.FINAN.

Unidad Metrado

UND

1.00

21,892.94

1 SEM

278.44

1.00

6000.00

CORTE SUPERFICIAL A NIVEL DE SUBRASANTE

M3

300.00

912.00

2.02

ENSANCHE DE CUNETAS

M3

200.34

1650.80

3.00

CONFORMACION BASE AFIRMADO e=0.10m.

3.01

EXTRACCION Y APILAMIENTO DE MATERIAL

M3

750.00

2190.00

3.02

CARGUIO

M3

750.00

1950.00

750.00 1950.00

3.03

TRANSPORTE A LA OBRA (DISTANCIA PROMEDIO 0.5M3


Km)

750.00

3690.00

750.00 3690.00

3.04

M2
6000.00
CONFORMACION DE BASE AFIRMADO (LASTRADO e=0.10m.)

7980.00

GASTOS GENERALES (8% C.D.)


PRESUPUESTO TOTAL

3 SEM

4 SEM

278.44

M2

COSTO DIRECTO

1620.00 1500.00

2 SEM

405.00 1500.00

405.00 1500.00

150.00

456.00

150.00

456.00

50.09

412.70

50.09

412.70

50.09

405.00 1500.00

405.00

412.70

412.70

50.09

750.00 2190.00

2000.00 2660.00 2000.00 2660.00 2000.00 2660.00

20271.24

3742.14

9573.70

3477.70

3477.70

1621.70

400.00

400.00

400.00

421.70

21892.94

4142.14

9973.70

3877.70

3899.40

AVANCE FISICO

(%)

18.46

47.23

17.16

17.16

AVANCE FISICO ACUMULADO

(%)

18.46

65.69

82.84

100.00

AVANCE FINANCIERO

(%)

18.92

45.56

17.71

17.81

AVANCE FINANCIERO ACUMULADO

(%)

18.92

64.48

82.19

100.00

MUNICIPALIDAD PROVINCIAL DE CAJAMARCA


DIRECCION GENERAL DE OBRAS
DIVISION DE ESTUDIOS Y PROYECTOS

CUADRO N 04
CRONOGRAMA DE DESEMBOLSOS
CONSTRUCCION Y MEJORAMIENTO
TROCHA CARROZABLE CASERIOS C.P. CHAMIS

PROYECTO:
FINANCIA:

MUNICIPALIDAD PROVINCIAL DE CAJAMARCA

UBICACION:

Fecha:
Elabor.:
Mod.:

PROV, DIST. : CAJAMARCA

PARTIDA

DESCRIPCION

DICIEMBRE 2003
DEP/2003
ADM. DIRECTA

MESES
1

SUB TOTAL
(S/.)

AVANC.FISICO (%/mes)
1
2

01.00.00
01.01.00
01.02.00

TRABAJOS PRELIMINARES
CARTEL DE OBRA (1.8x3.6m)
TRAZO Y REPLANTEO **

278.44
1,620.00

0.00
0.00

278.44
1,620.00

100.00%
100.00%

0.00%
0.00%

02.00.00
02.01.00
02.02.00

MOVIMIENTO DE TIERRAS
CORTE SUPERFICIAL A NIVEL DE SUBRASANTE
ENSANCHE DE CUNETAS

912.00
1,650.80

0.00
0.00

912.00
1,650.80

100.00%
100.00%

0.00%
0.00%

03.00.00
03.01.00
03.02.00
03.03.00
03.04.00

CONFORMACION BASE AFIRMADO e=0.10m.


EXTRACCION Y APILAMIENTO DE MATERIAL
CARGUIO
TRANSPORTE A LA OBRA
CONFORMACION DE BASE AFIRMADO (LASTRADO e=0.10m.)

2,190.00
1,950.00
3,690.00
7,980.00

0.00
0.00
0.00
0.00

2,190.00
1,950.00
3,690.00
7,980.00

100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%

COSTO DIRECTO
GASTOS GENERALES

20,271.24
1,621.70

0.00
0.00

20,271.24
1,621.70

TOTAL

21,892.94

0.00

21,892.94

% AVANCE MENSUAL

100.00%

0.00%

100.00%

PROGRAMACION DE OBRA GANTT


PROYECTO
FECHA

NOMBRE DEL PROYECTO: CONST. Y MEJ. TROCHA CARROZABLE CASERIOS C.P. CHAMIS
DIC. 2003

MONTO TOTAL PRESUPUESTADO S/.

21892.94

1 MES

Descripcin

Unidad Metrado

1 SEM
AV.FISICO

1.00
1.01

TRABAJOS PRELIMINARES
CARTEL DE OBRA (1.8x3.6m)

M2

1.00

1.02

TRAZO Y REPLANTEO **

M2

6000.00

2.00
2.01

MOVIMIENTO DE TIERRAS
CORTE SUPERFICIAL A NIVEL DE SUBRASANTE

M3

300.00

2.02

ENSANCHE DE CUNETAS

M3

200.34

3.00
3.01

CONFORMACION BASE AFIRMADO e=0.10m.


EXTRACCION Y APILAMIENTO DE MATERIAL

M3

750.00

3.02

CARGUIO

M3

750.00

3.03

TRANSPORTE A LA OBRA (DISTANCIA PROMEDIO 0.5M3


Km)

3.04

M2
6000.00
CONFORMACION DE BASE AFIRMADO (LASTRADO e=0.10m.)
AVANCE FISICO
AVANCE FISICO ACUMULADO

(%)
(%)

2 SEM
AV.FISICO

3 SEM
AV.FISICO

4 SEM
AV.FISICO

1.00
1500.00

1500.00

1500.00

1500.00

150.00

150.00

50.09

50.09

50.09

50.09

2000.00

2000.00

2000.00

47.23
65.69

17.16
82.84

17.16
100.00

750.00
750.00
750.00

750.00

18.46
18.46

S10
MPC-DEP

Precios y cantidades de insumos requeridos


Obra

0402002

Frmula

PAVIMENTACIONES 2003
PAVIMENTACIN JR. BEATO MASIAS (Entre Jr. Libertad y Jr. Tulipanes)

Fecha

14/10/2003

Cdigo

Descripcin insumo

Unidad

Precio

MANO DE OBRA
470032

TOPOGRAFO

HH

8.29

470101

CAPATAZ

HH

7.60

470102

OPERARIO

HH

6.91

470103

OFICIAL

HH

6.19

470104

PEON

HH

5.54

020105

CLAVOS PARA MADERA C/C 3"

KG

020409

ALAMBRE NEGRO N16

KG

2.40

050013

PIEDRA PARA EMPEDRADO

M3

29.40

050031

GRAVILLA LIMPIA DE RIO 1/2" - 3/4" M3

41.00

050104

ARENA GRUESA

M3

41.30

050113

MATERIAL CLASIFICADO PARA BASEM3

29.00

050376

PIEDRA GRANDE MAX. 4"

M3

29.40

053201

MATERIAL CLASIFICADO PARA BASEM3

29.00

130006

ASFALTO RC-250

170000

LADRILLO ARCILLA CORRIENTE REXUND


6x12x25 CM

172301

PLACA RECORDATORIA DE CANTERIA


UND

84.75

210000

CEMENTO PORTLAND TIPO I (42.5KG)


BOL

16.36

290304

YESO

BOL

5.95

290317

YESO DE 20 Kg

BLS

5.95

390500

AGUA

M3

399301

CARTEL DE OBRA

UND

237.29

430031

LEA

TER

1.00

430103

MADERA TORNILLO

P2

2.63

435113

ESTACAS MADERA 2"X2"X1'

UND

0.50

435751

LEA

TER

3.00

440018

MADERA EUCALIPTO CEPILLADA

P2

519912

Molde Metlico Para Limitar Losa

UND

25.50

530000

KEROSENE INDUSTRIAL

GLN

4.49

530327

THINER

GLN

8.47

539002

KEROSENE INDUSTRIAL

GLN

4.49

540242

PINTURA ESMALTE SINTETICO

GLN

30.55

541122

ESMALTE SINTETICO

GLN

29.90

544503

PINTURA TRANSITO

GLN

50.85

MATERIALES

GLN

2.50

3.88
0.25

3.53

1.40

735201

TUBERIA PVC PARA AGUA, PEGAMENTO


GLB Y ACCESORIOS

4.32

375401

MIRAS Y JALONES

HM

1.44

375406

MIRA TOPOGRAFICA

HM

1.44

375411

TEODOLITO

HE

4.31

480109

MEZCLADORA 11 P3

HM

16.65

480403

CAMION CISTERNA 4x2 (AGUA) 122 HP


HM2,000

76.82

481102

VOLQUETE DE 6 M3

HM

53.13

481103

VOLQUETE DE 8 M3

HM

60.72

481701

EQUIPO PARA PINTAR

HM

33.90

490102

COMPRESORA NEUMATICA 250-330HM


PCM, 87 HP

490131

COMPRESORA

HM

55.49

490491

CARGADOR FRONTAL CAT-950

HM

146.94

490704

VIBRADOR DE CONCRETO 4 HP 2.40"HM

490895

TRACTOR D7

HM

158.41

490900

MOTONIVELADORA DE 125 HP

HM

136.71

491007

MEZCLADORA CONCRETO TAMBORHM


18HP 11P3

491021

PLANCHA COMPACTADORA

HM

12.94

491184

RODILLO VIBRATORIO 10 - 12 TN

HM

109.12

491901

TEODOLITO

HM

4.31

491903

NIVEL

HE

3.59

498802

NIVEL TOPOGRAFICO

HM

3.29

EQUIPOS

55.49

14.14

16.65

INSUMOS COMODIN
EQUIPOS
370101

HERRAMIENTAS MANUALES

%MO

370247

DESGASTE DE HERRAMIENTAS

%MO

La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est
utilizando

Pgina :

e insumos requeridos

Jr. Libertad y Jr. Tulipanes)

Cant. Requerida

Parcial

Presupuestado

27.37

226.90

240.04

52.88

401.89

413.15

1,244.12

8,596.87

8,589.53

956.13

5,918.44

5,961.73

5,616.62

31,116.07

31,121.24

46,260.17

46,325.69

126.66

316.65

318.06

241.92

580.61

581.63

47.68

1,401.79

1,404.00

454.11

18,618.51

18,611.66

422.41

17,445.53

17,414.11

35.51

1,029.79

1,031.21

505.25

14,854.35

14,854.29

1,380.63

40,038.27

40,030.36

79.09

306.87

310.08

966.00

241.50

241.50

1.00

84.75

84.75

7,316.02

119,690.09

119,706.94

5.90

35.11

35.42

42.10

250.50

252.62

237.53

838.48

845.07

1.00

237.29

237.29

34.81

34.81

31.89

1,654.83

4,352.20

4,352.40

240.04

120.02

144.02

13.34

40.02

40.14

1,501.96

2,102.74

2,103.11

2.71

69.11

68.88

3.33

14.95

14.17

2.28

19.31

18.25

8.66

38.88

33.49

0.18

5.50

5.90

1.26

37.67

42.10

13.71

697.15

698.14

564.34

2,437.95

2,440.11

225,940.40

225,951.59

29.89

43.04

42.10

4.19

6.03

5.90

24.00

103.44

84.21

37.54

625.04

624.81

40.42

3,105.06

3,115.66

19.49

1,035.50

1,035.65

167.50

10,170.60

10,165.59

18.25

618.68

618.29

1.05

58.26

59.73

0.76

42.17

42.50

28.25

4,151.06

4,154.51

278.31

3,935.30

3,939.37

24.43

3,869.96

3,870.62

55.59

7,599.71

7,587.07

318.50

5,303.03

5,301.19

54.65

707.17

710.39

55.59

6,065.98

6,075.55

3.37

14.52

11.81

48.00

172.32

168.41

6.73

22.14

23.62

47,649.02

47,636.98

319,849.60

319,914.26

SUB-TOTAL

1,372.39
19.73
0.00

1,392.12

SUB-TOTAL

0.00

1,392.12

TOTAL

319,849.60

321,306.38

MONTO PARTIDAS ESTIMADAS

nto Real que se est

0.00

321,306.38

S10

Pgina :

M.P.C. DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

Tiempos para programacin


Obra

0902005

MEJORAMIENTO DE TROCHAS CARROZABLES

Frmula 01
Item

APERTURA Y MEJORAMIENTO TROCHA MAYOPATA


Descripcin partida

Unidad Metrado

Rendimiento

Tiempo unitario

(Ru)

(Tu=Metrado/Ru)

01.00.00 TRABAJOS PRELIMINARES


01.01.00 TRAZO Y REPLANTEO **

M2

7,996.00

1,400.00

5.71
6.58

02.00.00 MOVIMIENTO DE TIERRAS


02.01.00 TALA Y RETIRO DE ARBOLES *

UND

79.00

12.00

02.02.00 EXCAVACION PARA EXTRACCION DE RAICES Y OTROS

M3

86.90

180.00

0.48

02.03.00 CORTE SUPERFICIAL A NIVEL DE SUBRASANTE

M3

5,354.10

450.00

11.90

02.04.00 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA *

M3

3,346.31

590.00

5.67

02.05.01 EXTRACCION Y APILAMIENTO DE MATERIAL

M3

3,346.31

550.00

6.08

02.05.02 CARGUIO

M3

3,346.31

550.00

6.08

02.05.03 TRANSPORTE A LA OBRA

M3

3,346.31

120.00

27.89

02.05.04 CONFORMACION DE TERRAPLEN CON MATERIAL PROPIO

M3

3,346.31

435.00

7.69

02.06.01 EXTRACCION Y APILAMIENTO DE MATERIAL

M3

3,346.31

550.00

6.08

02.06.02 CARGUIO

M3

3,346.31

550.00

6.08

02.06.03 TRANSPORTE A LA OBRA

M3

3,346.31

120.00

27.89

02.06.04 CONFORMACION DE TERRAPLEN CON MATERIAL DE PRESTAMO

M3

3,346.31

435.00

7.69

02.07.00 PERFILADO Y COMPACTADO DE TERRENO HABILITADO

M2

7,996.00

3,000.00

2.67

02.08.01 EXTRACCION Y APILAMIENTO DE MATERIAL

M3

1,015.49

550.00

1.85

02.08.02 CARGUIO

M3

1,015.49

550.00

1.85

02.08.03 TRANSPORTE A LA OBRA (DISTANCIA PROMEDIO 0.5 Km)

M3

1,015.49

120.00

8.46

02.08.04 CONFORMACION DE BASE AFIRMADO (LASTRADO e=0.10m.)

M2

7,996.00

2,400.00

3.33

02.05.00 RELLENO CON MATERIAL PROPIO

02.06.00 RELLENO CON MATERIAL DE PRESTAMO

02.08.00 CONFORMACION BASE AFIRMADO e=0.10m.

Factor multiplicid.

Duracin

(f)

(D=Tu/f)

1.00

2.00

2.00

2.00

2.00

2.00

1.00

2.00

14

1.00

2.00

1.00

2.00

14

1.00

1.00

1.00

1.00

2.00

1.00

MUNICIPALIDAD PROVINCIAL DE CAJAMARCA


GERENCIA DE DESARROLLO URBANO Y ACONDICIONAMIENTO TERRITORIAL
DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

PRESUPUESTO ANALITICO DE GASTO


CONSTRUCCION Y MEJORAMIENTO

PROYECTO :

TROCHA CARROZABLE CASERIOS C.P. CHAMIS


UBICACION:

ITEM

PROV, DIST. : CAJAMARCA

GRUPO GENERICO DEL GASTO/


ESPECIFICA DEL GASTO

6 GASTOS DE CAPITAL
6.5

INVERSIONES

6.5 11.- Aplicaciones Directas


6.5 11. 20.- Viticos y Asignaciones
6.5 11. 22.- Vestuario
6.5 11. 23.- Combustibles y Lubricantes
6.5 11. 27.- Servicios No Personales
6.5 11. 29.- Materiales de Construccin
6.5 11. 30.- Bienes de Consumo
6.5 11. 36.- Tarifas de Servicios Bsicos
6.5 11. 37.- Alquiler de Bienes
6.5 11. 39.- Otros Servicios de Terceros
6.5 11. 51.- Equipamiento y Bienes Duraderos

TOTAL

RESUPUESTO ANALITICO DE GASTO


CONSTRUCCION Y MEJORAMIENTO
TROCHA CARROZABLE CASERIOS C.P. CHAMIS
SETIEMBRE 2003

MONTO
TOTAL

(S/.)

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

COSTO DE MANO DE OBRA


N
1
2
3
4
5
6

DESCRIPCION
Topografo
Capataz
Operario
Operador de Equipo Liviano
Oficial
Peon

UNIDAD
H-H
H-H
H-H
H-H
H-H
H-H

MPC-2003
UNITARIO ( S/. )
8.29
7.60
6.91
6.19
6.19
5.54

UNIDAD
Jgo
Gln
Kg

Dollar=S/.
3.50
SIN I.G.V. CON I.G.V.
UNITARIO ( S/. )
12.75
15.20
17.75
21.10
1.47
1.70

COSTO DE MATERIALES
N

DESCRIPCION
7 Accesorios para Tanque de Bao
8 Acelerante de Fragua # 5
9 Acero Corrugado
21 Afirmado

m3

21.19

25.20

COSTO DE EQUIPO
N

DESCRIPCION
371 Teodolito
372 Nivel
373 Jalones, Miras

UNIDAD
H-E
H-E
H-E

SIN I.G.V. CON I.G.V.


UNITARIO ( S/. )
4.31
5.10
3.59
4.30
1.44
1.70

UNIDAD
und
H-M
H-M
H-M
H-M
H-M
H-M
H-M
H-M
H-M
H-M
H-M

1 UIT = S/.
3100
MPC-2002-2003
IGV =
0.19
SIN I.G.V. CON I.G.V.
UNITARIO ( S/. )
10.17
12.10
76.82
91.40
262.72
312.60
18.40
21.90
76.82
91.40
76.82
91.40
146.94
174.90
206.15
245.30
12.94
15.40
55.49
66.00
12.50
14.90
0.00
0.00

COSTO DE MAQUINARIA

N
374
375
376
377
378
379
380
381
382
383
384
385

DESCRIPCION
Aplicador de Silicona para Vidrios
Barredora Mecanica
Barreno 5/8"x6'
Bloquetera
Camion Cisterna 2000 Glns.
Camion Esparcidor
Cargador Frontal CAT 950
Cocina de Asalto
Compactador Vibr. Tipo Plancha 5.8 HP
Compresora Neumtica
Maquina de Soldar
Martillo Neumatico de 25 Kg.

386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409

Mezcladora de Concreto 11 p3
Mini Esparcidora de Asfalto
Motobomba 3"
Motoniveladora 125 HP
Pavimentadora
Plancha Compactadora
Planta de Asfalto
Plataforma
Plataforma y Remolcador
Pulidora
Punta de Acero
Retrocargadora WB140-2, 86HP
Retroexcavadora Guria
Rod. Neumat. 81-100 HP, 5,5-20 Tn
Rod. Tandem 58-70 Tn. 5-8 Tn.
Rodillo Liso Vibrat. Aut. CA-25
Soldadora Elect. Monof. Alterna 255 Amp.
Tractor de Orugas D6-D
Tractor de Orugas D7
Transp. Mezcla Asfaltica
Vibrador de Concreto 4 HP
Volquete de 15 m3
Volquete de 6 m3
Volquete de 8 m3

H-M
H-M
H-M
H-M
H-M
H-M
H-M
DIA
DIA
H-M
U
H-M
H-M
H-M
H-M
H-M
H-M
H-M
H-M
H-M
H-M
H-M
H-M
H-M

16.65
34.50
4.28
136.71
97.64
12.94
162.84
106.95
1860.00
0.00
113.70
0.00
136.09
79.35
79.35
109.12
14.38
136.84
158.41
31.63
14.14
105.09
53.13
60.72

19.80
41.10
5.10
162.70
116.20
15.40
193.80
127.30
2213.40
0.00
135.30
0.00
161.90
94.40
94.40
129.90
17.10
162.80
188.50
37.60
16.80
125.10
63.20
72.30