Академический Документы
Профессиональный Документы
Культура Документы
11
10
1 H
REACTOR 1
1198.7
N
9 5. 3 4
50 1. 5
3 4"
3 4"
300.0
62 8.5
38 8.5
G
33 0.0
BOMBA
50 1. 5
500.0
9 5. 1 9
150.0 149.9
50 1. 5
0.0 4 2
40 8.5
120.0
F REACTOR 2 1-4"
119.3
3 4" 1 3 4"
29 5.1
38 8.5 40 8.5
1 2"
BOMBA
1 3. 4 7
30 0.0
62 8.5
33 0.0
0.0 4 2
E
120.0
18 0. 0 27 4. 6
60 0. 0
210.7
50 1. 5
224.2
0.0 0 10 9 7. 5 11
1202.0
0.0 0 8
38 8.5 BOMBA
553.3
1-4" BOMBA
0 0. 5 1
11 00 .0
40 8.5
1091.3
60 0. 0
225.0
1-4"
1 2"
26 2.1
3 4"
18 0. 0
62 8.5
BOMBA
239.3
1 1-4"
1 1-4"
6.0 7 25
1416.9
1657.1
1-4"
BOMBA
1 1-4"
26 7. 7 29 5. 1 55 8. 8
55 8. 8
26 7. 7
239.3
117.3
BOMBA
6.0 7 25 110
0. 0
3 4"
80.0
5.6 7 25
11 00 .0
DRENAJE REACTORES
1 2"
BOMBA 1-4"
1
NOTAS: 1-ANTES DE LA PREFABRICACION EL CONTRATISTA VERIFICARA EN SITIO LAS DIMENSIONES DE LOS ISOMETRICOS Y LAS POSIBLES INTERFERENCIAS PARA EL MONTAJE DE LAS TUBERIAS. 2-EL CONTRATISTA PREVEERA LA SOBRELONGITUD PARA EL AJUSTE EN EL MONTAJE DE LAS TUBERIAS. 3-EL CONTRATISTA TENDRA A SU CARGO LAS PRUEBAS DE INSPECCION RADIOGRAFICA DE SOLDADURAS EN LINEAS Y PRUEBAS HIDROSTATICAS DE EQUIPOS. 4-EL CONTRATISTA UBICARA SISTEMAS SMS. EN CAMPO NECESARIAS DE TAL FORMA QUE SE FACILITE EL MONTAJE Y DESMONTAJE DE TUBERIAS Y EQUIPOS. 5-MATERIAL: ACERO INOX-AISI-316L SCH-10S 12 11 10 9 8
12 25 .0
117.3
0.0 0 14
OPEREZ. LFGUTIERREZ.
26-08-2013 26-08-2013
PROYECTO
FORM.
REV
ESCALA
1:1
MEDIDAS
mm/pulg