Вы находитесь на странице: 1из 123
i y see eR ARS ECHR IRENE OB Pood cgi Eee iS cate Wis, TAMAS Projects P.O. Box: 48647 ‘Abu Dhabi UAE: exe 026286208 Att, Me. Noj Saba Senior Project F bien - Sow Project: Contraet No. 0.43834 ‘Construction Works Assoclted with Rehabilistion and Replacement of Exiting VC Sewer Lines at Mussafah Indust rea Category "5 Subject: Method Statement No, P712.18-18 Rev.02- Flow Control ee Sit, Further to OC letier No, 0-1389,1/18552 dated 29.12.10 regarding the above mentioned ube, please. be Informed that your proposed mated sblement forthe fow contra ubmifed va leter no PrT2INSI24eh10 dated 16.12.10 received on 20.12.10 ls provisionally Sotsplable as per eneloged ADSSC later No, ADSSCIPro/O20019 dated 20.12.10 received on oai-tt ‘Alleles specifestin and contract requirements shoud be sts flowed, “This epooval shall not ceive you rom any contractual cbigatons as par the conret, Your taht, DORSCH Holding GmbH OC Abu Dhabi ae \Wolaee Nasraish Rasen’ Engineer yin Ti sisi Ange ABSSC ‘erie wate 65 sae Ve Ref ADSSCIProj 8 ate: $1) DEC 2010 Fox: s971-28947089 - To: Dorsch Holding GmbH ¢ P.O. Box 26617 ‘Abu Ovabi Dear Si, Projects Contract No. O~ 1388.1 Construction Works Aesociated With Rehasiltation ané Replacement of Exiating VC Sewer Lines at Mussafah Industrial Aroa ~ Category B Subject Methed Statement ne, Pr12.MS-18, Rov. 02 Flow Controt Further to your etter O ~ 1965,1/12589110 dated 22" of Decernber 2010, recommending ‘approval ef tha Contractors Method Statement related tothe Flow Contvol for ha sewer works. ease nete that the above subject Method Statement has been reviewed ani found provisionally ( ‘secepiabe subject to 4, Alclated specication and Contraetreuicemens shouldbe sty followed 2. ny chengas in tha work methodology, the Risk Assessment should be revised ‘accorsingy ‘Yours fatty ala Manager eee a "alphns o71 269€ 73 fe 712 TAMAS PROJECTS Date 18 December 2010 Ourret = PrizNsi2aar0 Wis, Dorsch Gruppe P.O. Box 26617 ‘Abu Dhabi, UAE. ‘Allenton = Me, Waleed Nasvaan Resident Engineer Project: Contract No, 0-138. Construction Works Associated with Rehabilitation and Replacement of Existing VC Sewer Lines at Mussafah Industral Area-Category 8 Subject | Mothod Statement - Flow Gontrol Rev, 2 Dear Si, Reference fo your letter O-14383.115982/10 dated Nov. 30,2010 and our meeting on Dec. 16, 2010 in the presence of ADSSC representave, please find atlached our method statement for Faw Control for sewer pipeline ret. P712-MS-18 rev. 2 amended er your commenis with document transmital no. P712/D0x002, This is for your kind raview and approval ( Yours sincerely, For and on behalf of TAMAS Projects Enel 3 sot( eriinal +2 copies)

Вам также может понравиться