Area

Activity

Man-power

Man-power Required

Start & Completion Date 17/Dec/13

Fire & Raw Water Pump House

Clarifier water pump house

Valve Pit External plastering Terrace Screed Concrete Doors,windows & Rolling Shutter,Louvers Plinth Protection & Drains Valve pit Doors,windows & Rolling Shutter,Louvers Plinth Protection & Drains Rain Water Pipe Hydro Test Base Slab Flooring

GANG-1 GANG-2 GANG-2 GANG-3 GANG-2 GANG-11 GANG-3 GANG-2 GANG-6 GANG-8 GANG-4 GANG-4 GANG-7 GANG-8 GANG-1

Clarified Water Storage Tank

Cover Slab Screed Concrete Water Proofing 3 Coats of Bitumin For RCC Wall Staircase

clarriflooculator

Chamber Above Sludge Pump,Flash Mixer Chamber,Outlet Channel to CWST,RC Walkway (Balance Slab)

GANG-1

Water Proofing Coat 3 Coats of Bitumin For RCC Wall collumn upto ground floor ground flor slab Centifuge Building

GANG-8

GANG-4 GANG-1 GANG-2

Centifuge Building

collumns upto first floor slab first floor slab rcc brickwork plastering grad slab Collumns Up To Roof Slab Roof Slab Staircase Pedestal At +3.95 Mtr. Walkway Collumns And Slab Darins(+3.95) Flooring Brick Work & lintels Plastering Inner & Outer Painting Doors & Windows Rain Water Down Take Pipe Terrace Water Proofing Plinth Protection & Drains Raft First lift RCC wall upto base slab Base Slab 2nd lift RCC wall raft RCC Wall

GANG-9 GANG-9 GANG-10 GANG-2 GANG-9 GANG-11 GANG-11+GANG-5 GANG-5 GANG-5 GANG-5 GANG-5 GANG-5 GANG-5+GANG-2 GANG-2 GANG-7 GANG-3 GANG-6 GANG-6 GANG-2 GANG-12 GANG-12 GANG-12 GANG-9 GANG-13 GANG-13

Chemical House

Thickner

Common Sludge Sump

DM PLANT BUILDING

Grad Slab at Veseel GANG-5+GANG-9 Foundation RR Masonry at Drains & Cable Trench GANG-2 Outlet Doors,windows & Rolling GANG-3 Shutter,Louvers Painting GANG-7 Flooring(IPS) Staircase GANG-5

DM PLANT BUILDING
Inner Plastering

After completion of mechanical erection GANG-10+GANG14 GANG-6 GANG-14

outer Plastering Rain Water Downtake Pipe control room plastering Monorail

WSST near DM Plant Building DM WATER STORAGE TANk

Burnt oil slab

Pump Foundations Tank Sand Filling Pedestal At +5.2 Mtr.

GANG-13 GANG-15 GANG-15 GANG-15 GANG-15 GANG-15 GANG-16 GANG-15+GANG16 GANG-16 GANG-16 GANG-14

Degasser

Grad Slab & Pump Foundation Plinth Beam Plastering RCC Wall Cover Slab

Filter Water Storage Tank

Hydro Test & Water Proofing Screed Concrete & Flooring Dike Wall

Bulk acid & Caustic storage tank

Acid/Alkali lining Water Proofing/Acid/Alkali Lining Pump Pedestal

GANG-14

N-Pit

GANG-7 GANG-17

UF Product Water Storgae Tank RO Water Storgae Tank


GANG1,14,11,5,13,15,16 ,12 WILL BE all activities Related ENGAGED IN CIVIL to ETP will start in WORK OF ETP January month AREA IN STARTING

RO Reject Water Storage Tank Sludge Holding Tank Lamella Clarifier ETP Clarified Water Storage Tank RO Building Guard Pond

GANG1,14,11,5,13,15,16 ,12 WILL BE all activities Related ENGAGED IN CIVIL to ETP will start in WORK OF ETP January month AREA IN STARTING OF JANUARY MONTH

external plastering (west side) external plastering(south side) external plastering(north side) Brickwork(Elevator) staircase,collumns & floor slab elevator brickwork & plastering Ips flooring (ground) Ips flooring (first floor) Ips flooring (third floor) terrace water proofing SST-Burnt Oil Pit precast slab for trench GT transformer flooring for UAT & GT Transformer maintainance bay work Burnt oil pit-1 painting plinth protection

Gang-18 Gang-18

Gang-18 Gang-18 Gang-19 GANG-14 GANG-20 GANG-20 GANG-20 GANG-21 GANG-22 GANG-23 GANG-23+GANG24 GANG-23 GANG-23+GANG24 GANG-25 GANG-24

Switchgear Building

GTG

Compressor house building

Compressor house building

water proofing,doors,windo ws rolling shutter

GANG-26

ACW & DMCW Pump house

IPS Flooring GANG-27 Brickwork plastering GANG-23+GANGinside outside & 28 ceiling GANG-23+GANGparapit wall 28 water proofing,doors,windo ws IPS Flooring GANG-26 GANG-27 GANG-28 GANG-28 GANG-28 GANG-29

Transformer yard & FGHS

fencing Switchyard Equipment Foundation Fencing

GANG-30

Switchyard

STG

HRSG ACC Pipe & Cable TrenchesTrenc hes

GANG-29 GANG-27+GANGArea Grading 30 Metering room GANG-30 AFTER Balance Cable trench BACKFILLING IN SOUTH SIDE Plastering GANG-31 Floor Screeding GANG-31 UAT Fire wall GANG-31 GANG-31+GANGHot Well 24 GANG-31+GANGSwas Building 24 Aux. Equipment GANG-27+GANGFoundation 31 Balance Grad Slab GANG-31 Pump & Motor GANG-32 Foundations Cable trench from Switchgear Building To Acw pump house Pipe Cum Cable Trench(Including WTP Area) GANG-33

GANG-34

MANPOWER DEATIL GROUP GANG-1 GANG-2 GANG-3 GANG-4 GANG-5 GANG-6 GANG-7 GANG-8 GANG-9 GANG-10 GANG-11 GANG-12 GANG-13 GANG-14 GANG-15 GANG-16 GANG-17 GANG-18 GANG-19 GANG-20 GANG-21 GANG-22 GANG-23 GANG-24 GANG-25 GANG-26 GANG-27 GANG-28 GANG-29 GANG-30 GANG-31 GANG-32 GANG-33 GANG-34 TOTAL MANPOWER REQUIRED MANPOWER STATUS AT PRESENT MASSON (REQUIRED) 10 2 3 10 20 3 5 4 5 5 3 70 CARPENTER (REQUIRED) 4 5 5 4 8 5 3 4 2 10 3 5 4 5 10 15 92 BARBENDER (REQUIRED) 6 3 3 4 8 3 3 4 2 5 3 5 4 5 5 10 73 UNSKILLED/HEL PER (REQUIRED) 8 12 10 5 5 3 8 15 8 15 5 5 4 20 20 15 6 8 8 4 5 6 5 10 15 15 240

69

87

67

231

Start & Completion Date 18/Dec/13

Start & Completion Date 19/Dec/13

Start & Completion Date 20/Dec/13

Start & Completion Date 21/Dec/13

Start & Completion Date 22/Dec/13

OTHERS (REQUIRED) 5 3 10 4 5 15 10 8 4 64

539 485

31

Start & Completion Date 23/Dec/13

Start & Completion Date 24/Dec/13

Start & Completion Date 25/Dec/13

Start & Completion Date 26/Dec/13

Start & Completion Date 27/Dec/13

Start & Completion Date 28/Dec/13

Start & Completion Date 29/Dec/13

Start & Completion Date 30/Dec/13

Start & Completion Date 31/Dec/13

Start & Completion Date 1/Jan/14

Start & Completion Date 2/Jan/14

Start & Completion Date 3/Jan/14

Start & Completion Date 4/Jan/14

Start & Completion Date 5/Jan/14

Start & Completion Date 6/Jan/14

Start & Completion Date 7/Jan/14

Start & Completion Date 8/Jan/14

Start & Completion Date 9/Jan/14

Start & Completion Date 10/Jan/14

Start & Completion Date 11/Jan/14

Start & Completion Date 12/Jan/14

Start & Completion Date 13/Jan/14

Start & Completion Date 14/Jan/14

Start & Completion Date 15/Jan/14

Start & Completion Date 16/Jan/14

Start & Completion Date 17/Jan/14

Start & Completion Date 18/Jan/14

Start & Completion Date 19/Jan/14

Start & Completion Date 20/Jan/14

Start & Completion Date 21/Jan/14

Start & Completion Date 22/Jan/14

Start & Completion Date 23/Jan/14

Start & Completion Date 24/Jan/14

Start & Completion Date 25/Jan/14

Start & Completion Date 26/Jan/14

Start & Completion Date 27/Jan/14

Start & Completion Date 28/Jan/14

Start & Completion Date 29/Jan/14

Start & Completion Date 30/Jan/14

Start & Completion Date 31/Jan/14

Start & Completion Date 1/Feb/14

Start & Completion Date 2/Feb/14

Start & Completion Date 3/Feb/14

Start & Completion Date 4/Feb/14

Start & Completion Date 5/Feb/14

Start & Completion Date 6/Feb/14

Start & Completion Date 7/Feb/14

Start & Completion Date 8/Feb/14

Start & Completion Date 9/Feb/14

Start & Completion Date 10/Feb/14

Start & Completion Date 11/Feb/14

Start & Completion Date 12/Feb/14

Start & Completion Date 13/Feb/14

Start & Completion Date 14/Feb/14

Start & Completion Date 15/Feb/14

Start & Completion Date 16/Feb/14

Start & Completion Date 17/Feb/14

Start & Completion Date 18/Feb/14

Start & Completion Date 19/Feb/14

Start & Completion Date 20/Feb/14

Start & Completion Date 21/Feb/14

Start & Completion Date 22/Feb/14

Start & Completion Date 23/Feb/14

Start & Completion Date 24/Feb/14

Start & Completion Date 25/Feb/14

Start & Completion Date 26/Feb/14

Start & Completion Date 27/Feb/14

Start & Completion Date 28/Feb/14

Start & Completion Date 1/Mar/14

Start & Completion Date 2/Mar/14

Start & Completion Date 3/Mar/14

Start & Completion Date 4/Mar/14

Start & Completion Date 5/Mar/14

Start & Completion Date 6/Mar/14

Start & Completion Date 7/Mar/14

Start & Completion Date 8/Mar/14

Start & Completion Date 9/Mar/14

Start & Completion Date 10/Mar/14

Start & Completion Date 11/Mar/14

Start & Completion Date 12/Mar/14

Start & Completion Date 13/Mar/14

Start & Completion Date 14/Mar/14

Start & Completion Date 15/Mar/14

Start & Completion Date 16/Mar/14

Start & Completion Date 17/Mar/14

Start & Completion Date 18/Mar/14

Start & Completion Date 19/Mar/14

Start & Completion Date 20/Mar/14

Start & Completion Date 21/Mar/14

Start & Completion Date 22/Mar/14

Start & Completion Date 23/Mar/14

Start & Completion Date 24/Mar/14

Start & Completion Date 25/Mar/14

Start & Completion Date 26/Mar/14

Start & Completion Date 27/Mar/14

Start & Completion Date 28/Mar/14

Start & Completion Date 29/Mar/14

Start & Completion Date 30/Mar/14

Start & Completion Date 31/Mar/14

Start & Completion Date 1/Apr/14

Start & Completion Date 2/Apr/14

Start & Completion Date 3/Apr/14

Start & Completion Date 4/Apr/14

S.no

Area

Balance of Work precast slab for trench

completion date

25/12/2013 26/12/2013

GT transformer flooring

GTG
for UAT & GT Transformer maintainance bay work Burnt oil pit 1&2 IPS Flooring painting plinth protection water proofing,doors,windows rolling shutter IPS Flooring Brickwork plastering inside outside & ceiling parapit wall water proofing,doors,windows IPS Flooring IDCT hydro test & chemical dosing brickwork parapit wall floor finishing 10/1/2014 25/12/2013 28/1/2014 15/01/2014 17/01/2014

Compressor house building

20/01/2014 29/12/2013

ACW & DMCW Pump house

26/01/2014 15/01/2014 28/01/2014 5/2/2014

IDCT & Chemical Dosing Transformer yard & FGHS

fencing

Remarks