Observed time per unit X Observed Rating = Normal Time per unit X Standard Rating Observed time per unit = Observed Time for X units X
Observed time = Working time Idle Time Standard time per unit = Normal time per unit + Allowances Standard Production of a hrs shift = aX 60 mins Standard time per unit (mins)
Work Sampling
N = C^2pq E^2 Where: N = no. of observations required for work sampling study C= constant depending on confidence level p = percentage of idling q = percentage of activity = 1 - p E = absolute error s = relative error or C^2pq (sp)^2
C Values