PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank

Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Monthly Progress Report No. 5 (Revised Recovery Plan) (06/02/2014 ~ 19/02/2014)


Prepared by: Reviewed by:

. ROHAIZAT AHMAD MUSTAFA PSB TECHNICAL COORDINATOR

. MR IQBAL HASLAN PTSB Consultant

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Table Of Content: 1. Site Plan 2. Project Org. Chart 3. Work Program 4. Summary of Work 5. Detail of Work Progress 6. Progress Claim Progress 7. Master Deliverable List Payment 8. Machinery (MDL) 9. Manpower 10. Weather Chart 11. Progress

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Site Plan:

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Project Organization Chart:

PROJECT DIRECTOR Azhar Abd Rahman (HP : 0123837360) PROJECT MANAGER Shaiful Anuar Ramli (HP : 0193238807) PROJECT ENGINEER Ahmad Shah Zainal (HP : 0193550603)

PROJECT SUPERVISOR Azlan Abd Hadi (HP : 0192698286)

MECH TRADE

C&S TRADE

ELECT TRADE

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Work Program (Rev. No. 3):

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Summary of Work Progress:


Description Previous (Rev. No. 2) 90% 90% 0% Current (Rev. No. 3) 83% 83% 0% Weekly Progress -

Scheduled Actual Variance

Ahead/Delay

0 days

0 days

Overall Schedule % Complete Overall Actual % Complete

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Detail of Work Progress:

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Summary of Work Progress


Period 22/01/20 14 to 05/02/20 14 Planned Activity 1. To start Cleaning & Flushing work. Actual Activity 1. Installation of goose neck, temporary elbow connection at MH-2.

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

MDL Record
DOC NO. SUBJECT/DESCRIPTION DATE

SUBMIT
PSB/C1308/RFA.01 Catalogue for Butterfly Valve Progress Report No. 1 Progress Report No. 1 Progress Report No. 1 Progress Report No. 1 Org. Chart List of Machinery List of Manpower Work Program 02/10/2013 03/10/2013 03/10/2013 03/10/2013 03/10/2013

BY
AHAR AHAR AHAR AHAR AHAR

DOC. REF. NO
PSB/C1308/RFA.01 -

REPLIED STATU DATE S 07/10/2013 7/10/2013 7/10/2013 7/10/2013 7/10/2013 A A A A A

COMMENTS

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Progress Claim Payment:


Submitted Progress Claim
PC No. 1 2 3

Certified Progress Claim


%
41 % 75 % -

Payment Received
%
-

Date
24/12/2 013 21/01/2 014 -

Amount
650,600 .00 536,825 .00 -

Cumulati ve 650,600. 00 1,187,42 5.00 -

Date
08/01/2 014 -

Amount
457,960. 50 -

Cumulati ve 457,960. 50 -

Date
22/01/2 014 -

Amount
457,960. 50 -

Cumulati ve 457,960. 50 -

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Machinery:
No Machine 1. Excavator 2. Backhoe 3. Crane 4. HDD 5. W elding-set 6. G en-set 7. Lorry Total Month Jan14 Feb14 Day 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 2 2 2 2 2 2 2 - - - - 2 2 2 2 2 2 2 2 2 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 3 3 3 3 3 3 - - - - 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 - - - - 3 3 3 3 3 3 3 3 3 3 - - - - - - - - - - - - - - - - - - - - 8 8 8 8 8 8 8 0 0 0 0 8 8 8 8 8 8 8 8 8 8

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Manpower:
No Manpower Month Day Jan14 Feb14 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 - - - - - - - - - - - - - - - - - - - - 1 1 1 1 1 1 1 - - - - 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 - - - - 2 2 1 1 1 1 1 1 1 1 - - - - - - - - - - - - - - - - - - - - 3 3 3 3 3 3 3 - - - - 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 - - - - 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 - - - - 2 2 2 2 2 2 2 2 2 2 10 10 10 10 10 10 10 - - - - 10 10 7 7 7 7 7 7 7 7 19 19 19 19 19 19 19 0 0 0 0 18 18 14 14 14 14 14 14 14 14 1. Project Manager 2. S ite Agent / S afety 3. S upervisor 4. S urveyor 5. W elder 6. Fitter 7. Machine Operator 8. G eneral W orker Total

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Weather Record:

PROPOSED FOR LAYING OF UNDERGROUND CHILLED WATER PIPES AND ASSOCIATED M&E Proposed Of Existing Air-cooled Chillers Of Maybank Jelutong Lot No.12, Jalan AND CIVILReplacement WORKS FROM TAPPING POINT AT EXISTING VALVE Bukit CHAMBER AT At INTERSECTION OF Astaka U8/84, Bukit Jelutong, 40150 Shah Alam, Selangor Darul Ehsan For Messr Maybank Berhad. JALAN TECHNOKRAT 3 AND PERSIARAN MULTIMEDIA TO THE NEW DPULZE DEVELOPMENT AT THE INTERSECTION OF PERSIARAN FLORA AND PERSIARAN MULTIMEDIA

PORTNEKA SDN BHD

Progress Photo:

REFER TO ATTACHED PROGRESS PHOTOS