Garage Building Project

Activity

L K J I H G F E D C B A 1 2 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 2 1 1

1 1 2 1 1

2 1

19

20

21

22

23

24

Duration(days)

The table above show the activity, duration and also total manpower required for a garage building project. There are twelve activities involves in this project and the total duration to complete this project is 24 days.

Garage Building Project


4.5 Number of Man 4 3.5 3 2.5

2
1.5 1 0.5 0 10-11d 11-12d 12-13d 13-14d 14-15d 15-16d 16-17d 17-18d 18-19d 19-20d 20-21d 21-22d 22-23d 23-24d 0-1d 1-2d 2-3d 3-4d 4-5d 5-6d 6-7d 7-8d 8-9d 9-10d

Duration

The table above show a bar chart showing the total manpower requirements against times From the bar graph above, we can find the total cost for the total manpower.

Time m

Total cost

1d-3d 3 RM18.75 3

4d-9d 2 RM18.75 6

10d 0 RM18.75 0 RM0.00

11d-18d 1 RM18.75 8

19d-20d 3 RM18.75 2

21d 1

22d 4

23d 3

24d 1

Total Cost

Total Manpower(S) Cost/person(RM) Duration(days) Cost (RM)

RM18.75 RM18.75 RM18.75 RM18.75 1 1 1 1 RM825.00

RM168.75 RM225.00

RM150.00 RM112.50 RM18.75 RM75.00 RM56.25 RM18.75

To find the total cost for total manpower : Sum all the Total manpower x Cost per person x Duration From the table, we can conclude that the total cost for total manpower is RM825.00