TWO POLE STRUCTURE, 04 NOS OF TRANSFORMERS AND REPLACEMENT OF WOODEN POLE TO CONCRETE AND PROVIDING NEW 11 KV TWO POLE ISOLATION STRUCTURE
1 Job description:
2 Name of Contractor : 3 Quoted Amount for Material & Labour in Naira 4 Negotiated Amount for Material & Labour in Naira 8 Break-up Attached: 9 Mode of Payment: 10 Payment Schedule: 11 Job Duration:
MAINTENANCE ( SERVICING) OF H.T. TWO POLE STRUCTURE, 04 NOS OF TRANSFORMERS AND REPLACEMENT OF WOODEN POLE TO CONCRETE M/S MAK JOO (NIG) LIMITED.
#REF!
#REF! TO BE PAID Yes Cash/Cheque 1. Material/ Labour : 40 % of total amount in advance for mobilization of work 2 Material / Labour : 60 % after completion of work 5 day
12 Remarks:
Approved by:
REPLACEMENT OF WOODEN POLE TO CONCRETE AND MAINTENANCE OF TWO POLE STRUCTURE AND 04 NOS TRANSFORMERS SN DESCRIPTION QTY 100 100 300 15,000 1,500 400 400 60 600 600 600 UNIT NOS NOS NOS METRE. NOS METRE. METRE. NOS NOS NOS NOS RATE 28,000.00 3,500.00 2,000.00 220.00 250.00 450.00 200.00 2,000.00 1,000.00 400.00 500.00
1.
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.1 1.11 1.12
E AND 04 NOS TRANSFORMERS AMOUNT 2,800,000.00 350,000.00 600,000.00 3,300,000.00 375,000.00 180,000.00 80,000.00 120,000.00 600,000.00 240,000.00 300,000.00
8,945,000
1 CHILLER 1,3 & 4 2 COOLING TOWER ALL 3 AHU'S ALL 4 FU-1 ALL LOAD 5 CHILLED WATER PUMP 1 TO 5 Total
REMARKS This is common for fu-1 load, and all AHU's of fu-2 (we are taking this consumption in fu-2) Dedicated to fu-2 only for all machines Dedicated to fu-2 and stand by for CAT-2 Dedicated to fu-2 Dedicated to fu-1 and stand by for CAT-1 Dedicated to fu-1 security lighting
1 2 3 4
5 6 7
ARRANGEMENT OF UTILITY IN APRIL S.NO UTILITY LOCATION 1 2 3 4 5 6 7 CAT- 2 PERKINS - 500 ATH CAT -1 PERKINS - 350 BOILERS CUMMINS 25 KVA FU-2 FU-2 FU-2 FU-1 FU-1 FU-1 FU-1
REMARKS Dedicated to FU-2 Dedicated to FU-2 Dedicated to FU-2 Dedicated to FU-1 Dedicated to FU-1 Dedicated to FU-1 security lighting
CONSUMPTION OF UTILITY IN MARCH AND APRIL SHOWING WHY EXCESS CONSUMPTION IN APRIL THAN MARC Cons. Of generators CAT-1 is exclude form FU-1, S.NO GENERATOR 1 2 3 4 5 6 7 CAT -1 CAT- 2 PERKINS - 500 PERKINS - 350 CUMMINS 25 KVA BOILERS ATH TOTAL FU-1 CONSUMPTION FU-2 CONSUMPTION CONS. IN MARCH 8362 79 16898 920 288 765 0 27312 1973 25339 CONS. IN APRIL 16777 10027 9534 1222 236 357 0 38153 1815 36338
NOTE: PHCN AVAILABLITY WAS POOR IN APRIL, SO THAT THE OVER ALL CONSUMPTION IS HIGHER THAN MARCH
WING WHY EXCESS CONSUMPTION IN APRIL THAN MARCH Cons. Of April Cat-1 consumption is REMARKS included in FU-1 16777 10027 9534 1222 236 357 0 38153 We have include cons. 18592 19561 Of cat-1, for fu-1 from 10-4-09 FOR FU-1 FOR FU-2 FOR FU-2 FOR FU-1 FOR FU-1 FOR FU-1
3.
SN
3.1 Concert pole H.T 10.5 meter 3.2 U-channel Iron 6ft 3.3 Disc insulator 3.4 Tension clamp 11kv 3.5 Tong socket 11kv 3.6 J- Hock 11 kv 3.7 Bare copper earth 50mm 3.8 Earth rod 3.9 Nut-bolt, washers 3.1 11 KV line isolator
20 METER
TOTAL
117,150.00