Академический Документы
Профессиональный Документы
Культура Документы
Appendix
Project # 10034 Strathmore Minerals Corp/Roca Honda Resources Water Treatment Plant January 2011
Appendix A- Drawings
A.1 Process Flow Diagram
A.2 Piping and Instrumentation Diagrams
A.3a Plant General Arrangement
A.3b Plant General Arrangement
A.4 Civil Drawings
A.5 Electrical
LHEAT TRACER
L INSULATION
SPEC. LETTER
UNE NUMBER
L-_____________ SERVICE IN PIPE
UNE SIZE
INSTRUMENT INSTALLATION NOTES
1. PIPING ARRANGEMENTS SHOWN ARE SCHEMATIC. INSTRUMENT LOCATIONS ARE APPROXIMATE.
THEY MAY BE MOUNTED ON ADJACENT COLUMNS WALlS OR STRUCTURE. CAUTION SHOULD
BE USED TO AVOID STRUCTURAl.. MEMBERS THAT ARE SUBJECT TO VIBRATION.
2. ALL AELO INSTRUMENTS NOT INTEGRAl.. WITH PROCESS PIPING ARE TO BE LOCATED 4'-6"
FROM FLOOR OR PLATFORM UNLESS NOTED OTHERWISE
3. PROCESS CONNECTIONS TO AELD MOUNTED EQUIPMENT ARE TO BE SLOPED A MINIMUM OF
1/4" PER FOOT. SLOPE TOWARD PROCESS CONNECTION FOR GASES, AWAY FROM PROCESS
CONNECTIONS FOR STEAM AND UQUID APPUCATIONS. LOW POINT DRAINS AND HIGH POINT
VENTS WILL BE PROVIDED AS SHOWN ON THE INSTRUMENT DRAWINGS
4. ALL TUBING SHALL BE INSTALLED AND RUN TO PRESERVE MAXIMUM CLEARANCE AND
HEADROOM. ROUTING SHOULO NOT INTERFERE WITH PlANT MAINTENANCE AND OPERATIONS.
S. UNSUPPORTED AND/OR UNPROTECTED INDMDUAL TUBING RUNS WILL BE RUN IN 1 1/2"Xl
1/2"Xl/8" CHANNEL. AELO TO ROUTE AND SUPPORT CHANNEL AS NECESSARY.
6. INSTRUMENT SIGNAL WIRING SHALL NOT BE RUN IN THE SAME CONDUIT AS POWER WIRING.
7. SPUCING OF INSTRUMENT SIGNAL WIRES WILL NOT BE ALLOWED.
8. SHIELDING FOR INSTRUMENT SIGNAL WIRES WILL BE GROUNDED AT THE CONTROL PANEL
ONLY.
LOCAL INSTRUMENT
AUTO/MANUAL
START-STOP PB'S
HAND-OFF-AUTO
CONVEYOR EMERGENCY
STOP PULL CABLE
CONVEYOR TRAVEL
UMIT
ISOLATION DIAPHRAGM
CONTROL PANEL
PLC CONTROL SYSTEM
VARIABLE FREQUENCY
ORNE
POWER SAFETY
DISCONNECT
INSTRUMENT SYMBOLS
LOCALLY PANEL CABINET
MOUNTED MOUNTED OR MOUNTED
VALVE NUMBERING SYSTEM
( 16" -YY-ZZ )
t t t
PLC
MILUMETERS (11M) TO INCHES CONVERSION FOR THIS PROJECT A ISSUED FOR REVIEW lOT 1 RS 121-09-10
6101101 = 1/4" 12SIoIM = S"
13MM = 1/2" 150IoIM = 6"
19MM = 3/4" 200MM = 8"
2SMM = I" 250IoIM = 10"
32MM = 1 1/4" 3OOloiM = 12"
38MM = 1 1/2" 350IoIM = 14"
SOMM = 2" 400MM = 16"
64MM = 2 1/2" 450MM = 18"
75101101 = 3" 500MM = 20"
100MM = 4" 600MM = 24"
DRAWING NO.1 DRAWING TITLE
REFERENCE DRAWINGS
THIS DRAWING WAS PREPARED BY LYNTEK, ALL OF THE
INFORMATION CONTAINED THEREIN IS THE PROPERTY OF
LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT
THE PROPER WRITTEN AUTlHORIZATION OF LYNTEK.
NO REVISIONS BY lAPP DATE
Roca Honda Resources LLC
I STRATHMORE MINERALS CORP
P&ID SYMBOLS
IYNTEK
INCORPORATED
CAIl-QF MEJ 21-09-10 DATE.TlME lAST MODIFIED
CKD.
P .... RS DRAWING NO. REV.
SCALE:
10034-X-02 I A
CUENT
I::k
)
10034-0-06
RESIN 1RUCK
UWlIIG SIJIP
10034-0-02
IX COLlAIN SIIIP 3"-XX
omtARGE
10034-0-02
4x3
REACI10N TAN< SUIIP
3"-XX
omtARGE
10034-lI-04
4x3
LEGEND:
HANO SWITCH
MOTOR
FLOW METER
ALTERNATIVE FLOW
ELECTRICAl.. SIGNAL
(16 -cv 1m
ALTERNATE
_ .. _ .. _ .. ---! /- .. --'
(18 -BF-xx) I
ALTERNATE
.. - .. - .. - .. - .. -' I
SO-XX
"-
3"-XX
IS"-XX
4"-XX
LAH
LAI..
BATTERY UMrrs
BY OWNER
ill
T
L------
1
LAH
LAI..
l0034-D-04
....-_______________________ I""S_"-""XX'--___ ---iI::= TMK
lXX
HS
!
lXX
HS
lXX
HS
lXX
HS
I
IX COLUMN
FEED PUMP
I 10 PP 40
y 1-____ J.llS/..;" __ r---<:J-__ .6:24:r...;" TO IX CCl.UIINS
16x24
l0034-D-02
IS"-XX
r--JJ
lXX . I 1--
INFLOW
4000 GPM
INFLOW
4000 GPM
WATER MINE
SECTION 16
WATER MINE
SECTION 10
DRAWING REVIEW
D Reviewed: No Exceptions Noted
D Reviewed: Exceptions Noted
D Reviewed: Revise & Resubmit
NAME DATE
BACKUP SETTUNG
POND
WORK IN
PROGRESS
NOT RELEASED
NOT FOR REFERENCE
DRAWING NO. DRAWING TITLE
REFERENCE DRAWINGS
THIS DRAWING W1S PREPARED BY LYNTEK, ALL OF THE
INFORMATION CONTAINED THEREIN IS THE PROPERlY OF
LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT
THE PROPER WRITTEN AUTHORIZATION OF LYNTEK.
CAD-
CKD.
P.M.
CUENT
IYNTEK
INCORPORATED
LANDERSON 08-12-10 DATE.TlME LAST MODIFIED
083110.1300
R.SMITH DRAWING NO. REV.
10034-D-01 B
SEI11JIG PONDS
1JSCIWlGE
>-________________________________________________________________________________ ______
l0034-D-Ol
1W:KWASH PUMP
l0034-D-05
IX CII.lIIN RESIN
1JSCIWlGE
l0034-1Hl3
RESIN TRANSFER
WATER
120-TI<-101
HOSE
RESIN TRANSFER
PUP TRAILER
120-TK-20 I
RESIN TO MILL
l.AH
l.AL
(6
1-----1/
RESIN TRANSFER
PUMP
20-PP-l0
HOSE
HOSE
I RESIN )>----------------.
l0034-1Hl3
FAL
j---------t WAS/IXlWN WAlER
I----f-f)
WASHDOWN
WATER TANK
120-TK-JO I
3-XX
WASHDOWN PUMP
20-PP-20
l.AH
l.AL
6-lW-XXX-CSI
6.4
(4 BF lU
IX COWMN
I I
(6 BF
'10
,:;
13>,
T
24xS
(6 -BF-lm
RESIN TRANSFER
6.4
(4 BF 2u
IX COWMN
120+20 I
(6 BF
6-XX RESIN TRANSFER T
24xS
(8 -BF-2m
9(6 -BF-22J
N 24.-XX
6.4
(4 -BF-3u
IX COLUMN
I 2O-Jl(-J(J I
:a
'"
(6 -BF-33),
T
24.8
10034-0-03
24xS
(8 BY 40J [fiJ
6.4
IX COWMN
I 2O-IX-40 I
;:
'"
(6 -BF-43) ,
T
------------11 m
10034-0-03
1m
10034-0-03
1m
10034-0-03
>
>
>