Activity
L K J I H G F E D C B A 1 2 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 2 1 1
1 1 2 1 1
2 1
19
20
21
22
23
24
Duration(days)
The table above show the activity, duration and also total manpower required for a garage building project. There are twelve activities involves in this project and the total duration to complete this project is 24 days.
2
1.5 1 0.5 0 10-11d 11-12d 12-13d 13-14d 14-15d 15-16d 16-17d 17-18d 18-19d 19-20d 20-21d 21-22d 22-23d 23-24d 0-1d 1-2d 2-3d 3-4d 4-5d 5-6d 6-7d 7-8d 8-9d 9-10d
Duration
The table above show a bar chart showing the total manpower requirements against times From the bar graph above, we can find the total cost for the total manpower.
Time m
Total cost
1d-3d 3 RM18.75 3
4d-9d 2 RM18.75 6
11d-18d 1 RM18.75 8
19d-20d 3 RM18.75 2
21d 1
22d 4
23d 3
24d 1
Total Cost
RM168.75 RM225.00
To find the total cost for total manpower : Sum all the Total manpower x Cost per person x Duration From the table, we can conclude that the total cost for total manpower is RM825.00