I/P 1 COSTING
ENGG.ACTIVITIES
PUR.ACTIVITIES
PUR.ACTIVITIES
PDN.ACTIVITIES
QAD.ACTIVITIES
STOR.ACTIVITIES
STOR.ACTIVITIES
ACC.ACTIVITIES
ENQUIRY REGESTRATION
IF NOT FISIBLE
IF FISIBLE WORK
ANALYSIS REPORT FOR NONFISIBILITY REQUIRED IMPLIMENTATION PROPOSAL ENGINEERING SUPPORT FOR SIZING & PROJECT DETAILING
COMMERTIAL FINALISATION CHANGES IN BOM & PRICING IF REQUIRED COMMERTIAL PURCHASE ORDER RECEIVED. ENGINEERING ACTIVITY STARTS FOR PHASE I
WORK SHEET PREPARATION & RELEASE TO PURCHASE FOR SHEET METAL, FABRICATION WORK & ASSEMBLY
FABRICATION ACTIVITY STARTS ( SHEETS CUTTING, BENDING, DRILLING, TAPPING, WELDING ETC), CONTROL PANEL, CANOPY MANUFACTURING STARTS
FABRICATION FINISH
FINAL ELECTRICAL & MECHANICAL ( CANOPY + GENERATOR, CONTROL PANEL ) DRAWINGS SEND TO CUSTOMER FOR APPROVAL
INSPECTION O.K. THEN ASSEMMBLY / GENERATOR ALTERNATOR COUPLING, BASE MOUNTING, MAKING BRACKETS FOR GENERATORS PARTS ( IF APPLICABLE)
UPDATED BOM PRODUCTION COPY OF RELEASED TO DRAWING RELEASED PRODUCTION , STORES TO PRODUCTION & PURCHASE
ENGINE HARNESS, LOOSE PARTS CONTROL PANEL, ASSEMBLY RELEASED CANOPY RELEASED TO TO PRODUCTION PRODUCTION
ROUTINE TESTS