CALCULO DEL FLETE TOTAL

OBRA: "MEJORAMIENTO DEL PAVIMENTO RIGIDO Y VEREDAS DE LAS CALLES DEL DISTRITO DE MACHE OTUZCO - LA LIBERTAD"
ENTIDAD: MUNICIPALIDAD DISTRITAL DE MACHE
N

MATERIALES

UND.

CANTIDAD

PESO (kg)

22,133.65

42.50

272.63

1.00

858.77

1.00

kg

927.79

1.00

pza

25.00

0.10

15.33

0.10

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

4,790.98

1.00

ANGULO DE ACERO LIVIANO DE 1" X 1" X 1/8" X 6 m

5,279.86

7.25

TUBERIA DE FIERRO GALVANIZADO D= 1/2", e=3 mm

8,711.77

7.62

10

CAJA DE CONCRETO PARA AGUA

168.00

45.00

11

CAJA DE CONCRETO PARA DESAGUE

168.00

65.00

12

YESO DE 28 Kg

bls

123.83

13

HORMIGON (PUESTO EN OBRA)

m3

0.36

14

SOLDADURA CELLOCORD 1/8"

kg

923.98

1.00

15

MADERA TORNILLO HABILITADO

p2

12,565.82

2.40

16

ESTACA MADERA 2" x 2" x 1"

pza

1,238.30

0.50

17

TRANQUERA

30.00

45.00

18

TRIPLAY DE 4' X 8' X 12 mm

pl

24.53

6.00

19

ARENA FINA

M3

40.41

1500.00

20

PIEDRA CHANCADA DE 1/2"

M3

2,023.78

2000.00

21

ARENA GRUESA

M3

1,449.64

1450.00

22

ASFALTO RC-250

GAL

1,340.87

16.00

CEMENTO
ALAMBRE NEGRO RECOCIDO # 16

Bolsa
kg

ALAMBRE NEGRO RECOCIDO # 8

kg

CLAVOS PARA MADERA CON CABEZA DE 3"

PERNO HEXAGONAL DE 3/4" X 3 1/2"

PERNO HEXAGONAL DE 1/2" X 12"

28.00
1700.00

PESO TOTAL DE MATERIALES EN KILOGRAMOS (kg)

UNIDAD DE TRANSPORTE

UND

CANTIDAD

CAPACIDAD DEL CAMION (M3)

M3

15.00

CAPACIDAD DEL CAMION (KG)

KG

25,500.00

COSTO DEL FLETE POR KG (*)

KG

0.094

COSTO TOTAL DEL FLETE


(*) Ver Hoja de calculo de valor de flete por Kg

PESO

7,339,563.44

ITO DE MACHE -

PARCIAL

940,680.15
272.63
858.77
927.79
2.50
1.53
4,790.98
38,278.99
66,383.68
7,560.00
10,920.00
3,467.24
612.00
923.98
30,157.98
619.15
1,350.00
147.16
60,616.95
4,047,560.00
2,101,978.00
21,453.98
7,339,563.44

TOTAL

689,918.96

689,918.96