Вы находитесь на странице: 1из 1

BILL OF ENGINEERING MEASUREMENT& EVALUATION PROJECT TITLE: -STREET LIGHT INSTALLATIONS ALONG ASA DAM ROAD [FOSSIL OIL

TO OFFA GARAGE ROUND ABOUT],ILORIN

S/NO DESCRIPTIONS

QTY

UNIT

RATE

TOTAL

PRELIMINARIES AND GENERAL NOTES

THE CONTRACT SHALL BE THE LATEST REVISION OF THE NOMINATED SUB-CONTRACT AGREEMENT FOR USE WITH FIDIC CONDITIONS OF CONTRACT FOR CONSTRUCTION. THE TENDERER IS REFERRED TO THE CONTRACT DOCUMENT FOR FULL DESCRIPTIONS,INTENT AND MEANING OF THE ITEMS AND HE SHALL ALLOW WHATEVER COSTS AND CHARGES NECESSARY FOR THE EXECUTION AND DUE OBSERVANCE OF THE PROVISIONS THEREOF.

ALLOW THE LUMP SUM FOR SITE MOBILISATION/ ESTABILISHMENT COSTS

2,

ALLOW THE LUMP SUM FOR MANAGEMENT OF THE WOR!S PROGRAMMING ,ATTENDING SITE MEETINGS DURING ENTIRE CONTRACT PERIOD AND PROVIDING SAMPLES AS MAY BEREQUIRED

2,

"

ALLOW FOR THE PRODUCTION OF INSTALLATION #AS BUILT DRAWINGS# &2 COPIES IN ELECTRONICS FORMAT 'FLASH DRIVE( &) SETS OF HARD PRINTED PAPER COPIES

1,$% ,

ALLOW FOR PRO*ECT DOCUMENTATIONS,OPERATIONS/ MAINTENANCE MANUALS AND SCHEDULES+ &2 COPIES IN ELECTRONICS FORMAT 'FLASH DRIVE( &) SETS OF HARD PRINTED PAPER COPIES

$% ,

ALLOW FOR CONSTRUCTION GUARANTEE COSTS

1,12%,

ALLOW FOR COSTS RELATED TO ALL INSURANCES AS REQUIRED BY THE CONTRACT

2,$% ,

SUB-TOTAL SP/CON./ASA DAM/PG.NO1 OF PG.7