• LONGER HOLES
- NO LOSS OF POWER IN JOINTS
- NO SUBSTANTIAL DROP IN PENETRATION RATE
• STRAIGHTER HOLES
- A RELATIVELY LOW FEED FORCE IN COMBINATION WITH A RIGID DRILL STRING
- GOOD GUIDANCE BETWEEN DTH HAMMER & THE WALLS OF THE HOLE
• EXCELLENT FLUSHING
- SMALL ANNULAR SPACE BETWEEN THE DRILL TUBE & THE WALLS OF THE HOLE
- FROM THE OPERATING & DRILLER’S POINT OF VIEW, THIS METHOD IS ALSO
CONSIDERED THE SIMPLEST & THE SAFEST TO USE.
DRILLING METHODS IN SURFACE DRILLING OPERATIONS
Heavy benching
P N E U M A T IC T OH PY DH RA AM U M L EI C R T O P H A M M E
O P E R A T E S A TO P 6 E RB A TR E S A T 1 2 0 - 2 5 0 B
I M P A C T V E L O S I MI T PY A O C F T V E L O S IT Y O F
T H E P I S T O N I S T H8 E- 9 P MI S / T S O N I S 1 0 - 1 1 M /
I M P A C T R A T E I M P A C T R A T E
3 3 - 5 0 H z 5 0 - 6 0 H z
L O W IM P A C T P A O L WM E O R S T T W I C E T H E
A S C O M P A R E D I MT O P A C T P O W E R
H Y D R A U L I C D R IL L S
R E Q U I R E S H I G H R EI N Q P U U I RT E S 1 / 3 R D O F
E N E R G Y ( 2 6 5 - 4 2I N 5 P CU FT M E ) N E R G Y
L O W P E N E T R A HT I OG HN PR EA N T EE T R A T I O N R A T
( 0 . 2 5 - 0 . 9 M / M( 1 I .N 2 ) - 2 . 5 M / M I N )
L O W E F F IC I E N CH Y I G H E F F I C IE N C Y
L O W P O W E R T HO I G W H T P. OR WA T E I RO T O W T . R A T
ADVANTAGES WITH TOP HAMMER DRILLING METHOD
• HIGH EFFICIENCY
- HIGH DEGREE OF EFFICIENCY
- HIGH DRILLING CAPACITY IN RELATION THE INSTALLED POWER.
- LOW FUEL CONSUMPTION PER DRILL METRE (1/3 -1/4 OF DTH)
• VERSATILE
- VARIOUS ROCK DRILL PARAMETERS CAN EASILY BE ASJUSTED
FOR BEST RESULTS.
- CAN BE USED WITH VARIETY OF DRILL STEEL EQPT.
- CAN ADJUST TO ANY ROCK CONDITION
• COMPACTNESS
- FRAGMENTATION
- RESTRICTIONS & STATUTORY REQUIREMENTS
- ROCK CHARACTERISTICS ETC.
- PAST EXPERIENCE
SOME USEFUL THUMB RULES FOR BENCH CALCULATIONS
D = Drill hole diameter (M)
K = Bench height (M)
B = Burden (M)
S = Spacing between holes (M)
U = Under drilling (M)
H = Drill hole depth (DM=M)
b = Specific drilling (M/m3)
l = inclination factor
1
U = 0.3 - 0.4 B
H = (K+U) x l
3
l=1.05 for hole inclination 3:1=19.5o
l=1.03 for hole inclination 4:1=14.5o
H
l=1.02 for hole inclination 5:1=11.5o
l=1.01 for hole inclination 10:1=6.0o
b = H/ (K x S x B), DM/M3
CALCULATION OF CHARGE IN A DRILL HOLE
lC
Qb = Hb x lb x D2 X 250, (Kg)
HC
HC = Height of column charge = H - Hb - H0 ,
(M)
lb
Hb lC = 40 - 60% of lb , (Kg/L)