Activity
Man-power
Man-power Required
Valve Pit External plastering Terrace Screed Concrete Doors,windows & Rolling Shutter,Louvers Plinth Protection & Drains Valve pit Doors,windows & Rolling Shutter,Louvers Plinth Protection & Drains Rain Water Pipe Hydro Test Base Slab Flooring
GANG-1 GANG-2 GANG-2 GANG-3 GANG-2 GANG-11 GANG-3 GANG-2 GANG-6 GANG-8 GANG-4 GANG-4 GANG-7 GANG-8 GANG-1
Cover Slab Screed Concrete Water Proofing 3 Coats of Bitumin For RCC Wall Staircase
clarriflooculator
Chamber Above Sludge Pump,Flash Mixer Chamber,Outlet Channel to CWST,RC Walkway (Balance Slab)
GANG-1
Water Proofing Coat 3 Coats of Bitumin For RCC Wall collumn upto ground floor ground flor slab Centifuge Building
GANG-8
Centifuge Building
collumns upto first floor slab first floor slab rcc brickwork plastering grad slab Collumns Up To Roof Slab Roof Slab Staircase Pedestal At +3.95 Mtr. Walkway Collumns And Slab Darins(+3.95) Flooring Brick Work & lintels Plastering Inner & Outer Painting Doors & Windows Rain Water Down Take Pipe Terrace Water Proofing Plinth Protection & Drains Raft First lift RCC wall upto base slab Base Slab 2nd lift RCC wall raft RCC Wall
GANG-9 GANG-9 GANG-10 GANG-2 GANG-9 GANG-11 GANG-11+GANG-5 GANG-5 GANG-5 GANG-5 GANG-5 GANG-5 GANG-5+GANG-2 GANG-2 GANG-7 GANG-3 GANG-6 GANG-6 GANG-2 GANG-12 GANG-12 GANG-12 GANG-9 GANG-13 GANG-13
Chemical House
Thickner
DM PLANT BUILDING
Grad Slab at Veseel GANG-5+GANG-9 Foundation RR Masonry at Drains & Cable Trench GANG-2 Outlet Doors,windows & Rolling GANG-3 Shutter,Louvers Painting GANG-7 Flooring(IPS) Staircase GANG-5
DM PLANT BUILDING
Inner Plastering
outer Plastering Rain Water Downtake Pipe control room plastering Monorail
GANG-13 GANG-15 GANG-15 GANG-15 GANG-15 GANG-15 GANG-16 GANG-15+GANG16 GANG-16 GANG-16 GANG-14
Degasser
Grad Slab & Pump Foundation Plinth Beam Plastering RCC Wall Cover Slab
Hydro Test & Water Proofing Screed Concrete & Flooring Dike Wall
GANG-14
N-Pit
GANG-7 GANG-17
RO Reject Water Storage Tank Sludge Holding Tank Lamella Clarifier ETP Clarified Water Storage Tank RO Building Guard Pond
GANG1,14,11,5,13,15,16 ,12 WILL BE all activities Related ENGAGED IN CIVIL to ETP will start in WORK OF ETP January month AREA IN STARTING OF JANUARY MONTH
external plastering (west side) external plastering(south side) external plastering(north side) Brickwork(Elevator) staircase,collumns & floor slab elevator brickwork & plastering Ips flooring (ground) Ips flooring (first floor) Ips flooring (third floor) terrace water proofing SST-Burnt Oil Pit precast slab for trench GT transformer flooring for UAT & GT Transformer maintainance bay work Burnt oil pit-1 painting plinth protection
Gang-18 Gang-18
Gang-18 Gang-18 Gang-19 GANG-14 GANG-20 GANG-20 GANG-20 GANG-21 GANG-22 GANG-23 GANG-23+GANG24 GANG-23 GANG-23+GANG24 GANG-25 GANG-24
Switchgear Building
GTG
GANG-26
IPS Flooring GANG-27 Brickwork plastering GANG-23+GANGinside outside & 28 ceiling GANG-23+GANGparapit wall 28 water proofing,doors,windo ws IPS Flooring GANG-26 GANG-27 GANG-28 GANG-28 GANG-28 GANG-29
GANG-30
Switchyard
STG
GANG-29 GANG-27+GANGArea Grading 30 Metering room GANG-30 AFTER Balance Cable trench BACKFILLING IN SOUTH SIDE Plastering GANG-31 Floor Screeding GANG-31 UAT Fire wall GANG-31 GANG-31+GANGHot Well 24 GANG-31+GANGSwas Building 24 Aux. Equipment GANG-27+GANGFoundation 31 Balance Grad Slab GANG-31 Pump & Motor GANG-32 Foundations Cable trench from Switchgear Building To Acw pump house Pipe Cum Cable Trench(Including WTP Area) GANG-33
GANG-34
MANPOWER DEATIL GROUP GANG-1 GANG-2 GANG-3 GANG-4 GANG-5 GANG-6 GANG-7 GANG-8 GANG-9 GANG-10 GANG-11 GANG-12 GANG-13 GANG-14 GANG-15 GANG-16 GANG-17 GANG-18 GANG-19 GANG-20 GANG-21 GANG-22 GANG-23 GANG-24 GANG-25 GANG-26 GANG-27 GANG-28 GANG-29 GANG-30 GANG-31 GANG-32 GANG-33 GANG-34 TOTAL MANPOWER REQUIRED MANPOWER STATUS AT PRESENT MASSON (REQUIRED) 10 2 3 10 20 3 5 4 5 5 3 70 CARPENTER (REQUIRED) 4 5 5 4 8 5 3 4 2 10 3 5 4 5 10 15 92 BARBENDER (REQUIRED) 6 3 3 4 8 3 3 4 2 5 3 5 4 5 5 10 73 UNSKILLED/HEL PER (REQUIRED) 8 12 10 5 5 3 8 15 8 15 5 5 4 20 20 15 6 8 8 4 5 6 5 10 15 15 240
69
87
67
231
OTHERS (REQUIRED) 5 3 10 4 5 15 10 8 4 64
539 485
31
S.no
Area
completion date
25/12/2013 26/12/2013
GT transformer flooring
GTG
for UAT & GT Transformer maintainance bay work Burnt oil pit 1&2 IPS Flooring painting plinth protection water proofing,doors,windows rolling shutter IPS Flooring Brickwork plastering inside outside & ceiling parapit wall water proofing,doors,windows IPS Flooring IDCT hydro test & chemical dosing brickwork parapit wall floor finishing 10/1/2014 25/12/2013 28/1/2014 15/01/2014 17/01/2014
20/01/2014 29/12/2013
fencing
Remarks