Wis, TAMAS Projects
P.O. Box: 48647
‘Abu Dhabi UAE:
exe 026286208
Att, Me. Noj Saba
Senior Project
F
bien
-
Sow
Project: Contraet No. 0.43834
‘Construction Works Assoclted with Rehabilistion and
Replacement of Exiting VC Sewer Lines at Mussafah Indust rea
Category "5
Subject: Method Statement No, P712.18-18 Rev.02- Flow Control
ee Sit,
Further to OC letier No, 0-1389,1/18552 dated 29.12.10 regarding the above mentioned
ube, please. be Informed that your proposed mated sblement forthe fow contra
ubmifed va leter no PrT2INSI24eh10 dated 16.12.10 received on 20.12.10 ls provisionally
Sotsplable as per eneloged ADSSC later No, ADSSCIPro/O20019 dated 20.12.10 received
on oai-tt
‘Alleles specifestin and contract requirements shoud be sts flowed,
“This epooval shall not ceive you rom any contractual cbigatons as par the conret,
Your taht,
DORSCH Holding GmbH OC Abu Dhabi
ae
\Wolaee Nasraish
Rasen’ Engineer
yin Ti sisi Ange ABSSC
‘erie wate
65 saeVe
Ref ADSSCIProj 8
ate: $1) DEC 2010
Fox: s971-28947089
- To: Dorsch Holding GmbH
¢ P.O. Box 26617
‘Abu Ovabi
Dear Si,
Projects Contract No. O~ 1388.1
Construction Works Aesociated With Rehasiltation ané Replacement of
Exiating VC Sewer Lines at Mussafah Industrial Aroa ~ Category B
Subject Methed Statement ne, Pr12.MS-18, Rov. 02 Flow Controt
Further to your etter O ~ 1965,1/12589110 dated 22" of Decernber 2010, recommending
‘approval ef tha Contractors Method Statement related tothe Flow Contvol for ha sewer works.
ease nete that the above subject Method Statement has been reviewed ani found provisionally
( ‘secepiabe subject to
4, Alclated specication and Contraetreuicemens shouldbe sty followed
2. ny chengas in tha work methodology, the Risk Assessment should be revised
‘accorsingy
‘Yours fatty
ala
Manager
eee
a
"alphns o71 269€ 73 fe 712TAMAS
PROJECTS
Date 18 December 2010
Ourret = PrizNsi2aar0
Wis, Dorsch Gruppe
P.O. Box 26617
‘Abu Dhabi,
UAE.
‘Allenton = Me, Waleed Nasvaan
Resident Engineer
Project: Contract No, 0-138.
Construction Works Associated with Rehabilitation and
Replacement of Existing VC Sewer Lines at Mussafah
Industral Area-Category 8
Subject | Mothod Statement - Flow Gontrol Rev, 2
Dear Si,
Reference fo your letter O-14383.115982/10 dated Nov. 30,2010 and our meeting on
Dec. 16, 2010 in the presence of ADSSC representave, please find atlached our
method statement for Faw Control for sewer pipeline ret. P712-MS-18 rev. 2 amended
er your commenis with document transmital no. P712/D0x002,
This is for your kind raview and approval
( Yours sincerely,
For and on behalf of TAMAS Projects
Enel 3 sot( eriinal +2 copies)