ANLISIS DE COSTOS

1) PARTIDA
UNIDAD
RENDIMIENTO
DESCRIPCIN
OPERARIO
PEON
DESG. HERRAMIENTAS

: RETIRO DE PISO VINLICO.


: M2
: 60 M2/DA.
Costo Unitario Directo (M2)
S/.
1.05
UND.
CANTIDAD
PRECIO
PARCIAL
SUB TOTAL
ML.
0.133
4.50
0.60
HH.
0.133
3.01
0.40
1.00
%
0.050
1.00
0.05
0.05

: PISO VINLICO.
2) PARTIDA
: M2
UNIDAD
: 30 M2/DA.
RENDIMIENTO
Costo Unitario Directo (M2)
S/. 29.68
DESCRIPCIN
UND.
CANTIDAD
PRECIO
PARCIAL
SUB TOTAL
VINLICO PARACAS
M2.
1.050
23.50
24.68
PEGAMENTO PARA VINLICO
GLN.
0.100
29.00
2.90
27.58
OPERARIO
HH.
0.266
4.50
1.20
PEON
HH.
0.266
3.01
0.80
2.00
DESG. HERRAMIENTAS
%
0.050
2.00
0.10
0.10
3) PARTIDA
UNIDAD
RENDIMIENTO
DESCRIPCIN
LIJA METLICA
OPERARIO
PEON
DESG. HERRAMIENTAS

: DESPINTADO DE MUROS INTERIORES.


: M2
: 25 M2/DA.
Costo Unitario Directo (M2)
S/.
2.56
UND.
CANTIDAD
PRECIO
PARCIAL
SUB TOTAL
HJA.
0.020
2.00
0.04
0.04
HH.
0.320
4.50
1.44
HH.
0.320
3.01
0.96
2.40
%
0.050
2.40
0.12
0.12

4) PARTIDA
UNIDAD
RENDIMIENTO
DESCRIPCIN
PEGAMENTO PVC
CINTA TEFLN
OPERARIO
PEON
DESG. HERRAMIENTAS

: SALIDA PARA AGUA FRA.


: PTO
: 12 PTO/DA
Costo Unitario Directo (PTO.) S/.
6.01
UND.
CANTIDAD
PRECIO
PARCIAL
SUB TOTAL
GLN.
0.010
36.00
0.36
PZA.
0.040
9.90
0.40
0.76
HH.
0.666
4.50
3.00
HH.
0.666
3.01
2.00
5.00
%
0.050
5.00
0.25
0.25

VALORIZACIN

OBRA

: "AMPLIACIN CENTRO DE SALUD ACOBAMBA".

FECHA

: MARZO - 2000.

COSTOS
PARTIDA

DESCRIPCIN

UND. METRADO
P. UNIT.

P. PARCIAL

TOTAL

03.00.00 MOVIMIENTO DE TIERRAS:


03.05.00 ELIMINACIN DE MATERIAL EXCEDENTE.

M3.

458.50

7.07

3,241.60

3,241.60

09.01.00 RETIRO DEL VINLICO

M2.

175.60

1.05

184.38

09.03.00 PISO VINLICO

M2.

175.60

29.67

5,210.05

5,394.43

M2.

2.88

115.57

332.84

332.84

PZA.

6.00

2.00

12.00

12.00

16.01.00 DESPINTADO DE MUROS INTERIORES

M2.

80.00

2.56

204.80

16.02.00 PINTURA ESMALTE EN INTERIORES

M2.

80.00

8.35

668.00

872.80

UND.

2.00

70.08

140.16

140.16

PTO.

20.00

6.01

120.20

120.20

09.00.00 PISOS Y PAVIMENTOS:

12.00.00 CARPINTERA DE MADERA:


12.01.00 PUERTA CONTRAPLACADA - TRIPLAY
14.00.00 CERRAJERA:
14.01.00 BISAGRA CAPUCHINA
16.00.00 PINTURA:

17.00.00 APARATOS SANITARIOS:


17.01.00 DUCHA CROMADA
18.00.00 INSTALACIONES SANITARIAS:
18.04.00 SALIDA PARA AGUA FRA (REPARACIONES)

COSTO DIRECTO

S/. 10,114.03

CRONOGRAMA DE EJECUCIN FINANCIERA


PROYECTO :
OBRA
:
MODALIDAD :
FECHA
:

PARTIDA

DESARROLLO EDUCATIVO TAYACAJA


Constr. ISTE-PAMPAS
ADMINISTRACIN DIRECTA
Marzo del 2001
ESPECIFICACIN

01.00.00 OBRAS PRELIMINARES


02.00.00 TRABAJOS PRELIMINARES
03.00.00 MOVIMIENTO DE TIERRAS
04.00.00 OBRAS DE CONCRETO SIMPLE
05.00.00 OBRAS DE CONCRETO ARMADO:
05.01.00 ZAPATAS
05.02.00 COLUMNAS
05.03.00 VIGAS
05.04.00 LOSA ALIGERADA
05.05.00 ESCALERA
05.06.00 COLUMNETAS
06.00.00 MUROS Y TABIQUERAS
07.00.00 CIELO RASO
08.00.00 REVOQUES Y ENLUCIDOS
09.00.00 PISOS Y CONTRA PISOS
10.00.00 ZCALOS Y CONTRA ZCALOS
11.00.00 REVESTIMIENTO DE ESCALERAS
12.00.00 CARPINTERA DE MADERA
13.00.00 CARPINTERA METLICA
14.00.00 CERRAJERA
15.00.00 VIDRIOS Y CRISTALES
16.00.00 PINTURAS
17.00.00 SALIDA DE ELECTRICIDAD Y FUERZA
18.00.00 COBERTURA
19.00.00 SISTEMA DE PUESTA A TIERRA
20.00.00 INSTALACIONES SANITARIAS:
20.01.00 SISTEMA DE AGUA FRA
20.02.00 SISTEMA DE DESAGE
20.03.00 APARATOS SANITARIOS
TOTAL COSTO DIRECTO
GASTOS GENERALES (9.00%)
GASTOS DE SUPERVISIN (3.00%)
GASTOS ADMINISTRATIVOS (3.00%)
TOTAL PRESUPUESTO

COSTO
TOTAL
249.50
673.64
1,429.55
4,610.23
6,399.80
10,857.69
23,039.02
25,295.04
1,957.43
6,000.49
10,344.67
3,881.48
12,835.97
10,722.59
4,972.54
2,381.33
1,845.06
6,292.95
433.60
2,525.22
5,021.52
3,690.08
4,076.57
589.66

ABRIL

MAYO

JUNIO

249.50
673.64
1,429.55
4,610.23
6,399.80
10,857.69
13,039.02
15,200.00
1,957.43
3,000.00
2,083.14

10,000.00
10,095.04
3,000.49
8,261.53
5,055.99
10,722.59
2,381.33
6,292.95

3,881.48
7,779.98
4,972.54
1,845.06
433.60
2,525.22
5,021.52

3,690.08
4,076.57
589.66

417.95
794.42
1,662.00
153,000.00
16,200.00
5,400.00
5,400.00

59,500.00
6,300.00
2,100.00
2,100.00

59,500.00
6,300.00
2,100.00
2,100.00

417.95
794.42
1,662.00
34,000.00
3,600.00
1,200.00
1,200.00

180,000.00

70,000.00

70,000.00

40,000.00

CRONOGRAMA DE EJECUCIN FSICO


OBRA

: Constr. ISTE -PAMPAS

ANALISTA : - B/ING. JORGE GUISBERT DELGADO


FECHA

: MARZO DEL 2001

PARTIDA

ABRIL

DESCRIPCIN
1

01.00.00 OBRAS PRELIMINARES


02.00.00 TRABAJOS PRELIMINARES
03.00.00 MOVIMIENTO DE TIERRAS
04.00.00 OBRAS DE CONCRETO SIMPLE
05.00.00 OBRAS DE CONCRETO ARMADO:
05.01.00 ZAPATAS
05.02.00 COLUMNAS
05.03.00 VIGAS
05.04.00 LOSA ALIGERADA
05.05.00 ESCALERA
05.06.00 COLUMNETAS
06.00.00 MUROS Y TABIQUERAS
07.00.00 CIELO RASO
08.00.00 REVOQUES Y ENLUCIDOS
09.00.00 PISOS Y CONTRA PISOS
10.00.00 ZCALOS Y CONTRA ZCALOS
11.00.00 REVESTIMIENTO DE ESCALERAS
12.00.00 CARPINTERA DE MADERA
13.00.00 CARPINTERA METLICA
14.00.00 CERRAJERA
15.00.00 VIDRIOS Y CRISTALES
16.00.00 PINTURAS
17.00.00 SALIDA DE ELECTRICIDAD Y FUERZA
18.00.00 COBERTURA
19.00.00 SISTEMA DE PUESTA A TIERRA
20.00.00 INSTALACIONES SANITARIAS:
20.01.00 SISTEMA DE AGUA FRA
20.02.00 SISTEMA DE DESAGE
20.03.00 APARATOS SANITARIOS

MAYO
4

JUNIO
4

PRESUPUESTO ANALTICO
SECTOR

: 25 PRESIDENCIAL

PLIEGO

: 447 CTAR - HUANCAVELICA

FUNCIN

: 09 EDUCACION Y CULTURA

PROGRAMA

: 061 INFRAESTRUCTURA EDUCATIVA

SUB - PROGRAMA : 0174 EDIFICACIONES ESCOLARES


OBRA

: CONSTR. ISTE - PAMPAS

MOD. DE EJEC.

: ADMINISTRACIN DIRECTA

ANALISTA

: B/ING. JORGE GUISBERT DELGADO

ESC. DE GASTOS

DESCRIPCIN

10 Retribuciones y Complementos contratos a plazo fijo


11 Obligaciones del Empleador
13 Gastos Variables y Ocasionales
20 Viaticos y Asignaciones
22 Vestuario
23 Combustible y Lubricantes
24 Alimentos de Personas
26 Provisin de Materiales : explosivos y municiones
27 Servicios no personales
29 Materiales de Construccin
30 Bienes de Consumo
31 Materiales de distribucin Gratuita
32 Pasajes y gastos de Transporte
33 Servicios de Consultoria
34 Contratacin con Empresas de Servicio
35 Arrendamiento Financiero

META

ABRIL

MAYO

JUNIO

SUB-TOTAL

TOTAL

36 Tarifas de Servicio
37 Alquiler de Bienes