NOTES: 1. PORTABLE PUMP SUPPLIED BY MMB SHALL FULFILL THE FOLLOWING OPERATING CONDITIONS: FLOWRATE 141 m3/h, HEAD 78 m 2. PIPING PROFILE ACCORDING AMEC DRAWINGS: AMEC DRAWINGS PLAN AND PROFILES ISSUED FOR CONSTRUCTION FILENAME DRAWING No. REV 94201186E-M019 A010 0 OVERALL PLAN 74201186E-M002 A100 0 MINE ROAD 74201186E-M003 A110 0 MINE ROAD 74201186E-M004 A200 0 PIPELINE ROAD 74201186E-M005 A210 0 PIPELINE ROAD 74201186E-M006 A220 0 PIPELINE ROAD 74201186E-M011 A400 0 LIMESTONE ROAD 74201186E-M012 A410 0 LIMESTONE ROAD 3. TANKS WITH HOSE CONNECTION TO ALLOW WATER TO BE TAKEN BY THE TRUCK PORTABLE PUMP. 4. 60-PU-025 B WILL BE A COMMON SPARE PROVIDED FOR PUMPS 60-PU-024, 60-PU-025 A & 60-PU-031.
SEA WATER FROM BOOSTER PUMPS 60-PU-023A/B 60-P-DA-002 TRUCK FILL SEA WATER FROM MAIN CATCHMENT POND 77-PD-002 BY PORTABLE PUMP 77-P-DA-001 NOTE 1 POND SDR 11 1160 m SDR 17 665 m 1+650 m MINE ROAD 350 m P atm TRUCK FILL P= 8.3 kg/cm P= 7.74 kg/cm 35 hp TDH= 66.4 m 22 m3 60-TK-008 DESIGN FOR 100% FLOWRATE 141 to 98.7 m3/h 0+000 m ELEVATION APROX 127.5 1+100 m 60-PU-025 A/B NOTE 4 SDR 11 + SDR 17 450 m + 650 m 1100 m 8" PIPELINE ROAD 22 m3 60-TK-009 P= 7.77 kg/cm 36 hp TDH= 68.39 m 700 m 8" SDR 11 300 m P= 1.0 kg/cm P atm TRUCK FILL
P= 1.0 kg/cm P atm TRUCK FILL P= 7.54 kg/cm 34 hp TDH= 64.2 m 22 m3 60-TK-010 60-PU-031 600 m 8" SDR 11 + SDR 17 300 m + 300 m NOTE 3 60-PD-001 ELEVATION APROX 243.8 m 2+400 m TRUCK FILL P= 1.0 kg/cm
BY GRAVITY
60-PU-024
60-PD-002 ELEVATION APROX 150 m NEAR TAILINGS STORAGE FACILITY TRUCK FILL 2
SDR 11 + SDR 17 672 m + 1228 m 30% TOTAL FLOWRATE 42.3 m3/h 1900 m 4"
P= 2.0 kg/cm
P atm
LIMESTONE HAUL ROAD 22 m3 60-TK-012 (TEMPORARY) ELEVATION APROX 74.83 m 1+900 m ORIGINAL OPTION PIPE LENGHT (m), APROX MINE ROAD PIPELINE ROAD LIMESTONE HAUL ROAD TOTAL SDR 11 1510 1050 672 3232 SDR 17 665 1350 1228 3243 TOTAL 2175 2400 1900 6475 2 NOTE 3 HOLD FOR INFORMATION: 1 LINE NOT CONSIDERED IN ORIGINAL SCOPE, PENDING REVIEW LOCATION AND CALCULATION OF 60-PU-023 A/B WATER POND POSITION TO BE CONFIRMED.
SIGNATURES/FIRMAS
DATE/FECHA
20-JAN-11
FGH
COS
DRAWN BY/ DIBUJO DESIGNED / DISEO REVIEWED / REVISO APPROVED BY / APROBO CLIENT/ CLIENTE
FGH
20-JAN-11 20-JAN-11
COS JL RC/AS
1/1
Pump 60-PU-024A/B has been calculated to supply both roads, LIMESTONE and PIPELINE
141 m3/h Total Flow (108 m3/h sea water from pump house + 33 m3/h brine from temporary desal plant) pumped from 77-PD-002 by MMB portable pumps design for 100% flowrate
POINT
1 2 3 4 5
Water Pond 60-PD-002 elevation 150 m to be confirmed highest point el. 258 m aprox