1
1.1
Vessel
Barge PLB KL 101 1 PBJV PBJV - request vessel spec and layout - site visit on 13th March 2014 N
2
2.1 2.2 2.3 2.4 2.5 2.6 2.7
Project Deliverables
Project Execution Plan (PEP) Mobilisation Plan Project Control Flowchart Project Schedule HSE Bridging Document + ERP Chart Risk Assesment Documents Final Reports 1. Riser Guard Installation 2. Riser Tie-in 3. Cable Lay 1 1 1 AMSB AMSB - waiting for feedback from PBJV on technical infos
3
3.1 3.2 3.3 3.4 3.5 3.6
Personnel
Operations Team Diving Superintendant Air Diving Supervisor Air Divers NDT Air Divers Air Dive Technician 1 2 6 4 1
3.7
Reports Coordinator
3.8
Data Recorder/Engineer
4
4.1 4.2
No.
Description
General Specification
Quantity
Action Party
Owner
4.3 4.4
5
5.1
Diving Equipmet/Consumables
Diving Gases Gas requirements for both Air and Sat system
5.2
Soda Sorb
6
6.1
Project Equipment/Consumables
HP Waterjet
Rigging equipment
8
8.1 8.2
Inspection Equipment
CP Unit Underwater camera Fro water depth less than 10 meter 2 1
9
9.1 9.2
IT Requirements
Computer / Desktop Printer 2 1 Page 2 Mob Checklist Rev0.xls