JAFFNA KILINOCHCHI

WATER SUPPLY AND SANITATION PROJECT



AFD LOAN NO:CLK 1003-01 J

DESIGN,SUPPLY AND INSTALLATION/CONSTRUCTION OF WATER INTAKE,RAW WATER TRANSMISSION MAIN
AND WATER TREATMENT PLANT

CONTRACT No.:PEIC/JKWSSP/DESIGN-BUILT/2013/01

BIDDING DOCUMENT

VOLUME 3 of 3

SECTION V EMPLOYERS REQUIREMENTS TYPE DRAWINGS AND CONCEPTUAL DRAWINGS



GOVERNMENT OF THE DEMOCRATIC SOCIALIST
REPUBLIC OF SRI LANKA

MINISTRY OF WATER SUPPLY AND DRAINAGE

NATIONAL WATER SUPPLY AND DRAINAGE BOARD

PROJECT MANAGEMENT UNIT
JAFFNA KILINOCHCHI WATER SUPPLY & SANITATION PROJECT
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
KANDY ROAD
JAFFNA
SRI LANKA.

August 2013
The Bidding Document for the named contract consists of three Volumes, namely Volume 1, Volume 2 and Volume 3.

Volume 1
Bidding Procedure
Section I. Instructions to Bidders
Section II. Bid Data Sheet
Section III. Evaluation and Qualification Criteria
Section IV. Bidding Forms
Conditions of Contract and Contract Forms
Section VI. General Conditions (GC)
Section VII. Particular Conditions (PC)
Section VIII. Contract Forms

Volume 2
Employers Requirements
Section V. Employers Requirements

Volume 3
Employers Requirements
Type Drawings and Conceptual Drawings for Employers Requirements



ListofDrawings
General JK/DB/SWTP/01 SiteLayoutSWTP
JK/DB/G/01 JK/DB/SWTP/0101 TrainingCenterPlanView
WaterIntake JK/DB/SWTP/02 HydraulicProfileSWTP
JK/DB/IT/01 WaterIntakeLocationPlan JK/DB/SWTP/0201 PIDSymbols
JK/DB/IT/02 WaterIntakePlanView JK/DB/SWTP/0202A SWTPGeneralProcessPart1requirements
JK/DB/IT/03 WaterIntakeSectionalElevation JK/DB/SWTP/0202 SWTPGeneralProcess1of2
JK/DB/IT/04 WaterIntakeSectionalElevation JK/DB/SWTP/0203 SWTPGeneralProcess2of2
JK/DB/SWTP/0204 PIDKMnO
4
Intake
RawWaterTransmissionMain JK/DB/SWTP/0205 PIDKMnO
4
SWTP
JK/DB/RWTM/01 SchematicDiagramforRawWaterTransmissionMain JK/DB/SWTP/0206 PIDPre&PostChlor.
JK/DB/RWTM/0201
JK/DB/SWTP/0207 PIDAlumSWTP
To RawWaterTransmissionMainPipeLineTrace JK/DB/SWTP/0208 PIDLime
JK/DB/RWTM/0221 JK/DB/SWTP/0209 PIDPAC
JK/DB/RWTM/03 RawWaterTransmissionMainDetailsofDuctsforRoadCrossings JK/DB/SWTP/0210 PIDPolymer
JK/DB/RWTM/04 RawWaterTransmissionMainBeddingTypes JK/DB/SWTP/03 SWTPGeneralProcess
JK/DB/RWTM/05
RawWaterTransmissionMainBackfillingandReinstatementofTrenches
PS/PRDARoads
JK/DB/SWTP/04 InletWatermeterchamberSWTP
JK/DB/RWTM/06
RawWaterTransmissionMainBackfillingandReinstatementofTrenchesRDA
Roads
JK/DB/SWTP/05 Aerator
JK/DB/RWTM/0701
JK/DB/SWTP/06 DistributionChamber
To TypicalDrawingforCulvertCrossings JK/DB/SWTP/07 CoagulationFlocculationClarification
JK/DB/RWTM/0704 JK/DB/SWTP/09A Filtration
JK/DB/RWTM/0705 TypicalDrawingforLagoonCrossingRawWaterTransmissionMain JK/DB/SWTP/09B Filtration
JK/DB/RWTM/08 TypicalDrawingsforWashoutChambers JK/DB/SWTP/10A TreatedWaterStorage&PumpingStation
JK/DB/RWTM/09 TypicalDrawingsforAirValveChambers JK/DB/SWTP/10B TreatedWaterStorage&PumpingStation
JK/DB/RWTM/10 TypicalDrawingsforGateValveChambers JK/DB/SWTP/11 BackwashtankSWTP
JK/DB/RWTM/11 TypicalDrawingsforFlowmeter&SluiceValvechambers JK/DB/SWTP/12A ChemicalBuilding
JK/DB/RWTM/12 TypicalDrawingsforMarkerPosts JK/DB/SWTP/12B ChemicalBuilding
LandsforBuildings JK/DB/SWTP/13A Chlorination
JK/DB/BUILD/01
Layoutplanforproposedareaengineer'sofficeandquartersatkaddudai
(sandilipay)
JK/DB/SWTP/13B Chlorination
JK/DB/BUILD/02
LayoutplanforexistingwatersupplyofficepremisesatKilinochchi(bachelor's
quarters)
JK/DB/SWTP/14 RecyclingFacilities
JK/DB/BUILD/03
Layoutplanforproposedareaengineer'sofficeandquartersatnavatkuli
(kaithady)
JK/DB/SWTP/15 Sludgehandingsystem
JK/DB/BUILD/04 Layoutplanforproposedareaengineer'sofficeandquartersatVelanai(Islands) JK/DB/SWTP/16A DryingBeds
JK/DB/SWTP/16B DryingBeds
1
3
3
50000
14501
28092
MCB BLOWER CHEMICAL
9700
P
P
M
C
B
M
C
B
EG
ENGINE GENERATOR
ROOM
ROOM ROOM ROOM
D
I
E
S
E
L
20000
8000

5000 5000 5000 5000
7000
7000 3000
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
WATER INTAKE
SITE PLAN & LANDSCAPING
REV DESCRIPTION DATE SIGN
PROJ ECT DIRECTOR
APPROVED
DATE T.L. - CONSULTANT
CONSULTANT
SCALE:
1:200
DRG.NO.
J K/DB/IT/01
CHECKED DESIGN
,.
DRAWN
J RC J RC
RECOMMENDED PRINCIPLE SUBJ ECT TO THE
CONDITION THAT THE DESIGN & BUILD
CONTRACTOR IS RESPONSIBLE FOR THE
CONFORMITY OF DESIGN WITH FRACTIONAL
& STRUCTURAL REQUIREMENTS
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
WATER INTAKE
PLAN VIEW
REV DESCRIPTION DATE SIGN
PROJ ECT DIRECTOR
APPROVED CONSULTANT
SCALE:
1:100
DRG.NO.
J K/DB/IT/02
DESIGN CHIEF
CHECKED
ENGINEER
DESIGN
DRAWN
T.Subaram
RECOMMENDED PRINCIPLE SUBJ ECT TO THE
CONDITION THAT THE DESIGN & BUILD
CONTRACTOR IS RESPONSIBLE FOR THE
CONFORMITY OF DESIGN WITH FRACTIONAL
& STRUCTURAL REQUIREMENTS
TEAM LEADER DATE
FINE SCREEN
CHANNEL
GL +32.50
+20.75
+22.30
+22.00 +22.00 +22.00
+20.75
CONVEYOR
BELT
9800
1
1
4
0
0
300
+22.30
+23.50
MANUALLY - CLEANED
BAR RACK (50mmSPACING)
TOP SLAB
250mm
+33.00
S.G S.G
GL +32.50
SECTION 1-1
1000
400X400 COLUMN
PRE - AERATION
DIFFUSERS
600
2
3
6
3
6400
4000
2000
600
B.V
C.V
2200
MASS CON
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
WATER INTAKE
SECTION 1-1
REV DESCRIPTION DATE SIGN
PROJ ECT DIRECTOR
APPROVED CONSULTANT
SCALE1:100
DRG.NO.
J K/DB/IT/03
DESIGN CHIEF
CHECKED
ENGINEER
DESIGN
DRAWN
T.Subaram
RECOMMENDED PRINCIPLE SUBJ ECT TO THE
CONDITION THAT THE DESIGN & BUILD
CONTRACTOR IS RESPONSIBLE FOR THE
CONFORMITY OF DESIGN WITH FRACTIONAL
& STRUCTURAL REQUIREMENTS
TEAM LEADER DATE
+22.50
+24.50
+26.50
+28.50
+22.00
+30.50
+33.00
4800
2
0
0
0
2000
800
1600
12977
SECTION 2-2
5
0
0
MANUALLY
CLEANED
BAR RACK
(50mm SPACING)
800X1200
SLUICE
GATES
(TYPE 4 LOC)
600X2000
SLUICE GATE
(TYPE 4 LOC)
+22.00
CHANNEL BOTTOM +21.50
SLOPE
1
2
0
0
300
SECTION 3-3
400
600
+22.50
HANDRAIL
600
MONORAIL
HOIST
4 - 600W X 2000 HIGH
SLUICE GATES
WATER ABSTRACTION
CONTROL GATES
+38.00
2000
1000
8000
7000
1500
2500
SLOPED WALL
TO CONFORM WITH
CHANNEL SIDE SLOPE
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
WATER INTAKE
SECTION 2-2 & 3-3
REV DESCRIPTION DATE SIGN
PROJ ECT DIRECTOR
SCALE:
1:100
DRG.NO.
J K/DB/IT/04
DESIGN CHIEF
CHECKED
ENGINEER
DESIGN DRAWN
T.Subaram
RECOMMENDED PRINCIPLE SUBJ ECT TO THE
CONDITION THAT THE DESIGN & BUILD
CONTRACTOR IS RESPONSIBLE FOR THE
CONFORMITY OF DESIGN WITH FRACTIONAL
& STRUCTURAL REQUIREMENTS
TEAM LEADER DATE
Intake well &
Pump house
Pipe - HDPE (PE 100, SDR 17)
Dia. - 900mm
Length - 7200 m
Pipe - HDPE (PE 100, SDR 17)
Dia. - 800mm
Length - 23600m
Pipe - HDPE(PE 100, SDR 17)
Dia. - 355mm
Length - 250m
Existing WTP
at Killinochchi
New SWTP at
Pallai
LEGEND
Section Valve
Bulk fiow meter
Location shall be as instructed by
the engineer
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ
A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
SCHEMATIC DIAGRAM FOR THE
RAW WATER TRANSMISSION MAIN
Notes:- All dimension are in millimeters
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
J K/DB/RWTM/01
S.Kajithan
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-01
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAWWATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
C
u
l,P
ip
e
(D
=
.0
.6
0
, d
e
c
=
0
.5
0
)
C
u
l,P
ip
e
(D
=
.0
.6
0
, d
e
c
=
0
.6
0
)
C
u
l,P
ip
e
(D
=
.0
.6
0
, d
e
c
=
0
.5
0
)
C
u
l,P
ip
e
(D
=
0
.6
0
, d
e
c=
0
.5
0
)
C
u
l,P
ip
e
(D
=
0
.6
0
, d
e
c
=
0
.5
0
)
Cul,Pipe (D=0.80, dec=0.75)
C
ul,P
ipe (D
=0.60, dec=0.70)
C
u
lve
rt B
ro
ke
n
C
u
lv
e
rt B
ro
k
e
n
1
+
5
6
0 1
+
5
3
0
1
+
4
7
0
1
+
4
4
0 1
+
4
1
0
1
+
3
8
0
1
+
3
5
0 1
+
3
2
0
1
+
2
9
0 1
+
2
6
0
1
+
2
3
0
1
+
2
0
0
1
+
1
7
0
1
+
1
4
0
1
+
1
1
0
1
+
0
8
0
1
+
0
5
0
1
+
0
2
0
0
+
9
9
0
0
+
9
6
0
0
+
9
3
0
0
+
9
0
0
0
+
8
7
0
0
+
8
4
0
0
+
8
1
0
0
+
7
8
0
C
u
lv
e
rt B
ro
k
e
n
C
u
lve
rt B
ro
ke
n
PLAN
Scale - 1:2500
RHS - Right Hand Side
LHS - Left Hand Side
LHS
LHS
LHS
LHS
LHS
LHS
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-02
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAWWATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
C
u
l,P
ip
e
(D
=
0
.4
5
, d
e
c
=
0
.3
0
)
C
u
l,P
ip
e
(D
=
0
.4
5
, d
e
c
=
0
.3
0
)
C
u
l,P
ip
e
(D
=
0
.6
0
, d
e
c
=
0
.3
0
)
C
u
l,P
ip
e
(D
=
0
.6
0
, d
e
c
=
0
.3
0
)
C
u
l,P
ip
e
(D
=
0
.5
0
, d
e
c
=
0
.3
0
)
C
u
lv
e
rt B
ro
k
e
n
C
u
lv
e
rt B
ro
k
e
n
C
u
lv
e
rt B
ro
k
e
n
3
+
1
2
0
3
+
0
9
0
3
+
0
6
0
3
+
0
3
0
3
+
0
0
0
2
+
9
7
0
2
+
9
4
0
2
+
9
1
0
2
+
8
8
0
2
+
8
5
0
2
+
8
2
0
2
+
7
9
0
2
+
7
6
0
2
+
7
3
0
2
+
7
0
0
2
+
6
7
0
2
+
6
4
0
2
+
6
1
0
2
+
5
8
0
2
+
5
5
0
2
+
5
2
0
2
+
4
9
0
2
+
4
6
0
2
+
4
3
0
2
+
4
0
0
2
+
3
7
0
2
+
3
4
0
S
e
e
S
h
e
e
t
N
o
.0
5
S
e
e
S
h
e
e
t
N
o
. 0
3
PLAN
Scale - 1:2500
LHS
LHS
LHS
LHS
LHS
LHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-03
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
LHS
LHS
LHS
LHS
LHS
LHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-04
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
LHS
LHS
LHS
LHS
LHS
LHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
CROSSING
Gravel road
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-05
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAWWATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
C
u
l,P
ip
e
(D
=
0
.6
0
, d
e
c
=
0
.5
0
)
Cul,Pipe (D=0.60, dec=0.50)
C
u
l, B
o
x
(1
.1
0
x
0
.8
5
)d
e
c
=
0
.3
0
C
ul, B
ox (1.10 x0.85)dec=
0.30
7
+
8
0
0 7
+
7
7
0
7
+
7
4
0
7
+
7
1
0
7
+
6
8
0
7
+
6
5
0
7
+
6
2
0
7
+
5
9
0
7
+
5
6
0
7
+
5
3
0
7
+
5
0
0
7
+
4
7
0
7
+
4
4
0
7
+
4
1
0
7
+
3
8
0
7
+
3
5
0
7
+
3
2
0
7
+
2
9
0
7
+
2
6
0
7
+
2
3
0
7
+
2
0
0
7
+
1
7
0
7
+
1
4
0
7
+
1
1
0
7
+
0
8
0
7
+
0
5
0
7
+
0
2
0
S
e
e
S
h
e
e
t N
o
.1
1
S
e
e
S
h
e
e
t
N
o
.0
9
PLAN
Scale - 1:2500
RHS RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
C
u
l, B
o
x (1
2
x0
.8
0
)d
e
c=
0
.1
0
C
u
l,P
ip
e
(D
=
0
.4
5
, d
e
c=
0
.8
5
) &
surveying detail not available
84.0098 Approd. 250m
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-06
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
S
e
e
S
h
e
e
t N
o
.1
2
S
e
e
S
h
e
e
t
N
o
. 1
0
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-07
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
RHS
RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-08
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAWWATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
1
1
+
8
2
0
1
1
+
7
9
0
1
1
+
7
6
0
1
1
+
7
3
0
1
1
+
7
0
0
1
1
+
6
7
0
1
1
+
6
4
0
1
1
+
6
1
0
1
1
+
5
8
0
1
1
+
5
5
0
1
1
+
5
2
0
1
1
+
4
9
0
1
1
+
4
6
0
1
1
+
4
3
0
1
1
+
4
0
0
1
1
+
3
7
0
1
1
+
3
4
0
1
1
+
3
1
0
1
1
+
2
8
0
1
1
+
2
5
0
1
1
+
2
2
0
1
1
+
1
9
0
1
1
+
1
6
0
1
1
+
1
3
0
1
1
+
1
0
0
1
1
+
0
7
0
1
1
+
0
4
0
S
e
e
S
h
e
e
t
N
o
. 1
7
S
e
e
S
h
e
e
t
N
o
.1
5
PLAN
Scale - 1:2500
RHS
RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-09
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
1
3
+
3
8
0
1
3
+
3
5
0
1
3
+
3
2
0
1
3
+
2
9
0
1
3
+
2
6
0
1
3
+
2
3
0
1
3
+
2
0
0
1
3
+
1
7
0
1
3
+
1
4
0
1
3
+
1
1
0
1
3
+
0
8
0
1
3
+
0
5
0
1
3
+
0
2
0
1
2
+
9
9
0
1
2
+
9
6
0
1
2
+
9
3
0
1
2
+
9
0
0
1
2
+
8
7
0
1
2
+
8
4
0
1
2
+
8
1
0
1
2
+
7
8
0
1
2
+
7
5
0
1
2
+
7
2
0
1
2
+
6
9
0
1
2
+
6
6
0
1
2
+
6
3
0
1
2
+
6
0
0S
e
e
S
h
e
e
t
N
o
. 1
9
S
e
e
S
h
e
e
t
N
o
.1
7
PLAN
Scale - 1:2500
RHS
RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-10
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
1
4
+
9
4
0
1
4
+
9
1
0
1
4
+
8
8
0
1
4
+
8
5
0
1
4
+
8
2
0
1
4
+
7
9
0
1
4
+
7
6
0
1
4
+
7
3
0
1
4
+
7
0
0
1
4
+
6
7
0
1
4
+
6
4
0
1
4
+
6
1
0
1
4
+
5
8
0
1
4
+
5
5
0
1
4
+
5
2
0
1
4
+
4
9
0
1
4
+
4
6
0
1
4
+
4
3
0
1
4
+
4
0
0
1
4
+
3
7
0
1
4
+
3
4
0
1
4
+
3
1
0
1
4
+
2
8
0
1
4
+
2
5
0
1
4
+
2
2
0
1
4
+
1
9
0
1
4
+
1
6
0
C
u
l, B
o
x
(4
.8
0
x
1
.2
0
)d
e
c
=
0
.4
0
S
e
e
S
h
e
e
t
N
o
. 2
1
S
e
e
S
h
e
e
t
N
o
.1
9
PLAN
Scale - 1:2500
RHS
RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-11
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
RHS
RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-12
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
RHS
RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-13
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
1
9
+
5
6
0
1
9
+
5
3
0
1
9
+
5
0
0
1
9
+
4
7
0
1
9
+
4
4
0
1
9
+
4
1
0
1
9
+
3
8
0
1
9
+
3
5
0
1
9
+
3
2
0
1
9
+
2
9
0
1
9
+
2
6
0
1
9
+
2
3
0
1
9
+
2
0
0
1
9
+
1
7
0
1
9
+
1
4
0
1
9
+
1
1
0
1
9
+
0
8
0
1
9
+
0
5
0
1
9
+
0
2
0
1
8
+
9
9
0
1
8
+
9
6
0
1
8
+
9
3
0
1
8
+
9
0
0
1
8
+
8
7
0
1
8
+
8
4
0
1
9
+
5
9
0
S
e
e
S
h
e
e
t
N
o
. 2
7
S
e
e
S
h
e
e
t
N
o
.2
5
PLAN
Scale - 1:2500
RHS
RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-14
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-15
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
2
2
+
7
4
0
2
2
+
7
1
0
2
2
+
6
8
0
2
2
+
6
5
0
2
2
+
6
2
0
2
2
+
5
9
0
2
2
+
5
6
0
2
2
+
5
3
0
2
2
+
5
0
0
2
2
+
4
7
0
2
2
+
4
4
0
2
2
+
4
1
0
C
u
l,P
ip
e
(D
=
0
.9
0
, d
e
c=
0
.4
0
)
2
2
+
3
8
0
S
e
e
S
h
e
e
t N
o
. 3
1
S
e
e
S
h
e
e
t
N
o
. 2
9
RHS
RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-16
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
2
4
+
3
0
0
2
4
+
2
7
0
2
4
+
2
4
0
2
4
+
2
1
0
2
4
+
1
8
0
2
4
+
1
5
0
2
4
+
1
2
0
2
4
+
0
9
0
2
4
+
0
6
0
2
4
+
0
3
0
2
4
+
0
0
0
2
3
+
9
7
0
2
3
+
9
4
0
2
3
+
9
1
0
2
3
+
8
8
0
2
3
+
8
5
0
2
3
+
8
2
0
2
3
+
7
9
0
2
3
+
7
6
0
2
3
+
7
3
0
2
3
+
7
0
0
2
3
+
6
7
0
2
3
+
6
4
0
2
3
+
6
1
0
2
3
+
5
8
0
2
3
+
5
5
0
2
3
+
5
2
0
S
e
e
S
h
e
e
t
N
o
. 3
3
S
e
e
S
h
e
e
t
N
o
. 3
1
PLAN
Scale - 1:2500
RHS RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-17
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
2
5
+
8
6
0
2
5
+
8
3
0
2
5
+
8
0
0
2
5
+
7
7
0
2
5
+
7
4
0
2
5
+
7
1
0
2
5
+
6
8
0
2
5
+
6
5
0
2
5
+
6
2
0
2
5
+
5
9
0
2
5
+
5
6
0
2
5
+
5
3
0
2
5
+
5
0
0
2
5
+
4
7
0
2
5
+
4
4
0
2
5
+
4
1
0
2
5
+
3
8
0
2
5
+
3
5
0
2
5
+
3
2
0
2
5
+
2
9
0
2
5
+
2
6
0
2
5
+
2
3
0
2
5
+
2
0
0
2
5
+
1
7
0
2
5
+
1
4
0
2
5
+
1
1
0
2
5
+
0
8
0
S
e
e
S
h
e
e
t
N
o
. 3
5
S
e
e
S
h
e
e
t
N
o
.3
3
PLAN
Scale - 1:2500
RHS RHS
RHS
RHS
RHS
RHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-18
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
RHS
RHS
LHS
LHS
LHS
LHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-19
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAW WATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
2
8
+
2
0
0
2
8
+
1
7
0
2
8
+
1
4
0
2
8
+
1
1
0
2
8
+
0
8
0
2
8
+
0
5
0
2
8
+
0
2
0
2
7
+
9
9
0
2
7
+
9
6
0
2
7
+
9
3
0
2
7
+
9
0
0
2
7
+
8
7
0
2
7
+
8
4
0
2
7
+
8
1
0
2
7
+
7
8
0
2
7
+
7
5
0
2
7
+
7
2
0
2
7
+
6
9
0
2
7
+
6
6
0
2
7
+
6
3
0
2
7
+
6
0
0
2
7
+
5
7
0
2
7
+
5
4
0
2
7
+
5
1
0
2
7
+
4
8
0
2
7
+
4
5
0
2
7
+
4
2
0
S
e
e
S
h
e
e
t
N
o
.3
8
S
e
e
S
h
e
e
t
N
o
.3
6
PLAN
Scale - 1:2500
C
u
l,P
ip
e
(D
=
0
.9
0
, d
e
c
=
0
.6
0
)
C
ul,P
ipe (D
=0.90, dec=0.70)
2
8
+
9
8
0
2
8
+
9
5
0
2
8
+
9
2
0
2
8
+
8
9
0
2
8
+
8
6
0
2
8
+
8
3
0
2
8
+
8
0
0
2
8
+
7
7
0
2
8
+
7
4
0
2
8
+
7
1
0
2
8
+
6
8
0
2
8
+
6
5
0
2
8
+
6
2
0
2
8
+
5
9
0
2
8
+
5
6
0
2
8
+
5
3
0
2
8
+
5
0
0
2
8
+
4
7
0
2
8
+
4
4
0
2
8
+
4
1
0
2
8
+
3
8
0
2
8
+
3
5
0
2
8
+
3
2
0
2
8
+
2
9
0
2
8
+
2
6
0
2
8
+
2
3
0
2
8
+
2
0
0
S
e
e
S
h
e
e
t
N
o
.3
9
S
e
e
S
h
e
e
t
N
o
.3
7
PLAN
Scale - 1:2500
LHS
LHS
LHS
LHS
LHS
LHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-20
J RC J RC
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
RAWWATER TRANSMISSION MAIN
PIPE LINE TRACE
REV DESCRIPTION DATE SIGN
LHS
LHS
LHS
Bank - B
Tree Tr -
- CUL Culvert
EP -
G -
WF -
BW -
EDn -
MDn -
U -
NB -
TP -
ElectricPost
Gate
WireFence
BoundaryWall
TelephonePost
NameBoard
UndefinedBoundary
MasonryDrain
EarthDrain
BenchMark BM -
TemporaryBenchMark TBM
SignBoard SB
ElectricPost HighTension - EPHT
Manhole MH
TF TinFence
-
-
-
-
Masonry My -
IronFence IF -
- RW RetainingWall
- RE RoadEdge
Reference
GPS Global PositionSystem -
P - Permanent Building
LF LiveFence -
WT - Water Tap
Topof Bottom TB -
Bottomof Bank - BB
FencePost - FP
TW - TubeWell
Kerb K -
Housesetc.
WLF - WireLiveFence
- - - - RoadEdge -
Center Line -
Longitudinal SectionLine -
ExistingBoundaries -
TRS - Tiledroofedshop
TH - TemporaryHut
ARS - Asbestosroofedshop
- CF ConcreteFence
BH - BusHalt
RHS - Right Hand Side
LHS - Left Hand Side
LHS
LHS
LHS
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
A.SIVATHARAN
J K/DB/RWTM/02-21
J RC J RC
75mm Thick Screed Conc 1:3:6(20)
Compacted sand filling
CONCRETE DUCT FOR ROAD CROSSING
AT IYAKKACHI JUNCTION
(CHINAGE 26+100)
200
450
250
Length
Clear Width
Clear Depth
20m
2.0m
1.5m
1500
2000
11+880
11+850
11+820
2
6
+
1
9
0
2
6
+
1
6
0
26+130
CONCRETE DUCT FOR ROAD CROSSING
AT PARANTHAN JUNCTION
(CHINAGE 11+850)
250 250
250
250
75
200
450
250
Length
Clear Width
Clear Depth
25m
2.0m
1.5m
1500
2000
250 250
250
250
75
PLAN VIEW PLAN VIEW
75mm Thick Screed Conc 1:3:6(20)
Compacted sand filling
LEGEND :-
26+100
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ
A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
DETAILS OF CONCRETE DUCTS FOR
ROAD CROSSING
RAW WATER TRANSMISSION MAIN
NOTE:-
ALL DIMENSION ARE IN MILLIMETER
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
S.Kajithan
J K/DB/RWTM/03
1
0
0
D
5
0
1
5
0
BEDDING TYPE C
QUARRY DUST / MINED SAND.
COMPACTED.
CRUSHED STONE (<6 mm)
COMPACTED
BEDDING TYPE B
1
0
0
D
1
5
0IMPORTED OR SELECTED
EXCAVATED BACK FILL
MATERIAL
TO BE COMPACTED TO A DRY
DENSITY NOT LESS THAN 98%
OF MAXIMUM DRY DENSITY OF
HE METERIAL,HAVING MAX.
PLASTIC LIMIT OF15% AND
LIQUID LIMIT OF 40 %AND
FREE FROM STONES GREATER
THAN 15mm
D
BEDDING TYPE D
GEOTEXTILES
QUARRY DUST /
MINED SAND.
COMPACTED.
1
5
0
1
5
0
1
0
0
CRUSHED STONE (<6 mm)
COMPACTED
BEDDING TYPE A
1
0
0
QUARRY DUST / MINED SAND.
COMPACTED.
D
1
5
0
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETRES.
2. FOR NORMAL SOIL BACKFILLING MATERIAL SHALL BE SOIL (TYPE 1 MATERIAL) HAVING THE MAXIMUM
DRY DENSITY UNDER STANDARD CONDITIONS OF PROCTOR COMPACTION NOT LESS THAN
1600KG/M. WITH THE PROPERTIES OF PLASTIC LIMIT LESS THAN 15, LIQUID LIMIT LESS THAN 40
AND CBR > 20. EXCAVATED SOIL CAN BE USED AS BACK FILLING MATERIAL IF THEY CONFORM TO
THE REQUIRED SPECIFICATION MATERIAL TO BE COMPACTED TO A DRY DENSITY NOT LESS THAN 98%
OF MAXIMUM DRY DENSITY .
3 . FOR PIPES IN SOFT OR PEATY GROUND THE GRANULAR
BEDDING SHALL BE COMPLETELY SURROUNDED
BY A GEOTEXTILE AS SHOWN IN THE DRAWING
AND AS DIRECTED BY THE ENGINEER TO PREVENT THE INGRESS OF FINES
GEOTEXTILE FABRIC SHALL BE WOVEN POLYPROPYLINE
THERMALLY BONDED HAVING FOLLOWING PROPERTIES
WEIGHTH 150 G/M (MINIMUM) (ASTM D5261)
TENSILE STRENGTH 9KN/m ( MINIMUM) (ASTM D4595) @ 5% ELONGATION
PERMEABILITY 30L/m
2
/S (MINIMUM) (BS 6906/3)(100mm WATER HEAD)
PORE SIZE (090) <300 MICRONS (BS 6906/2)
NOT TO SCALE
DIA (D) WIDTH (W)
(mm) (m)
800
900
1.20
1.30
DETAIL OF BEDDING FOR HDPE PIPES
HEIGHT (L) FROM INVERT
LEVEL TO THE TRENCH
BOTTOM (m)
0.10
0.10
355 0.60 0.10
TYPE OF
SOIL
APPROXIMATE
BEARING CAPACITY KN/m
BEDDING
TYPE
HARD SOIL/ROCK
LOOSE SOIL
CLAY
PEAT/MASHY
AREAS
A
C
D
C
D
>75
<75
<200
>200
TABLE TO SELECT APPROPRIATE BEDDING TYPE
NORMAL SOIL B 100-200
<75
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CR0NTMIJ A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
BEDDING TYPES FOR HDPE PIPES
RAW WATER TRANSMISSION MAIN
S.K
ajithan
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
J K/DB/RWTM/04
50mm ASPHALT WEARING COURSE
(LAY AND COMPACT)
75mm AGGREGATE BASE
COURSE - 98% COMPACTION.
H
D

+

3
0
0
m
m
TACK COAT WITH CSS @ RATE OF 0.5 ltr/ Sqr.m.
W
REMOVED & FILLED GRADED AGGREGATE BASE
COURSE (DGABC) - 98% COMPACTION.
SELECTED EARTH FILL (TYPE 1 MATERIAL)
WITH 98% COMPACTION
WARNING TAPE
SELECTED EARTH FILL (TYPE 1 MATERIAL)
WITH 98% COMPACTION
ASPHALT / TARRED ROADS/ CARRIAGEWAY
BACK FILLING &PERMANENT REINSTATEMENT
APPROPRIATE TYPE OF BEDDING
AS PER Drg. No.- JK/DB/RWTM/04)
225mm AGGREGATE BASE
COURSE - 98% COMPACTION.
SELECTED EARTH FILL (TYPE 1 MATERIAL)
WITH 98% COMPACTION
WARNING TAPE
APPROPRIATE TYPE OF BEDDING
AS PER Drg. No.- JK/DB/RWTM/04)
H
D

+

3
0
0
m
m
TACK COAT WITH CSS @ RATE OF 0.5 ltr/ Sqr.m.
W
ASPHALT / TARRED ROADS/ CARRIAGEWAY
BACK FILLING &TEMPORARY REINSTATEMENT
2
2
5
SELECTED EARTH FILL (TYPE 1 MATERIAL)
WITH 98% COMPACTION
NOT TO SCALE
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETRES.
2. CSS-CATAIONIC SLOW SETTING
3. FOR NORMAL SOIL BACKFILLING MATERIAL SHALL BE SOIL (TYPE 1 MATERIAL) HAVING THE MAXIMUM
DRY DENSITY UNDER STANDARD CONDITIONS OF PROCTOR COMPACTION NOT LESS THAN
1600KG/M. WITH THE PROPERTIES OF PLASTIC LIMIT LESS THAN 15, LIQUID LIMIT LESS THAN 40
AND CBR > 20. EXCAVATED SOIL CAN BE USED AS BACK FILLING MATERIAL IF THEY CONFORM TO
THE REQUIRED SPECIFICATION MATERIAL TO BE COMPACTED TO A DRY DENSITY NOT LESS THAN 98%
OF MAXIMUM DRY DENSITY .
DIA (D) WIDTH (W)
(mm) (m)
800
900
1.20
1.30
DETAIL OF TRENCH FOR HDPE PIPES
HEIGHT (L) FROM INVERT
LEVEL TO THE TRENCH
BOTTOM (m)
0.10
0.10
DEPTH (H) UP
TO THE INVERT
LEVEL (m)
1.70
1.90
355 0.60 0.10 1.30
TYPE OF
SOIL
APPROXIMATE
BEARING CAPACITY KN/m
BEDDING
TYPE
HARD SOIL/ROCK
LOOSE SOIL
CLAY
PEAT/MASHY
AREAS
A
C
D
C
D
>75
<75
<200
>200
TABLE TO SELECT APPROPRIATE BEDDING TYPE
NORMAL SOIL B 100-200
<75
150mm THICK GRADE 20
WARNING TAPE
CONCRETE ROAD
BACK FILLING & PERMANENT REINSTATEMENT
H
D

+

3
0
0
m
m
MASS CONCRETE
W
APPROPRIATE TYPE OF BEDDING
AS PER Drg. No.- JK/DB/RWTM/04)
SELECTED EARTH FILL (TYPE 1 MATERIAL)
WITH 95% COMPACTION
SELECTED EARTH FILL (TYPE 1 MATERIAL)
WITH 98% COMPACTION
BACK FILLING & PERMANENT/ TEMPORARY REINSTATEMENT
PIPE LOCATED AWAY FROM THE ROAD SHOULDER / SHOULDER/
EARTH CARRIAGEWAY
H
D
+

3
0
0
m
m
W
SELECTED EARTH FILL (TYPE 1 MATERIAL)
WITH 95% COMPACTION
WARNING TAPE
SELECTED EARTH FILL (TYPE 1 MATERIAL)
WITH 98% COMPACTION
APPROPRIATE TYPE OF BEDDING
AS PER Drg. No.- JK/DB/RWTM/04)
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CONSULTANTS
CRONTMIJ A/S-DENMARK
JAFFNA KILINOCHCHI WATER
SUPPLY & SANITATION PROJECT
TITLE
BACKFILLING AND TEMPORARY / PERMANENT
REINSTATEMENT OF TRENCHES - PS/PRDA ROADS
RAW WATER TRANSMISSION MAIN
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
J K/DB/RWTM/05
S.K
ajithan
TYPE OF
SOIL
APPROXIMATE
BEARING CAPACITY KN/m
BEDDING
TYPE
HARD SOIL/ROCK
LOOSE SOIL
CLAY
PEAT/MASHY
AREAS
A
C
D
C
D
>75
<75
<200
>200
TABLE TO SELECT APPROPRIATE BEDDING TYPE
NORMAL SOIL
B 100-200
<75
REINSTATEMENT SHOULDER
DIA (D) WIDTH (W)
(mm)
(m)
800
900
1.30
1.50
DETAIL OF TRENCH FOR HDPE PIPES
HEIGHT (L) FROM INVERT
LEVEL TO THE TRENCH
BOTTOM (m)
0.10
0.10
DEPTH (H) UP
TO THE INVERT
LEVEL (m)
1.90
2.00
355 0.70 0.10 1.37
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETRES.
2. PRIME COAT AND SAND SEAL
- BINDER MATERIAL TO BE USED FOR PRIMING - CSS-1
- RATE OF SPARED OF BINDER IN PRIME COAT - 1liter/m
- BINDER MATERIAL TO BE USED FOR SAND SEAL - CRS-1
- RATE OF SPARED OF BINDER IN SAND SEAL - 1liter/m
3. DENSE GRADED AGGREGATE BASE COURSE
- DEGREE OF COMPACTION 98% MODIFIEDPROCTOR DENSITY
4. SUB BASE
- CBR OF SUBBASE MATERIAL 20 (TO BE APPROVEDBY RDA)
-
- DEGREE OF COMPACTION 98% MODIFIEDPROCTOR DENSITY
-
5. SHOULDER
- CBR OF SHOULDER MATERIAL 20 (TO BE APPROVEDBY RDA)
- DEGREE OF COMPACTION 98% MODIFIEDPROCTOR DENSITY
6. EMBANKMENT
- CBR OF EMBANKMENT MATERIAL 20 (TO BE APPROVEDBY RDA)
- DEGREE OF COMPACTION 98% MODIFIEDPROCTOR DENSITY
7. AWAY FROMEMBANKMENT
- CBR OF TYPE 1 MATERIAL 20 (TO BE APPROVEDBY NWS&DB)
- DEGREE OF COMPACTION 98% MODIFIEDPROCTOR DENSITY
- EXCAVATED SOIL CAN BE USED AS BACK FILLING MATERIAL IF THEY
CONFORM TO THE REQUIRED SPECIFICATION
WARNING TAPE
BACK FILLING & TEMPORARY/ PERMANENT
REINSTATEMENT
PIPE AWAY FROM THE ROAD EMBANKMENT
H
D
+
3
0
0
m
m
W
LAPPROPRIATE TYPE OF BEDDING
AS PER Drg. No.- JK/DB/RWTM/04)
WARNING TAPE
BACK FILLING & TEMPORARY/ PERMANENT
REINSTATEMENT
OF EARTH SHOULDER
H
D
+
3
0
0
m
m
W
LAPPROPRIATE TYPE OF BEDDING
AS PER Drg. No.- JK/DB/RWTM/04)
WARNING TAPE
H
D
+
3
0
0
m
m
PRIME COAT AND SAND SEAL
W
CARRIAGEWAY & AT LOCATIONS OF
BY ROAD CROSSING
BACK FILLING &TEMPORARY REINSTATEMENT
RIVER SAND (SATURATED)
LAPPROPRIATE TYPE OF BEDDING
AS PER Drg. No.- JK/DB/RWTM/04)
50mm THICK SURFACING WITH ASPHALT
CONCRETE WEARING COURSE
(LAY AND COMPACT)
WARNING TAPE
H
D
+
3
0
0
m
m
W
BACK FILLING & PERMANENT REINSTATEMENT OF
250mm DENSE GRADED AGGREGATE BASE COURSE
(DGAB) (APPROVED BY RDA)
LAPPROPRIATE TYPE OF BEDDING
AS PER Drg. No.- JK/DB/RWTM/04)
150mm THICK SHOULDER MATERIAL
(APPROVED BY RDA)
TYPE 1 SOIL
SUB BASE MATERIAL (APPROVED BY RDA
&THICKNESS TO BE DECIDED DEPENDING ON THE
DEPTH OF TRENCH)
300mm DENSE GRADED AGGREGATE BASE
COURSE (DGAB) (APPROVED BY RDA)
CARRIAGEWAY & AT LOCATIONS OF
BY ROAD CROSSING
RIVER SAND (SATURATED)
SUB BASE MATERIAL (APPROVED BY RDA
&THICKNESS TO BE DECIDED DEPENDING ON THE
DEPTH OF TRENCH)
RIVER SAND (SATURATED)
SUB BASE MATERIAL (APPROVED BY RDA
&THICKNESS TO BE DECIDED DEPENDING ON THE
DEPTH OF TRENCH)
RIVER SAND (SATURATED)
WARNING TAPE
BACK FILLING & TEMPORARY/ PERMANENT
REINSTATEMENT
OF EMBANKMENT
H
D
+
3
0
0
m
m
W
LAPPROPRIATE TYPE OF BEDDING
AS PER Drg. No.- JK/DB/RWTM/04)
TYPE 1 SOIL ( APPROVED BY RDA)
RIVER SAND (SATURATED)
POLYTHENE COVER / CONCRETE COVER
SLAB (TO BE DECIDED ACCORDING TO
DEPTH OF TRENCH (H) )
POLYTHENE COVER / CONCRETE COVER
SLAB (TO BE DECIDED ACCORDING TO
DEPTH OF TRENCH (H) )
POLYTHENE COVER / CONCRETE COVER
SLAB (TO BE DECIDED ACCORDING TO
DEPTH OF TRENCH (H) )
POLYTHENE COVER / CONCRETE COVER
SLAB (TO BE DECIDED ACCORDING TO
DEPTH OF TRENCH (H) )
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
BACK FILLING AND TEMPORARY/ PERMANENT
REINSTATEMENT OF TRENCHES - RDA ROADS
RAW WATER TRANSMISSION MAIN
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
J K/DB/RWTM/06
S.Kajithan
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ
A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TYPICAL DRAWING FOR CULVERT CROSSING
TYPE -A, B & C
RAW WATER TRANSMISSION MAIN
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
S.Kajithan
J K/DB/RWTM/07-01
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ
A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TYPICAL DRAWING FOR CULVERT CROSSING
TYPE -D & F
RAW WATER TRANSMISSION MAIN
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
S.Kajithan
J K/DB/RWTM/07-02
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ
A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
TYPICAL DRAWING FOR CULVERT CROSSING
TYPE -E
RAW WATER TRANSMISSION MAIN
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
S.Kajithan
J K/DB/RWTM/07-03
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ
A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TYPICAL DRAWING FOR CULVERT CROSSING
TYPE -G
RAW WATER TRANSMISSION MAIN
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
S.Kajithan
J K/DB/RWTM/07-04
TOP VIEW
SECTION B-B
ANCHORING BLOCK (A)
C
B B
HA12@
HA6@
C
SECTION C-C
D D
NOT TO SCALE
G.L G.L
s
w A w
w
A
SUPPORT BLOCK
WEIGHT BLOCK
ANCHORING BLOCK
s
w A w
w
A
LAYOUT FOR LAGOON CROSSING
G.L G.L
TOP VIEW
CROSS SECTION
WEIGHTING BLOCK (W)
Bituminous Product
FramHA8
Washer +Nut
20
Stud Bot 12
50
NOTE:
1. Dimension of Support Block , Weighting Block and Anchor Block Shall be Decided to Suite Site Condition.
2. Spacing Between Weighting Blocks Shall be Decided to Suite Site Condition.
3. Anchor Blocks Shall be Placed in Between Weighting Blocks.
4. Shores Support Blocks Shall be Provided at the Two Ends.
A
A
D
D
E
DETAIL AT "E"
SUPPORT BLOCK (S)
Grade 25
Concrete
D
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJECT
TITLE
TYPICAL DRAWING FOR LAGOON CROSSING
RAW WATER TRANSMISSION MAIN
REV DESCRIPTION DATE SIGN DESIGNED
ENGINEER
DRAWN
CHECKED
DRG NO: JK/DB/RWTM/07-05
RECOMMENDED PRINCIPLE SUBJECT TO THE
CONDITION
THAT THE DESIGN & BUILD CONTRACTOR IS
RESPONSIBLE FOR THE CONFORMITY OF THE
DESIGN WITH FRACTIONAL & STRUCTURAL
REQUIREMENTS
DATE
APPROVED
PROJECT DIRECTOR. DATE
CONSULTANT
TEAM LEADER
SCALE:
DESIGN CHIEF

SIGN. DATE DESCRIPTION REV.


NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
S.Kajithan
WASHOUT VALVE CHAMBERS
J K/DB/RWTM/08
1. CHAMBER SIZE GIVEN IN THE DRAWING ARE THE MINIMUM.
2. MANHOLE COVER SHALL BE OF HINGED, HEAVY DUTY (CLASS)
VENTILATEDTYPE WITH 600mmDIA. MINIMUMCLEAR OPENING.
3. MANHOLE FRAME SHALL BE FIRMLY FIXEDTO THE CHAMBER
WITH 4 Nos. RAG BOLTS OR SIMILAR MANNER.
4. ALL INSITU CONCRETE, SUPPORTS ANDTHRUST RESTRAINTS
SHALL BE GRADE 20 UNLESS OTHERWISE STATED. MOUNTED ON TOP OF ABOVE GROUND PIPE LINE
DOUBLE ORIFICE AIR VALVE
WITH INSECT PROOF MESH
80 DIA. GRP AIR VENT
CYLINDRICAL GRP PROTECTIVE COVER
STRAPPED TO THE PIPE WITH A
REMOVABLE LOCKING ARRANGEMENT
FLANGED BRANCH TEE
DOUBLE FLANGE REDUCER (IF NECESSARY)
DOUBLE FLANGE GATE VALVE
(WHEEL TYPE)
WITH INSECT PROOF MESH
80 DIA. GRP AIR VENT
FLANGED BRANCH TEE
S
MOUNTED ON TOP OF ABOVE GROUND PIPE LINE
SINGLE ORIFICE AIR VALVE
25 SINGLE AIR VALVE WITH
ISOLATING VALVE
CYLINDRICAL GRP PROTECTIVE COVER
STRAPPED TO THE PIPE WITH A
REMOVABLE LOCKING ARRANGEMENT
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CRONTMIJ A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
J K/DB/RWTM/09
S.Kajithan
AIR VALVE CHAMBERS

SIGN. DATE DESCRIPTION REV.


NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
J K/DB/RWTM/10
S.Kajithan
GATE VALVE CHAMBERS
D
3 5 4 6
2
1
MIN. 10 x D
FLOW DIRECTION
1
2
0
0
1
2
0
0
1200
4
1800
1
8
0
0
Y 10-150
Y
1
0
-1
5
0
T
O
S
U
IT
T
H
E
S
IT
E
C
O
N
D
IT
IO
N
1
5
0
150 150 1200 150 150
Y 10 - 150 B.W
Y 10 - 150
1
MIN. 5 x D
5
4 PE FLANGE ADAPTOR
3
2
PE TAPER (ONE STEP REDUCER )
SLUICE VALVE
1
ELECTRO MAGNETIC FLOW METER OR SWAP TEE
PE FLANGED PIPE WITH PUDDLE COLLAR
D
GRADE 25 CONCRETE
0 1rr 0ALvANlZE0
MS STEPS AT 300 cts.
GRADE25 CONCRETE
GROUND LEVEL
600mm DIA. DUCTILE IRON HEAVY DUTY
MANHOLE COVER (LOCKABLE)
1200
1
5
0
1
5
0
GRADE25 CONCRETE
0 1rr 0ALvANlZE0
MS STEPS AT 300 cts.
600mm DIA. DUCTILE IRON HEAVY DUTY
MANHOLE COVER (LOCKABLE)
V
A
R
IE
S
V
A
R
IE
S
1
DOUBLE FLANGE PE PIPE WITH PUDDLE COLLAR 6
GROUND LEVEL
150 150
1200
3 7 7
PE-PE COUPLING 7
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
S.Kajithan
SLUICE VALUE AND
FLOW METER CHAMBER J K/DB/RWTM/11
200 100 200
150
FOR BOUNDARY POST AN ENGRAVING SHOULD BE
MADE IN THE CONCRETE INSTEAD OF THE
INDICATOR PLATE (REFER DETAIL)
NOTE
200
X
150
SCALE :- 1:20
5
0
5
0
0
3
5
02
0
0
1
5
0
1
5
0
X
3
5
0
R6 STIRRUPS AT 150 c/c
R/F WITH 2No 10YRODS &
PRECAST CONCRETE(GR 20)
1
5
0
150 25 25
INDICATOR PLATE
(ONLY FOR MARKER POST)
150X150 RECESS FOR THE
15
100
ALUMINIUM INDICATOR
PLATE FOR MARKER POST
(SEE DETAIL)
INSITU CONC.
BASE(GR.20)
DETAIL OF MARKER POST
& BOUNDARY POST
FRONT ELEVATION SECTION X-X
X
`X' IN METRES
E
D
G
E
O
F
W
A
L
K
W
A
Y
O
R
P
R
O
P
E
R
T
Y
L
IN
E
P
E
R
P
E
N
D
IC
U
L
A
R
D
IS
T
A
N
C
E
(X
)
VALVE
PIPE LINE
P
R
O
P
E
R
T
Y
L
IN
E
E
D
G
E
O
F
W
A
L
K
W
A
Y
O
R
D
IS
T
A
N
C
E
(X
)
P
E
R
P
E
N
D
IC
U
L
A
R
X
PIPE LINE
VALVE
`X' &`Y' RESPECTIVELY IN METRES
Y
L
A
T
E
R
A
L
D
IS
T
A
N
C
E
(Y
)
L
A
T
E
R
A
L
D
IS
T
A
N
C
E
(Y
)
E
D
G
E
O
F
W
A
L
K
W
A
Y
O
R
PIPE LINE
P
E
R
P
E
N
D
IC
U
L
A
R
D
IS
T
A
N
C
E
(X
)
P
R
O
P
E
R
T
Y
L
IN
E
X
Y
VALVE
`X' &`Y' RESPECTIVELY IN METRES
SCALE :- NOT TO SCALE
TYPE C
DOWNWARD & HORIZONTAL
ARROWS WITH DISTANCE
DOWNWARD & HORIZONTAL
ARROWS WITH DISTANCE
ONLY DOWNWARD ARROW
WITH DISTANCE
TYPES OF INSTALLATION OF MARKER POST
TYPE A TYPE B
25 150 25
200
NWSDB
DETAIL OF ENGRAVING FOR
BOUNDARY POST
SCALE:-1:5
3.2 1.7
1
0
1
0
(DISTANCES IN METRES)
(SEE LETTERING DETAILS)
900
5
0
1
0
1
5
0
150
NWSDB
1
5
SCREWNAIL
NOTE:- PLATE SHALL BE 5 mm TH. ALUMINIUM PLATE,WITH LETTERING
ETCHED OR ENGRAVED.
SCALE:-1:1
(DIAMETER OF PIPE)
DETAIL OF INDICATOR PLATE FOR MARKER POST
GV
WO
AV
FM
FOR GATE VALVE
FOR WASHOUT
FOR AIR VALVE
FOR FLOW METER
NOTES
PLATES SHALL BE INSTALLED ON THE SAME POST ONE BELOW THE OTHER,
5. IF MORE THAN ONE FITTING ARE INSTALLED CLOSE TO EACH OTHER, RELEVENT
4. TYPE `A' INSTALLATION SHALL BE USED WHERE EVER POSSIBLE.
3. MARKER POST SHALL BE INSTALLED ON THE SAME SIDE OF THE ROAD WHERE THE
25 mm LONG BRASS SCREW NAIL AND PLASTIC RAWL PLUGS
2. INDICATOR PLATE SHALL BE FIXED TO THE RECESS IN THE POST WITH 4 Nos. OF
FITTING IS INSTALLED.
WITH NECESSARY MODIFICATIONS.
1. ALL DIMENSIONS ARE IN MILLIMETRES.
LETTERING DETAIL
5
0
6. BOUNDARY POSTS SHALL BE INSTALLED ON THE BOUNDARY OF
ACQUIRED LAND, AT ALL CORNERS.
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
DESIGNED DRAWN CHECKED RECOMMENDED PRINCIPLE SUBJECT TO THE CONDITION
THAT THE DESIGN & BUILD CONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
& STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAM LEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJECT DIRECTOR DATE
JK/DB/RWTM/12
S.Kajithan
AIR VALVE CHAMBERS
6m
18.5m
10.7m
31m
55m
6m
EXSISTING
OFFICE BUILDING
EXSISTING PIT
26.8m
MAIN GATE
PROPOSEDAREA FOR
BACHELOR'S QUARTERS
25 m
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
REV DESCRIPTION DATE SIGN DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
TITLE:
LAYOUT PLAN FOR EXISTING WATER SUPPLY
OFFICE PREMISES AT KILINOCHCHI
(BACHELOR'S QUARTERS)
JK/DB/BUILD/01
44.557
61.334
21.582
21.449
28.542
76.267
8.300
8.847
12.000
2.358
F
r
o
m

P
o
n
n
a
l
a
i

R
o
a
d

(
R
.
D
.
A
)

T
o

M
a
n
i
p
a
y
house
apron
well
N
6.781
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
TITLE
LAYOUT PLAN FOR PROPOSED AREA
ENGINEER'S OFFICE AND QUARTERS
AT KADDUDAI (SANDILIPAY)
REV DESCRIPTION DATE SIGN
1:500
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
J K/DB/BUILD/02
Navarkuli
Tower
location
26.1898
33.1324
123.2028
108.1050
Scale. 1:500
f
r
o
m

j
a
f
f
n
a

r
o
a
d

(
H
)

t
o

k
a
n
d
y
N
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
REV DESCRIPTION DATE SIGN
1:500
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
J K/DB/BUILD/03
TITLE
LAYOUT PLAN FOR PROPOSEDAREA
ENGINEER'S OFFICE ANDQUARTERS
AT NAVATKULI (KAITHADY)
30m
30m
Velanai
V
a
l
u
k
k
a
i
i
r
u
-

p
u
n
g
u
d
u
t
h
i
v
u
-

k
u
r
i
k
a
d
d
u
v
a
n

r
o
a
d
to
c
h
a
d
d
y
PS Office
PROPOSED
LAND
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
CLIENT:
NATIONAL WATER SUPPLY &
DRAINAGE BOARD
CONSULTANTS:
GRONTMIJ
A/S-DENMARK
J AFFNA KILINOCHCHI WATER SUPPLY&
SANITATION PROJ ECT
REV DESCRIPTION DATE SIGN DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
J K/DB/BUILD/04
TITLE
LAYOUT PLAN FOR PROPOSED AREA
ENGINEER'S OFFICE AND QUARTERS AT
VELANAI (ISLANDS)
DATE SIGN. REV. DESCRIPTION
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
CLIENT
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CONSULTANT
CRONTMIJ
A/S-DENMARK
DATE PROJ ECT DIRECTOR
APPROVED
DATE T.L. - CONSULTANT
CHECKED THE CONFORMITY OF THE
DESIGN WITH ALL THE STRUCTURAL
AND FUNCTIONAL REQUIREMENTS AND
RECOMMENDED
CONSULTANT
SCALE:
DRG.NO.
J K/DB/SWTP/01
DESIGN CHIEF
CHECKED
ENGINEER
DESIGN JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
SITE LAYOUT-SWTP
Training Centre
40x15 Water Treatment Plant
A
r
e
a

R
e
s
e
r
v
e
d

f
o
r

o
f
f
i
c
e

Q
u
a
r
t
e
r
's
5
DINING
S
E
R
V
E
R
Y
STORE
CLASS ROOM
AUDITORIUM
P
A
S
A
G
E
P
A
S
A
G
E
STORE
OFFICE
AUDIO
VISUAL
RM
RECEPTION
POND POND
RAMPUP RAMPUP
ENTRANCE
MAIN
ENTRANCE
WAITING
LOBBY
WAITING
LOBBY
M
A
L
E

T
O
I
L
E
T
F
/
T
O
I
L
E
T
D/T
S/T
FLOOR AREA =733 m
COURT YARD
LORRY
50 m
2
1
0

m
2
15 m
2
74 m
2
2
1

m
2
1
1

m
2
4 m
147 m
150 m
2
4.5 m
2
10.5 m
2
10.5 m
2
4.5 m
2
12 m
2
12 m
2
16 m
2
30 m
2
5900 11700 3000
3
0
0
0
2
0
0
0
4
0
0
0
5
0
0
0
1
5
0
0
0
8
3
0
0
3
0
0
0
2
0
0
0
4
0
0
0
3
5
0
0
1
5
0
0
1
5
0
0
0
5
0
0
0
3
3
0
0
6800 3000 2300 3000 4000 3000 2300 3000 6800
1000 10000
5
0
0
0
FLOOR PLAN
6 m
2
AUDITORIUM
147 m
147 m
2
2
SCALE 1:200
2
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
GRONTMIJ
A/S- DENMARK
SOURCE WATER TREATMENT PLANT
TRAINING CENTER
PLAN VIEW J K/DB/SWTP/01-01
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS
Rapid Sand Filters
Treated Water Storage Tank
Backwash Water Tank
DN.400
R
DN.400
DN.900 from Aerator
Tube Settler Clarification Unit
FLOCCULATION
COAGULATION
Raw Water Line DN.700
TO RAPID SAND FILTERS
From Clarifiers
GL+0.000
+4.657
NL MAX =+4.057
NL MAX =+4.720
GL+0.000
NL MAX =+3.657
NL MAX =+3.907
NL MAX =+3.557
DEVERSOIR +3.757
NL MAX =+3.907
NL MAX =+3.557
-Estimated - 1.473
NL MAX =+3.547
NL MAX =+3.537
NL MAX =+3.041
Center Line +3.316
-4.000
NL MAX =+0.150 NL MAX =-0.250
Roof level =Min.+0.300
NL MIN =+0.911
NL MAX =+2.741
-0.150
+0.600
+1.700
Weir level=+0.200
NL Q0 =+3.191
NL MAX =+3.441
NL MAX =+3.527
WEIR
NL MAX =+3.041
NL MAX =+3.041
NL Q0 =+3.191
NL MAX =+3.441
+3.191
NL MAX =+3.527
GL+0.000
GL+0.000
GL+0.000
+0.200
+0.000
NL MAX =+0.050
NL MAX =+0.000
+0.375
+0.175
NL MAX =+0.400
+2.841
+3.266
+3.066
GL+0.000
Raw Water Line
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
CRONTMIJ
A/S-DENMARK
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
HYDRAULIC PROFILE
Tranquisation Chamber
Aerator
+4.132
+3.932
+4.282
+4.082
+5.257
NL MAX =+5.320
+5.857
NL MAX =+5.920
+6.457
NL MAX =+6.520
Chemical Injection
A
TENDER DOSSIER
J K/DB/SWTP/02
DESIGNED DRAWN CHECKED RECOMMENDED PRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILD CONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE TEAM LEADER
DRG.NO.
ENGINEER DESIGN CHIEF
DATE
EGS EGS V.SATHEESKANTH
APPROVED
PROJ ECT DIRECTOR DATE
VALVES
ACTUATORS
ACCESSORI ES PROCESS EQUI PMENT
M
M
LI NE SYMBOLS I NSTRUMENTS
FL
GENERAL EQUI PMENT
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY ANDDRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
PRELIMINARY DESIGN A
M
GRONTMIJ
A/S- DENMARK
PID - SIMBOLS
NOTE: NOT AT SCALE - DIMENSION IS SHOWN
TENDER DOSSIER B
J K/DB/SWTP/02-01
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
DN.700
DN.600
DN.900
1 MV02
1 MV01 1 EV01
M
FIT 01
1
INLET RAW WATER
Sampling
DN.40
INLET RAW WATER
DISTRIBUTION CHAMBER
2 W01A
2 W01B
2 W01C
2 W01D
2 MV01A
2 MV01B
2 MV01C
2 MV01D
2 VM02A
DN.150
LSH 01
2
Coagulation
3 VM02A
3 MV03A 3 MV02A
M LSH 01A
3
DN.100 DN.100
LSM 01A
3
Coaguaton N1
3 MV03B 3 MV02B
M LSH 01B
3
DN.100 DN.100
LSM 01B
3
ZONE 3 - COAGULATION
3 MV04A
3 MV04B
ZONE 4
Foccuaton N2 Foccuaton N1
4 VM01A1 4 VM02A1
4 MV02A1
M M LSH 01A1
4
DN.100
LSM 01A1
4
4 EV04A1
Foccuaton N2 Foccuaton N1
4 MV02B1
M M LSH 01B1
4
DN.100
LSM 01B1
4
4 EV04B1
Foccuaton N2 Foccuaton N1
4 VM01B2 4 VM02B2
4 MV02B2
M M LSH 01B2
4
DN.100
LSM 01B2
4
4 EV04B2
Foccuaton N2 Foccuaton N1
4 VM01A2 4 VM02A2
4 MV02A2
M M LSH 01A2
4
DN.100
LSM 01A2
4
4 EV04A2
4 EV01B
4 EV01A
M
4 MV05A1
4 MV05A2
4 MV05B1
4 MV05B2
ZONE 5 - DECANTATION
DN.100-PN10
5 ZC01A1 M
LSH 01A1
5
LSL 01A1
5
5 EV01A1
M
DN.150-PN10
5 ZC01A2 M
LSH 01A2
5
LSL 01A2
5
5 EV01A2
M
DN.150-PN10
5 ZC01B1 M
LSH 01B1
5
LSL 01B1
5
5 EV01B1
M
DN.150-PN10
5 ZC01B2 M
LSH 01B2
5
LSL 01B2
5
5 EV01B2
M
Pneumatic Syst.
2 2
4
3
Back-wash pumps
4
3
DN.50
C11.01
ZONE 6' - RECYCLING TANK AND PUMPING FACILITIES
40 m |h at 20mCE
??? *???
DN80
Sampling
6 MV07 A/D 6 MV05A
6 MV01A/D
6 PV01A/D
DN.250-PN10
DN.250-PN10
6' MV01A to D
6' CV01A to D
12 VM02A
12 VM02B
12 PM01
6 PV02A/D 6 PV03A/D
6 PV04A/D
LSH 01
6
LIT 01A to D
6
DPIT 01A/D
6
LSH 01
6'
LSM 01
6'
LSL 01
7
FIT 01
6'
PISL xx xx
PAL xx xx
PI xx
xx
PI xx
xx
6' MVxx
6' MVxx
Drain
Bottom valve DN100 6 MV05B
Recycling
Recycling
LSHH 01
6'
DN.100
6 PV06A/D C11.02
12 VM02C
PI xx
xx
PISL xx xx
PAL xx xx
2 2
4
3
Back-wash pumps
4
3
ZONE 6 - FILTRATION - 2 0F 4 FILTERS - LINE 2
DN.80
600*600
DN80
Sampling
6 MV07 A/H 6 MV05A
6 MV01A/D
6 PV01A/D
6 PV02A/D 6 PV03A/D
6 PV04A/D
LSH 01
6
LIT 01A to D
6
DPIT 01A/D
6
Bottom valve DN100 6 MV05B
Recycling
Recycling
6 PV06A/D
6 MV10A
TO FILTERS DN.500-PN10 7 EV10A
7 V11A
DNXXX 7 MV11A
7 CV01A
7 CV01B
7 MV01A
7 MV01B
3 x 560 m|h at 8 mCE
FIT 01
7
LSL 01A
7
RECYCLING
7 CV01C 7 MV01C
M
ZONE 7 BACK-WASH WATER TANK AND PUMPING FACILITIES
DNXXX
TO FILTERS DN.500-PN10 7 EV10C
7 MV11C FIT 03
7
M
PRECHLORINATION
PRECHLORINATION
SERVICE WATER DN.200 PN10
2500 M
2500 M
8 MV01A
8 MV09A
8 MV09B
8 MV03B
PSL xx
8
PSL xx
8
PI xx
8
8 CV01B 8 MV04B
8 MV03C 8 CV01C 8 MV04C
8 MV08
8 MV06
8 MV07 FIT 01
8
8 MV13
DN.50 PN10
8 MV14B 8 CV03B 8 MV15B
8 MV17
DN.50 PN10
LSH 01A
8
LIT 02A
8
TWPS
LIT 02B
8
11 MV01B
LSH 01B
8
LSL 01B
8
LABORATORY
8 MV03A 8 MV04A
8 MV14A 8 CV03A 8 MV15A
8 MV16A
8 MV10C
8 MV10B
8 MV10A
AIT 01
8 PH
AIT 01
8 NTU
8 CV01A
RECYCLING
RECYCLING
500 M
ZONE 8 - PUMPING SUMP
SEWER
Drainage pumps
STORAGE RESERVOIRS A&B
CHAMBER FLOCCULATION
DN.250 -PN10
9 MV03C
9 CV01C
9 MV02
ZONE 9 - SLUDGE PUMPING STATION
DN.200-PN10
9 MV01A DN.100-PN10
DN.100-PN10
3* 10 m|h at 13 mCE
9 MV03B
9 CV01B
9 MV03A
9 CV01A
9 MV02A
DN100-PN10
SEWER
9 MV06B
9 MV06A DN.200
DN.100
DN.80 DN.80 DN.80
DN.200
DN.200
3*30 m|h at 40 mCE
PRECHLORINATION
8 MV14C 8 CV03C 8 MV15C
8 MV18
DN.50 PN10
8 MV14D 8 CV03D 8 MV15D 4*4 m|h at 40 mCE
POSTCHLORINATION
POSTCHLORINATION
8 MV13
DN.50 PN10
8 MV14B 8 CV03B 8 MV15B
8 MV17
DN.50 PN10
8 MV14A 8 CV03A 8 MV15A
POSTCHLORINATION
8 MV14C 8 CV03C 8 MV15C
8 MV18
DN.50 PN10
8 MV14D 8 CV03D 8 MV15D 4*4 m|h at 40 mCE
Recycling
FIT 01A
9
PAC
AIT 01
6 NTU
AIT 01
6 NTU
LSH 01A
7
7 MV01A
7 MV01B
7 MV01C
8 MV04A
8 MV04B
PAC
POLY
POLY
POLY
POLY
LIME
CHLORINE
ALUM
ZONE 2
ZONE 1
CHEMICALS - CHLORINATION
ZONES 10 & 11
PRE CHLORINE
POST CHLORINE
ALUM. SULPH.
LIME PRE-TRT.
LIME POST-TRT.
POLYMER
FLOCCULATION
ZONE 8
ZONE 8 - BOOSTER PUMPING STATION
ZONE 6 - FILTRATION - 4 FILTERS - LINE 1
ZONE 12
BLOWERS & COMPRESSORS
4 EV01C
M
LSH 01
6
LSH 01
6
LSH 01
8
LSL 01
8
SEWER
M
M
M
M
12 VM02A
12 VM02A
12 VM02A
12 VM02A
12 VM02A
DN.50 11 PV01
Drain
7 MV02C
7 MV02B
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
13 MV01 A to H
ZONE 13 - DRYING BEDS
SEWER
2
3
4
5
6
7
8
DN.100
DRYING BEDS
PAC
PAC
PAC
LSL 01
8
DN.700
DN.700
6 MV08 A/D
6 PV08A/D
Recycling
6 MV08 A/D
6 PV08A/D
Recycling
DN.150-PN10
DN.150-PN10
DN.150-PN10
DN.150-PN10
DN.350-PN10
DN.700
DN.700
DN.700
4 EV01D
MDN.700
DN.500
DN.700
DN.700
DN.700
DN.700
DN.500
DN.500
DN.500
DN.500
2 VM02B
DN.150
2 VM02C
DN.150
DN.200 DN.400
DN.600
DN.400
DN.80
DN.200 DN.400
DN.600
DN.400
DN.250
DN.250
DN.250
DN.250
DN.250
DN.800
DN.800
DN.800
DN.800
DN.800
DN.800
Mn. 250 M
CHLORINE LIME
Recycling
PI xx
xx
PI xx
xx
PI xx
xx
PI xx
xx
PI xx
xx
PI xx
xx
PI xx
xx
PI xx
xxPI xx
xxPI xx
xx
DN.150
4 VM01B1 4 VM02B1
PI xx
xx
PI xx
xx
PI xx
xx
DN.800
DN.800
DN.800
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.100 PN10
DN.100 PN10
DN.100 PN10
DN.250-PN10
DN.250-PN10
DN.200 PN10
KMnO4
PAC
2 MV10A
AERATION
KMnO4
Chlorine
Chlorine
Chlorine
Chlorine
DN.500 DN.500
DN.900
1 MV05A 1 MV05B
1 MV10A
AIT 01
1
NTU
AIT 01
1
pHDN.800
AIT 01
1
O2
AIT 01
1
S|cmM
AIT 01
3 pH
AIT 01
3 pH
DN.800
AIT 01
6
NTU
AIT 01
6
NTU
AIT 01
6
NTU AIT 01
6
NTU AIT 01
6
NTU
AIT 01
6
NTU AIT 01
6
NTU AIT 01
6
NTU
DN.350-PN10
LSM 01A
7
SEWER
3* 1250 m|h at 600 mbar
PI xx
xx
PI xx
xx
PI xx
xx
PI xx
xx
FIT 01
8
FIT 01
8
FIT 01
8
FIT 01
8
FIT 01
8
FIT 01
8
DN.900
DN.700
DN.700
DN.150 PN10
LIT 02
9 LIT 01
9
AIT 01
O2
AIT 01
1
FL
DN.500
DN.500
DN.500
PAC
PAC
PAC
Mn. 125 M
DN.700
LSL 01
Mn. 2* 250 m
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
Mn. 36 M
Mn. 72 (2*36) M
Mn. 10 M
CONTRACT LIMIT OF PART-1
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
J K/DB/SWTP/02-02A
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
SWTP GENERAL PROCESS
PART-1 REQUIREMENTS
CRONTMIJ
A/S-DENMARK
DN.700
DN.600
DN.900
1 MV02
1 MV01 1 EV01
M
FIT
01
1
INLET RAW WATER
Sampling
DN.40
INLET RAW WATER
DISTRIBUTION CHAMBER
2 W01A
2 W01B
2 W01C
2 W01D
2 MV01A
2 MV01B
2 MV01C
2 MV01D
2 VM02A
DN.150
LSH
01
2
Coagulation
3 VM02A
3 MV03A 3 MV02A
M
LSH
01A
3
DN.100 DN.100
RECYCLING TANK
RECYCLING TANK
LSM
01A
3
Coaguaton N1
3 MV03B 3 MV02B
M
LSH
01B
3
DN.100 DN.100
RECYCLING TANK
LSM
01B
3
ZONE 3 - COAGULATION
3 MV04A
3 MV04B
ZONE 4
Foccuaton N2 Foccuaton N1
4 VM01A1 4 VM02A1
4 MV02A1
M M
LSH
01A1
4
DN.100
LSM
01A1
4
4 EV04A1
Foccuaton N2 Foccuaton N1
4 MV02B1
M M
LSH
01B1
4
DN.100
RECYCLING TANK
LSM
01B1
4
4 EV04B1
Foccuaton N2 Foccuaton N1
4 VM01B2 4 VM02B2
4 MV02B2
M M
LSH
01B2
4
DN.100
RECYCLING TANK
LSM
01B2
4
4 EV04B2
Foccuaton N2 Foccuaton N1
4 VM01A2 4 VM02A2
4 MV02A2
M M
LSH
01A2
4
DN.100
RECYCLING TANK
LSM
01A2
4
4 EV04A2
4 EV01B
4 EV01A
M
4 MV05A1
4 MV05A2
4 MV05B1
4 MV05B2
ZONE 5 - DECANTATION
DN.100-PN10
5 ZC01A1 M
LSH
01A1
5
LSL
01A1
5
5 EV01A1
M
DN.150-PN10
5 ZC01A2 M
LSH
01A2
5
LSL
01A2
5
5 EV01A2
M
DN.150-PN10
5 ZC01B1 M
LSH
01B1
5
LSL
01B1
5
5 EV01B1
M
DN.150-PN10
5 ZC01B2 M
LSH
01B2
5
LSL
01B2
5
5 EV01B2
M
Pneumatic Syst.
2 2
4
3
Back-wash pumps
4
3
DN.50
C11.01
ZONE 6' - RECYCLING TANK AND PUMPING FACILITIES
TP
40 m |h at 20mCE
??? *???
DN80
Sampling
6 MV07 A/D
6 MV05A
6 MV01A/D
6 PV01A/D
DN.250-PN10
DN.250-PN10
6' MV01A to D
6' CV01A to D
12 VM02A
12 VM02B
12 PM01
6 PV02A/D 6 PV03A/D
6 PV04A/D
LSH 01
6
LIT
01A to D
6
DPIT
01A/D
6
LSH
01
6'
LSM 01
6'
LSL
01
7
FIT
01
6'
PISL xx
xx
PAL xx
xx
PI
xx
xx
PI
xx
xx
6' MVxx
6' MVxx
Drain
Bottom valve DN100 6 MV05B
Recycling
Recycling
LSHH
01
6'
DN.100
6 PV06A/D C11.02
12 VM02C
PI
xx
xx
PISL xx
xx
PAL xx
xx
2 2
4
3
Back-wash pumps
4
3
ZONE 6 - FILTRATION - 4 FILTERS - LINE 2
DN.80
600*600
DN80
Sampling
6 MV07 A/H
6 MV05A
6 MV01A/D
6 PV01A/D
6 PV02A/D 6 PV03A/D
6 PV04A/D
LSH
01
6
LIT
01A to D
6
DPIT
01A/D
6
Bottom valve DN100 6 MV05B
Recycling
Recycling
6 PV06A/D
6 MV10A
TO FILTERS DN.500-PN10
7 EV10A
7 V11A
DNXXX
7 MV11A
7 CV01A
7 CV01B
7 MV01A
7 MV01B
3 x 560 m|h at 8 mCE
FIT
01
7
LSL
01A
7
RECYCLING
7 CV01C 7 MV01C
M
ZONE 7 BACK-WASH WATER TANK AND PUMPING FACILITIES
DNXXX
TO FILTERS DN.500-PN10
7 EV10C
7 MV11C FIT
03
7
M
PRECHLORINATION
PRECHLORINATION
SERVICE WATER
DN.200 PN10
2500 M
2500 M
8 MV01A
8 MV09A
8 MV09B
8 MV03B
PSL
xx
8
PSL
xx
8
PI
xx
8
8 CV01B 8 MV04B
8 MV03C 8 CV01C 8 MV04C
8 MV08
8 MV06
8 MV07 FIT
01
8
8 MV13
DN.50 PN10
8 MV14B 8 CV03B 8 MV15B
8 MV17
DN.50 PN10
LSH
01A
8
LIT
02A
8
TWPS
LIT
02B
8
11 MV01B
LSH
01B
8
LSL
01B
8
LABORATORY
8 MV03A 8 MV04A
8 MV14A 8 CV03A 8 MV15A
8 MV16A
8 MV10C
8 MV10B
8 MV10A
AIT
01
8 PH
AIT
01
8 NTU
8 CV01A
RECYCLING
RECYCLING
500 M
ZONE 8 - PUMPING SUMP
SEWER
Drainage pumps
STORAGE RESERVOIRS A&B
CHAMBER
FLOCCULATION
DN.250 -PN10
9 MV03C
9 CV01C
9 MV02
ZONE 9 - SLUDGE PUMPING STATION
DN.200-PN10
9 MV01A DN.100-PN10
DN.100-PN10
3* 10 m|h at 13 mCE
9 MV03B
9 CV01B
9 MV03A
9 CV01A
9 MV02A
DN100-PN10
SEWER
9 MV06B
9 MV06A
DN.200
DN.100
DN.80 DN.80 DN.80
DN.200
DN.200
3*30 m|h at 40 mCE
PRECHLORINATION
8 MV14C 8 CV03C 8 MV15C
8 MV18
DN.50 PN10
8 MV14D 8 CV03D 8 MV15D
4*4 m|h at 40 mCE
POSTCHLORINATION
POSTCHLORINATION
8 MV13
DN.50 PN10
8 MV14B 8 CV03B 8 MV15B
8 MV17
DN.50 PN10
8 MV14A 8 CV03A 8 MV15A
POSTCHLORINATION
8 MV14C 8 CV03C 8 MV15C
8 MV18
DN.50 PN10
8 MV14D 8 CV03D 8 MV15D
4*4 m|h at 40 mCE
Recycling
FIT
01A
9
PAC
AIT
01
6 NTU
AIT
01
6 NTU
LSH
01A
7
7 MV01A
7 MV01B
7 MV01C
8 MV04A
8 MV04B
PAC
POLY
POLY
POLY
POLY
LIME
CHLORINE
ALUM
ZONE 2
ZONE 1
CHEMICALS - CHLORINATION
ZONES 10 & 11
PRE CHLORINE
POST CHLORINE
ALUM. SULPH.
LIME PRE-TRT.
LIME POST-TRT.
POLYMER
FLOCCULATION
ZONE 8
ZONE 8 - BOOSTER PUMPING STATION
ZONE 6 - FILTRATION - 4 FILTERS - LINE 1
ZONE 12
BLOWERS & COMPRESSORS
4 EV01C
M
LSH
01
6
LSH
01
6
LSH
01
8
LSL
01
8
SEWER
M
M
M
M
SEWER
12 VM02A
12 VM02A
12 VM02A
12 VM02A
12 VM02A
DN.50
11 PV01
Drain
7 MV02C
7 MV02B
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
13 MV01 A to H
ZONE 13 - DRYING BEDS
SEWER
2
3
4
5
6
7
8
DN.100
DRYING BEDS
PAC
PAC
PAC
LSL
01
8
DN.700
DN.700
6 MV08 A/D
6 PV08A/D
Recycling
Recycling
6 MV08 A/D
6 PV08A/D
Recycling
Recycling
Recycling
Recycling
Recycling
Recycling
DN.150-PN10
DN.150-PN10
DN.150-PN10
DN.150-PN10
DN.350-PN10
DN.700
DN.700
DN.700
4 EV01D
M
DN.700
DN.500
DN.700
DN.700
DN.700
DN.700
DN.500
DN.500
DN.500
DN.500
2 VM02B
DN.150
2 VM02C
DN.150
DN.200
DN.400
DN.600
DN.400
DN.80
DN.200
DN.400
DN.600
DN.400
DN.250
DN.250
DN.250
DN.250
DN.250
DN.800
DN.800
DN.800
DN.800
DN.800
DN.800
Mn. 250 M
CHLORINE LIME
Recycling
PI
xx
xx
PI
xx
xx
PI
xx
xx
PI
xx
xx
PI
xx
xx
PI xx
xx
PI
xx
xx
PI xx
xx
PI xx
xxPI xx
xx
PI xxxxPI xxxxPI xxxxPI xxxx
DN.150
4 VM01B1 4 VM02B1
PI
xx
xx
PI
xx
xx
PI xx
xx
DN.800
DN.800
DN.800
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.100 PN10
DN.100 PN10
DN.100 PN10
DN.250-PN10
DN.250-PN10
DN.200 PN10
KMnO4
PAC
2 MV10A
AERATION
KMnO4
Chlorine
Chlorine
Chlorine
Chlorine
DN.500 DN.500
DN.900
1 MV05A 1 MV05B
1 MV10A
AIT 01
1
NTU
AIT 01
1
pHDN.800
AIT 01
1
O2
AIT 01
1
S|cm
M
SLUDGE TANK
AIT
01
3 pH
AIT
01
3 pH
SLUDGE TANK
SLUDGE TANK
SLUDGE TANK
SLUDGE TANK
SLUDGE TANK
SLUDGE TANK
DN.800
AIT 01
6
NTU
AIT 01
6
NTU
AIT 01
6
NTU AIT 01
6
NTU AIT 01
6
NTU
AIT 01
6
NTU AIT 01
6
NTU AIT 01
6
NTU
DN.350-PN10
LSM
01A
7
SEWER
3* 1250 m|h at 600 mbar
PI
xx
xx
PI
xx
xx
PI
xx
xx
PI
xx
xx
FIT
01
8
FIT
01
8
FIT
01
8
FIT
01
8
FIT
01
8
FIT
01
8
DN.900
DN.700
DN.700
DN.150 PN10
LIT
02
9
LIT
01
9
Sludge tank
Sludge tank
Sludge tank
Sludge tank
Sludge tank
Sludge tank
SKIMMER
SKIMMER
SKIMMER
SKIMMER
SKIMMER
SKIMMER
AIT 01
O2
AIT 01
1
FL
DN.500
DN.500
DN.500
PAC
PAC
PAC
Mn. 125 M
DN.700
LSL
01
Mn. 2* 250 m
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
RECYCLING TANK
DN.900
DN.900
DN.900
DN.900
Mn. 36 M
Mn. 72 (2*36) M
Mn. 10 M
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
DESIGNED DRAWN CHECKED RECOMMENDED PRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILD CONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAM LEADER
DRG.NO.
J K/DB/SWTP/02-02
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS
EGS V.SATHEESKANTH
SWTP GENERAL PROCESS CRONTMIJ
A/S-DENMARK
DN.700
DN.600
DN.900
1 MV02
1 MV01 1 EV01
M
FI T 01
1
I NLET RAW WATER
Sampl i ng
DN.40
I NLET RAW WATER
DI STRI BUTI ON CHAMBER
2 W01A
2 W01B
2 W01C
2 W01D
2 MV01A
2 MV01B
2 MV01C
2 MV01D
2 VM02A
DN.150
LSH 01
2
Coagul at i on
3 VM02A
3 MV03A 3 MV02A
M LSH 01A
3
DN.100 DN.100
LSM 01A
3
Coagul at i on N1
3 MV03B 3 MV02B
M LSH 01B
3
DN.100 DN.100
LSM 01B
3
ZONE 3 - COAGULATI ON
3 MV04A
3 MV04B
ZONE 4
Fl oc c ul at i on N2 Fl oc c ul at i on N1
4 VM01A1 4 VM02A1
4 MV02A1
M M LSH 01A1
4
DN.100
LSM 01A1
4
4 EV04A1
Fl oc c ul at i on N2 Fl oc c ul at i on N1
4 MV02B1
M M LSH 01B1
4
DN.100
LSM 01B1
4
4 EV04B1
Fl oc c ul at i on N2 Fl oc c ul at i on N1
4 VM01B2 4 VM02B2
4 MV02B2
M M LSH 01B2
4
DN.100
LSM 01B2
4
4 EV04B2
Fl oc c ul at i on N2 Fl oc c ul at i on N1
4 VM01A2 4 VM02A2
4 MV02A2
M M LSH 01A2
4
DN.100
LSM 01A2
4
4 EV04A2
4 EV01B
4 EV01A
M
4 MV05A1
4 MV05A2
4 MV05B1
4 MV05B2
ZONE 5 - DECANTATI ON
DN.100-PN10
5 ZC01A1 M
LSH 01A1
5
LSL 01A1
5
5 EV01A1
M
DN.150-PN10
5 ZC01A2 M
LSH 01A2
5
LSL 01A2
5
5 EV01A2
M
DN.150-PN10
5 ZC01B1 M
LSH 01B1
5
LSL 01B1
5
5 EV01B1
M
DN.150-PN10
5 ZC01B2 M
LSH 01B2
5
LSL 01B2
5
5 EV01B2
M
Pneumat i c Syst .
2 2
4
3
Bac k -w ash pumps
4
3
DN.50
C11.01
ZONE 6' - RECYCLI NG TANK AND PUMPI NG FACI LI TI ES
40 m/h at 20mCE
??? * ???
DN80
Sampl i ng
6 MV07 A/D 6 MV05A
6 MV01A/D
6 PV01A/D
DN.250-PN10
DN.250-PN10
6' MV01A t o D
6' CV01A t o D
12 VM02A
12 VM02B
12 PM01
6 PV02A/D 6 PV03A/D
6 PV04A/D
LSH 01
6
LI T 01A t o D
6
DPI T 01A/D
6
LSH 01
6'
LSM 01
6'
LSL 01
7
FI T 01
6'
PI SL x x x x
PAL x x x x
PI x x
x x
PI x x
x x
6' MVx x
6' MVx x
Dr ai n
Bot t om val ve DN100 6 MV05B
Rec yc l i ng
Rec yc l i ng
LSHH 01
6'
DN.100
6 PV06A/D C11.02
12 VM02C
PI x x
x x
PI SL x x x x
PAL x x x x
2 2
4
3
Bac k -w ash pumps
4
3
ZONE 6 - FI LTRATI ON - 4 FI LTERS - LI NE 2
DN.80
600* 600
DN80
Sampl i ng
6 MV07 A/H 6 MV05A
6 MV01A/D
6 PV01A/D
6 PV02A/D 6 PV03A/D
6 PV04A/D
LSH 01
6
LI T 01A t o D
6
DPI T 01A/D
6
Bot t om val ve DN100 6 MV05B
Rec yc l i ng
Rec yc l i ng
6 PV06A/D
6 MV10A
TO FI LTERS DN.500-PN10 7 EV10A
7 V11A
DNXXX
7 MV11A
7 CV01A
7 CV01B
7 MV01A
7 MV01B
3 x 560 m/h at 8 mCE
FI T 01
7
LSL 01A
7
RECYCLI NG
7 CV01C 7 MV01C
M
ZONE 7 BACK-WASH WATER TANK AND PUMPI NG FACI LI TI ES
DNXXX
TO FI LTERS DN.500-PN10 7 EV10C
7 MV11C FI T 03
7
M
PRECHLORI NATI ON
PRECHLORI NATI ON
SERVI CE WATER DN.200 PN10
2500 M
2500 M
8 MV01A
8 MV09A
8 MV09B
8 MV03B
PSL x x
8
PSL x x
8
PI x x
8
8 CV01B 8 MV04B
8 MV03C 8 CV01C 8 MV04C
8 MV08
8 MV06
8 MV07 FI T 01
8
8 MV13
DN.50 PN10
8 MV14B 8 CV03B 8 MV15B
8 MV17
DN.50 PN10
LSH 01A
8
LI T 02A
8
TWPS
LI T 02B
8
11 MV01B
LSH 01B
8
LSL 01B
8
LABORATORY
8 MV03A 8 MV04A
8 MV14A 8 CV03A 8 MV15A
8 MV16A
8 MV10C
8 MV10B
8 MV10A
AI T 01
8 PH
AI T 01
8 NTU
8 CV01A
RECYCLI NG
RECYCLI NG
500 M
ZONE 8 - PUMPI NG SUMP
SEWER
Dr ai nage pumps
STORAGE RESERVOI RS A& B
CHAMBER FLOCCULATI ON
DN.250 -PN10
9 MV03C
9 CV01C
9 MV02
ZONE 9 - SLUDGE PUMPI NG STATI ON
DN.200-PN10
9 MV01A DN.100-PN10
DN.100-PN10
3* 10 m/h at 13 mCE
9 MV03B
9 CV01B
9 MV03A
9 CV01A
9 MV02A
DN100-PN10
SEWER
9 MV06B
9 MV06A DN.200
DN.100
DN.80 DN.80 DN.80
DN.200
DN.200
3* 30 m/h at 40 mCE
PRECHLORI NATI ON
8 MV14C 8 CV03C 8 MV15C
8 MV18
DN.50 PN10
8 MV14D 8 CV03D 8 MV15D 4* 4 m/h at 40 mCE
POSTCHLORI NATI ON
POSTCHLORI NATI ON
8 MV13
DN.50 PN10
8 MV14B 8 CV03B 8 MV15B
8 MV17
DN.50 PN10
8 MV14A 8 CV03A 8 MV15A
POSTCHLORI NATI ON
8 MV14C 8 CV03C 8 MV15C
8 MV18
DN.50 PN10
8 MV14D 8 CV03D 8 MV15D 4* 4 m/h at 40 mCE
Rec yc l i ng
FIT 01A
9
PAC
AI T 01
6 NTU
AI T 01
6 NTU
LSH 01A
7
7 MV01A
7 MV01B
7 MV01C
8 MV04A
8 MV04B
PAC
POLY
POLY
POLY
POLY
LI ME
CHLORI NE
ALUM
ZONE 2
ZONE 1
CHEMI CALS - CHLORI NATI ON
ZONES 10 & 11
PRE CHLORI NE
POST CHLORI NE
ALUM. SULPH.
LI ME PRE-TRT.
LI ME POST-TRT.
POLYMER
FLOCCULATI ON
ZONE 8
ZONE 8 - BOOSTER PUMPI NG STATI ON
ZONE 6 - FI LTRATI ON - 4 FI LTERS - LI NE 1
ZONE 12
BLOWERS & COMPRESSORS
4 EV01C
M
LSH 01
6
LSH 01
6
LSH 01
8
LSL 01
8
SEWER
M
M
M
M
SEWER
12 VM02A
12 VM02A
12 VM02A
12 VM02A
12 VM02A
DN.50 11 PV01
Dr ai n
7 MV02C
7 MV02B
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
13 MV01 A t o H
ZONE 13 - DRYI NG BEDS
SEWER
2
3
4
5
6
7
8
DN.100
DRYI NG BEDS
PAC
PAC
PAC
LSL 01
8
DN.700
DN.700
6 MV08 A/D
6 PV08A/D
Rec yc l i ng
6 MV08 A/D
6 PV08A/D
Rec yc l i ng
DN.150-PN10
DN.150-PN10
DN.150-PN10
DN.150-PN10
DN.350-PN10
DN.700
DN.700
DN.700
4 EV01D
MDN.700
DN.500
DN.700
DN.700
DN.700
DN.700
DN.500
DN.500
DN.500
DN.500
2 VM02B
DN.150
2 VM02C
DN.150
DN.200 DN.400
DN.600
DN.400
DN.80
DN.200 DN.400
DN.600
DN.400
DN.250
DN.250
DN.250
DN.250
DN.250
DN.800
DN.800
DN.800
DN.800
DN.800
DN.800
Mi n. 250 M
CHLORI NE LI ME
Rec yc l i ng
PI x x
x x
PI x x
x x
PI x x
x x
PI x x
x x
PI x x
x x
PI x x
x x
PI x x
x x
PI xx
xxPI xx
xxPI xx
xx
DN.150
4 VM01B1 4 VM02B1
PI x x
x x
PI x x
x x
PI x x
x x
DN.800
DN.800
DN.800
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.100 PN10
DN.100 PN10
DN.100 PN10
DN.250-PN10
DN.250-PN10
DN.200 PN10
KMnO4
PAC
2 MV10A
AERATI ON
KMnO4
Chl or i ne
Chl or i ne
Chl or i ne
Chl or i ne
DN.500 DN.500
DN.900
1 MV05A 1 MV05B
1 MV10A
AIT 01
1
NTU
AIT 01
1
pHDN.800
AIT 01
1
O2
AIT 01
1
S/cmM
AI T 01
3 pH
AI T 01
3 pH
DN.800
AIT 01
6
NTU
AIT 01
6
NTU
AIT 01
6
NTU AIT 01
6
NTU AIT 01
6
NTU
AIT 01
6
NTU AIT 01
6
NTU AIT 01
6
NTU
DN.350-PN10
LSM 01A
7
SEWER
3* 1250 m/h at 600 mbar
PI x x
x x
PI x x
x x
PI x x
x x
PI x x
x x
FI T 01
8
FI T 01
8
FI T 01
8
FI T 01
8
FI T 01
8
FI T 01
8
DN.900
DN.700
DN.700
DN.150 PN10
LI T 02
9 LI T 01
9
AIT 01
O2
AIT 01
1
FL
DN.500
DN.500
DN.500
PAC
PAC
PAC
Mi n. 125 M
DN.700
LSL 01
Mi n. 2* 250 m
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
Mi n. 36 M
Mi n. 72 (2* 36) M
Mi n. 10 M
SIGN. DATE DESCRIPTION REV.
NATI ONAL WATER SUPPLY AND DRAI NAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
SWTP GENERAL PROCESS
J K/DB/SWTP/02-03
O.F. O.F.
R.W.
R.W.
DN40 PN 10 - PVC
DN40
D
N
4
0

(

5
0
)
-

P
V
C
DN40
DN50 - Galva
DN 40 PN10 - PVC
DN50 - Galva
Min. 10 m3
PN10
DN100
DN50
DN40
DN40
PN10
DN100
Min. 10 m3
DN50 - Galva
DN 50
DN40 DN40
DN40
DN40
PPE N1
DN40
DN40
Q
.

=

4
6
0

L
/
h
NEUTRALISATION
SERVICE
WATER
Hose pipe
Calibration
Column
0VM01B
0 01A
0 01A
0 01A
0 01B
0 01B
0 01B
0VM01A
0PV01B
0DP01C 0DP01B 0DP01A
OBA01A
0PV01A
DN 50
D
P
-
1

H
E
A
D
DN40
0 01A 0 01B
Q
.

=

4
6
0

L
/
h
D
P
-
1

H
E
A
D
Q
.

=

4
6
0

L
/
h
D
P
-
1

H
E
A
D
D
N
4
0

(

5
0
)
-

P
V
C
D
N
5
0

(

6
3
)
-

P
V
C
RWTP N 2
DN40
DN40 PN 10 - PVC
0BA01B
ZONE 0 - K-PERMANGANATE
DN 50 (63) PN10 - GALVA
DN 50 (63) PN10 - GALVA
DN 100 PN10 - PVC
HDPE DN 40
HDPE DN 40
DN40
DN 40
DN40
DN40
DN 40
DN40
DN 100
DN 100
MONO RAIL
FOR MAINTENANCE
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
PRELIMINARY DESIGN A
GRONTMIJ
A/S- DENMARK
PID KMnO4 INTAKE
DESIGNED DRAWN CHECKED RECOMMENDED PRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILD CONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAM LEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS
J K/DB/SWTP/02-04
O.F. O.F.
S.W.
S.W.
DN40
D
N
4
0
(
5
0
)- P
V
C
DN40
DN50 - Gal va
DN 40 PN10 - PVC
DN50 - Gal va
Mi n. 10 m3
PN10
DN100
DN50
DN40
DN40
PN10
DN100
Mi n. 10 m3
DN50 - Gal va
DN50
DN40 DN40
DN40
DN40
CHAMBER
I NLET PI PE
DN40
DN40
Q
. =
4
6
0
L
/h
NEUTRALI SATI ON
SERVI CE
WATER
Hose pi pe
Cal i br at i on
Col umn
10KM VM01B
10KM 01A
10KM 01A
10KM 01A
10KM 01B
10KM 01B
10KM 01B
10KM VM01A
10KM PV01B
10KM DP01C 10KM DP01B 10KM DP01A
10KM PV01A
DN 40
D
P
-1
H
E
A
D
DN40
10KM 01A 10KM 01B
Q
. =
4
6
0
L
/h
D
P
-1
H
E
A
D
Q
. =
4
6
0
L
/h
D
P
-1
H
E
A
D
D
N
4
0
(
5
0
)- P
V
C
D
N
4
0
(
5
0
)- P
V
C
DN40
DN40 PN 10 - PVC
10KMBA01A
DN50 (63) PN10 - GALVA
0-6000 l/h
10KM EV01 A
S.W.
ZONE 10 - K-PERMANGATE
DN 50 (63) PN10 - GALVA
DN 50 (63) PN10 - GALVA
DN 100 PN10 - PVC
HDPE DN 50
DN 40
DN40
DN 40
10KM PV02A 10KM PV02B 10KM PV02C
DN 100
DN 100
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
PRELIMINARY DESIGN A
GRONTMIJ
A/S- DENMARK
PID KMnO4 SWTP
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS
J K/DB/SWTP/05
3.5 kg/h
NaOH Max.200g/l
Mn. 8.0 m|
DN250PVC
PALL 50x50
NEUTRALISATION TOWER
CHLORINE DETECTION
35 m|/h
10 mCE
10 mCE
35 m|/h
DN80
DN50
150 mmCE
150 mmCE
3000 m|/h
DN80.PN10 PVC
11MV12
11CP01A
11MV07
11CV02B 11MV09B
11MV09A 11CV02A
11MV10
11MV11
11Vent02B
11Vent02A
11Vent01B
11Vent01A
11MV14A
11MV13B
Na OH
S.W.
M
DN50.PN10 GS
11VM01B
11CP01B DN80
11MV15A
DN80
11MV15B
DN50
11MV14B
M
11VM01A
11MV13A
Na OH
S.W.
DN50.PN10 GS
11MV01A
11MV01B
DN80
DN50
DN50 DN50
CHLORINE DETECTION
3.5 kg/h
3.5 kg/h
11MV09A
11MV09B
11MV09A
11MV09B
3.5 kg/h
3.5 kg/h
3.5 kg/h
3.5 kg/h
3.5 kg/h
CHLORINE DETECTION 150 mmCE CHLORINE DETECTION 150 mmCE
3000 m|/h
CHLORINE DETECTION 150 mmCE
DN300PVC
Dia. 3.0 Mx H. 5.0 M
ZONE 11 PRE & POST-CHLORINATION
Mn. 8.0 m|
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
PRELIMINARY DESIGN A
GRONTMIJ
A/S- DENMARK
PID-PRE & POST CHLORINATION
TENDER DOSSIER B
J K/DB/SWTP/02-06
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
O.F. O.F.
S.W.
S.W.
DN40
D
N
4
0
(
5
0
)- P
V
C
DN40
DN50 - Gal va
DN 40 PN10 - PVC
DN50 - Gal va
Mi n.10 m3
PN10
DN100
DN50
DN40
DN40
PN10
DN100
Mi n.10 m3
DN50 - Gal va
DN50
DN40 DN40
DN40
DN40
CHAMBER A& B
DI STRI BUTI ON
DN40
DN40
Q
. =
3
7
5
L
/h
NEUTRALI SATI ON
SERVI CE
WATER
Hose pi pe
Cal i br at i on
Col umn
10AL VM01B
10AL 01A
10AL 01A
10AL 01A
10AL 01B
10AL 01B
10AL 01B
10AL VM01A
10AL PV01B
10AL DP01C 10AL DP01B 10AL DP01A
10AL PV01A
DN 40
D
P
-1
H
E
A
D
DN40
10AL 01A 10AL 01B
Q
. =
3
7
5
L
/h
D
P
-1
H
E
A
D
Q
. =
3
7
5
L
/h
D
P
-1
H
E
A
D
D
N
4
0
(
5
0
)- P
V
C
D
N
4
0
(
5
0
)- P
V
C
DN40
DN40 PN 10 - PVC
10AL BA01A
DN50 (63) PN10 - GALVA
0-6000 l/h
10AL EV02A
S.W.
ZONE 10 - Al ALUMI NI UM SULPHATE
DN 50 (63) PN10 - GALVA
DN 50 (63) PN10 - GALVA
DN 100 PN10 - PVC
HDPE DN 50
DN 40
DN40
DN 40
10AL PV02A 10AL PV02B 10AL PV02C
MONO RAI L
FOR MAI NTENANCE
DN 100
DN 100
CHAMBER B& C
DI STRI BUTI ON
DN40 PN 10 - PVC
10AL BA01A
DN50 (63) PN10 - GALVA
0-6000 l/h
10AL EV02A
S.W.
HDPE DN 50
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
PRELIMINARY DESIGN A
GRONTMIJ
A/S- DENMARK
PID ALUM SWPT
TENDER DOSSIER B
J K/DB/SWTP/02-07
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
DN 25 (32) PN10 - GALVA
DN50
D
N
4
0
(
5
0
)- P
V
C
DN40 DN40
D
N
4
0
(
5
0
) - P
V
C
DN 40
NEUTRALI SATI ON
0-6000 l/h
DN 25 (32) PN10 - GALVA
E.S.
10LI EV02A
DN 40
DN 25 (32) PN10 - GALVA
10LI EV02B
0-6000 l/h
10LI DP02A
10LI EV02C
0-6000 l/h
Col umn
Cal i br at i on
10LI 01A
10LI 01A
10LI 01A
DN50
DN 40 PN10 - PVC
10LI PV02A
DN40
DN40
O.F.
Mi n. 10 m3
DN100
PN10
10LI PV02B
DN40
DN40
O.F.
PN10
DN100
Mi n. 10 m3
10LI VM01A
DN50 - Gal va
S.W.
10LI VM01B
DN50 - Gal va
D
N
4
0
(
5
0
)- P
V
C
DN40
DN 40
HDPE DN50
DN40
S.W.
10LI 01B
10LI 01B
Fl ex i bl e Hoose
10LI 01B
STORAGE RESERVOI R
10LI DP02B 10LI DP02C
Q
. =
4
6
0
L
/h
D
P
-1
H
E
A
D
10LI EV03
DN40
DN 40
E.S. E.S.
10LI 01A 10LI 01B
DN 25 (32) PN10 - GALVA
10LI EV02D
0-6000 l/h
D
N
4
0
(
5
0
)- P
V
C
DN40
DN 40
10LI DP02D
E.S.
Q
. =
4
6
0
L
/h
D
P
-1
H
E
A
D
Q
. =
4
6
0
L
/h
D
P
-1
H
E
A
D
Q
. =
4
6
0
L
/h
D
P
-1
H
E
A
D
DN 40 DN 40 DN 40
DN 25 (32) PN10 - GALVA
10LI EV02E
0-6000 l/h
D
N
4
0
(
5
0
)- P
V
C
DN40
DN 40
10LI DP02E
E.S.
Q
. =
4
6
0
L
/h
D
P
-1
H
E
A
D
DN 40
I NLET PI PE
CHAMBER
DN 40
DN 40
ZONE 10 - LI ME PRE & POST-TREATMENT
DN 50 (63) PN10 - GALVA
DN 50 (63) PN10 - GALVA
DN 100 PN10 - PVC
HDPE DN 50
DN50 - Gal va
DN 100
MONO RAI L
FOR MAI NTENANCE
DN50
10LI 01C
10LI 01C
10LI 01C
DN50
DN 40 PN10 - PVC
10LI PV02C
DN40
DN40
O.F.
Mi n. 10 m3
DN100
PN10
10LI PV02D
DN40
DN40
O.F.
PN10
DN100
Mi n. 10 m3
10LI VM01C
DN50 - Gal va
S.W.
10LI VM01D
DN50 - Gal va
10LI 01D
10LI 01D
10LI 01D
10LI 01C 10LI 01D
DN 100 PN10 - PVC
SERVI CE
WATER
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
PRELIMINARY DESIGN A
GRONTMIJ
A/S- DENMARK
PID LIME
TENDER DOSSIER B
J K/DB/SWTP/02-08
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
O.F. O.F.
S.W.
S.W.
DN40
D
N
4
0
(
5
0
)- P
V
C
DN40
DN50 - Gal va
DN 40 PN10 - PVC
DN50 - Gal va
Mi n. 10 m3
PN10
DN100
DN50
DN40
DN40
PN10
DN100
Mi n. 10 m3
DN50 - Gal va
DN50
DN40 DN40
DN40
DN40
LI NE 1 (A& B)
COAGULATI ON
DN40
DN40
Q
. =
4
6
0
L
/h
NEUTRALI SATI ON
SERVI CE
WATER
Hose pi pe
Cal i br at i on
Col umn
10PA VM01B
10PA 01A
10PA 01A
10PA 01A
10PA 01B
10PA 01B
10PA 01B
10PA VM01A
10PA PV01B
10PA DP01C 10PA DP01B 10PA DP01A
10PA PV01A
DN 40
D
P
-1
H
E
A
D
DN40
10PA 01A 10PA 01B
Q
. =
4
6
0
L
/h
D
P
-1
H
E
A
D
Q
. =
4
6
0
L
/h
D
P
-1
H
E
A
D
D
N
4
0
(
5
0
)- P
V
C
D
N
4
0
(
5
0
)- P
V
C
DN40
DN40 PN 10 - PVC
DN50 (63) PN10 - GALVA
0-6000 l/h
10PA EV02B
S.W.
ZONE 10 - POWDERED ACTI VATED CARBON
DN 50 (63) PN10 - GALVA
DN 50 (63) PN10 - GALVA
DN 100 PN10 - PVC
HDPE DN 50
DN 40
DN40
DN 40
10PA PV02A 10PA PV02B 10PA PV02C
DN40
DN40
10PA DP01C Q
. =
4
6
0
L
/h
D
P
-1
H
E
A
D
D
N
4
0
(
5
0
)- P
V
C
DN40
10PA PV02D
8 Li nes
FI LTERS
DN40 PN 10 - PVC
DN50 (63) PN10 - GALVA
0-6000 l/h
10PA EV02C
S.W.
HDPE DN 50
LI NE 2(C& D)
COAGULATI ON
DN40 PN 10 - PVC
DN50 (63) PN10 - GALVA
0-6000 l/h
10PA EV02A
S.W.
HDPE DN 50
DN 40
DN 100
DN 100
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER
SUPPLY & SANITATION PROJECT
TITLE
PRELIMINARY DESIGN A
DN 40
GRONTMIJ
A/S- DENMARK
PID PAC
TENDER DOSSIER B
NOTE: NOT AT SCALE- DIMENSIONS AS SHOWN
J K/DB/SWTP/02-09
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
DN25 (32) PN10 - GALVA
0-2000 l/h
S.W.
Fl ex i bl e Hoose
NEUTRALI SATI ON
10PO EV02B
DN25 (32) PN10 - GALVA
DN20
D
N
4
0
(
5
0
) P
N
1
0
-P
V
C
10PO EV02A
DN40
0-2000 l/h
O
=
0
.1
0
0
m
|/h
2.5 g/l
DN20
0-2000 l/h
DN25 (32) PN10 - GALVA
10PO EV02C
O
=
0
.1
0
0
m
|/h
DN40
DN25 (32) - gal va
10PO VM01A
10PO DS01A
10PO EV01A
10PO VM02A
S.W.
10PO VM03A 10PO VM01B
DN25 (32) - gal va
10PO DS01B
10PO VM02B
10PO EV01B
DN20
O
=
0
.1
0
0
m
|/h
DN20
2.5g/l
DN 40
Col umn
Cal i br at i on
HDPE DN 40
HDPE DN 40
FLOCCULATI ON
10PO VM03B
UNITS : 500 l/h
10PO APU 01 B 10PO APU 01 A
DN40
10PO MP 01 C 10PO MP 01 A 10PO MP 01 B
DN20 DN20
S.W.
S.W. S.W.
FLOCCULATI ON
S.W.
DN40 DN40
ZONE 10 - POLYMER
DN 50 PN10 - PVC
DN 50 (63) PN10 - GALVA
DN 50 (63) PN10 - GALVA
DN 40
DN 40
DN 40
DN 40
DN 40
A & B
C & D
DN50 - Gal va
D
N
4
0
(
5
0
) P
N
1
0
-P
V
C
D
N
4
0
(
5
0
) P
N
1
0
-P
V
C
DN50 - Gal va DN50 - Gal va
10PO PV 01 A 10PO PV O1 B 10PO PV 01 C
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
PRELIMINARY DESIGN A
GRONTMIJ
A/S- DENMARK
PID POLYMER
TENDER DOSSIER B
J K/DB/SWTP/02-10
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
DN.700
DN.600
DN.900
1 MV02
1 MV01 1 EV01
M
FI T 01
1
I NLET RAW WATER
Sampl i ng
DN.40
I NLET RAW WATER
DI STRI BUTI ON CHAMBER
2 W01A
2 W01B
2 W01C
2 W01D
2 MV01A
2 MV01B
2 MV01C
2 MV01D
2 VM02A
DN.150
LSH 01
2
Coagul at i on
3 VM02A
3 MV03A 3 MV02A
M LSH 01A
3
DN.100 DN.100
LSM 01A
3
Coagul at i on N1
3 MV03B 3 MV02B
M LSH 01B
3
DN.100 DN.100
LSM 01B
3
ZONE 3 - COAGULATI ON
3 MV04A
3 MV04B
ZONE 4
Fl oc c ul at i on N2 Fl oc c ul at i on N1
4 VM01A1 4 VM02A1
4 MV02A1
M M LSH 01A1
4
DN.100
LSM 01A1
4
4 EV04A1
Fl oc c ul at i on N2 Fl oc c ul at i on N1
4 MV02B1
M M LSH 01B1
4
DN.100
LSM 01B1
4
4 EV04B1
Fl oc c ul at i on N2 Fl oc c ul at i on N1
4 VM01B2 4 VM02B2
4 MV02B2
M M LSH 01B2
4
DN.100
LSM 01B2
4
4 EV04B2
Fl oc c ul at i on N2 Fl oc c ul at i on N1
4 VM01A2 4 VM02A2
4 MV02A2
M M LSH 01A2
4
DN.100
LSM 01A2
4
4 EV04A2
4 EV01B
4 EV01A
M
4 MV05A1
4 MV05A2
4 MV05B1
4 MV05B2
ZONE 5 - DECANTATI ON
DN.100-PN10
5 ZC01A1 M
LSH 01A1
5
LSL 01A1
5
5 EV01A1
M
DN.150-PN10
5 ZC01A2 M
LSH 01A2
5
LSL 01A2
5
5 EV01A2
M
DN.150-PN10
5 ZC01B1 M
LSH 01B1
5
LSL 01B1
5
5 EV01B1
M
DN.150-PN10
5 ZC01B2 M
LSH 01B2
5
LSL 01B2
5
5 EV01B2
M
Pneumat i c Syst .
2 2
4
3
Bac k -w ash pumps
4
3
DN.50
C11.01
ZONE 6' - RECYCLI NG TANK AND PUMPI NG FACI LI TI ES
40 m/h at 20mCE
??? * ???
DN80
Sampl i ng
6 MV07 A/D 6 MV05A
6 MV01A/D
6 PV01A/D
DN.250-PN10
DN.250-PN10
6' MV01A t o D
6' CV01A t o D
12 VM02A
12 VM02B
12 PM01
6 PV02A/D 6 PV03A/D
6 PV04A/D
LSH 01
6
LI T 01A t o D
6
DPI T 01A/D
6
LSH 01
6'
LSM 01
6'
LSL 01
7
FI T 01
6'
PI SL x x x x
PAL x x x x
PI x x
x x
PI x x
x x
6' MVx x
6' MVx x
Dr ai n
Bot t om val ve DN100 6 MV05B
Rec yc l i ng
Rec yc l i ng
LSHH 01
6'
DN.100
6 PV06A/D C11.02
12 VM02C
PI x x
x x
PI SL x x x x
PAL x x x x
2 2
4
3
Bac k -w ash pumps
4
3
ZONE 6 - FI LTRATI ON - 4 FI LTERS - LI NE 2
DN.80
600* 600
DN80
Sampl i ng
6 MV07 A/H 6 MV05A
6 MV01A/D
6 PV01A/D
6 PV02A/D 6 PV03A/D
6 PV04A/D
LSH 01
6
LI T 01A t o D
6
DPI T 01A/D
6
Bot t om val ve DN100 6 MV05B
Rec yc l i ng
Rec yc l i ng
6 PV06A/D
6 MV10A
TO FI LTERS DN.500-PN10 7 EV10A
7 V11A
DNXXX
7 MV11A
7 CV01A
7 CV01B
7 MV01A
7 MV01B
3 x 560 m/h at 8 mCE
FI T 01
7
LSL 01A
7
RECYCLI NG
7 CV01C 7 MV01C
M
ZONE 7 BACK-WASH WATER TANK AND PUMPI NG FACI LI TI ES
DNXXX
TO FI LTERS DN.500-PN10 7 EV10C
7 MV11C FI T 03
7
M
PRECHLORI NATI ON
PRECHLORI NATI ON
SERVI CE WATER DN.200 PN10
2500 M
2500 M
8 MV01A
8 MV09A
8 MV09B
8 MV03B
PSL x x
8
PSL x x
8
PI x x
8
8 CV01B 8 MV04B
8 MV03C 8 CV01C 8 MV04C
8 MV08
8 MV06
8 MV07 FI T 01
8
8 MV13
DN.50 PN10
8 MV14B 8 CV03B 8 MV15B
8 MV17
DN.50 PN10
LSH 01A
8
LI T 02A
8
TWPS
LI T 02B
8
11 MV01B
LSH 01B
8
LSL 01B
8
LABORATORY
8 MV03A 8 MV04A
8 MV14A 8 CV03A 8 MV15A
8 MV16A
8 MV10C
8 MV10B
8 MV10A
AI T 01
8 PH
AI T 01
8 NTU
8 CV01A
RECYCLI NG
RECYCLI NG
500 M
ZONE 8 - PUMPI NG SUMP
SEWER
Dr ai nage pumps
STORAGE RESERVOI RS A& B
CHAMBER FLOCCULATI ON
DN.250 -PN10
9 MV03C
9 CV01C
9 MV02
ZONE 9 - SLUDGE PUMPI NG STATI ON
DN.200-PN10
9 MV01A DN.100-PN10
DN.100-PN10
3* 10 m/h at 13 mCE
9 MV03B
9 CV01B
9 MV03A
9 CV01A
9 MV02A
DN100-PN10
SEWER
9 MV06B
9 MV06A DN.200
DN.100
DN.80 DN.80 DN.80
DN.200
DN.200
3* 30 m/h at 40 mCE
PRECHLORI NATI ON
8 MV14C 8 CV03C 8 MV15C
8 MV18
DN.50 PN10
8 MV14D 8 CV03D 8 MV15D 4* 4 m/h at 40 mCE
POSTCHLORI NATI ON
POSTCHLORI NATI ON
8 MV13
DN.50 PN10
8 MV14B 8 CV03B 8 MV15B
8 MV17
DN.50 PN10
8 MV14A 8 CV03A 8 MV15A
POSTCHLORI NATI ON
8 MV14C 8 CV03C 8 MV15C
8 MV18
DN.50 PN10
8 MV14D 8 CV03D 8 MV15D 4* 4 m/h at 40 mCE
Rec yc l i ng
FIT 01A
9
PAC
AI T 01
6 NTU
AI T 01
6 NTU
LSH 01A
7
7 MV01A
7 MV01B
7 MV01C
8 MV04A
8 MV04B
PAC
POLY
POLY
POLY
POLY
LI ME
CHLORI NE
ALUM
ZONE 2
ZONE 1
CHEMI CALS - CHLORI NATI ON
ZONES 10 & 11
PRE CHLORI NE
POST CHLORI NE
ALUM. SULPH.
LI ME PRE-TRT.
LI ME POST-TRT.
POLYMER
FLOCCULATI ON
ZONE 8
ZONE 8 - BOOSTER PUMPI NG STATI ON
ZONE 6 - FI LTRATI ON - 4 FI LTERS - LI NE 1
ZONE 12
BLOWERS & COMPRESSORS
4 EV01C
M
LSH 01
6
LSH 01
6
LSH 01
8
LSL 01
8
SEWER
M
M
M
M
SEWER
12 VM02A
12 VM02A
12 VM02A
12 VM02A
12 VM02A
DN.50 11 PV01
Dr ai n
7 MV02C
7 MV02B
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
8 MV16A
13 MV01 A t o H
ZONE 13 - DRYI NG BEDS
SEWER
2
3
4
5
6
7
8
DN.100
DRYI NG BEDS
PAC
PAC
PAC
LSL 01
8
DN.700
DN.700
6 MV08 A/D
6 PV08A/D
Rec yc l i ng
6 MV08 A/D
6 PV08A/D
Rec yc l i ng
DN.150-PN10
DN.150-PN10
DN.150-PN10
DN.150-PN10
DN.350-PN10
DN.700
DN.700
DN.700
4 EV01D
MDN.700
DN.500
DN.700
DN.700
DN.700
DN.700
DN.500
DN.500
DN.500
DN.500
2 VM02B
DN.150
2 VM02C
DN.150
DN.200 DN.400
DN.600
DN.400
DN.80
DN.200 DN.400
DN.600
DN.400
DN.250
DN.250
DN.250
DN.250
DN.250
DN.800
DN.800
DN.800
DN.800
DN.800
DN.800
Mi n. 250 M
CHLORI NE LI ME
Rec yc l i ng
PI x x
x x
PI x x
x x
PI x x
x x
PI x x
x x
PI x x
x x
PI x x
x x
PI x x
x x
PI xx
xxPI xx
xxPI xx
xx
DN.150
4 VM01B1 4 VM02B1
PI x x
x x
PI x x
x x
PI x x
x x
DN.800
DN.800
DN.800
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.50 PN10
DN.100 PN10
DN.100 PN10
DN.100 PN10
DN.250-PN10
DN.250-PN10
DN.200 PN10
KMnO4
PAC
2 MV10A
AERATI ON
KMnO4
Chl or i ne
Chl or i ne
Chl or i ne
Chl or i ne
DN.500 DN.500
DN.900
1 MV05A 1 MV05B
1 MV10A
AIT 01
1
NTU
AIT 01
1
pHDN.800
AIT 01
1
O2
AIT 01
1
S/cmM
AI T 01
3 pH
AI T 01
3 pH
DN.800
AIT 01
6
NTU
AIT 01
6
NTU
AIT 01
6
NTU AIT 01
6
NTU AIT 01
6
NTU
AIT 01
6
NTU AIT 01
6
NTU AIT 01
6
NTU
DN.350-PN10
LSM 01A
7
SEWER
3* 1250 m/h at 600 mbar
PI x x
x x
PI x x
x x
PI x x
x x
PI x x
x x
FI T 01
8
FI T 01
8
FI T 01
8
FI T 01
8
FI T 01
8
FI T 01
8
DN.900
DN.700
DN.700
DN.150 PN10
LI T 02
9 LI T 01
9
AIT 01
O2
AIT 01
1
FL
DN.500
DN.500
DN.500
PAC
PAC
PAC
Mi n. 125 M
DN.700
LSL 01
Mi n. 2* 250 m
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
DN.900
Mi n. 36 M
Mi n. 72 (2* 36) M
Mi n. 10 M
SIGN. DATE DESCRIPTION REV.
NATI ONAL WATER SUPPLY AND DRAI NAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
J K/DB/SWTP/03
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
PID - PROCESS - GENERAL SWTP
A
A
Mi n 8000
M
i
n
.

1
0
0
0
M
i
n
.

2
0
0
0
DN.600
F.I .
Mi n. 5D Mi n. 500
VENT PI PE HI GH
DN.700 DN.800
VENT PI PE LOW
SECTI ON A-A
DN.700
MANHOLE
Conc r et e mobi l e sl abs
w i t h handdl es
Mi n. 8000
M
i
n
.

2
0
0
0
6
0
0
But t er f l y Val ve
manual
But t er f l y Val ve
mot or i zed
DN.600
PLAN VI EW PLAN VI EW
Ac c ess l adder GI
Conc r et e Suppor t
Conc r et e Suppor t s
DN.100
DN.100
DN.700
DN.800
9
0
0
x
9
0
0
9
0
0
x
9
0
0
9
0
0
x
9
0
0
9
0
0
x
9
0
0
GI 800x 800
800
8
0
0
GI 800 x 800
MANHOLE
Mi n. 3D
6
0
0
3
0
0
600
3
0
0
TN=+?.000
M
i
n
.

1
0
0
0
Ac c ess l adder
GI
DN.800
DN.600
Mi n. 8000
Sampl i ng poi nt
Dr ai nage f ac i l i t i es
Mi n. 5D Mi n. 500
Mi n. 8000
Mi n. 3D
Sampl i ng poi nt
But t er f l y Val ve
manual But t er f l y Val ve
mot or i zed
El ec t r o-magnet i c w at er met er
SIGN. DATE DESCRIPTION REV.
NATI ONAL WATER SUPPLY AND DRAI NAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
GRONTMIJ
A/S- DENMARK
INLET WATER METER
CHAMBER
A TENDER DOSSIER
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/04
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
DN 500
DN 500
DN 500
DN 500
DN 500
DN 500
0.000
4057

6520
MIN 600
MIN 400
SECTION A-A
PLAN VIEW
DN 900
MIN 2000
MIN 5000
A A
DN 900
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER
SUPPLY & SANITATION PROJECT
TITLE

GRONTMIJ
A/S- DENMARK
CASCADE AERATOR
A TENDER DOSSIER
DN 150
DN 150
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/05
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
SECTION C - C.
SECTION B - B.
B.
C.
PLAN VIEW
B.
B.
3757
GL +0000
3907
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
GRONTMIJ
A/S- DENMARK
A TENDER DOSSIER
DISTRIBUTION CHAMBER
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/06
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
PLAN VIEW
SECTION A - A.
A.
C.
C.
SECTION C - C.
M
in
1
0
0
0
A.
GL +0000 GL +0000
3527
3091
3527
GL +0000
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
GRONTMIJ
A/S- DENMARK
COAGULATION-FLOCCULATION-DECANTATION
A TENDER DOSSIER
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
DN 100
M
in
4
0
0
0
J K/DB/SWTP/07
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
C.
B.
B.
C.
PLAN VIEW PLAN VIEW
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
GRONTMIJ
A/S- DENMARK
A TENDER DOSSIER
FILTERS PLAN VIEW
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/09-A
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
SECTION B - B.
SECTION F - F.
SECTION C - C.
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
GRONTMIJ
A/S- DENMARK
A TENDER DOSSIER
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
GL +0000
3041
2841
2741
1700
FILTERS SECTION VIEW
J K/DB/SWTP/09-B
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
A
PLAN VI EW ABOVE TANK
C C
D
D
B
G
G
A
C C
B
D
D
F
M
i
n

3
2
0
0
0
Mi n. 10500
RESERVOIR "B"
RESERVOIR "A"
M
i
n
.

1
0
5
0
0
PUMPI NG STATI ON
ACCESS TO WALL VALVES
Mi n 43000
Min. 4000
Mi n. 5000
MI N 900 x 2100
Mi n. 4000
Min. 1000
GRATI NG
Min. 1500

DN 900
DN 700

SIGN. DATE DESCRIPTION REV.


NATI ONAL WATER SUPPLY AND DRAI NAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
GRONTMIJ
A/S-DENMARK
A TENDER DOSSIER
STORAGE TANK & PUMPING STATION
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
PLAN VI EW
J K/DB/SWTP/10-A
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
M
in
4
0
0
0
M
in
. 4
0
0
0
SECTI ON D-D
SECTI ON C-C
M
in
. 4
0
0
0
SECTI ON B-B
M
in
3
0
0
0
PUMPING SUMP
Min. 43000
RESERVOIR "B"
RESERVOIR "B" RESERVOIR "A"
Min. 4500
3
7
8
0
RESERVOIR "A" RESERVOIR "B"
Min. 1500
MIn. 10500
Min.10500 Min. 10500
PUMPI NG STATI ON
Min 3500
Min. 21000
500m
GL +0000
SIGN. DATE DESCRIPTION REV.
NATI ONAL WATER SUPPLY AND DRAI NAGE BOARD
NATIONAL WATER
SUPPLY
AND DRAINAGE
BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI
WATER SUPPLY &
SANITATION
PROJECT
TITLE
GRONTMIJ A/S-
DENMARK
A TENDER DOSSIER
STORAGE TANK & PUMPING STATION
-0250
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
0200
GL +0000
GL +0000
2500m 2500m
PUMPI NG STATI ON
PUMPING SUMP
M
in
7
0
0
J K/DB/SWTP/10-B
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
SECTI ON E-E
Backwash Tank
Ai r vent - Low
Backwash Tank
E
H
SECTI ON H-H
J IB CRANE
DN 900
SECTI ON B-B
SIGN. DATE DESCRIPTION REV.
NATI ONAL WATER SUPPLY AND DRAI NAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
GRONTMIJ
A/S- DENMARK
A TENDER DOSSIER
PLAN VIEW
B
B
MIN 7000
MIN 7000
BACK WASH WATER TANK
MIN 4000X1500
Backwash Tank
Backwash Tank
GL +0000
0150
0050
GL +0000
MIN 9000
0250
0050
MIN 7000
MIN 1500
MIN 4000

GL +0000

MIN 4000
MIN 2000
MIN 2000
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/11
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
CONTROL
ROOM
TOILETS
WORSHOP
SPARE PARTS
STORE ROOM
Al2S04
P
A
C
PAC STORAGE
SEPARATE
A
L
U
M
LIME
KMnO4
L
I
M
E
PLAN VI EW
A
A
P
O
L
Y
M
E
R
NaOH
Neutralization
T
o

S
lu
d
g
e
T
o

S
lu
d
g
e
POLYMER
F Vi ew s
MANHOLE WITH SYPHON SYSTEM
CONCRETE COVER
Min. 2000
Monorail
Min. 6000
SECTION WALL
Monorail
LOS
Chemical pipes channel
Min. 5500
M
in
. 1
5
0
0
0
OTHER
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
GRONTMIJ
A/S- DENMARK
CHEMICAL BUILDING PLAN VIEW
A TENDER DOSSIER
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/12-A
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
SECTI ON A-A
1
0
0
0
STORAGE
DOSI NG PUMP
6
0
0
PAC STORAGE
SEPARATE
DRAI NAGE CANAL
MIN. 600
Min. 1500
MIN. 600
APPROX 40000
ALUMI NI UM SULPHATE LI ME
APPROX. 40000
1
2
8
0
2000
2
1
0
0
2
4
0
0
x
H
t2
1
0
0
2
4
0
0
x
H
t2
1
0
0
2
4
0
0
DOSI NG PUMP
SLOPE
SLOPE
LI ME
1
0
0
M
in
. 5
0
0
0
800 800
SECTION WALL
800
Monor ai l Monor ai l
SECTI ON WALL
CONTROL ROOM - PLANT OPERATION - TECHNICAL DIRECTION
M
in
. 3
0
0
0
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
GRONTMIJ
A/S- DENMARK
CHEMICAL BUILDING SECTION VIEW
A TENDER DOSSIER
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
OTHER
GL +0000
J K/DB/SWTP/12-B
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
A
D
PLAN VIEW
3000 x 3350
3000 x 3350
1
0
0
0
Min. 10000
M
in
.

9
0
0
0
M
in

3
0
0
0
M
in
.

6
0
0
0
1000 1000
Min 4000 Min. 5000 Min. 13000
Min. 22000
6
2
5
F
D F
B
A
B
NEUTRALIZATION
SECTION F - F.
SECTION D - D.
M
in
.

5
0
0
0
1
0
0
To Sludge
CONTROL
ROOM
CHLORINATOR
ROOM
ROOM
GRATI NG
M
in
.

6
0
0
4
0
0
Min 1000
2
0
0
2
0
0
4
0
0
1
0
0
CHLORINE TANK
STORAGE
ROOM
800 800
8
0
0
8
0
0
GRATI NG GRATI NG
Min. 1000
Min. 1500
800
8
0
0
M
in

5
0
0
0
Ver t i c al mi x er
8
0
0
Drainage and Pumping Sump
Drainage and Pumping Sump
800
800
Drainage and Pumping Sump
Pre-Chlorination
Post-Chlorination
STORAGE
200
GL +0000
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER
SUPPLY & SANITATION
PROJECT TITLE
GRONTMIJ
A/S- DENMARK
CHLORINATION BUILDING
A TENDER DOSSIER
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/13-A
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
SECTION A - A.
SECTION B - B.
Min. 400
M
i
n

5
0
0
0
M
i
n
.

5
0
0
0
FI XED WI NDOW PANES
Neut r al i zat i on t ow er
ACCESS LADDER
Tr avel i ng l i f t i ng br i dge
Drainage and Pumping Sump
M
i
n

5
0
0
0
GL +0000
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS:
JAFFNA KILINOCHCHI WATER SUPPLY
& SANITATION PROJECT
TITLE
GRONTMIJ
A/S- DENMARK
CHLORINATION BUILDING
A TENDER DOSSIER
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/13-B
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
Recycling Tank
Min 7000
SECTI ON B-B
SIGN. DATE DESCRIPTION REV.
NATI ONAL WATER SUPPLY AND DRAI NAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
A
GRONTMIJ
A/S- DENMARK
RECYCLING TANK / 2 UNITS
TENDER DOSSIER
PLAN VI EW
Recycling Tank
M
i
n

7
0
0
0
B
E
B
H
Min. 9500
SECTI ON H-H
M
i
n

4
0
0
0
M
i
n

1
5
0
0
DN 900
Min. 9500
SECTI ON E-E
Recycling Tank
Min 3000x1500
Ai r vent - Low
J IB CRANE
MOBILE HAND RAIL
250m3
M
i
n

4
0
0
0
-0.700
Recycling Tank
250m3
-0.700
-0.475
-0.675
GL 0+000
GL 0+000
-0.700
250m3
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/14
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER
DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
SECTI ON E-E
PLAN VI EW
B
E
B
Sludge Tank
Sludge Tank
Mi n 3000 x 1500
Ai r vent - Low
H
Sludge Tank
Sludge Tank
SECTI ON H-H
Mi n. 5500
J IB CRANE
MOBILE HAND RAIL
TN+000.00
DN 200
m
i
n
1
4
0
0
SECTI ON B-B
Mi n. 5500
M
i
n
.

5
5
0
0
SIGN. DATE DESCRIPTION REV.
NATI ONAL WATER SUPPLY AND DRAI NAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
PRELIMINARY DESIGN
M
i
n

4
0
0
0
A
GRONTMIJ
A/S- DENMARK
SLUDGE BUFFER TANK
TENDER DOSSIER
Mi n. 5500
B
M
i
n

4
0
0
0
125 m3
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
LEVEL TO BE DEFINEDFOLLOWING THE SEDIMENTATION PROCESS
J K/DB/SWTP/15
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
A
GRONTMIJ
A/S- DENMARK
DRYING BEDS
ACCESS ROAD
D
D
E E
B B
PLAN VI EW
SECTI ON E-E
Approx. 3000
Min. 3200
Min. 10000
Manhole Slope Min. 0,5%
Min. 600x600
Conc r et e Sl ab
TENDER DOSSIER
Min 60m
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/16-A
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH
Slope 2% Slope 2%
SECTI ON B.-B.
DRAINAGE PIPE min. 110 - PVC
DRAINAGE LAYER
GEOTEXTILE
SAND 2-3mm
GRAVEL 8-12mm
GRAVEl 10-30mm
Min. 110 - P.V.C. Slope 2%
M
i
n
.

1
8
0
0
m
in
. 1
2
0
0
M
in
. 4
0
0
SECTI ON D-D
Prefabricated Concrete pannels
Min. 30m
Prefabricated
Manhole
Concrete Slab
GEOTEXTILE
Concrete Poles
Min 5000 Min 5000
Min 10000
SIGN. DATE DESCRIPTION REV.
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
NATIONAL WATER SUPPLY
AND DRAINAGE BOARD
CLIENT
CONSULTANTS
JAFFNA KILINOCHCHI WATER SUPPLY &
SANITATION PROJECT
TITLE
A
GRONTMIJ
A/S- DENMARK
DRYING BEDS
TENDER DOSSIER
NOTE: NOT AT SCALE - DIMENSION AS SHOWN
J K/DB/SWTP/16-B
DESIGNED DRAWN CHECKED RECOMMENDEDPRINCIPLE SUBJ ECT TO THE CONDITION
THAT THE DESIGN &BUILDCONTRACTOR IS RESPONSIBLE
FOR THE CONFORMITY OF THE DESIGN WITH FRACTIONAL
&STRUCTURAL REQUIREMENTS
SCALE
APPROVED
TEAMLEADER DRG.NO.
CONSULTANT
ENGINEER DESIGN CHIEF
DATE PROJ ECT DIRECTOR DATE
EGS EGS V.SATHEESKANTH

Вам также может понравиться