Вы находитесь на странице: 1из 2

Eni - IRAQ

ZUBAIR OIL FIELD DEVELOPMENT PROJECT

PSV PROCESS DATA SHEET FOR OIL FLOW TANK 002509012200TA003

EX-DE
Validity Status

00
Rev. Number

1/9/2013 Description

Z. Hatem
Prepared by Project name

C. Guzman
Cheched by

L. Fernandez
Approved by Contractor Approval Company Approval

Date Revision index Company logo and business name

Company Document ID

ZUBAIR OIL FIELD DEVELOPMENT PROJECT


SOUTH OIL COMPANY Contractor logo and business name ZUBAIR FIELD OIL DIVISION

Job n. Contractor Document ID

RAFIDAIN OIL SERVICES CO. Vendor logo and business name

TECNOCONSULT (UK) LTD.

Contract n. Vendor Document ID Order n.

Facility Name ZUBAIR FIELD Document Title

Location ZUBAIR DEGASSING STATION

Scale Supersedes N.

Sheet of Sheets 1 of 2

PSV PROCESS DATA SHEET

Supersedes by N. Plant area

Plant unit

This document is property of eni Iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

Document No. 2200-PSV-159

REV 00

CLIENT S.O.C LOCATION ZUBAIR UNIT ZUBAIR DEGASSING STATION ITEM NUMBER QUANTITY REFERENCE P&ID PROTECTED EQUIPMENT GENERAL DATA MAX. ALLOWED WORKING PRESSURE OF THE PROTECTED EQUIPMENT EQUIPMENT OPERATING PRESSURE OPERATING TEMPERATURE DISCHARGE LOCATION DESIGN CASE FLUID DESCRIPTION FLUID STATE CORROSIVE OR EROSIVE COMPONENTES

Rev.

Date 1/9/2013

By ZH

Checked CG

App TC LF S.O.C.

Page

RELIEF & SAFETY VALVES PROCESS DATA SHEET

00

2200-PSV-159A 1 00250901BPFM03560 002509012200TA003 mbarg mbarg C 53.4 30.0 76.0 ATM FLARE BLOCKED FLOW HYDROCARBON GAS -

2200-PSV-159B 1 00250901BPFM03560 002509012200TA003 53.4 30.0 76.0 ATM FLARE BLOCKED FLOW HYDROCARBON GAS -

PROCESS CONDITION

LIQUID LIQUID DENSITY LIQUID VISCOSITY GAS MOLECULAR RELATIVE MASS Cp/Cv RATIO COMPRESSIBILITY FACTOR

kg/h kg/m3 Cp kg/h

2714.0 60.30 1.100 1.00

2714.0 60.30 1.100 1.00

BACK PRESSURE DATA

BUILT-UP BACK PRESSURE (WHILE RELIEVING) CONSTANT SUPERIMPOSED BACK PRESSURE (WHILE CLOSED, NOT RELIEVING) VARIABLE SUPERIMPOSED BACK PRESSURE (FROM OTHER SOURCES) TOTAL BACK PRESSURE ALLOWABLE OVERPRESSURE DESIGN TEMPERATURE GAUGE SET PRESSURE

barg barg barg barg

BY SOW-FEED BY SOW-FEED BY SOW-FEED BY SOW-FEED

BY SOW-FEED BY SOW-FEED BY SOW-FEED BY SOW-FEED

% As per API 2000 & API 650 As per API 2000 & API 650 C mbarg C 125 -2.5/37 76.0 T in2 in2 20.70 26.00 VTA (NOTE 1) YES / NO NO 125 -2.5/37 76.0 T 20.70 26.00 VTA (NOTE 1) NO -

VALVE DATA

RELIEF TEMPERATURE STANDARD ORIFICE DESIGNATION REQUIRED ORIFICE AREA STANDARD EFFECTIVE ORIFICE AREA (API STD 526) VALVE TYPE IS AN UPSTREAM RUPTURE DISC INSTALLED? RUPTURE DISC ITEM NUMBER (IF ANY)

NOTAS: 1.- Vendor to advice as per API Standard 2000 for venting devices less than 15 psi for pressure and vacuum vent.

Sheet Rev.

00

Date

01/09/13

Description Zubair PSV Process Data Sheet COMPANY Document ID

Prepared by Ziad Hatem CONTRACTOR Document ID

Checked by

Ciro Guzman

Approved by Sheet No

Luis Fernandez

Logo and business name of document

SOUTH OIL COMPANY

ZUBAIR FIELD OIL DIVISION

00250900DPGS00001

2/2