* Summary
Designated Total No. Sector 1 D/W Sector 3 Sector 5 Sector 6 Tunnel Bored pile Sector 2(Lane 2) Sector 4(Lane 1) Sector 1 85 76 96 194 52 44 12 Previous month 36 52 96 140 0 27 12 Today 0 0 0 1 0 0 0 Jan-14 0 0 0 1 0 0 0 Total sum 36 52 96 141 0 27 12 Percent (%) 42.4% 68.4% 100.0% 72.7% 0.0% 61.4% 100.0% Day / Night Actual Balance rate Plan Additional
Date :
D-Wall(m3) Today/month Today/month Today/month Today/month 55.33 m3 -15.79 m3 139.9% 39.54 m3 202.50 m 983.69 m3 17.1% 1186.19 m3
Tunnel (m) 0.00 m3 12.52 m 0.0% 12.52 m 0.00 m 375.56 m 0.0% 375.56 m
* Detail
Excavation Depth ITEM Panel no. Dia & Thk. Width Design Depth 1 bite (2.8) 2 bite Description of Activities Machinery Operation rate (%) Remark
1 2 3 4 5 6 7 8 S6 55 800 5600 25.65 23.6 - 25.65 3 - 25.65 Excavation MBC 30 41.0% 55.33 m3 S6 134 800 5700 28.20 28.20 28.20 Desanding & Lowering rebar cage (6/6) & Casting (130m3)
D/W
ITEM
No.
Dia.
Pipe No.
Design Length
Excavation Depth
Description of Activities
Machinery
Remark
1 2 3 4 Shaft Escavation Soil disposal 71/70(Dispose soil by 07:00pm, Hacking the ground & Entrance - 2 shift operation)
Tunnel
S 55
Excavation