DATE: 05.02.10 63-INQ-10-011-DC-01_REV.

0 LPG BOTTLING PLANT RATIONALISATION STUDY Exxon-Mobil_JTM, S'PORE

CIVIL & STRUCTURAL WORKS

1 of 28

2 of 28

3 of 28

4 of 28

5 of 28

6 of 28

7 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2

63-INQ10-011-DC-01

BQ1008

BILL OF QUANTITY LOCATION JT Terminal

(CONSTRUCTION OF NEW PIT_TYPE-P1)

1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT WALL THICKNESS OF PIT BASE SLAB THICKNESS OF PIT PILING REQUIRED 2) CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) REINFORCEMENT i) VERTICAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) HORIZONTAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iv) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 10 = = = = = = T 13 = = = = = = T 13 = = = 1.20 m 200 mm 51.00 nos. Bar 1.042 kg/m 0.064 Tons. 10.00 m 200 mm 6.00 nos. Bar 0.617 kg/m 0.037 Tons. 3.00 m 200 mm 11 nos. Bar 1.042 kg/m 0.034 Tons. 2.00 m 200 mm 16 nos. Bar 1.042 kg/m 0.033 Tons. 0.168 Tons. (Z-direction) (X-direction) = =
3 3.200 m 3 0.300 m

= = = = = =

3.00 m 2.00 m 1.00 m 0.20 m 0.20 m NO. GRADE- C 35

fy =

2 460 N/mm

8 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2

63-INQ10-011-DC-01

BQ1008

4) EXCAVATION WORK ESTIMATED EXCAVATION DEPTH ESTIMATED EXCAVATION VOLUME 5) STRUCTURAL STEEL = = 0.85 m 3 10.20 m GRADE- S 275

(FOR GRATING SUPPORT) = = = 25.00 kg/m 10.00 m 0.34 tons.

UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
6) FRP GRATING

GREATING AREA REQUIRED


II BQ SUMMARY

6.00 m2

(CONSTRUCTION OF NEW PIT_TYPE-P1) = = = = = = = 5 16.00 1.50 0.84 1.69 30.00 51.00 nos. m3 m3 Tons. tons. m2 m3

TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT TOTAL STEEL WEIGHT REQUIRED GREATING AREA REQUIRED TOTAL ESTIM'D EXCAVATION VOLUME Note: All excavation required hacking of ext'g concrete floor Assume all pits not clashing with ext'g ground beam.

9 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2

63-INQ10-011-DC-01

BQ1008

BILL OF QUANTITY LOCATION JT Terminal

(CONSTRUCTION OF NEW PIT_TYPE-P2)

1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT WALL THICKNESS OF PIT BASE SLAB THICKNESS OF PIT PILING REQUIRED 2) CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) REINFORCEMENT i) VERTICAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) HORIZONTAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iv) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 10 = = = = = = T 13 = = = = = = T 13 = = = 1.20 m 200 mm 81.00 nos. Bar 1.042 kg/m 0.101 Tons. 16.00 m 200 mm 6.00 nos. Bar 0.617 kg/m 0.059 Tons. 5.00 m 200 mm 16 nos. Bar 1.042 kg/m 0.083 Tons. 3.00 m 200 mm 26 nos. Bar 1.042 kg/m 0.081 Tons. 0.325 Tons. (Z-direction) (X-direction) = =
3 6.200 m 3 0.750 m

= = = = = =

5.00 m 3.00 m 1.00 m 0.20 m 0.20 m NO. GRADE- C 35

fy =

2 460 N/mm

10 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2

63-INQ10-011-DC-01

BQ1008

4) EXCAVATION WORK ESTIMATED EXCAVATION DEPTH ESTIMATED EXCAVATION VOLUME 5) STRUCTURAL STEEL = = 0.85 m 3 20.40 m GRADE- S 275

(FOR GRATING SUPPORT) = = = 25.00 kg/m 25.00 m 0.84 tons.

UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
6) FRP GRATING

GREATING AREA REQUIRED


II BQ SUMMARY

15.00 m2

(CONSTRUCTION OF NEW PIT_TYPE-P2) = = = = = = = 2 12.40 1.50 0.65 1.69 30.00 40.80 nos. m3 m3 Tons. tons. m2 m3

TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT TOTAL STEEL WEIGHT REQUIRED GREATING AREA REQUIRED TOTAL ESTIM'D EXCAVATION VOLUME Note: All excavation required hacking of ext'g concrete floor Assume all pits not clashing with ext'g ground beam.

11 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2

63-INQ10-011-DC-01

BQ1008

BILL OF QUANTITY LOCATION JT Terminal

(BACKFILLING OF EXT'G PIT_TYPE-EP1)

1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT NEW FLOOR SLAB THICKNESS 2) SAND BACKFILLING WORK SAND VOLUME REQUIRED 2) NEW CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) NEW REINFORCEMENT i) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) DOWEL BAR LENGTH BAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = = = = T 13 = = = 3.00 m 150 mm 18 nos. Bar 1.042 kg/m 0.055 Tons. 2.50 m 150 mm 21 nos. Bar 1.042 kg/m 0.055 Tons. 200 mm 250 mm 44 nos. Bar 1.042 kg/m 0.009 Tons. 0.119 Tons. (Z-direction) = =
3 1.875 m 3 0.375 m

= = = =

3.00 m 2.50 m 1.00 m 0.25 m

3 5.63 m

GRADE- C 35

fy =

2 460 N/mm

(X-direction)

12 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2

63-INQ10-011-DC-01

BQ1008

II

BQ SUMMARY

(BACKFILLING OF EXT'G PIT_TYPE-EP1) = = = = = 4 22.50 7.50 1.50 0.48 nos. m3 m3 m3 Tons.

TOTAL NOS. OF PITS TOTAL SAND VOLUME REQUIRED TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT

13 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2

63-INQ10-011-DC-01

BQ1008

BILL OF QUANTITY LOCATION JT Terminal

(BACKFILLING OF EXT'G PIT_TYPE-EP2)

1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT NEW FLOOR SLAB THICKNESS 2) SAND BACKFILLING WORK SAND VOLUME REQUIRED 2) NEW CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) NEW REINFORCEMENT i) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) DOWEL BAR LENGTH BAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = = = = T 13 = = = 4.00 m 150 mm 14 nos. Bar 1.042 kg/m 0.060 Tons. 2.00 m 150 mm 28 nos. Bar 1.042 kg/m 0.058 Tons. 200 mm 250 mm 48 nos. Bar 1.042 kg/m 0.010 Tons. 0.127 Tons. (Z-direction) = =
3 1.600 m 3 0.400 m

= = = =

4.00 m 2.00 m 1.00 m 0.20 m

3 6.40 m

GRADE- C 35

fy =

2 460 N/mm

(X-direction)

14 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2

63-INQ10-011-DC-01

BQ1008

II

BQ SUMMARY

(BACKFILLING OF EXT'G PIT_TYPE-EP2) = = = = = 2 12.80 3.20 0.80 0.25 nos. m3 m3 m3 Tons.

TOTAL NOS. OF PITS TOTAL SAND VOLUME REQUIRED TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT

15 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2

63-INQ10-011-DC-01

BQ1008

BILL OF QUANTITY LOCATION JT Terminal

(BACKFILLING OF EXT'G PIT_TYPE-EP3)

1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT NEW FLOOR SLAB THICKNESS 2) SAND BACKFILLING WORK SAND VOLUME REQUIRED 2) NEW CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) NEW REINFORCEMENT i) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) DOWEL BAR LENGTH BAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = = = = T 13 = = = 6.00 m 150 mm 16 nos. Bar 1.042 kg/m 0.102 Tons. 2.30 m 150 mm 41 nos. Bar 1.042 kg/m 0.098 Tons. 200 mm 250 mm 66 nos. Bar 1.042 kg/m 0.014 Tons. 0.214 Tons. (Z-direction) = =
3 2.760 m 3 0.690 m

= = = =

6.00 m 2.30 m 1.00 m 0.20 m

3 11.04 m

GRADE- C 35

fy =

2 460 N/mm

(X-direction)

16 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2

63-INQ10-011-DC-01

BQ1008

II

BQ SUMMARY

(BACKFILLING OF EXT'G PIT_TYPE-EP3) = = = = = 1 11.04 2.76 0.69 0.21 nos. m3 m3 m3 Tons.

TOTAL NOS. OF PITS TOTAL SAND VOLUME REQUIRED TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT

17 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2

63-INQ10-011-DC-01

BQ1008

BILL OF QUANTITY LOCATION JT Terminal

(BACKFILLING OF EXT'G PIT_TYPE-EP4)

1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT NEW FLOOR SLAB THICKNESS 2) SAND BACKFILLING WORK SAND VOLUME REQUIRED 2) NEW CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) NEW REINFORCEMENT i) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) DOWEL BAR LENGTH BAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = = = = T 13 = = = 7.20 m 150 mm 22 nos. Bar 1.042 kg/m 0.168 Tons. 3.20 m 150 mm 49 nos. Bar 1.042 kg/m 0.163 Tons. 200 mm 250 mm 83 nos. Bar 1.042 kg/m 0.017 Tons. 0.348 Tons. (Z-direction) = =
3 4.608 m 3 1.152 m

= = = =

7.20 m 3.20 m 1.00 m 0.20 m

3 18.43 m

GRADE- C 35

fy =

2 460 N/mm

(X-direction)

18 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2

63-INQ10-011-DC-01

BQ1008

II

BQ SUMMARY

(BACKFILLING OF EXT'G PIT_TYPE-EP4) = = = = = 1 18.43 4.61 1.15 0.35 nos. m3 m3 m3 Tons.

TOTAL NOS. OF PITS TOTAL SAND VOLUME REQUIRED TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT

19 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 1

63-INQ10-011-DC-01

BQ1010

BILL OF QUANTITY

(PIT UPGRADING OF OLD GRATING TO NEW FRP GRATING_FRP1)

LOCATION -

JT Terminal

1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT 2) CONCRETE CONC. VOLUME REQUIRED 3) STRUCTURAL STEEL =
3 0.65 m

= =

7.50 m 3.20 m GRADE- C 35 (FOR TOUCH UP WORK) GRADE- S 275

(FOR GRATING SUPPORT) = = = 35.00 kg/m 40.00 m 1.89 tons.

UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
4) ANCHOR BOLT

SIZE OF ANCHOR BOLT REQUIRED ANCHOR BOLT REQUIRED


5) FRP GRATING

= M 16 =

25 nos.

GRATING AREA REQUIRED


II BQ SUMMARY

24.00 m2

(PIT UPGRADING OF OLD GRATING TO NEW FRP GRATING_FRP1) = = = = = M 16 = 1 0.65 1.89 24.00 nos. m3 tons. m2

TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED TOTAL STEEL WEIGHT REQUIRED GRATING AREA REQUIRED SIZE OF ANCHOR BOLT REQUIRED ANCHOR BOLT REQUIRED

25.00 nos.

Note: Total steel weight cover greating supports and angle bar for recess. Anchor bolt should be Hilti-chenical anchor bolt

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 1

63-INQ10-011-DC-01

BQ1010

BILL OF QUANTITY

(PIT UPGRADING OF OLD GRATING TO NEW FRP GRATING_FRP2)

LOCATION -

JT Terminal

1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT 2) CONCRETE CONC. VOLUME REQUIRED 3) STRUCTURAL STEEL =
3 0.50 m

= =

5.00 m 2.50 m GRADE- C 35 (FOR TOUCH UP WORK) GRADE- S 275

(FOR GRATING SUPPORT) = = = 35.00 kg/m 20.83 m 0.98 tons.

UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
4) ANCHOR BOLT

SIZE OF ANCHOR BOLT REQUIRED ANCHOR BOLT REQUIRED


5) FRP GRATING

= M 16 =

17 nos.

GRATING AREA REQUIRED


II BQ SUMMARY

12.50 m2

(PIT UPGRADING OF OLD GRATING TO NEW FRP GRATING_FRP2) = = = = = M 16 = 1 0.50 0.98 12.50 nos. m3 tons. m2

TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED TOTAL STEEL WEIGHT REQUIRED GRATING AREA REQUIRED SIZE OF ANCHOR BOLT REQUIRED ANCHOR BOLT REQUIRED

16.67 nos.

Note: Total steel weight cover greating supports and angle bar for recess. Anchor bolt should be Hilti-chenical anchor bolt

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 1

63-INQ10-011-DC-01

BQ1010

BILL OF QUANTITY

(PIT UPGRADING OF OLD GRATING TO NEW FRP GRATING_FRP3)

LOCATION -

JT Terminal

1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT 2) CONCRETE CONC. VOLUME REQUIRED 3) STRUCTURAL STEEL =
3 1.00 m

= =

7.50 m 6.00 m GRADE- C 35 (FOR TOUCH UP WORK) GRADE- S 275

(FOR GRATING SUPPORT) = = = 50.00 kg/m 75.00 m 5.06 tons.

UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
4) ANCHOR BOLT

SIZE OF ANCHOR BOLT REQUIRED ANCHOR BOLT REQUIRED


5) FRP GRATING

= M 20 =

25 nos.

GRATING AREA REQUIRED


II BQ SUMMARY

45.00 m2

(PIT UPGRADING OF OLD GRATING TO NEW FRP GRATING_FRP3) = = = = = M 20 = 1 1.00 5.06 45.00 nos. m3 tons. m2

TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED TOTAL STEEL WEIGHT REQUIRED GRATING AREA REQUIRED SIZE OF ANCHOR BOLT REQUIRED ANCHOR BOLT REQUIRED

25.00 nos.

Note: Total steel weight cover greating supports and angle bar for recess. Anchor bolt should be Hilti-chenical anchor bolt

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2

63-INQ10-011-DC-01

BQ1012

BILL OF QUANTITY LOCATION JT Terminal

(CONSTRUCTION OF NEW TRENCHES)

1) TRENCH GEOMETRY UNIT LENGTH OF TRENCH WIDTH OF TRENCH DEPTH OF TRENCH WALL THICKNESS BASE THICKNESS 2) CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) REINFORCEMENT i) VERTICAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) HORIZONTAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iv) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 10 = = = = = = T 10 = = = = = = T 13 = = = = = = T 13 = = = 0 60 m 0.60 150 mm 15 nos. Bar 0.617 kg/m 0.006 Tons. 2.00 m 150 mm 4 nos. Bar 0.617 kg/m 0.005 Tons. 0.70 m 150 mm 8 nos. Bar 1.042 kg/m 0.006 Tons. 1.00 m 150 mm 6 nos. Bar 1.042 kg/m 0.006 Tons. 0 022 Tons. 0.022 Tons (Z-direction) (X-direction) = =
3 0.260 m 3 0.035 m

= = = = =

1.00 m 0.40 m 0.40 m 0.15 m 0.20 m GRADE- C 35

fy =

2 460 N/mm

23 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2

63-INQ10-011-DC-01

BQ1012

4) EXCAVATION WORK ESTIMATED EXCAVATION DEPTH ESTIMATED EXCAVATION VOLUME 5) STRUCTURAL STEEL = = 0.60 m 3 0.46 m GRADE- S 275

(FOR RECESS) = = = 10.00 kg/m 2.00 m 0.027 tons.

UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
II BQ SUMMARY

(Include fish tails)

(CONSTRUCTION OF NEW TRENCHES) = = = = = = 122 31.72 4.27 2.65 3.29 55.51 m m3 m3 Tons. tons. m3

TOTAL LENGTH OF TRENCH TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT TOTAL STEEL WEIGHT REQUIRED TOTAL ESTIM'D EXCAVATION VOLUME Note: All excavation required hacking of ext'g concrete floor Assume all threches not clashing with ext'g ground beam.

24 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2

63-INQ10-011-DC-01

BQ1011

BILL OF QUANTITY LOCATION JT Terminal

(BACKFILLING OF EXT'G TRENCHES)

1) TRENCH GEOMETRY UNIT LENGTH OF TRENCH WIDTH OF TRENCH DEPTH OF TRENCH WALL THICKNESS BASE THICKNESS NEW FLOOR SLAB THICKNESS 2) SAND BACKFILLING WORK SAND VOLUME REQUIRED 2) NEW CONCRETE CONC VOLUME REQUIRED CONC. LEAN CONC. REQUIRED 3) NEW REINFORCEMENT i) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) DOWEL BAR LENGTH BAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = = = = T 13 = = = 1.00 m 150 mm 4 nos. Bar 1.042 kg/m 0.004 Tons. 0.40 m 150 mm 8 nos. Bar 1.042 kg/m 0.003 Tons. 200 mm 200 mm 10 nos. Bar 1.042 kg/m 0.002 Tons. 0.009 Tons. (Z-direction) = =
3 0 100 m 0.100 3 0.020 m 3

= = = = = =

1.00 m 0.40 m 0.40 m 0.15 m 0.20 m 0.25 m

3 0.11 m

GRADE- C 35

fy =

2 460 N/mm

(X-direction)

25 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2

63-INQ10-011-DC-01

BQ1011

II

BQ SUMMARY

(BACKFILLING OF EXT'G TRENCHES) = = = = = 136 14.28 13.60 2.72 1.24 m m3 m3 m3 Tons.

TOTAL LENGTH OF TRENCH TOTAL SAND VOLUME REQUIRED TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT

26 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2

63-INQ10-011-DC-01

BQ0922

BILL OF QUANTITY LOCATION -

(PUMP FOUNDATION & CONTAINMENT) Pump Plinth

INSIDE PUMP STATION

1) PUMP FOUNDATION GEOMETRY LENGTH OF FOUNDATION WIDTH OF FOUNDATION FOUNDATION THICKNESS HEIGHT ABOVE GROUND HEIGHT UNDER GROUND CONTAINMENT KERB HEIGHT CONTAINMENT KERB THICKNESS CONTAINMENT LENGTH CONTAINMENT WIDTH CONTAINMENT FLOOR THICKNESS TOTAL CONTAINMENT PERIMETER 2) CONCRETE PUMP PLINTH CONC. VOLUME REQ'D CONTAINMENT CONC. VOLUME REQ'D LEAN CONC. REQUIRED 3) REINFORCEMENT i) REBAR LENGTH QTY. REBAR SIZE REBAR SPACING UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) REBAR LENGTH QTY. REBAR SIZE REBAR SPACING UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) REBAR LENGTH FOR KERB QTY. REBAR SIZE REBAR SPACING UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = T 13 = = = = = = T 13 = = = = = = T 10 = = = = 2.20 m 6 nos. Bar 200 mm 1.042 kg/m 0.01 Tons. 1.60 m 12.00 nos. Bar 200 mm 1.042 kg/m 0.02 Tons. 0.2 m 50 nos. Bar 200 mm 0.617 kg/m 0.01 Tons. 0 04 Tons. 0.04 Tons (MAIN REBAR) (LONGITUDINAL) (MAIN) = = =
3 0.36 m 3 1.13 m 3 0.30 m

= = = = = = = = = = =

1.20 m 0.60 m 0.50 m 0.50 m 0.00 m 0.15 m 0.15 m 3.00 m 2.00 m 0.15 m 10.00 m GRADE- C 35 Containment

fy =

2 460 N/mm

27 of 28

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2

63-INQ10-011-DC-01

BQ0922

4) EXCAVATION WORK N.A. II BQ SUMMARY (PUMP FOUNDATION & CONTAINMENT) = = = = 1 1.49 0.30 0.04 nos. m3 m3 Tons.

TOTAL NOS. OF PUMP FOUND TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT

28 of 28