H P = = HOLD (100% WITNESS) APPROVAL REQUIRED PREPARED W1 = W2 = 100% WITNESS SPOT WITNESS M =
PAGES:
MONITOR PROCESS/RANDOM CHECK
1 OF 10
0 0
REVIEW REPORT/ DOCUMENT/ APPROVED NOT APPLICABLE
AR =
N/A =
NO 1
INSPECTION
Documentary Review (if required)
ACCEPTANCE CRITERIA
CHARACTERISTIC TO BE VARIFIED
REPORT FORMAT
INSPECTION FREQUENCY
STATUS
a) Welding Procedure Specification (WPS) b) Procedure Qualification Record (PQR) c) Welder Qualification Test Certificate d) Drawing 2 Material Verification a) Material Receiving Inspection (MRI) b) Visual Inspection As Per Material Specified As Per Standard ASME IX
WHK Procedures Mechanical Test Visual, Radiography Examination & Mechanical Test As Per Requirement
P P P -
10% Dimensional, Appearance & Heat No. Mechanical & Chemical properties Tube size (I.D,O.D & length) Mill Certificates 10%
M M
R/A R/A
New Thermocouple Installation a) Thermocouple TS-7 ASME B31.3 b) Thermocouple TS-8 Thermocouple protrud & alignment Thermocouple condition Weld Defect 100% M M/R/A 100% M M/R/A
Non Destructive Examination (Shop) if any a) Dye Penetration Testing (DPT) ASME V As Per Specified Drawing As Per Client Requirement Surface weld defect Dimension & Appearance Clearing all items in punch list Certification & Records Acceptability & Completion of document Mill Certificates, NDT, Box-up cert. all signed off 100% P R/A DPT Report Report 100% 100% R/W2 W2/M R/A R/A
5 6
Client Requirement
Report Document
100%
R/A
Rev.
Date
Revision Description
Prepared By
Reviewed By
Approve By
0 0
REVIEW REPORT/ DOCUMENT/ APPROVED NOT APPLICABLE
REMARKS
i) Approve WPS, PQR & WQT ii) Inspect & evaluate all RT report