HOJA DE METRADOS DE SISTEMA DE AGUA POTABLE

PROYECTO:

"AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO LA


COCA-DISTRITO DE VALERA, PROVINCIA DE BONGAR-AMAZONAS"
1.00

SISTEMA DE AGUA POTABLE ANEXO "LA COCA"

1.01

CAPTACION

1.01.01

TRABAJOS PRELIMINARES

01.01.01.01 Limpieza de terreno manual


MEDIDAS
Largo
Ancho
7.26
5.26

DESCRIPCIN
AREA DE CAPTACION

CANT.

1.00

AREA (m2)

PARCIAL
38.19

TOTAL

Se tomar 1 metro adicional a cada lado

38.19

01.01.01.02 Trazo y replanteo


MEDIDAS
Largo
Ancho
5.26
3.30

DESCRIPCIN
AREA DE CAPTACIN

1.01.02

CANTID
1.00

AREA (M2)
PARCIAL
TOTAL
17.36
17.36

MOVIMIENTO DE TIERRAS

01.01.02.01 Excavacin manual en roca suelta (M3)


DESCRIPCIN
Muros de encausamiento
Caseta de vlvulas, cmara de agua
Enrrocado
Ua
Losa de fondo
Barraje

Largo
3.60
0.70
1.70
Area=
3.40
3.40
3.40

MEDIDAS
Ancho
0.60
0.60
0.60
4.20
0.60
1.80
0.60

Prof.
0.50
0.50
0.50
0.50
0.93
0.50
0.50

Largo
3.60
0.70
1.70
Area=
3.40
3.40
3.40

MEDIDAS
Ancho
0.60
0.60
0.60
4.20
0.60
1.80
0.60

veces
2.00
3.00
1.00
1.00
1.00
1.00
1.00

VOLUMEN (m3)
N
veces
PARCIAL
TOTAL
2.00
2.16
3.00
0.63
1.00
0.51
1.00
2.10
1.00
1.90
1.00
3.06
1.00
1.02
11.38

01.01.02.02 Refine, Nivelacion de Paredes y Fondo


DESCRIPCIN
Muros de encausamiento
Caseta de vlvulas, cmara de agua
Enrrocado
Ua
Losa de fondo
Barraje

AREA (m2)
PARCIAL
TOTAL
4.32
1.26
1.02
4.20
2.04
6.12
2.04
21.00

01.01.02.03 Eliminacin de Material Excedente en boogui ( 30m )


DESCRIPCIN

Cant.
11.38

MATERIAL EXCAVADO (roca suelta)

1.01.03

CONCRETO SIMPLE

1.01.03.01

Solado de 4", Concreto f'c=100 Kg/cm2

MEDIDAS
%Esponj.
40.00

MEDIDAS
Largo
Ancho
3.60
0.60
0.70
0.60
1.70
0.60
3.40
0.60
3.40
1.80
3.40
0.60

DESCRIPCIN
Muros de encausamiento
Caseta de vlvulas, cmara de agua
Ua
Losa de fondo
Barraje

Correc.

VOLUMEN (m3)
PARCIAL
TOTAL
15.93
15.93

AREA (m2)

CANT.
2.00
3.00
1.00
1.00
1.00
1.00

PARCIAL
4.32
1.26
1.02
2.04
6.12
2.04

TOTAL

16.80

1.01.04

CONCRETO ARMADO

1.01.04.01

Concreto f'c = 210 kg/cm

DESCRIPCIN
Muros de encausamiento
Cimiento de muro de encausamiento
Ua de losa de fondo
Losa de fondo
Barraje
Pilar
Caseta de vlvulas
Muro longitudinal
Muro transversal
Losa de fondo
Tapa de concreto 1
Tapa de concreto 2

1.01.04.02

Largo
3.60
3.60
3.00
3.40
3.00
1.20
1.70
0.70
1.20
1.00
0.80
0.80

MEDIDAS
Ancho
1.20
0.60
0.70
2.20
Area=
1.00
1.00
1.20
1.00
0.70
0.50
0.80

Espesor
0.20
0.20
0.20
0.20
0.14
0.15
0.20
0.20
0.20
0.15
0.08
0.08

N
veces
2.00
2.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00

VOLUMEN (m3)
PARCIAL
TOTAL
1.73
0.86
0.42
1.50
0.41
0.18
0.34
0.50
0.24
0.11
0.03
0.05
6.37

Encofrados y desencofrado normal


DESCRIPCIN

Largo
7.60
7.00
3.00
3.00
1.20

Muros de encausamiento
Barraje
Pilar
Caseta de vlvulas

Muro exterior
Muros interiores
Muros interiores

Pinto para tapa de vlvula 1


Pinto para tapa de vlvula 2
Tapa de concreto 1
tapa de concreto 2

3.70
0.75
0.70
0.75
0.40
3.30
2.70
0.80
0.80
0.80
0.80

MEDIDAS
Altura
1.20
1.20
0.50
0.60
1.00
1.00
1.00
1.00
1.00
1.05
1.05

Esp.

0.15

0.08
0.08
0.80
0.08
0.08
0.08

0.50

N
veces
1.00
1.00
1.00
1.00
2.00
2.00
1.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
4.00
1.00
4.00

Parcial
9.12
8.40
1.50
1.80
2.40
0.30
3.70
1.50
0.70
1.58
0.42
0.26
0.22
0.64
0.26
0.03
0.26

AREA (m2)
TOTAL

33.08
1.01.04.03

Acero Fy=4200 Kg/cm2


DESCRIPCIN

3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"

Long.
(m)
3.80
1.55
2.62
4.30
1.45
1.45
2.02
1.45
4.07
1.30
4.07
1.20
1.15
1.30
0.74
0.46
0.72
0.42
0.72

3/8"

475.52

Muro de encausamiento
Losa de fondo + Ualosa de fondo
Caseta valvula + Cmara de agua
Muro derecho de cmara
Barraje

Pilar

Tapa de concreto 01
Tapa de concreto 02

RESUMEN DE LONG. DE ACEROS

N
Varillas
7.00
20.00
21.00
15.00
6.00
7.00
7.00
9.00
7.00
30.00
6.00
30.00
5.00
5.00
2.00
3.00
6.00
6.00
4.00

Element.
lguales
2.00
2.00
1.00
1.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00

53

PESO
kg/m
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56

Varillas

Parcial
29.79
34.72
30.81
36.12
14.62
17.05
7.92
7.31
15.95
21.84
13.68
20.16
3.22
3.64
0.83
0.77
4.84
1.41
1.61
266.29

1.01.05

REVOQUES Y ENLUCIDOS

1.01.05.01

Tarrajeo con impermeabilizantes mezcla 1:1, E=1.5cm.


MEDIDAS
Largo
Ancho
3.60
1.00
0.70
0.93
0.40
0.93
3.40
1.80
0.70
0.70
0.70
0.40
3.60
0.56
3.60
0.65
1.28
1.00
1.00
0.18
0.80
0.80
0.80
0.08
0.80
0.50
0.80
0.08
0.50
0.08

DESCRIPCIN
Muro de encausamiento
Caseta de valvula + Cmara de agua
Losa de fondo
Fondo de caseta + Cmara
Barraje
Pilar
Tapa de concreto 1
Tapa de concreto 2

N
caras
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
4.00
2.00
2.00
2.00

N
veces
2.00
6.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00

Parcial
7.20
3.89
0.74
6.12
0.49
0.28
2.02
2.34
2.57
0.36
1.28
0.24
0.80
0.12
0.08

AREA (m2)
TOTAL

28.51
1.01.05.02

Tarrajeo en exteriores (m2)


MEDIDAS
Largo
3.70
6.10

DESCRIPCIN
Caseta de valvula + Cmara de agua
Muro de encausamiento

Ancho
1.00
1.00

N
caras
1.00
1.00

N
veces
1.00
1.00

Parcial
3.70
6.10

AREA (m2)
TOTAL

9.80

1.01.06

MAMPOSTERIA DE PIEDRA

1.01.06.01

Mampostera de piedra seleccionada c:a 1:5


DESCRIPCIN

B
4.39

Losa de fondo de piedra; e=20cm

MEDIDAS
b
3.40

H
1.06

N
veces
1.00

Parcial
4.13

AREA (m2)
TOTAL
4.13

1.01.07

VALVULAS Y ACCESORIOS

1.01.07.01
1.01.07.02
1.01.07.03
1.01.07.04
1.01.07.05
1.01.07.06
1.01.07.07
1.01.07.08
1.01.07.09

Sumin. e instalacin de tubera PVC ISO 4"


Sum y instalacin de tuberia PVC ISO 2"
Sum. y coloc. de rejilla de 0.38 x 0.50m
Sum. y coloc. de vertedero triangular 0.4 x 0.70m.
Sum. y coloc. Canastilla de bronce de 4"
Valvula compuerta de F Fdo. 4" para limpia
Valvula compuerta de F Fdo. 2 para salida
Suministro y colocacion Cono de rebose 4"
Compuerta de limpia de madera tratada 30x30cm;E=1"
con vstago

ML
ML
UN
UN
UN
UN
UN
UN
UN

3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

Вам также может понравиться