00 cumec Design Discharge: Head Difference: 110.00 m Head Difference: Length of HDPE Pipe: 200.00 m Length of HDPE Pipe: Bed Slope of Pipe: 0.55 Bed Slope of Pipe: % of Flow in Pipe: 90% % of Flow in Pipe: Coefficient of Friction: 0.01 Coefficient of Friction: Diameter of HDPE Pipe Diameter of Pipe: Area of Cross Section: Flow Area in Pipe: Wetted Perimeter: Hydraulic Mean Depth: Velocity in the Pipe: Discharging Capacity: 0.58 m 0.27 Sq.m. 0.24 Sq.m. 1.46 m 0.17 m 22.35 m/s 6.00 cumec Diameter of HDPE Pipe Diameter of Pipe: Area of Cross Section: Flow Area in Pipe: Wetted Perimeter: Hydraulic Mean Depth: Velocity in the Pipe: Discharging Capacity:
6.00 cumec 110.00 m 200.00 m 0.55 70% 0.01 0.59 m 0.27 Sq.m. 0.19 Sq.m. 1.16 m 0.16 m 22.13 m/s 6.00 cumec
Discharging Capacity in Free Flow Pipe Total Head: Total Length of Pipe: Diameter of HDPE Pipe: Percentage of Flow Area: 110 170 0.6 80%
Cross Sectional Area: 0.28274 Actual Flow Area: 0.2262 Wetted Perimeter: 1.32858 Hydraulic Mean Depth: 0.17025 Friction Loss Coefficient: Number of Bends: Bend Loss Coefficient: 0.01 5 0.1
Total Head Velocity Head Head Losses
Head Losses in terms of Square of Flow Velocity Friction Loss = 0.18016 Bend Loss = 0.02548 Total Loss = 0.20564 Flow Velocity = 20.7042 Discharging Capacity = Totla Head Loss till exit = 4.68
88.15 m
cumecs
Sl.No. 1
Qty 21 cum.
a. Cement 168 bags b. Sand 9.26 cum. c. Aggregate 18.52 cum. Size 12.5 mm to 10 mm 2 M25-A10 Shotcrete 53 cum. a. Cement 647 bags b. Sand 23.85 cum. c. Aggregate 47.70 cum. Size 10 mm and down Water / Cement = 0.54