Вы находитесь на странице: 1из 4

Designing a purchase

module indicating all the


parameters along with
linkages
Mango pulp processing
Mango pulp production
The group has decided to make a procurement design for Sugarcane (Saccharum officinarum)
cultivation.

1. Master Production Schedule

March April May June


Monthly demand for Mango pulp(kg) 200 400 500 300
Working days in a month 23 23 23 23
MPS daily demand for Mango pulp(kg) 9 17 22 13

2. Production schedule:

M on
th s W e e k

S e le c tio n
Feb 1 p ro d u c ti
3. Bill of material (BOM):

C om p onen t
W a te r tu b s
Material Requirement Planning (MRP II):

1. Source finding:
Materials
Bank loan
Processing equipment
Source
IDBI
DCF

T u b e lig h t s e t
Water tubs XZY
Tube light set ABC
Bottles BVB
Labels GHG
KMS KLJ
Fresh/Damaged Mangoes(Raw material) Identified local farmers
No Objection Certificate(NOC) Police and Gram panchayat

M a n g o p u lp in g
Labours Locals
Vendors Locals/Dealers/Wholesalers/Commission agents

2. Indenting:

• Raw material (Mangoes): Indenting period should be 15-20 days for raw
mangoes(depends on variety)

B o ttle s
• Sugar/Salt: Indenting period should be 1 month

Quality control:

Mangoes: Varietal standards: Alphonso, Kesar and Totapuri


Composition:
Parameter Specification
T.S.S 14-18 brix

L a b e ls
Acidity 0.7%
pH 3.6-4.2

Procurement Process:

Vendor rating
Done for mangoes, KMS and Sugar on the basis of cost involved, quality supplied, inventory
kept, relationship, pricing, discounts etc

Bin Card

Bin card of the following format will be prepared for the mango pulp bottles
Date Mango bottles Inventory Total bottles Bottles sold Balance
received quantity

Вам также может понравиться