CONEXIONES DESCARGA REACTOR A TK.

REACTOR 1

1198.7

N
9 5. 3 4
50 1. 5

3 4"

3 4"

300.0

BOMBA A INTERCAMBIADOR DE UNIDAD RECUPERADORA DE METANOL


1198.7
553.3

62 8.5
38 8.5

G
33 0.0

BOMBA
50 1. 5

500.0

9 5. 1 9

150.0 149.9

50 1. 5

0.0 4 2

40 8.5

SISTEMA DE PESAJE 4 UNIDADES

120.0

F REACTOR 2 1-4"
119.3
3 4" 1 3 4"

29 5.1

38 8.5 40 8.5

1 2"

BOMBA
1 3. 4 7

30 0.0

62 8.5

33 0.0

0.0 4 2

E
120.0

18 0. 0 27 4. 6

60 0. 0

210.7

50 1. 5

224.2

0.0 0 10 9 7. 5 11

1202.0

0.0 0 8

38 8.5 BOMBA
553.3

1-4" BOMBA
0 0. 5 1

11 00 .0

40 8.5

1091.3

60 0. 0

225.0

CONEXION DESCARGA TK. CATALIZADOR METANOL

1-4"
1 2"

26 2.1
3 4"

18 0. 0

62 8.5

BOMBA
239.3
1 1-4"

1 1-4"

6.0 7 25

1416.9

1657.1

1-4"

BOMBA
1 1-4"
26 7. 7 29 5. 1 55 8. 8

55 8. 8

26 7. 7

239.3

117.3

BOMBA

6.0 7 25 110

0. 0

3 4"

80.0

5.6 7 25
11 00 .0

DRENAJE REACTORES
1 2"

BOMBA 1-4"
1

NOTAS: 1-ANTES DE LA PREFABRICACION EL CONTRATISTA VERIFICARA EN SITIO LAS DIMENSIONES DE LOS ISOMETRICOS Y LAS POSIBLES INTERFERENCIAS PARA EL MONTAJE DE LAS TUBERIAS. 2-EL CONTRATISTA PREVEERA LA SOBRELONGITUD PARA EL AJUSTE EN EL MONTAJE DE LAS TUBERIAS. 3-EL CONTRATISTA TENDRA A SU CARGO LAS PRUEBAS DE INSPECCION RADIOGRAFICA DE SOLDADURAS EN LINEAS Y PRUEBAS HIDROSTATICAS DE EQUIPOS. 4-EL CONTRATISTA UBICARA SISTEMAS SMS. EN CAMPO NECESARIAS DE TAL FORMA QUE SE FACILITE EL MONTAJE Y DESMONTAJE DE TUBERIAS Y EQUIPOS. 5-MATERIAL: ACERO INOX-AISI-316L SCH-10S 12 11 10 9 8

12 25 .0

117.3

0.0 0 14

CONEXION DESCARGA TK. METANOL PURO

CONEXION DESCARGA TK. ACEITE BLANQUEADO


140.7
8.0 3 29
DIBUJO REVISO APROBO VERIFICO

OPEREZ. LFGUTIERREZ.

26-08-2013 26-08-2013

PROYECTO

PLANTA DE BIODIESEL BARRANQUILLA


CONTIENE

* VER PLANO CON EQUIPOS.


7 6 5 4 3

FORM.

ISO LINEAS SISTEMA DE PESAJE PROCESO PL-ISO-027 A-1


PLANO N

REV

ESCALA

1:1

MEDIDAS

mm/pulg