Вы находитесь на странице: 1из 9

Substation Automation Products Training

Product Integration Course Network setup

ABB Power Technologies AB, 2005 2006-03-30 1

Substation Automation Products Training

Contents Network setup

Network setup

Network layout

Define the IP-address for all included nodes within the network
Configure and parameterize the switch Test the communication

ABB Power Technologies AB, 2005 2006-03-30 2

Substation Automation Products Training

Training System architecture

Station HSI, MicroSCADA Pro 9.1.5 Engineering Workstation PCM600 + CCT

IP Adress: 110.111.112.99

IP Adress: 110.111.112.98 IP Adress: 110.111.112.100

Fibre connections

ABB Power Technologies AB, 2005

Line Bay REC670 IP Adress:110.111.112.10


2006-03-30 3 Substation Automation Products Training

Bus Coupler Bay REC670 IP Adress:110.111.112.11

Network setup

Define IP-address for the computers

ABB Power Technologies AB, 2005 2006-03-30 4

Substation Automation Products Training

Network setup

Define IP-address for the computers

ABB Power Technologies AB, 2005 2006-03-30 5

Substation Automation Products Training

Network setup

Define IP-address for the IEDs

HMI -> Select Settings


General Settings Communication TCP-IP configuration Rear OEM - Port AB IP-address

ABB Power Technologies AB, 2005

Note: Do not forget to activate the port

Change the Link from OFF to OEM311_AB

2006-03-30 6

Substation Automation Products Training

Network setup

Test the communication

ABB Power Technologies AB, 2005 2006-03-30 7

Substation Automation Products Training

Network setup

Exercise time.

Exercise 1