GOVERNMENT OF ANDHRA PRADESH

PANCHAYATRAJ ENGINEERING DEPARTMENT

REPAIRS TO THE DAMAGED CULVERT AT IDDUVANIPALEM


ESTIMATED COST:-Rs.0.50 lakhs

DISTRICT

SRIKAKULAM

CIRCLE

SRIKAKULAM

DIVISION

TEKKALI

SUB-DIVISION

ICHAPURAM

MANDAL

KAVITY

SH

ENT

ANIPALEM

SPECIFICATION REPORT
Name of the work:-Repairs to the Damaged Culvert at Idduvanipalem Est.Cost.Rs.0.50 lakhs As per the instructions of the instructions of the Dy.Exe.Engineer,PR,Ichapuram and as per the need,it is proposed to repair the damaged culvert at Edduvanipalem village of Kavity(M). The village Idduvanipalem is situated at sea-shore edge.The villagers are always being suffered due to erosion of houses and road portion,due to sea back water tides and waves.The above village road is gradually eroding.Further,the existing culvert at the entrance of the village is badly damaged and the deck slab of the culvert is partially collapsed.Due to the rains from 3-10-2004 to 6-10-2004,the culvert is further damaged and road portion was also partially eroded.At present only two wheelers can go on the culvert. Hence,it is proposed to repair the culvert and to strengthen the eroded road portion by gravel packing.The following provisions are made in the estimate. 1.Provision for cost and supply of steel 2.Provision for Rabbit Mesh 3.Provision for C.C(1:2:4) for parapet walls 4.Provision for VRCC(1:2:4) for DECK SLAB 4.Provision for gravel packing The estimate is prepared as per the current SSR,i.e.2004-2005 rates and the work will be carried out as per APDSS.

Asst.Executive Engineer PR(spl),Ichapuram

ABSTRACT-CUM-DETAILED ESTIMATE
Name of the Sub work:-Repairs to the Damaged Slab Culvert at Idduvanipalem village
Est.Cost:Rs.0.50 lakhs S.No Description of item Nos Length 1 Measurements Bredth Depth Quantity Rate Per

Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials and all labour charges including machine mixing charges Parapet walls 1X2 4.00 0.45 0.40 1.44Cum 1.44Cum

2313.80

1.00Cum

VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials and all labour charges including machine mixing and vibrating charges but excluding cost and fabrication charges of steel for deck slab Deck slab 1X2 3.50 2.00 0.24 3.36Cum 3213.65 1.00Cum

Cost,supply and fabrication charges of steel including cost of binding wire and all labour charges etc.complete 400.00Kgs 33.28 Cost,supply of Rabbit mesh for repairs to deck slab 1X2 3.50 2.00 ---14.00Sqm 79.04

1.00Kg

1.00Sqm

Filling with gravel in the eroded road portion including watering and rolling with hand road roller including all labour charges etc.complete

Eroded road portion

1X1

25.00

(1.5+2.5)/2

1.00

#########

207.77

1.00Cum

Provision for unforeseen items,if any

--------LS-----------TOTAL

Asst.Executive Engineer PR(spl),Ichapuram

Amount

7.5 3332

0.24

2.6

4.68 80 374.4

10798

13312

1107

20777

674 50000

LEAD STATEMENT
Name of the work:-Repairs to the damaged culvert at Idduvanipalem,Est.Cost.Rs.0.50 lakhs S.No Description of item Name of the quarry MR Lead in Kms CT Total Initial Cost Conveyance Seinorage Blasting charges Machine Deduct Total crushing stacking charges 0.00 0.00 0.00 0.00 (-)3.70 (-)3.70 (-)6.10 (-)6.10 187.20 249.20 544.80 745.80

1 2 3 4

Gravel Sand for Mortar 40mm HBG metal-SS5 20mm HBG metal-SS5

Rajapuram Bahuda river Rattakanna Rattakanna

17.40 21.90 27.40 27.40

0.00 0.00 0.00 0.00

17.40 21.90 27.40 27.40

38.50 71.00 269.00 470.00

132.40 145.90 183.90 183.90

20.00 36.00 45.00 45.00

0.00 0.00 53.00 53.00

Certified that the above leads are correct to the best of my knowledge

Asst.Executive Engineer PR(spl),Ichapuram

DATA SHEET
Name of the work:-Repairs to the Damaged culvert at Idduvanipalem Est.Cost.Rs.0.50 lakhs S.No Quantity 1 Description of item Rate Per Amount

Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials and all labour charges including machine mixing charges for parapet walls 0.92Cum 0.46Cum 330.00Kg 1.00Cum 1.00Cum 1.50Nos Cost of 20mm HBG metal Cost of sand Cost of cement Labour charges Machine mixing charges Woman Mazdoor Add TOT@4% 745.80 249.20 2700.00 350.54 31.00 101.00 1.00Cum 1.00Cum 1000.00Kg 1.00Cum 1.00Cum 1.00Cum 686.14 114.63 891.00 350.54 31.00 151.50 88.99 2313.80

TOTAL 2 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials and all labour charges including machine mixing and vibrating charges but excluding cost and fabrication charges of steel for deck slab 0.92Cum 0.46Cum 330.00Kg 1.00Cum 1.00Cum 1.00Cum 1.00Cum 1.50Nos Cost of 20mm HBG metal Cost of sand Cost of cement Labour charges Machine mixing charges Centring charges Vibrating charges Woman Mazdoor Add TOT@4% 745.80 249.20 2700.00 620.28 31.00 564.00 31.50 101.00 1.00Cum 1.00Cum 1000.00Kg 1.00Cum 1.00Cum 1.00Cum 1.00Cum 1.00Cum

686.14 114.63 891.00 620.28 31.00 564.00 31.50 151.50 123.60 3213.65

TOTAL 3 Cost,supply and fabrication charges of steel including cost of binding wire and all labour charges etc.complete 1.00Kg Cost and supply of steel 1.00Kg Fabrication charges of steel Add TOT@4% 28.00 4.00 1.00Kg 1.00Kg

28.00 4.00 1.28 33.28

TOTAL 4

Filling with gravel and rolling the formation with hand road roller irrespective of thickness including cost and conveyance of all materials and all labour charges etc.complete. 1.00Cum Cost of gravel 1.00Cum Labour charges Add TOT@2% 187.20 165.00 1.00Cum 10.00Cum 187.20 16.50 4.07 207.77

TOTAL

Asst.Executive Engineer PR(spl),Ichapuram