Вы находитесь на странице: 1из 1

1/100 @A0

30TH FLOOR SLAB -TOWER


S-422
TOP &BOTTOM BARS REINF.
30TH FLOOR SLAB REINFORCEMENT LAYOUT - BOTTOM BARS 30TH FLOOR SLAB REINFORCEMENT LAYOUT - TOP BARS 1 SCALE 1:100 M 2 SCALE 1:100 M
0
05/16/2007
I55G8-2P
Dwg Number
Scale:
Project No
Date
:
:
Rev
KION TRC/ARCHITECT
163 bis avenue de clichy 75017 Paris, France
TEL. No.+33 1 56 33 09 97 FAX No. +33 1 53 42 2829
444 Broadway, Third Floor NewYork, NY 10013
T 212.966.9292 F 212.966.9242
LOCAL STRUCTURE
KOT CIU TRONG NOOC
STRUCTURE
KOT CIU
#30 BROADST., 47TH FLOOR
LESLIE E. ROBERTSON ASSOCIATES, R.L.L.P.
NEWYORK, NY 10004
TEL. (1) 212-750-9000
LERA
FAX (1) 212-750-9002
TEL. ( ) 722-62-78
Unit 301 MALIGAYA Bldg.III 430 E.Rodriguez Ave.
Cubao, Quezon City, Philippines
FAX. ( ) 721-73-91
STRUCTURE
KOT CIU
STRUCTURE
KOT CIU
VIET NAMNATIONAL
CONSTRUCTION CONSULTANTS
CORPORATION - VNCC
BITEXCO FINANCIAL TOWER
DU N/PROJECT
TRUNG TAM V N PHdNG - THOE NG MEI
DBCH Vp TI CHcNH
nBA nIhM: 45 NGD nq C KO, OUWN 1, TP. HU CHcMINH
45 NGO DUC KE ST., DIST. 1, HOCHIMINH CITY
P.bqn M tq P.duyt KGm Ngy
Appr.
By
Check
By
Prep.
By
Date Rev Issue Description
CHq nPU TO - PRO| ECT OWNER
GICMhSC - DIRECTOR
2nd FL., THE MANOR-MY DINH- HA NOI
DATE
HVAC
PLUMBING
ELECTRICAL
CIVIL
ARCHITECTURE
SIGNATURE DEPARTMENT
COORDINATION
DATE
HVAC
PLUMBING
ELECTRICAL
CIVIL
ARCHITECTURE
SIGNATURE DEPARTMENT
COORDINATION
NOTES :
A0 Boundary position established from the site
survey drawing received from Turner on
29th August 2006
FFL at Level 1 is to be set at level +2.040 relative
to the datum taken from the drawing 'existing
site elevation' received fromTurner on 18th
October 2006.
Engineering Consultants
0 01/10/08 Issued for Construction