task_code status_code wbs_id task_name target_start_date target_end_date delete_record_flag Activity ID Activity Status WBS Code Activity Name (*)Planned Start (*)Planned Finish Delete This Row CCWIF010 Not StartedPLNE REHAB-1.2.5.20 Interface with 09/12/2014 Saudi Aramco 12/01/2015 06:00:00 Communication 17:00:00 System CCWIF020 Not StartedPLNE REHAB-1.2.5.20 FOC Precommissioning 13/01/2015 28/02/2015 06:00:00 17:00:00 CCWIP295Not StartedPLNE REHAB-1.2.5.19.4 Survey 18/02/2014 23/02/2014 06:00:00 17:00:00 CCWIP300Not StartedPLNE REHAB-1.2.5.19.4 Excavation 22/02/2014 & sand bedding 10/03/2014 06:00:00 17:00:00 CCWIP310Not StartedPLNE REHAB-1.2.5.19.4 FOC Installation 26/02/2014 20/03/2014 06:00:00 17:00:00 CCWIP320Not StartedPLNE REHAB-1.2.5.19.4 Testing, Splicing, 22/03/2014 & termination 29/03/2014 06:00:00 17:00:00 CCWIP325Not StartedPLNE REHAB-1.2.5.19.4 Backfill & compaction 25/03/2014 10/04/2014 06:00:00 17:00:00 CCWIP330Not StartedPLNE REHAB-1.2.5.19.4 Fibre glass 31/03/2014 marker post 10/04/2014 06:00:00 installation17:00:00 CCWIP340Not StartedPLNE REHAB-1.2.5.19.4 Distribution 12/04/2014 & Enclosure 04/05/2014 06:00:00 installation17:00:00 CCWIP650Not StartedPLNE REHAB-1.2.5.19.4 LDS connectivity 05/05/2014 21/05/2014 06:00:00 17:00:00 CCWOP045 Not StartedPLNE REHAB-1.2.5.19.5 Survey 12/04/2014 15/05/2014 06:00:00 17:00:00 CCWOP050 Not StartedPLNE REHAB-1.2.5.19.5 Excavation 20/04/2014 & sand bedding 06/09/2014 06:00:00 17:00:00 CCWOP060 Not StartedPLNE REHAB-1.2.5.19.5 FOC Installation 07/05/2014 23/09/2014 06:00:00 17:00:00 CCWOP070 Not StartedPLNE REHAB-1.2.5.19.5 Testing, Splicing, 05/06/2014 & termination 13/08/2014 06:00:00 17:00:00 CCWOP075 Not StartedPLNE REHAB-1.2.5.19.5 Backfill & compaction 29/06/2014 15/11/2014 06:00:00 17:00:00 CCWOP080 Not StartedPLNE REHAB-1.2.5.19.5 Fibre glass 16/07/2014 marker post 11/09/2014 06:00:00 installation17:00:00 CCWOP090 Not StartedPLNE REHAB-1.2.5.19.5 Distribution 09/08/2014 & Enclosure 29/09/2014 06:00:00 installation17:00:00 CCWOP660 Not StartedPLNE REHAB-1.2.5.19.5 LDS Connectivity 30/09/2014 08/12/2014 06:00:00 17:00:00 CFC010 Not StartedPLNE REHAB-1.2.3 Final Commissioning 01/03/2015 04/04/2015 06:00:00 17:00:00 CFC020 Not StartedPLNE REHAB-1.2.3 Project closeout 04/04/2015 17:00:00 CKRT3XCMW10 Not StartedPLNE REHAB-1.2.2.2.7 Survey & Markings 04/10/2012 30/09/2013 06:00:00 17:00:00 CKRT3XFCO0040 Not StartedPLNE REHAB-1.2.2.2.2.4 Pipeline crossings 15/07/2013 12/12/2013 06:00:00 17:00:00 CKRT3XHYD70 Not StartedPLNE REHAB-1.2.2.2.5 Installation of 13/08/2014 temporary 21/10/2014 06:00:00 testing facilities 17:00:00 CKRT3XHYD80 Not StartedPLNE REHAB-1.2.2.2.5 Pressure testing 13/08/2014 28/09/2014 06:00:00 17:00:00 CKRT3XHYD90 Not StartedPLNE REHAB-1.2.2.2.5 Dewatering 29/09/2014 / drying / lay-up 22/10/2014 06:00:00 17:00:00 CKRT3XMLV0940 Not StartedPLNE REHAB-1.2.2.2.4.2.1 Site grading 02/03/2014 18/03/2014 06:00:00 17:00:00 CKRT3XMLV0950 Not StartedPLNE REHAB-1.2.2.2.4.2.1 Excavation 19/03/2014 ,compaction 12/04/2014 06:00:00 and foundation 17:00:00 CKRT3XMLV0960 Not StartedPLNE REHAB-1.2.2.2.4.2.2 Piping / jump 28/04/2014 over & valve 08/05/2014 06:00:00 installation 17:00:00 CKRT3XMLV0970 Not StartedPLNE REHAB-1.2.2.2.4.2.2 Access platform 10/05/2014 14/05/2014 06:00:00 17:00:00 CKRT3XMLV0980 Not StartedPLNE REHAB-1.2.2.2.4.2.2 Hydrotest valve 15/05/2014 & pipe 20/05/2014 assembly 06:00:00 17:00:00 CKRT3XMLV0990 Not StartedPLNE REHAB-1.2.2.2.4.2.2 Tie-in to existing 21/05/2014 (Hot Tap) 07/06/2014 06:00:00 17:00:00 CKRT3XMLV1000 Not StartedPLNE REHAB-1.2.2.2.4.2.3 cable installation 13/04/2014 29/04/2014 06:00:00 17:00:00 CKRT3XMLV1010 Not StartedPLNE REHAB-1.2.2.2.4.2.4 painting / Labelling 09/06/2014 14/06/2014 06:00:00 17:00:00 CKRT3XMLV1020 Not StartedPLNE REHAB-1.2.2.2.4.2.4 Backfilling /compaction 15/06/2014 30/06/2014 06:00:00 17:00:00 CKRT3XMLV1030 Not StartedPLNE REHAB-1.2.2.2.4.2.4 Asphalt Pavement 26/06/2014 restoration 07/07/2014 06:00:00 17:00:00 CKRT3XMLV1040 Not StartedPLNE REHAB-1.2.2.2.4.2.1 Concrete foundation 13/04/2014 erection 20/04/2014 06:00:00 17:00:00 CKRT3XMLV1050 Not StartedPLNE REHAB-1.2.2.2.4.2.1 Structural steel 21/04/2014 support27/04/2014 06:00:00 erection 17:00:00 CKRT3XMLV1060 Not StartedPLNE REHAB-1.2.2.2.4.2.3 Grounding system 30/04/2014 07/05/2014 06:00:00 17:00:00 CKRT3XMLV1070 Not StartedPLNE REHAB-1.2.2.2.4.2.3 task & area 08/05/2014 lighting 15/05/2014 06:00:00 17:00:00 CKRT3XMLV1080 Not StartedPLNE REHAB-1.2.2.2.4.2.3 Field instrument 17/05/2014 JB & instrument 24/05/2014 06:00:00 17:00:00 CKRT3XMLV1090 Not StartedPLNE REHAB-1.2.2.2.4.2.3 E & I Precommissioning 01/06/2014 08/06/2014 06:00:00 17:00:00 CKRT3XMLV1100 Not StartedPLNE REHAB-1.2.2.2.4.2.4 Fencing & guardrail 26/06/2014 07/07/2014 06:00:00 17:00:00 CKRT3XMLV1110 Not StartedPLNE REHAB-1.2.2.2.4.4.1 Site grading 19/03/2014 05/04/2014 06:00:00 17:00:00 CKRT3XMLV1120 Not StartedPLNE REHAB-1.2.2.2.4.4.1 Excavation 06/04/2014 ,compaction 29/04/2014 06:00:00 and foundation 17:00:00 CKRT3XMLV1130 Not StartedPLNE REHAB-1.2.2.2.4.4.2 Piping / jump 15/05/2014 over & valve 26/05/2014 06:00:00 installation 17:00:00 CKRT3XMLV1140 Not StartedPLNE REHAB-1.2.2.2.4.4.2 Access platform 27/05/2014 01/06/2014 06:00:00 17:00:00 CKRT3XMLV1150 Not StartedPLNE REHAB-1.2.2.2.4.4.2 Hydrotest valve 02/06/2014 & pipe 07/06/2014 assembly 06:00:00 17:00:00 CKRT3XMLV1160 Not StartedPLNE REHAB-1.2.2.2.4.4.3 cable installation 30/04/2014 17/05/2014 06:00:00 17:00:00 CKRT3XMLV1170 Not StartedPLNE REHAB-1.2.2.2.4.4.2 Tie-in to existing 08/06/2014 (Hot Tap) 24/06/2014 06:00:00 17:00:00 CKRT3XMLV1180 Not StartedPLNE REHAB-1.2.2.2.4.4.4 painting / Labelling 26/06/2014 01/07/2014 06:00:00 17:00:00

Page 1

TASK

CKRT3XMLV1190 Not StartedPLNE CKRT3XMLV1200 Not StartedPLNE CKRT3XMLV1210 Not StartedPLNE CKRT3XMLV1220 Not StartedPLNE CKRT3XMLV1230 Not StartedPLNE CKRT3XMLV1240 Not StartedPLNE CKRT3XMLV1250 Not StartedPLNE CKRT3XMLV1260 Not StartedPLNE CKRT3XMLV1270 Not StartedPLNE CKRT3XMLV600 Not StartedPLNE CKRT3XMLV610 Not StartedPLNE CKRT3XMLV620 Not StartedPLNE CKRT3XMLV630 Not StartedPLNE CKRT3XMLV640 Not StartedPLNE CKRT3XMLV650 Not StartedPLNE CKRT3XMLV660 Not StartedPLNE CKRT3XMLV670 Not StartedPLNE CKRT3XMLV680 Not StartedPLNE CKRT3XMLV690 Not StartedPLNE CKRT3XMLV695 Not StartedPLNE CKRT3XMLV700 Not StartedPLNE CKRT3XMLV710 Not StartedPLNE CKRT3XMLV720 Not StartedPLNE CKRT3XMLV730 Not StartedPLNE CKRT3XMLV740 Not StartedPLNE CKRT3XMLV750 Not StartedPLNE CKRT3XMLV770 Not StartedPLNE CKRT3XMLV780 Not StartedPLNE CKRT3XMLV790 Not StartedPLNE CKRT3XMLV800 Not StartedPLNE CKRT3XMLV810 Not StartedPLNE CKRT3XMLV820 Not StartedPLNE CKRT3XMLV830 Not StartedPLNE CKRT3XMLV840 Not StartedPLNE CKRT3XMLV850 Not StartedPLNE CKRT3XMLV860 Not StartedPLNE CKRT3XMLV870 Not StartedPLNE CKRT3XMLV880 Not StartedPLNE CKRT3XMLV890 Not StartedPLNE CKRT3XMLV900 Not StartedPLNE CKRT3XMLV910 Not StartedPLNE CKRT3XMLV920 Not StartedPLNE CKRT3XMLV930 Not StartedPLNE CKRT3XMW400 Not StartedPLNE CKRT3XMW410 Not StartedPLNE CKRT3XMW420 Not StartedPLNE CKRT3XMW430 Not StartedPLNE CKRT3XMW440 Not StartedPLNE CKRT3XMW450 Not StartedPLNE CKRT3XMW460 Not StartedPLNE CKRT3XMW470 Not StartedPLNE CKRT3XMW480 Not StartedPLNE

REHAB-1.2.2.2.4.4.4 Backfilling /compaction 02/07/2014 17/07/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.4.4 Asphalt Pavement 14/07/2014 restoration 24/07/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.4.1 Concrete foundation 30/04/2014 erection 07/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.4.1 Structural steel 08/05/2014 support14/05/2014 06:00:00 erection 17:00:00 REHAB-1.2.2.2.4.4.3 Grounding system 18/05/2014 25/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.4.3 task & area 26/05/2014 lighting 02/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.4.3 Field instrument 03/06/2014 JB & instrument 10/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.4.3 E & I Precommissioning 18/06/2014 25/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.4.4 Fencing & guardrail 14/07/2014 24/07/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.1 Site grading 26/01/2014 11/02/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.1 Excavation 12/02/2014 ,compaction 08/03/2014 06:00:00 and foundation 17:00:00 REHAB-1.2.2.2.4.3.2 Piping / jump 24/03/2014 over & valve 03/04/2014 06:00:00 installation 17:00:00 REHAB-1.2.2.2.4.3.2 Access platform 05/04/2014 09/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.2 Hydrotest valve 10/04/2014 & pipe 15/04/2014 assembly 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.3 cable installation 16/03/2014 01/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.2 Tie-in to existing 16/04/2014 (Hot Tap) 03/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.4 painting / Labelling 05/05/2014 10/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.4 Backfilling /compaction 11/05/2014 26/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.4 Asphalt Pavement 22/05/2014 restoration 02/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.4 Fencing & guardrail 22/05/2014 02/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.1 Concrete foundation 09/03/2014 erection 16/03/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.1 Structural steel 17/03/2014 support23/03/2014 06:00:00 erection 17:00:00 REHAB-1.2.2.2.4.3.3 Grounding system 02/04/2014 09/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.3 task & area 10/04/2014 lighting 17/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.3 Field instrument 19/04/2014 JB & instrument 26/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.3.3 E & I Precommissioning 27/04/2014 04/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.1 Site grading 12/02/2014 01/03/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.1 Excavation 02/03/2014 ,compaction 25/03/2014 06:00:00 and foundation 17:00:00 REHAB-1.2.2.2.4.1.2 Piping / jump 10/04/2014 over & valve 21/04/2014 06:00:00 installation 17:00:00 REHAB-1.2.2.2.4.1.2 Access platform 22/04/2014 27/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.2 Hydrotest valve 28/04/2014 & pipe 03/05/2014 assembly 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.3 cable installation 26/03/2014 12/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.2 Tie-in to existing 04/05/2014 (Hot Tap) 20/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.4 painting / Labelling 22/05/2014 27/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.4 Backfilling /compaction 28/05/2014 12/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.4 Asphalt Pavement 09/06/2014 restoration 19/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.1 Concrete foundation 26/03/2014 erection 02/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.1 Structural steel 03/04/2014 support09/04/2014 06:00:00 erection 17:00:00 REHAB-1.2.2.2.4.1.3 Grounding system 13/04/2014 20/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.3 task & area 21/04/2014 lighting 28/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.3 Field instrument 29/04/2014 JB & instrument 06/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.3 E & I Precommissioning 14/05/2014 21/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.4.1.4 Fencing & guardrail 09/06/2014 19/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.1.1 ROW construction 28/10/2012 (Sabkah 17/10/2013 06:00:00 / Non Sabkah) 17:00:00 REHAB-1.2.2.2.1.1 Trenching 31/10/2012 21/10/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.1 Pipe hauling 03/11/2012 & stringing 23/10/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.1 Pipe bending 05/11/2012 26/10/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.1 Beveling / line-up 07/11/2012 & welding 28/10/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.1 NDE 07/11/2012 28/10/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.1 Ext field joint 10/11/2012 coating 30/10/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.1 Sand bedding 12/11/2012 02/11/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.1 Pipe lowering 15/11/2012 05/11/2013 06:00:00 17:00:00

Page 2

TASK

CKRT3XMW490 Not StartedPLNE CKRT3XMW500 Not StartedPLNE CKRT3XMW510 Not StartedPLNE CKRT3XMW520 Not StartedPLNE CKRT3XMW530 Not StartedPLNE CKRT3XMW540 Not StartedPLNE CKRT3XMW550 Not StartedPLNE CKRT3XMWT200 Not StartedPLNE CKRT3XMWT210 Not StartedPLNE CKRT3XMWT220 Not StartedPLNE CKRT3XMWT230 Not StartedPLNE CKRT3XMWT240 Not StartedPLNE CKRT3XMWT250 Not StartedPLNE CKRT3XMWT260 Not StartedPLNE CKRT3XMWT270 Not StartedPLNE CKRT3XMWT280 Not StartedPLNE CKRT3XMWT290 Not StartedPLNE CKRT3XMWT300 Not StartedPLNE CKRT3XMWT310 Not StartedPLNE CKRT3XMWT320 Not StartedPLNE CKRT3XMWT330 Not StartedPLNE CKRT3XOFW50 Not StartedPLNE CKRT3XOFW60 Not StartedPLNE CKRT3XOFW70 Not StartedPLNE CKRT3XOFW80 Not StartedPLNE CKRT3XOFW90 Not StartedPLNE CKRT3XPW40 Not StartedPLNE CKRT3XPW70 Not StartedPLNE CKRT3XRC0215 Not StartedPLNE CKRT3XRC0220 Not StartedPLNE CKRT3XRC0235 Not StartedPLNE CKRT3XRC0245 Not StartedPLNE CKRT3XRC0275 Not StartedPLNE CKRT3XRC0285 Not StartedPLNE CKRT3XRC0295 Not StartedPLNE CKRT3XRC0300 Not StartedPLNE CKRT3XRCO1005 Not StartedPLNE CKRT3XRCO1015 Not StartedPLNE CKRT3XRCO1025 Not StartedPLNE CKRT3XRCO1055 Not StartedPLNE CKRT3XRCO1065 Not StartedPLNE CKRT3XRCO1075 Not StartedPLNE CKRT3XRCO1085 Not StartedPLNE CKRT3XRCO1095 Not StartedPLNE CKRT3XRCO1105 Not StartedPLNE CKRT3XRCO1135 Not StartedPLNE CKRT3XRCO1145 Not StartedPLNE CKRT3XRCO1155 Not StartedPLNE CKRT3XRCO210 Not StartedPLNE CKRT3XRCO230 Not StartedPLNE CKRT3XRCO240 Not StartedPLNE CKRT3XRCO270 Not StartedPLNE

REHAB-1.2.2.2.1.1 CP works - 18/11/2012 test & bonding 07/11/2013 06:00:00 thermit weld 17:00:00 REHAB-1.2.2.2.1.1 Holiday test21/11/2012 / Sand Padding 11/11/2013 06:00:00 & Backfill 17:00:00 REHAB-1.2.2.2.1.1 String to string 24/03/2013 tie-in 11/11/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.1 Berm construction 25/06/2013 11/11/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.1 CP works - 25/06/2013 test station 11/11/2013 & 06:00:00 bonding 17:00:00 REHAB-1.2.2.2.1.1 Install KM Marker 21/09/2013 & warning 11/11/2013 06:00:00 sign 17:00:00 REHAB-1.2.2.2.1.1 Clean up 23/09/2013 13/11/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.2 Excavation 09/01/2013 16/01/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.2 Lean concrete 17/01/2013 19/01/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.2 Rebar/formwork/Anchor 20/01/2013 04/02/2013 06:00:00 flange & sleeve 17:00:00 fab/erection REHAB-1.2.2.2.1.2 Cast in situ 05/02/2013 & curing 13/02/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.2 Surface touch 14/02/2013 up/Concrete 19/02/2013 06:00:00 coating 17:00:00 & painting REHAB-1.2.2.2.1.2 Install magnesium 17/02/2013 anode 17/02/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.2 Backfill / compact 19/02/2013 & berming 07/03/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.3 Excavation 17/01/2013 24/01/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.3 Lean concrete 26/01/2013 27/01/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.3 Rebar/formwork/Anchor 28/01/2013 12/02/2013 06:00:00 flange & sleeve 17:00:00 fab/erection REHAB-1.2.2.2.1.3 Cast in situ 13/02/2013 & curing 21/02/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.3 Surface touch 23/02/2013 up/Concrete 27/02/2013 06:00:00 coating 17:00:00 & painting REHAB-1.2.2.2.1.3 Install magnesium 25/02/2013 anode 25/02/2013 06:00:00 17:00:00 REHAB-1.2.2.2.1.3 Backfill / compact 27/02/2013 & berming 16/03/2013 06:00:00 17:00:00 REHAB-1.2.2.2.8 Concrete & 02/01/2014 pre-cast 05/02/2014 06:00:00 17:00:00 REHAB-1.2.2.2.8 Piping prefabrication 20/01/2014 23/02/2014 06:00:00 17:00:00 REHAB-1.2.2.2.8 Structural &06/02/2014 Access platform 02/03/2014 06:00:00 prefabrication 17:00:00 REHAB-1.2.2.2.8 Misc pre-fabrication 24/02/2014 12/03/2014 06:00:00 17:00:00 REHAB-1.2.2.2.8 Valves shop 08/03/2014 testing 24/03/2014 06:00:00 17:00:00 REHAB-1.2.2.2.9 Partial MCC 23/10/2014 walkthrough 26/10/2014 06:00:00 17:00:00 REHAB-1.2.2.2.9 PMCC punchlist 27/10/2014 works 30/11/2014 06:00:00 17:00:00 REHAB-1.2.2.2.2.13 Detour construction 13/05/2013 20/05/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.13 Sheet pile / 14/05/2013 Dewatering28/05/2013 06:00:00 System Installation 17:00:00& Operation REHAB-1.2.2.2.2.13 Excavation 15/05/2013 18/05/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.13 Install /weld19/05/2013 / NDE/ Coat 25/05/2013 06:00:00 Pipe 17:00:00 REHAB-1.2.2.2.2.13 Tie-in to existing 26/05/2013 28/05/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.13 Holiday test29/05/2013 / sand padding 05/06/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.2.2.13 Asphalt pavement 06/06/2013 restoration 10/06/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.13 Remove Sheet 29/05/2013 pile & dewatering 02/06/2013 06:00:00 system 17:00:00 REHAB-1.2.2.2.2.11 Detour construction 04/04/2013 11/04/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.11 Excavation 08/04/2013 10/04/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.11 Install /weld11/04/2013 / NDE/ Coat 17/04/2013 06:00:00 Pipe 17:00:00 REHAB-1.2.2.2.2.11 Tie-in to existing 18/04/2013 22/04/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.11 Holiday test23/04/2013 / sand padding 25/04/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.2.2.11 Asphalt pavement 27/04/2013 restoration 30/04/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.14 Detour construction 23/04/2013 30/04/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.14 Excavation 27/04/2013 29/04/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.14 Install /weld30/04/2013 / NDE/ Coat 07/05/2013 06:00:00 Pipe 17:00:00 REHAB-1.2.2.2.2.14 Tie-in to existing 08/05/2013 12/05/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.14 Holiday test13/05/2013 / sand padding 15/05/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.2.2.14 Asphalt pavement 16/05/2013 restoration 20/05/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.2 Detour construction 17/03/2013 24/03/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.2 Excavation 20/03/2013 23/03/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.2 Install /weld24/03/2013 / NDE/ Coat 30/03/2013 06:00:00 Pipe 17:00:00 REHAB-1.2.2.2.2.2 Tie-in to existing 31/03/2013 03/04/2013 06:00:00 17:00:00

Page 3

TASK

CKRT3XRCO280 Not StartedPLNE CKRT3XRCO290 Not StartedPLNE CKRT3XRCO310 Not StartedPLNE CKRT3XRCO320 Not StartedPLNE CKRT3XRCO330 Not StartedPLNE CKRT3XRCO340 Not StartedPLNE CKRT3XRCO370 Not StartedPLNE CKRT3XRCO380 Not StartedPLNE CKRT3XRCO390 Not StartedPLNE CKRT3XRCO400 Not StartedPLNE CKRT3XRCO410 Not StartedPLNE CKRT3XRCO420 Not StartedPLNE CKRT3XRCO430 Not StartedPLNE CKRT3XRCO440 Not StartedPLNE CKRT3XRCO470 Not StartedPLNE CKRT3XRCO480 Not StartedPLNE CKRT3XRCO490 Not StartedPLNE CKRT3XRCO500 Not StartedPLNE CKRT3XRCT1000 Not StartedPLNE CKRT3XRCT1010 Not StartedPLNE CKRT3XRCT1020 Not StartedPLNE CKRT3XRCT1030 Not StartedPLNE CKRT3XRCT1040 Not StartedPLNE CKRT3XRCT1060 Not StartedPLNE CKRT3XRCT1080 Not StartedPLNE CKRT3XRCT1090 Not StartedPLNE CKRT3XRCT1100 Not StartedPLNE CKRT3XRCT1105 Not StartedPLNE CKRT3XRCT1108 Not StartedPLNE CKRT3XRCT1110 Not StartedPLNE CKRT3XRCT1120 Not StartedPLNE CKRT3XRCT1140 Not StartedPLNE CKRT3XRCT1160 Not StartedPLNE CKRT3XRCT1170 Not StartedPLNE CKRT3XRCT1175 Not StartedPLNE CKRT3XRCT1178 Not StartedPLNE CKRT3XRCT1180 Not StartedPLNE CKRT3XRCT1190 Not StartedPLNE CKRT3XRCT1210 Not StartedPLNE CKRT3XRCT1230 Not StartedPLNE CKRT3XRCT1240 Not StartedPLNE CKRT3XRCT1245 Not StartedPLNE CKRT3XRCT1248 Not StartedPLNE CKRT3XRCT1249 Not StartedPLNE CKRT3XRCT1250 Not StartedPLNE CKRT3XRCT1260 Not StartedPLNE CKRT3XRCT1280 Not StartedPLNE CKRT3XRCT1300 Not StartedPLNE CKRT3XRCT1310 Not StartedPLNE CKRT3XRCT1315 Not StartedPLNE CKRT3XRCT1320 Not StartedPLNE CKRT3XRCT1330 Not StartedPLNE

REHAB-1.2.2.2.2.2 Holiday test04/04/2013 / sand padding 07/04/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.2.2.2 Asphalt pavement 08/04/2013 restoration 11/04/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.15 Detour construction 03/06/2013 10/06/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.15 Sheet pile / 04/06/2013 Dewatering18/06/2013 06:00:00 System Installation 17:00:00& Operation REHAB-1.2.2.2.2.15 Excavation 05/06/2013 08/06/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.15 Install /weld09/06/2013 / NDE/ Coat 15/06/2013 06:00:00 Pipe 17:00:00 REHAB-1.2.2.2.2.15 Tie-in to existing 16/06/2013 18/06/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.15 Holiday test19/06/2013 / sand padding 26/06/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.2.2.15 Asphalt pavement 27/06/2013 restoration 01/07/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.15 Remove Sheet 19/06/2013 pile & dewatering 23/06/2013 06:00:00 system 17:00:00 REHAB-1.2.2.2.2.16 Detour construction 24/06/2013 01/07/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.16 Sheet pile / 25/06/2013 Dewatering09/07/2013 06:00:00 System Installation 17:00:00& Operation REHAB-1.2.2.2.2.16 Excavation 26/06/2013 29/06/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.16 Install /weld30/06/2013 / NDE/ Coat 06/07/2013 06:00:00 Pipe 17:00:00 REHAB-1.2.2.2.2.16 Tie-in to existing 07/07/2013 09/07/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.16 Holiday test10/07/2013 / sand padding 17/07/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.2.2.16 Asphalt pavement 18/07/2013 restoration 22/07/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.16 Remove Sheet 10/07/2013 pile & dewatering 14/07/2013 06:00:00 system 17:00:00 REHAB-1.2.2.2.2.1 Sheet pile & 18/11/2012 dewatering 22/11/2012 06:00:00 system installation 17:00:00 REHAB-1.2.2.2.2.1 Sheet pile / 24/11/2012 Dewatering25/12/2012 06:00:00 System Operation 17:00:00 REHAB-1.2.2.2.2.1 Construct Thrust 25/11/2012 pit & recieving 02/12/2012 06:00:00pit 17:00:00 REHAB-1.2.2.2.2.1 TB equipment 03/12/2012 setup 05/12/2012 06:00:00 17:00:00 REHAB-1.2.2.2.2.1 Install /weld06/12/2012 / NDE/ Coat 17/12/2012 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.2.2.1 Dismantle / 18/12/2012 remove TB19/12/2012 06:00:00 setup 17:00:00 REHAB-1.2.2.2.2.1 Tie-in to existing 20/12/2012 25/12/2012 06:00:00 17:00:00 REHAB-1.2.2.2.2.1 Backfill & restoration 26/12/2012 12/01/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.1 Remove Sheet 26/12/2012 pile & dewatering 30/12/2012 06:00:00 system 17:00:00 REHAB-1.2.2.2.2.12 Sheet pile installation 31/12/2012 01/01/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.12 Construct Thrust 02/01/2013 pit & recieving 06/01/2013 06:00:00pit 17:00:00 REHAB-1.2.2.2.2.12 TB equipment 07/01/2013 setup 09/01/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.12 Install /weld10/01/2013 / NDE/ Coat 16/01/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.2.2.12 Dismantle / 17/01/2013 remove TB19/01/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.2.2.12 Tie-in to existing 20/01/2013 24/01/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.12 Backfill & restoration 26/01/2013 05/02/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.5 Sheet pile installation 28/01/2013 29/01/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.5 Construct Thrust 30/01/2013 pit & recieving 03/02/2013 06:00:00pit 17:00:00 REHAB-1.2.2.2.2.5 TB equipment 04/02/2013 setup 06/02/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.5 Install /weld07/02/2013 / NDE/ Coat 13/02/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.2.2.5 Dismantle / 14/02/2013 remove TB16/02/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.2.2.5 Tie-in to existing 17/02/2013 21/02/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.5 Backfill & restoration 23/02/2013 05/03/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.5 Remove sheet 23/02/2013 pile 24/02/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.3 Sheet pile installation 25/02/2013 03/03/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.3 Construct Thrust 04/03/2013 pit & recieving 07/03/2013 06:00:00pit 17:00:00 REHAB-1.2.2.2.2.3 TB equipment 09/03/2013 setup 13/03/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.3 Install /weld14/03/2013 / NDE/ Coat 01/04/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.2.2.3 Dismantle / 02/04/2013 remove TB06/04/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.2.2.3 Tie-in to existing 07/04/2013 11/04/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.3 Backfill & restoration 13/04/2013 29/04/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.3 Remove sheet 13/04/2013 pile 18/04/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.6 Sheet pile & 20/04/2013 dewatering 24/04/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.2.2.6 Sheet pile / 25/04/2013 Dewatering06/07/2013 06:00:00 System Operation 17:00:00

Page 4

TASK

CKRT3XRCT1340 Not StartedPLNE CKRT3XRCT1350 Not StartedPLNE CKRT3XRCT1360 Not StartedPLNE CKRT3XRCT1380 Not StartedPLNE CKRT3XRCT1400 Not StartedPLNE CKRT3XRCT1410 Not StartedPLNE CKRT3XRCT1420 Not StartedPLNE CKRT3XRCT1430 Not StartedPLNE CKRT3XRCT1440 Not StartedPLNE CKRT3XRCT1450 Not StartedPLNE CKRT3XRCT1460 Not StartedPLNE CKRT3XRCT1470 Not StartedPLNE CKRT3XRCT1490 Not StartedPLNE CKRT3XRCT1510 Not StartedPLNE CKRT3XRCT1520 Not StartedPLNE CKRT3XRCT1530 Not StartedPLNE CKRT3XRCT1540 Not StartedPLNE CKRT3XRCT1550 Not StartedPLNE CKRT3XRCT1560 Not StartedPLNE CKRT3XRCT1570 Not StartedPLNE CKRT3XRCT1580 Not StartedPLNE CKRT3XRCT1600 Not StartedPLNE CKRT3XRCT1620 Not StartedPLNE CKRT3XRCT1630 Not StartedPLNE CKRT3XRCT1640 Not StartedPLNE CKRT3XRCT1650 Not StartedPLNE CKRT3XRCT1660 Not StartedPLNE CKRT3XRCT1670 Not StartedPLNE CKRT3XRCT1680 Not StartedPLNE CKRT3XRCT1690 Not StartedPLNE CKRT3XRCT1710 Not StartedPLNE CKRT3XRCT1730 Not StartedPLNE CKRT3XRCT1740 Not StartedPLNE CKRT3XRCT1750 Not StartedPLNE CKRT3XRCT1760 Not StartedPLNE CKRT3XST410 Not StartedPLNE CKRT3XST420 Not StartedPLNE CKRT3XST430 Not StartedPLNE CKRT3XST440 Not StartedPLNE CKRT3XST450 Not StartedPLNE CKRT3XST460 Not StartedPLNE CKRT3XST470 Not StartedPLNE CKRT3XST475 Not StartedPLNE CKRT3XST480 Not StartedPLNE CKRT3XST485 Not StartedPLNE CKRT3XST490 Not StartedPLNE CKRT3XST500 Not StartedPLNE CKRT3XST510 Not StartedPLNE CKRT3XST520 Not StartedPLNE CKRT3XST530 Not StartedPLNE CKRT3XST540 Not StartedPLNE CKRT3XST545 Not StartedPLNE

REHAB-1.2.2.2.2.6 Construct Thrust 27/04/2013 pit & recieving 07/05/2013 06:00:00pit 17:00:00 REHAB-1.2.2.2.2.6 TB equipment 08/05/2013 setup 13/05/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.6 Install /weld14/05/2013 / NDE/ Coat 17/06/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.2.2.6 Dismantle / 18/06/2013 remove TB23/06/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.2.2.6 Tie-in to existing 24/06/2013 04/07/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.6 Backfill & restoration 06/07/2013 28/07/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.6 Remove Sheet 07/07/2013 pile & dewatering 11/07/2013 06:00:00 system 17:00:00 REHAB-1.2.2.2.2.7 Sheet pile & 13/07/2013 dewatering 17/07/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.2.2.7 Sheet pile / 18/07/2013 Dewatering15/08/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.2.2.7 Construct Thrust 20/07/2013 pit & recieving 27/07/2013 06:00:00pit 17:00:00 REHAB-1.2.2.2.2.7 TB equipment 28/07/2013 setup 30/07/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.7 Install /weld31/07/2013 / NDE/ Coat 07/08/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.2.2.7 Dismantle / 08/08/2013 remove TB10/08/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.2.2.7 Tie-in to existing 11/08/2013 15/08/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.7 Backfill & restoration 17/08/2013 02/09/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.7 Remove Sheet 17/08/2013 pile & dewatering 20/08/2013 06:00:00 system 17:00:00 REHAB-1.2.2.2.2.8 Sheet pile & 21/08/2013 dewatering 26/08/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.2.2.8 Sheet pile / 27/08/2013 Dewatering17/10/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.2.2.8 Construct Thrust 28/08/2013 pit & recieving 05/09/2013 06:00:00pit 17:00:00 REHAB-1.2.2.2.2.8 TB equipment 07/09/2013 setup 11/09/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.8 Install /weld12/09/2013 / NDE/ Coat 03/10/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.2.2.8 Dismantle / 05/10/2013 remove TB09/10/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.2.2.8 Tie-in to existing 10/10/2013 17/10/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.8 Backfill & restoration 19/10/2013 10/11/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.8 Remove Sheet 19/10/2013 pile & dewatering 23/10/2013 06:00:00 system 17:00:00 REHAB-1.2.2.2.2.9 Sheet pile & 24/10/2013 dewatering 27/10/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.2.2.9 Sheet pile / 28/10/2013 Dewatering05/12/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.2.2.9 Construct Thrust 29/10/2013 pit & recieving 05/11/2013 06:00:00pit 17:00:00 REHAB-1.2.2.2.2.9 TB equipment 06/11/2013 setup 11/11/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.9 Install /weld12/11/2013 / NDE/ Coat 24/11/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.2.2.9 Dismantle / 25/11/2013 remove TB30/11/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.2.2.9 Tie-in to existing 01/12/2013 05/12/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.9 Backfill & restoration 07/12/2013 24/12/2013 06:00:00 17:00:00 REHAB-1.2.2.2.2.9 Remove Sheet 07/12/2013 pile & dewatering 09/12/2013 06:00:00 system 17:00:00 REHAB-1.2.2.2.2.12 Remove sheet 26/01/2013 pile 27/01/2013 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.1 Excavation 08/03/2014 ,base compaction 10/04/2014 06:00:00 for foundation 17:00:00 REHAB-1.2.2.2.6.1.1 Cast in place 31/03/2014 conc foundation 23/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.1 Install precast 31/03/2014 foundation 23/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.2 Scraper trap 12/05/2014 /Jib crane 13/05/2014 06:00:00 installation 17:00:00 REHAB-1.2.2.2.6.1.2 Cast in place 14/05/2014 trap containment 31/05/2014 06:00:00 pond 17:00:00 REHAB-1.2.2.2.6.1.2 AG/ UG piping 18/05/2014 works 03/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.2 Scraper trap 26/05/2014 valve installtn 18/06/2014 06:00:00 & associated 17:00:00 piping REHAB-1.2.2.2.6.1.2 Access platform 03/06/2014 erection 19/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.3 Cable installation 12/04/2014 28/04/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.2 Hydrotesting 04/06/2014 21/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.3 Install power 29/04/2014 panel 22/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.3 Task & area 24/05/2014 lighting 31/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.3 Field instruments 01/06/2014 JB & 05/06/2014 instruments 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.3 Conduit stub 07/06/2014 up 17/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.4 Painting / coating 22/06/2014 02/07/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.4 Backfilling restoration 03/07/2014 & 14/07/2014 06:00:00 clean up 17:00:00 REHAB-1.2.2.2.6.1.4 Fencing & Guardrail 26/05/2014 16/07/2014 06:00:00 17:00:00

Page 5

TASK

CKRT3XST560 Not StartedPLNE CKRT3XST580 Not StartedPLNE CKRT3XST590 Not StartedPLNE CKRT3XST610 Not StartedPLNE CKRT3XST620 Not StartedPLNE CKRT3XST630 Not StartedPLNE CKRT3XST640 Not StartedPLNE CKRT3XST650 Not StartedPLNE CKRT3XST660 Not StartedPLNE CKRT3XST670 Not StartedPLNE CKRT3XST680 Not StartedPLNE CKRT3XST685 Not StartedPLNE CKRT3XST690 Not StartedPLNE CKRT3XST695 Not StartedPLNE CKRT3XST700 Not StartedPLNE CKRT3XST710 Not StartedPLNE CKRT3XST720 Not StartedPLNE CKRT3XST730 Not StartedPLNE CKRT3XST740 Not StartedPLNE CKRT3XST750 Not StartedPLNE CKRT3XST770 Not StartedPLNE CKRT3XST790 Not StartedPLNE CKRT3XST800 Not StartedPLNE CKRT3XST810 Not StartedPLNE CKRT3YCMW20 Not StartedPLNE CKRT3YFCO400 Not StartedPLNE CKRT3YHYD100 Not StartedPLNE CKRT3YHYD110 Not StartedPLNE CKRT3YHYD120 Not StartedPLNE CKRT3YMW560 Not StartedPLNE CKRT3YMW570 Not StartedPLNE CKRT3YMW580 Not StartedPLNE CKRT3YMW590 Not StartedPLNE CKRT3YMW600 Not StartedPLNE CKRT3YMW610 Not StartedPLNE CKRT3YMW620 Not StartedPLNE CKRT3YMW630 Not StartedPLNE CKRT3YMW640 Not StartedPLNE CKRT3YMW650 Not StartedPLNE CKRT3YMW660 Not StartedPLNE CKRT3YMW670 Not StartedPLNE CKRT3YMW680 Not StartedPLNE CKRT3YMW690 Not StartedPLNE CKRT3YMW700 Not StartedPLNE CKRT3YMW710 Not StartedPLNE CKRT3YMWT410 Not StartedPLNE CKRT3YMWT420 Not StartedPLNE CKRT3YMWT430 Not StartedPLNE CKRT3YMWT440 Not StartedPLNE CKRT3YMWT450 Not StartedPLNE CKRT3YMWT460 Not StartedPLNE CKRT3YMWT470 Not StartedPLNE

REHAB-1.2.2.2.6.1.1 Structural steel 17/04/2014 supports 11/05/2014 06:00:00 erection 17:00:00 REHAB-1.2.2.2.6.1.3 Cable termination 18/06/2014 & tagging 29/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.1.3 E & I Precomissioning 30/06/2014 16/07/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.1 Clearing & grading 12/04/2014 10/05/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.1 Excavation 29/04/2014 ,base compaction 08/06/2014 06:00:00 for foundation 17:00:00 REHAB-1.2.2.2.6.2.1 Install precast 22/05/2014 foundation 15/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.1 Cast in place 22/05/2014 conc foundation 15/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.2 Scraper trap 03/07/2014 /Jib crane 05/07/2014 06:00:00 installation 17:00:00 REHAB-1.2.2.2.6.2.2 Cast in place 06/07/2014 trap containment 22/07/2014 06:00:00 pond 17:00:00 REHAB-1.2.2.2.6.2.2 AG/ UG piping 09/07/2014 works 26/07/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.2 Scraper trap 17/07/2014 valve installtn 10/08/2014 06:00:00 & associated 17:00:00 piping REHAB-1.2.2.2.6.2.2 Access platform 26/07/2014 erection 11/08/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.3 Cable installation 09/06/2014 25/06/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.2 Hydrotesting 27/07/2014 12/08/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.3 Install power 26/06/2014 panel 20/07/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.3 Task & area 21/07/2014 lighting 28/07/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.3 Field instruments 29/07/2014 JB & 03/08/2014 instruments 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.3 Conduit stub 04/08/2014 up 14/08/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.4 Painting / coating 13/08/2014 24/08/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.4 Backfilling restoration 25/08/2014 & 28/09/2014 06:00:00 clean up 17:00:00 REHAB-1.2.2.2.6.2.1 Structural steel 09/06/2014 supports 02/07/2014 06:00:00 erection 17:00:00 REHAB-1.2.2.2.6.2.3 Cable termination 16/08/2014 & tagging 26/08/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.3 E & I Precomissioning 27/08/2014 13/09/2014 06:00:00 17:00:00 REHAB-1.2.2.2.6.2.4 Fencing & Guardrail 10/08/2014 30/09/2014 06:00:00 17:00:00 REHAB-1.2.2.3.7 Survey & Markings 04/10/2012 16/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.4 Pipeline crossing 11/02/2014 08/05/2014 06:00:00 17:00:00 REHAB-1.2.2.3.5 Installation of 22/12/2012 temporary 28/02/2013 06:00:00 testing facilities 17:00:00 REHAB-1.2.2.3.5 Pressure testing 02/03/2013 16/04/2013 06:00:00 17:00:00 REHAB-1.2.2.3.5 Dewatering 17/04/2013 / drying / lay-up 11/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 ROW construction 08/11/2012 (Sabkah 05/01/2013 06:00:00 / Non Sabkah) 17:00:00 REHAB-1.2.2.3.1.1 Trenching 12/11/2012 08/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 Pipe hauling 15/11/2012 & stringing 12/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 Pipe bending 18/11/2012 14/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 Beveling / line-up 20/11/2012 & welding 16/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 NDE 20/11/2012 16/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 Ext field joint 22/11/2012 coating 19/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 Sand bedding 25/11/2012 21/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 Pipe lowering 26/11/2012 22/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 CP works - 28/11/2012 test & bonding 24/01/2013 06:00:00 thermit weld 17:00:00 REHAB-1.2.2.3.1.1 Holiday test02/12/2012 / Sand Padding 28/01/2013 06:00:00 & Backfill 17:00:00 REHAB-1.2.2.3.1.1 String to string 05/12/2012 tie-in 31/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 Berm construction 26/12/2012 04/02/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.1 CP works - 30/12/2012 test station 07/02/2013 & 06:00:00 bonding 17:00:00 REHAB-1.2.2.3.1.1 Install KM Marker 22/01/2013 & warning 07/02/2013 06:00:00 sign 17:00:00 REHAB-1.2.2.3.1.1 Clean up 24/01/2013 10/02/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.2 Sheet pile & 07/07/2012 dewatering 14/07/2012 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.1.2 Sheet pile / 15/07/2012 Dewatering18/08/2012 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.1.2 Excavation 19/08/2012 10/09/2012 06:00:00 17:00:00 REHAB-1.2.2.3.1.2 Formwork fabrication 27/08/2012 &30/09/2012 06:00:00 erection 17:00:00 REHAB-1.2.2.3.1.2 Anchor flange 04/09/2012 & sleeve08/10/2012 06:00:00 fab/erection 17:00:00 REHAB-1.2.2.3.1.2 Cast in situ 22/09/2012 & curing 02/10/2012 06:00:00 17:00:00 REHAB-1.2.2.3.1.2 Concrete coating 03/10/2012 10/10/2012 06:00:00 17:00:00

Page 6

TASK

CKRT3YMWT480 Not StartedPLNE CKRT3YMWT490 Not StartedPLNE CKRT3YMWT500 Not StartedPLNE CKRT3YMWT510 Not StartedPLNE CKRT3YMWT520 Not StartedPLNE CKRT3YMWT530 Not StartedPLNE CKRT3YMWT540 Not StartedPLNE CKRT3YMWT550 Not StartedPLNE CKRT3YMWT560 Not StartedPLNE CKRT3YMWT570 Not StartedPLNE CKRT3YMWT580 Not StartedPLNE CKRT3YMWT590 Not StartedPLNE CKRT3YMWT600 Not StartedPLNE CKRT3YOFW100 Not StartedPLNE CKRT3YOFW110 Not StartedPLNE CKRT3YOFW120 Not StartedPLNE CKRT3YOFW130 Not StartedPLNE CKRT3YOFW140 Not StartedPLNE CKRT3YPW080 Not StartedPLNE CKRT3YPW100 Not StartedPLNE CKRT3YPW110 Not StartedPLNE CKRT3YPW120 Not StartedPLNE CKRT3YRCO310 Not StartedPLNE CKRT3YRCO320 Not StartedPLNE CKRT3YRCO330 Not StartedPLNE CKRT3YRCO340 Not StartedPLNE CKRT3YRCO350 Not StartedPLNE CKRT3YRCO360 Not StartedPLNE CKRT3YRCO370 Not StartedPLNE CKRT3YRCO380 Not StartedPLNE CKRT3YRCO390 Not StartedPLNE CKRT3YRCO400 Not StartedPLNE CKRT3YRCO410 Not StartedPLNE CKRT3YRCO420 Not StartedPLNE CKRT3YRCO430 Not StartedPLNE CKRT3YRCO440 Not StartedPLNE CKRT3YRCO450 Not StartedPLNE CKRT3YRCO460 Not StartedPLNE CKRT3YRCO470 Not StartedPLNE CKRT3YRCO480 Not StartedPLNE CKRT3YRCO490 Not StartedPLNE CKRT3YRCO500 Not StartedPLNE CKRT3YRCO510 Not StartedPLNE CKRT3YRCO520 Not StartedPLNE CKRT3YRCO530 Not StartedPLNE CKRT3YRCO540 Not StartedPLNE CKRT3YRCO550 Not StartedPLNE CKRT3YRCO560 Not StartedPLNE CKRT3YRCO570 Not StartedPLNE CKRT3YRCO580 Not StartedPLNE CKRT3YRCO590 Not StartedPLNE CKRT3YRCO600 Not StartedPLNE

REHAB-1.2.2.3.1.2 Install magnesium 06/10/2012 anode 07/10/2012 06:00:00 17:00:00 REHAB-1.2.2.3.1.2 Backfill & berming 08/10/2012 30/10/2012 06:00:00 17:00:00 REHAB-1.2.2.3.1.2 Remove Sheet 24/10/2012 pile & dewatering 30/10/2012 06:00:00 system 17:00:00 REHAB-1.2.2.3.1.3 Sheet pile & 31/10/2012 dewatering 07/11/2012 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.1.3 Sheet pile / 08/11/2012 Dewatering12/12/2012 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.1.3 Excavation 13/12/2012 05/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.3 Formwork fabrication 22/12/2012 &24/01/2013 06:00:00 erection 17:00:00 REHAB-1.2.2.3.1.3 Anchor flange 30/12/2012 & sleeve02/02/2013 06:00:00 fab/erection 17:00:00 REHAB-1.2.2.3.1.3 Cast in situ 16/01/2013 & curing 27/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.3 Concrete coating 28/01/2013 04/02/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.3 Install magnesium 30/01/2013 anode 31/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.3 Backfill & berming 02/02/2013 24/02/2013 06:00:00 17:00:00 REHAB-1.2.2.3.1.3 Remove Sheet 18/02/2013 pile & dewatering 24/02/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.8 Concrete & 04/10/2012 pre-cast 07/11/2012 06:00:00 17:00:00 REHAB-1.2.2.3.8 Piping prefabrication 07/10/2012 10/11/2012 06:00:00 17:00:00 REHAB-1.2.2.3.8 Structural &09/10/2012 Access platform 01/11/2012 06:00:00 prefabrication 17:00:00 REHAB-1.2.2.3.8 Misc pre-fabrication 17/10/2012 03/11/2012 06:00:00 17:00:00 REHAB-1.2.2.3.8 Valves shop 20/10/2012 testing 05/11/2012 06:00:00 17:00:00 REHAB-1.2.2.3.9 Partial MCC 12/05/2013 walkthrough 14/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.9 Civil punchlist 15/05/2013 works 18/06/2013 06:00:00 17:00:00 REHAB-1.2.2.3.9 Mechanical 19/06/2013 punchlist works 23/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.9 Electrical & 24/07/2013 instrumentation 27/08/2013 06:00:00 punchlist 17:00:00 works REHAB-1.2.2.3.2.2 Detour construction 09/05/2013 16/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.2 Sheet pile / 18/05/2013 Dewatering04/06/2013 06:00:00 System Installation 17:00:00& Operation REHAB-1.2.2.3.2.2 Excavation 21/05/2013 22/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.2 Install / weld 23/05/2013 pipe 25/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.2 NDE 26/05/2013 27/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.2 Tie-in to existing 28/05/2013 30/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.2 Ext field joint 01/06/2013 coating 02/06/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.2 Holiday test03/06/2013 / sand padding 10/06/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.3.2.2 Asphalt pavement 11/06/2013 restoration 15/06/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.2 Remove Sheet 16/06/2013 pile & dewatering 19/06/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.10 Detour construction 10/09/2013 17/09/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.10 Sheet pile / 18/09/2013 Dewatering06/10/2013 06:00:00 System Installation 17:00:00& Operation REHAB-1.2.2.3.2.10 Excavation 22/09/2013 23/09/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.10 Install / weld 24/09/2013 pipe 25/09/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.10 NDE 26/09/2013 28/09/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.10 Tie-in to existing 29/09/2013 01/10/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.10 Ext field joint 02/10/2013 coating 03/10/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.10 Holiday test05/10/2013 / sand padding 12/10/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.3.2.10 Asphalt pavement 13/10/2013 restoration 16/10/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.10 Remove Sheet 07/10/2013 pile & dewatering 10/10/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.12 Detour construction 21/11/2013 28/11/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.12 Sheet pile / 30/11/2013 Dewatering17/12/2013 06:00:00 System Installation 17:00:00& Operation REHAB-1.2.2.3.2.12 Excavation 03/12/2013 04/12/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.12 Install / weld 05/12/2013 pipe 07/12/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.12 NDE 08/12/2013 09/12/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.12 Tie-in to existing 10/12/2013 12/12/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.12 Ext field joint 14/12/2013 coating 15/12/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.12 Holiday test16/12/2013 / sand padding 23/12/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.3.2.12 Asphalt pavement 24/12/2013 restoration 28/12/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.12 Remove Sheet 29/12/2013 pile & dewatering 01/01/2014 06:00:00 system 17:00:00

Page 7

TASK

CKRT3YRCO610 Not StartedPLNE CKRT3YRCO620 Not StartedPLNE CKRT3YRCO630 Not StartedPLNE CKRT3YRCO640 Not StartedPLNE CKRT3YRCO650 Not StartedPLNE CKRT3YRCO660 Not StartedPLNE CKRT3YRCO670 Not StartedPLNE CKRT3YRCO680 Not StartedPLNE CKRT3YRCO690 Not StartedPLNE CKRT3YRCO700 Not StartedPLNE CKRT3YRCO710 Not StartedPLNE CKRT3YRCO720 Not StartedPLNE CKRT3YRCO730 Not StartedPLNE CKRT3YRCO740 Not StartedPLNE CKRT3YRCO750 Not StartedPLNE CKRT3YRCO760 Not StartedPLNE CKRT3YRCO770 Not StartedPLNE CKRT3YRCO780 Not StartedPLNE CKRT3YRCO790 Not StartedPLNE CKRT3YRCO800 Not StartedPLNE CKRT3YRCT1000 Not StartedPLNE CKRT3YRCT1010 Not StartedPLNE CKRT3YRCT1020 Not StartedPLNE CKRT3YRCT1030 Not StartedPLNE CKRT3YRCT1040 Not StartedPLNE CKRT3YRCT1050 Not StartedPLNE CKRT3YRCT1060 Not StartedPLNE CKRT3YRCT1070 Not StartedPLNE CKRT3YRCT1080 Not StartedPLNE CKRT3YRCT1090 Not StartedPLNE CKRT3YRCT1100 Not StartedPLNE CKRT3YRCT1110 Not StartedPLNE CKRT3YRCT1120 Not StartedPLNE CKRT3YRCT1130 Not StartedPLNE CKRT3YRCT1140 Not StartedPLNE CKRT3YRCT1150 Not StartedPLNE CKRT3YRCT1160 Not StartedPLNE CKRT3YRCT1170 Not StartedPLNE CKRT3YRCT1180 Not StartedPLNE CKRT3YRCT1190 Not StartedPLNE CKRT3YRCT1200 Not StartedPLNE CKRT3YRCT1210 Not StartedPLNE CKRT3YRCT340 Not StartedPLNE CKRT3YRCT350 Not StartedPLNE CKRT3YRCT360 Not StartedPLNE CKRT3YRCT370 Not StartedPLNE CKRT3YRCT380 Not StartedPLNE CKRT3YRCT390 Not StartedPLNE CKRT3YRCT400 Not StartedPLNE CKRT3YRCT410 Not StartedPLNE CKRT3YRCT420 Not StartedPLNE CKRT3YRCT430 Not StartedPLNE

REHAB-1.2.2.3.2.13 Detour construction 28/03/2013 04/04/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.13 Sheet pile / 06/04/2013 Dewatering23/04/2013 06:00:00 System Installation 17:00:00& Operation REHAB-1.2.2.3.2.13 Excavation 09/04/2013 10/04/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.13 Install / weld 11/04/2013 pipe 13/04/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.13 NDE 14/04/2013 15/04/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.13 Tie-in to existing 16/04/2013 18/04/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.13 Ext field joint 20/04/2013 coating 21/04/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.13 Holiday test22/04/2013 / sand padding 29/04/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.3.2.13 Asphalt pavement 30/04/2013 restoration 04/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.13 Remove Sheet 05/05/2013 pile & dewatering 08/05/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.14 Detour construction 25/02/2013 04/03/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.14 Sheet pile / 05/03/2013 Dewatering23/03/2013 06:00:00 System Installation 17:00:00& Operation REHAB-1.2.2.3.2.14 Excavation 09/03/2013 10/03/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.14 Install / weld 11/03/2013 pipe 12/03/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.14 NDE 13/03/2013 14/03/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.14 Tie-in to existing 16/03/2013 18/03/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.14 Ext field joint 19/03/2013 coating 20/03/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.14 Holiday test21/03/2013 / sand padding 28/03/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.3.2.14 Asphalt pavement 30/03/2013 restoration 02/04/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.14 Remove Sheet 24/03/2013 pile & dewatering 27/03/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.11 Sheet pile & 12/10/2013 dewatering 13/10/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.2.11 Sheet pile / 14/10/2013 Dewatering13/11/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.2.11 Construct Thrust 15/10/2013 pit & recieving 20/10/2013 06:00:00pit 17:00:00 REHAB-1.2.2.3.2.11 TB equipment 21/10/2013 setup 23/10/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.11 Install /weld24/10/2013 / push pipe28/10/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.11 Dismantle / 29/10/2013 remove TB29/10/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.3.2.11 NDE 26/10/2013 29/10/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.11 Tie-in to existing 30/10/2013 03/11/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.11 Field joint ext 04/11/2013 coating 05/11/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.11 Backfill & restoration 06/11/2013 12/11/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.11 Remove Sheet 14/11/2013 pile & dewatering 20/11/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.15 Sheet pile & 09/05/2013 dewatering 11/05/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.2.15 Sheet pile / 12/05/2013 Dewatering11/06/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.2.15 Construct Thrust 13/05/2013 pit & recieving 18/05/2013 06:00:00pit 17:00:00 REHAB-1.2.2.3.2.15 TB equipment 19/05/2013 setup 21/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.15 Install /weld22/05/2013 / push pipe26/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.15 Dismantle / 27/05/2013 remove TB27/05/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.3.2.15 NDE 23/05/2013 27/05/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.15 Tie-in to existing 28/05/2013 01/06/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.15 Field joint ext 02/06/2013 coating 03/06/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.15 Backfill & restoration 04/06/2013 10/06/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.15 Remove Sheet 12/06/2013 pile & dewatering 18/06/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.1 Sheet pile & 19/06/2013 dewatering 20/06/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.2.1 Sheet pile / 22/06/2013 Dewatering22/07/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.2.1 Construct Thrust 23/06/2013 pit & recieving 27/06/2013 06:00:00pit 17:00:00 REHAB-1.2.2.3.2.1 TB equipment 29/06/2013 setup 01/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.1 Install /weld02/07/2013 / push pipe06/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.1 Dismantle / 07/07/2013 remove TB07/07/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.3.2.1 NDE 03/07/2013 07/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.1 Tie-in to existing 08/07/2013 11/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.1 Field joint ext 13/07/2013 coating 14/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.1 Backfill & restoration 15/07/2013 21/07/2013 06:00:00 17:00:00

Page 8

TASK

CKRT3YRCT440 Not StartedPLNE CKRT3YRCT450 Not StartedPLNE CKRT3YRCT460 Not StartedPLNE CKRT3YRCT470 Not StartedPLNE CKRT3YRCT480 Not StartedPLNE CKRT3YRCT490 Not StartedPLNE CKRT3YRCT500 Not StartedPLNE CKRT3YRCT510 Not StartedPLNE CKRT3YRCT520 Not StartedPLNE CKRT3YRCT530 Not StartedPLNE CKRT3YRCT540 Not StartedPLNE CKRT3YRCT550 Not StartedPLNE CKRT3YRCT560 Not StartedPLNE CKRT3YRCT570 Not StartedPLNE CKRT3YRCT580 Not StartedPLNE CKRT3YRCT590 Not StartedPLNE CKRT3YRCT600 Not StartedPLNE CKRT3YRCT610 Not StartedPLNE CKRT3YRCT620 Not StartedPLNE CKRT3YRCT630 Not StartedPLNE CKRT3YRCT640 Not StartedPLNE CKRT3YRCT650 Not StartedPLNE CKRT3YRCT660 Not StartedPLNE CKRT3YRCT670 Not StartedPLNE CKRT3YRCT680 Not StartedPLNE CKRT3YRCT690 Not StartedPLNE CKRT3YRCT700 Not StartedPLNE CKRT3YRCT710 Not StartedPLNE CKRT3YRCT720 Not StartedPLNE CKRT3YRCT730 Not StartedPLNE CKRT3YRCT740 Not StartedPLNE CKRT3YRCT750 Not StartedPLNE CKRT3YRCT760 Not StartedPLNE CKRT3YRCT770 Not StartedPLNE CKRT3YRCT780 Not StartedPLNE CKRT3YRCT790 Not StartedPLNE CKRT3YRCT800 Not StartedPLNE CKRT3YRCT810 Not StartedPLNE CKRT3YRCT820 Not StartedPLNE CKRT3YRCT830 Not StartedPLNE CKRT3YRCT840 Not StartedPLNE CKRT3YRCT850 Not StartedPLNE CKRT3YRCT860 Not StartedPLNE CKRT3YRCT870 Not StartedPLNE CKRT3YRCT880 Not StartedPLNE CKRT3YRCT890 Not StartedPLNE CKRT3YRCT900 Not StartedPLNE CKRT3YRCT910 Not StartedPLNE CKRT3YRCT920 Not StartedPLNE CKRT3YRCT930 Not StartedPLNE CKRT3YRCT940 Not StartedPLNE CKRT3YRCT950 Not StartedPLNE

REHAB-1.2.2.3.2.1 Remove Sheet 23/07/2013 pile & dewatering 29/07/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.5 Sheet pile & 30/07/2013 dewatering 31/07/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.2.5 Sheet pile / 01/08/2013 Dewatering01/09/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.2.5 Construct Thrust 03/08/2013 pit & recieving 07/08/2013 06:00:00pit 17:00:00 REHAB-1.2.2.3.2.5 TB equipment 08/08/2013 setup 11/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.5 Install /weld12/08/2013 / push pipe15/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.5 Dismantle / 17/08/2013 remove TB17/08/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.3.2.5 NDE 13/08/2013 17/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.5 Tie-in to existing 18/08/2013 21/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.5 Field joint ext 22/08/2013 coating 24/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.5 Backfill & restoration 25/08/2013 31/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.5 Remove Sheet 01/09/2013 pile & dewatering 07/09/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.6 Sheet pile & 08/09/2013 dewatering 09/09/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.2.6 Sheet pile / 10/09/2013 Dewatering10/10/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.2.6 Construct Thrust 11/09/2013 pit & recieving 16/09/2013 06:00:00pit 17:00:00 REHAB-1.2.2.3.2.6 TB equipment 17/09/2013 setup 19/09/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.6 Install /weld21/09/2013 / push pipe24/09/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.6 Dismantle / 25/09/2013 remove TB25/09/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.3.2.6 NDE 22/09/2013 25/09/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.6 Tie-in to existing 26/09/2013 30/09/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.6 Field joint ext 01/10/2013 coating 02/10/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.6 Backfill & restoration 03/10/2013 09/10/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.6 Remove Sheet 10/10/2013 pile & dewatering 16/10/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.7 Sheet pile & 17/10/2013 dewatering 19/10/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.2.7 Sheet pile / 20/10/2013 Dewatering19/11/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.2.7 Construct Thrust 21/10/2013 pit & recieving 26/10/2013 06:00:00pit 17:00:00 REHAB-1.2.2.3.2.7 TB equipment 27/10/2013 setup 29/10/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.7 Install /weld30/10/2013 / push pipe03/11/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.7 Dismantle / 04/11/2013 remove TB04/11/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.3.2.7 NDE 31/10/2013 04/11/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.7 Tie-in to existing 05/11/2013 09/11/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.7 Field joint ext 10/11/2013 coating 11/11/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.7 Backfill & restoration 12/11/2013 18/11/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.7 Remove Sheet 20/11/2013 pile & dewatering 26/11/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.8 Sheet pile & 31/07/2013 dewatering 01/08/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.2.8 Sheet pile / 03/08/2013 Dewatering02/09/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.2.8 Construct Thrust 04/08/2013 pit & recieving 08/08/2013 06:00:00pit 17:00:00 REHAB-1.2.2.3.2.8 TB equipment 10/08/2013 setup 12/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.8 Install /weld13/08/2013 / push pipe17/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.8 Dismantle / 18/08/2013 remove TB18/08/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.3.2.8 NDE 14/08/2013 18/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.8 Tie-in to existing 19/08/2013 22/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.8 Field joint ext 24/08/2013 coating 25/08/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.8 Backfill & restoration 26/08/2013 01/09/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.8 Remove Sheet 03/09/2013 pile & dewatering 09/09/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.9 Sheet pile & 20/06/2013 dewatering 22/06/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.2.9 Sheet pile / 23/06/2013 Dewatering23/07/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.2.9 Construct Thrust 24/06/2013 pit & recieving 29/06/2013 06:00:00pit 17:00:00 REHAB-1.2.2.3.2.9 TB equipment 30/06/2013 setup 02/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.9 Install /weld03/07/2013 / push pipe07/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.9 Dismantle / 08/07/2013 remove TB08/07/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.3.2.9 NDE 04/07/2013 08/07/2013 06:00:00 17:00:00

Page 9

TASK

CKRT3YRCT960 Not StartedPLNE CKRT3YRCT970 Not StartedPLNE CKRT3YRCT980 Not StartedPLNE CKRT3YRCT990 Not StartedPLNE CKRT3YRWCT450 Not StartedPLNE CKRT3YRWCT460 Not StartedPLNE CKRT3YRWCT470 Not StartedPLNE CKRT3YRWCT480 Not StartedPLNE CKRT3YRWCT490 Not StartedPLNE CKRT3YRWCT500 Not StartedPLNE CKRT3YRWCT510 Not StartedPLNE CKRT3YRWCT520 Not StartedPLNE CKRT3YRWCT530 Not StartedPLNE CKRT3YRWCT540 Not StartedPLNE CKRT3YRWCT550 Not StartedPLNE CKRT3YST0970 Not StartedPLNE CKRT3YST0980 Not StartedPLNE CKRT3YST0990 Not StartedPLNE CKRT3YST1000 Not StartedPLNE CKRT3YST1010 Not StartedPLNE CKRT3YST1020 Not StartedPLNE CKRT3YST1030 Not StartedPLNE CKRT3YST700 Not StartedPLNE CKRT3YST710 Not StartedPLNE CKRT3YST720 Not StartedPLNE CKRT3YST730 Not StartedPLNE CKRT3YST740 Not StartedPLNE CKRT3YST750 Not StartedPLNE CKRT3YST760 Not StartedPLNE CKRT3YST770 Not StartedPLNE CKRT3YST780 Not StartedPLNE CKRT3YST790 Not StartedPLNE CKRT3YST800 Not StartedPLNE CKRT3YST810 Not StartedPLNE CKRT3YST820 Not StartedPLNE CKRT3YST830 Not StartedPLNE CKRT3YST840 Not StartedPLNE CKRT3YST850 Not StartedPLNE CKRT3YST860 Not StartedPLNE CKRT3YST870 Not StartedPLNE CKRT3YST880 Not StartedPLNE CKRT3YST890 Not StartedPLNE CKRT3YST900 Not StartedPLNE CKRT3YST910 Not StartedPLNE CKRT3YST920 Not StartedPLNE CKRT3YST930 Not StartedPLNE CKRT3YST940 Not StartedPLNE CKRT3YST950 Not StartedPLNE CKRT3YST960 Not StartedPLNE CKRTJ1CMW30 Not StartedPLNE CKRTJ1FCO530 Not StartedPLNE CKRTJ1HYD130 Not StartedPLNE

REHAB-1.2.2.3.2.9 Tie-in to existing 09/07/2013 13/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.9 Field joint ext 14/07/2013 coating 15/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.9 Backfill & restoration 16/07/2013 22/07/2013 06:00:00 17:00:00 REHAB-1.2.2.3.2.9 Remove Sheet 24/07/2013 pile & dewatering 30/07/2013 06:00:00 system 17:00:00 REHAB-1.2.2.3.2.3 Sheet pile & 02/01/2014 dewatering 04/01/2014 06:00:00 system installation 17:00:00 REHAB-1.2.2.3.2.3 Sheet pile / 05/01/2014 Dewatering04/02/2014 06:00:00 System Operation 17:00:00 REHAB-1.2.2.3.2.3 Construct Thrust 06/01/2014 pit & recieving 11/01/2014 06:00:00pit 17:00:00 REHAB-1.2.2.3.2.3 TB equipment 12/01/2014 setup 14/01/2014 06:00:00 17:00:00 REHAB-1.2.2.3.2.3 Install /weld15/01/2014 / push pipe19/01/2014 06:00:00 17:00:00 REHAB-1.2.2.3.2.3 Dismantle / 20/01/2014 remove TB20/01/2014 06:00:00 setup 17:00:00 REHAB-1.2.2.3.2.3 NDE 16/01/2014 20/01/2014 06:00:00 17:00:00 REHAB-1.2.2.3.2.3 Tie-in to existing 21/01/2014 25/01/2014 06:00:00 17:00:00 REHAB-1.2.2.3.2.3 Field joint ext 26/01/2014 coating 27/01/2014 06:00:00 17:00:00 REHAB-1.2.2.3.2.3 Backfill & restoration 28/01/2014 03/02/2014 06:00:00 17:00:00 REHAB-1.2.2.3.2.3 Remove Sheet 04/02/2014 pile & dewatering 10/02/2014 06:00:00 system 17:00:00 REHAB-1.2.2.3.6.2.3 Cable installation 12/01/2013 17/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.3 Grounding system 19/01/2013 24/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.3 Task & area 26/01/2013 lighting 31/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.3 Field instruments 02/02/2013 JB & 07/02/2013 instruments 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.3 E & I Precomissioning 09/02/2013 14/02/2013 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.4 Painting / coating 16/02/2013 21/02/2013 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.4 backfilling restoration 23/02/2013 &28/02/2013 06:00:00 clean up 17:00:00 REHAB-1.2.2.3.6.1.1 Clearing & grading 07/07/2012 12/07/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.1 Marl cap & compact 14/07/2012 19/07/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.1 Excavation 21/07/2012 26/07/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.2 Supports foundation 28/07/2012 erection 02/08/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.2 Structural steel 04/08/2012 supports 09/08/2012 06:00:00 erection 17:00:00 REHAB-1.2.2.3.6.1.2 Scraper trap 11/08/2012 / utility piping 16/08/2012 06:00:00 installation 17:00:00 REHAB-1.2.2.3.6.1.2 AG/ UG piping 18/08/2012 works 23/08/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.2 Access platform 25/08/2012 erection 30/08/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.2 Concrete pad 01/09/2012 construction 06/09/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.2 Hydrotesting 08/09/2012 13/09/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.3 Cable installation 15/09/2012 20/09/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.3 Grounding system 22/09/2012 27/09/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.3 Task & area 29/09/2012 lighting 04/10/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.3 Field instruments 06/10/2012 JB & 11/10/2012 instruments 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.3 E & I Precomissioning 13/10/2012 18/10/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.4 Painting / coating 20/10/2012 25/10/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.1.4 backfilling restoration 27/10/2012 &01/11/2012 06:00:00 clean up 17:00:00 REHAB-1.2.2.3.6.2.1 Clearing & grading 03/11/2012 08/11/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.1 Marl cap & compact 10/11/2012 15/11/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.1 Excavation 17/11/2012 22/11/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.2 Supports foundation 24/11/2012 erection 29/11/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.2 Structural steel 01/12/2012 supports 06/12/2012 06:00:00 erection 17:00:00 REHAB-1.2.2.3.6.2.2 Scraper trap 08/12/2012 / utility piping 13/12/2012 06:00:00 installation 17:00:00 REHAB-1.2.2.3.6.2.2 AG/ UG piping 15/12/2012 works 20/12/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.2 Access platform 22/12/2012 erection 27/12/2012 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.2 Concrete pad 29/12/2012 construction 03/01/2013 06:00:00 17:00:00 REHAB-1.2.2.3.6.2.2 Hydrotesting 05/01/2013 10/01/2013 06:00:00 17:00:00 REHAB-1.2.2.4.1 Survey & markings 18/05/2013 14/07/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.4 Pipeline crossing 04/12/2013 25/01/2014 06:00:00 17:00:00 REHAB-1.2.2.4.5 Installation of 11/06/2014 temporary 19/08/2014 06:00:00 testing facilities 17:00:00

Page 10

TASK

CKRTJ1HYD140 Not StartedPLNE CKRTJ1HYD150 Not StartedPLNE CKRTJ1MW720 Not StartedPLNE CKRTJ1MW730 Not StartedPLNE CKRTJ1MW740 Not StartedPLNE CKRTJ1MW750 Not StartedPLNE CKRTJ1MW760 Not StartedPLNE CKRTJ1MW770 Not StartedPLNE CKRTJ1MW780 Not StartedPLNE CKRTJ1MW790 Not StartedPLNE CKRTJ1MW800 Not StartedPLNE CKRTJ1MW810 Not StartedPLNE CKRTJ1MW820 Not StartedPLNE CKRTJ1MW830 Not StartedPLNE CKRTJ1MW840 Not StartedPLNE CKRTJ1MW850 Not StartedPLNE CKRTJ1MW860 Not StartedPLNE CKRTJ1MW870 Not StartedPLNE CKRTJ1MWT730 Not StartedPLNE CKRTJ1MWT740 Not StartedPLNE CKRTJ1MWT750 Not StartedPLNE CKRTJ1MWT760 Not StartedPLNE CKRTJ1MWT770 Not StartedPLNE CKRTJ1MWT780 Not StartedPLNE CKRTJ1MWT790 Not StartedPLNE CKRTJ1MWT810 Not StartedPLNE CKRTJ1MWT820 Not StartedPLNE CKRTJ1MWT830 Not StartedPLNE CKRTJ1MWT840 Not StartedPLNE CKRTJ1MWT850 Not StartedPLNE CKRTJ1MWT860 Not StartedPLNE CKRTJ1MWT870 Not StartedPLNE CKRTJ1MWT880 Not StartedPLNE CKRTJ1MWT890 Not StartedPLNE CKRTJ1MWT900 Not StartedPLNE CKRTJ1OFW150 Not StartedPLNE CKRTJ1OFW160 Not StartedPLNE CKRTJ1OFW170 Not StartedPLNE CKRTJ1OFW180 Not StartedPLNE CKRTJ1OFW190 Not StartedPLNE CKRTJ1PW120 Not StartedPLNE CKRTJ1PW140 Not StartedPLNE CKRTJ1RCO410 Not StartedPLNE CKRTJ1RCO430 Not StartedPLNE CKRTJ1RCO440 Not StartedPLNE CKRTJ1RCO460 Not StartedPLNE CKRTJ1RCO480 Not StartedPLNE CKRTJ1RCO490 Not StartedPLNE CKRTJ1RCT470 Not StartedPLNE CKRTJ1RCT475 Not StartedPLNE CKRTJ1RCT480 Not StartedPLNE CKRTJ1RCT490 Not StartedPLNE

REHAB-1.2.2.4.5 Pressure testing 11/06/2014 27/07/2014 06:00:00 17:00:00 REHAB-1.2.2.4.5 Dewatering 28/07/2014 / drying / lay-up 20/08/2014 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 ROW construction 30/05/2013 (Sabkah 27/07/2013 06:00:00 / Non Sabkah) 17:00:00 REHAB-1.2.2.4.2.1 Trenching 30/05/2013 27/07/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 Pipe hauling 02/06/2013 & stringing 29/07/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 Pipe bending 04/06/2013 31/07/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 Beveling / line-up 06/06/2013 & welding 03/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 NDE 06/06/2013 03/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 Ext field joint 09/06/2013 coating 05/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 Sand bedding 11/06/2013 07/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 Pipe lowering 11/06/2013 07/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 CP works - 13/06/2013 test & bonding 10/08/2013 06:00:00 thermit weld 17:00:00 REHAB-1.2.2.4.2.1 Holiday test17/06/2013 / Sand Padding 13/08/2013 06:00:00 & Backfill 17:00:00 REHAB-1.2.2.4.2.1 String to string 20/06/2013 tie-in 17/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 Berm construction 25/07/2013 17/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.1 CP works - 25/07/2013 test station 17/08/2013 & 06:00:00 bonding 17:00:00 REHAB-1.2.2.4.2.1 Install KM Marker 31/07/2013 & warning 17/08/2013 06:00:00 sign 17:00:00 REHAB-1.2.2.4.2.1 Clean up 03/08/2013 19/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.2 Excavation 11/06/2013 17/06/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.2 Lean concrete 18/06/2013 19/06/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.2 Rebar/formwork/Anchor 20/06/2013 03/07/2013 06:00:00 flange & sleeve 17:00:00 fab/erection REHAB-1.2.2.4.2.2 Cast in situ 04/07/2013 & curing 11/07/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.2 Surface touch 13/07/2013 up/Concrete 17/07/2013 06:00:00 coating 17:00:00 & painting REHAB-1.2.2.4.2.2 Install magnesium 18/07/2013 anode 18/07/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.2 Backfill / compact 20/07/2013 & berming 03/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.3 Sheet pile & 18/06/2013 dewatering 23/06/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.4.2.3 Sheet pile / 24/06/2013 Dewatering06/08/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.4.2.3 Excavation 25/06/2013 & Base compaction 02/07/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.3 Formwork fabrication 03/07/2013 &04/07/2013 06:00:00 erection 17:00:00 REHAB-1.2.2.4.2.3 Anchor flange 06/07/2013 & sleeve21/07/2013 06:00:00 fab/erection 17:00:00 REHAB-1.2.2.4.2.3 Cast in situ 22/07/2013 & curing 30/07/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.3 Surface touch 31/07/2013 up/Concrete 05/08/2013 06:00:00 coating 17:00:00 & painting REHAB-1.2.2.4.2.3 Install magnesium 06/08/2013 anode 06/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.3 Backfill / compact 07/08/2013 & berming 24/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.2.3 Remove Sheet 07/08/2013 pile & dewatering 11/08/2013 06:00:00 system 17:00:00 REHAB-1.2.2.4.7 Concrete & 04/12/2013 pre-cast 07/01/2014 06:00:00 17:00:00 REHAB-1.2.2.4.7 Piping prefabrication 22/12/2013 25/01/2014 06:00:00 17:00:00 REHAB-1.2.2.4.7 Structural &08/01/2014 Access platform 01/02/2014 06:00:00 prefabrication 17:00:00 REHAB-1.2.2.4.7 Misc pre-fabrication 26/01/2014 11/02/2014 06:00:00 17:00:00 REHAB-1.2.2.4.7 Valves shop 06/02/2014 testing 23/02/2014 06:00:00 17:00:00 REHAB-1.2.2.4.8 Partial MCC 21/08/2014 walkthrough 24/08/2014 06:00:00 17:00:00 REHAB-1.2.2.4.8 PMCC punchlist 25/08/2014 work 28/09/2014 06:00:00 17:00:00 REHAB-1.2.2.4.4.2 Detour construction 05/11/2013 12/11/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.2 Excavation 13/11/2013 14/11/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.2 Install /weld16/11/2013 / NDE/ Coat 17/11/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.4.4.2 Tie-in to existing 18/11/2013 20/11/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.2 Holiday test21/11/2013 / sand padding 28/11/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.4.4.2 Asphalt pavement 30/11/2013 restoration 03/12/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.1 Sheet pile installation 12/08/2013 13/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.1 Construct Thrust 14/08/2013 pit & recieving 18/08/2013 06:00:00pit 17:00:00 REHAB-1.2.2.4.4.1 TB equipment 19/08/2013 setup 21/08/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.1 Install /weld22/08/2013 / NDE/ Coat 28/08/2013 06:00:00 /push pipe 17:00:00

Page 11

TASK

CKRTJ1RCT500 Not StartedPLNE CKRTJ1RCT520 Not StartedPLNE CKRTJ1RCT540 Not StartedPLNE CKRTJ1RCT550 Not StartedPLNE CKRTJ1RCT560 Not StartedPLNE CKRTJ1RCT570 Not StartedPLNE CKRTJ1RCT580 Not StartedPLNE CKRTJ1RCT590 Not StartedPLNE CKRTJ1RCT600 Not StartedPLNE CKRTJ1RCT610 Not StartedPLNE CKRTJ1RCT630 Not StartedPLNE CKRTJ1RCT650 Not StartedPLNE CKRTJ1RCT660 Not StartedPLNE CKRTJ1RCT670 Not StartedPLNE CKRTJ1RCT680 Not StartedPLNE CKRTJ1RCT690 Not StartedPLNE CKRTJ1RCT700 Not StartedPLNE CKRTJ1RCT710 Not StartedPLNE CKRTJ1RCT720 Not StartedPLNE CKRTJ1RCT740 Not StartedPLNE CKRTJ1RCT760 Not StartedPLNE CKRTJ1RCT770 Not StartedPLNE CKRTJ1ST0890 Not StartedPLNE CKRTJ1ST0900 Not StartedPLNE CKRTJ1ST0910 Not StartedPLNE CKRTJ1ST0920 Not StartedPLNE CKRTJ1ST0930 Not StartedPLNE CKRTJ1ST0940 Not StartedPLNE CKRTJ1ST0950 Not StartedPLNE CKRTJ1ST0990 Not StartedPLNE CKRTJ1ST1000 Not StartedPLNE CKRTJ1ST1010 Not StartedPLNE CKRTJ1ST1020 Not StartedPLNE CKRTJ1ST1030 Not StartedPLNE CKRTJ1ST1040 Not StartedPLNE CKRTJ1ST1050 Not StartedPLNE CKRTJ1ST1060 Not StartedPLNE CKRTJ1ST1070 Not StartedPLNE CKRTJ1ST1080 Not StartedPLNE CKRTJ1ST1090 Not StartedPLNE CKRTJ1ST1100 Not StartedPLNE CKRTJ1ST1110 Not StartedPLNE CKRTJ1ST1120 Not StartedPLNE CKRTJ1ST1130 Not StartedPLNE CKRTJ1ST1140 Not StartedPLNE CKRTJ1ST1150 Not StartedPLNE CKRTJ1ST1160 Not StartedPLNE CKRTJ1ST1170 Not StartedPLNE CKRTJ1ST1180 Not StartedPLNE CKRTJ1ST1190 Not StartedPLNE CKRTJ1ST1200 Not StartedPLNE CKRTJ1ST1210 Not StartedPLNE

REHAB-1.2.2.4.4.1 Dismantle / 29/08/2013 remove TB31/08/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.4.4.1 Tie-in to existing 01/09/2013 03/09/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.1 Backfill & restoration 04/09/2013 12/09/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.1 Remove Sheet 14/09/2013 pile 17/09/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.3 Sheet pile & 23/10/2013 dewatering 28/10/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.4.4.3 Sheet pile / 29/10/2013 Dewatering20/11/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.4.4.3 Construct Thrust 30/10/2013 pit & recieving 04/11/2013 06:00:00pit 17:00:00 REHAB-1.2.2.4.4.3 TB equipment 05/11/2013 setup 07/11/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.3 Install /weld09/11/2013 / NDE/ Coat 14/11/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.4.4.3 Dismantle / 16/11/2013 remove TB17/11/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.4.4.3 Tie-in to existing 18/11/2013 20/11/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.3 Backfill & restoration 21/11/2013 30/11/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.3 Remove Sheet 21/11/2013 pile & dewatering 25/11/2013 06:00:00 system 17:00:00 REHAB-1.2.2.4.4.5 Sheet pile & 18/09/2013 dewatering 23/09/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.4.4.5 Sheet pile / 24/09/2013 Dewatering17/10/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.4.4.5 Construct Thrust 25/09/2013 pit & recieving 30/09/2013 06:00:00pit 17:00:00 REHAB-1.2.2.4.4.5 TB equipment 01/10/2013 setup 03/10/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.5 Install /weld05/10/2013 / NDE/ Coat 12/10/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.4.4.5 Dismantle / 13/10/2013 remove TB14/10/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.4.4.5 Tie-in to existing 15/10/2013 17/10/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.5 Backfill & restoration 19/10/2013 29/10/2013 06:00:00 17:00:00 REHAB-1.2.2.4.4.5 Remove Sheet 19/10/2013 pile & dewatering 22/10/2013 06:00:00 system 17:00:00 REHAB-1.2.2.4.6.1.3 Cable installation 18/02/2014 03/03/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.3 Install power 04/03/2014 panel 24/03/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.3 Task & area 25/03/2014 lighting 01/04/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.3 Field instruments 02/04/2014 JB & 07/04/2014 instruments 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.3 Conduit stub 08/04/2014 up 16/04/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.4 Painting / coating 29/04/2014 07/05/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.4 Backfilling restoration 08/05/2014 & 17/05/2014 06:00:00 clean up 17:00:00 REHAB-1.2.2.4.6.1.3 Cable termination 17/04/2014 & tagging 26/04/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.3 E & I Precomissioning 27/04/2014 10/05/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.4 Fencing & Guardrail 03/04/2014 19/05/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.1 Clearing & grading 18/02/2014 03/03/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.1 Excavation 04/03/2014 ,base compaction 01/04/2014 06:00:00 for foundation 17:00:00 REHAB-1.2.2.4.6.2.1 Cast in place 27/03/2014 conc foundation 16/04/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.1 Install precast 27/03/2014 foundation 16/04/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.2 Scraper trap 05/05/2014 /Jib crane 06/05/2014 06:00:00 installation 17:00:00 REHAB-1.2.2.4.6.2.2 Cast in place 07/05/2014 trap containment 20/05/2014 06:00:00 pond 17:00:00 REHAB-1.2.2.4.6.2.2 AG/ UG piping 11/05/2014 works 24/05/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.2 Scraper trap 19/05/2014 valve installtn 08/06/2014 06:00:00 & associated 17:00:00 piping REHAB-1.2.2.4.6.2.3 Cable installation 02/04/2014 19/04/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.3 Install power 20/04/2014 panel 10/05/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.3 Task & area 11/05/2014 lighting 18/05/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.3 Field instruments 19/05/2014 JB & 24/05/2014 instruments 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.3 Conduit stub 25/05/2014 up 04/06/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.4 Painting / coating 11/06/2014 22/06/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.4 Backfilling restoration 23/06/2014 & 03/07/2014 06:00:00 clean up 17:00:00 REHAB-1.2.2.4.6.2.2 Access platform 27/05/2014 erection 09/06/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.1 Structural steel 14/04/2014 supports 04/05/2014 06:00:00 erection 17:00:00 REHAB-1.2.2.4.6.2.2 Hydrotesting 28/05/2014 10/06/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.3 Cable termination 05/06/2014 & tagging 16/06/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.2.3 E & I Precomissioning 17/06/2014 03/07/2014 06:00:00 17:00:00

Page 12

TASK

CKRTJ1ST1220 Not StartedPLNE CKRTJ1ST820 Not StartedPLNE CKRTJ1ST830 Not StartedPLNE CKRTJ1ST840 Not StartedPLNE CKRTJ1ST8501 Not StartedPLNE CKRTJ1ST860 Not StartedPLNE CKRTJ1ST870 Not StartedPLNE CKRTJ1ST880 Not StartedPLNE CKRTJ1ST885 Not StartedPLNE CKRTJ1ST970 Not StartedPLNE CKRTJ1ST980 Not StartedPLNE CMOB020 Not StartedPLNE CMOB030 Not StartedPLNE CSJ1CMW010 Not StartedPLNE CSJ1FCO010 Not StartedPLNE CSJ1HYD010 Not StartedPLNE CSJ1HYD020 Not StartedPLNE CSJ1HYD030 Not StartedPLNE CSJ1HYD040 Not StartedPLNE CSJ1MLV010 Not StartedPLNE CSJ1MLV020 Not StartedPLNE CSJ1MLV030 Not StartedPLNE CSJ1MLV040 Not StartedPLNE CSJ1MLV050 Not StartedPLNE CSJ1MLV060 Not StartedPLNE CSJ1MLV070 Not StartedPLNE CSJ1MLV080 Not StartedPLNE CSJ1MLV090 Not StartedPLNE CSJ1MLV100 Not StartedPLNE CSJ1MLV110 Not StartedPLNE CSJ1MLV120 Not StartedPLNE CSJ1MLV130 Not StartedPLNE CSJ1MLV140 Not StartedPLNE CSJ1MLV150 Not StartedPLNE CSJ1MLV160 Not StartedPLNE CSJ1MLV170 Not StartedPLNE CSJ1MLV180 Not StartedPLNE CSJ1MLV190 Not StartedPLNE CSJ1MLV200 Not StartedPLNE CSJ1MLV210 Not StartedPLNE CSJ1MLV2201 Not StartedPLNE CSJ1MLV230 Not StartedPLNE CSJ1MLV240 Not StartedPLNE CSJ1MW010 Not StartedPLNE CSJ1MW020 Not StartedPLNE CSJ1MW030 Not StartedPLNE CSJ1MW040 Not StartedPLNE CSJ1MW050 Not StartedPLNE CSJ1MW060 Not StartedPLNE CSJ1MW070 Not StartedPLNE CSJ1MW080 Not StartedPLNE CSJ1MW090 Not StartedPLNE

REHAB-1.2.2.4.6.2.4 Fencing & Guardrail 15/05/2014 06/07/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.1 Excavation 20/01/2014 ,base compaction 17/02/2014 06:00:00 for foundation 17:00:00 REHAB-1.2.2.4.6.1.1 Install precast 12/02/2014 foundation 04/03/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.1 Cast in place 12/02/2014 conc foundation 04/03/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.2 Scraper trap 23/03/2014 /Jib crane 24/03/2014 06:00:00 installation 17:00:00 REHAB-1.2.2.4.6.1.2 Cast in place 25/03/2014 trap containment 07/04/2014 06:00:00 pond 17:00:00 REHAB-1.2.2.4.6.1.2 AG/ UG piping 29/03/2014 works 10/04/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.2 Scraper trap 06/04/2014 valve installtn 26/04/2014 06:00:00 & associated 17:00:00 piping REHAB-1.2.2.4.6.1.2 Access platform 14/04/2014 erection 27/04/2014 06:00:00 17:00:00 REHAB-1.2.2.4.6.1.1 Structural steel 02/03/2014 supports 22/03/2014 06:00:00 erection 17:00:00 REHAB-1.2.2.4.6.1.2 Hydrotesting 15/04/2014 28/04/2014 06:00:00 17:00:00 REHAB-1.2.1 Site office construction 19/08/2012 05/01/2013 06:00:00 17:00:00 REHAB-1.2.1 Camp construction 19/08/2012 05/01/2013 06:00:00 17:00:00 REHAB-1.2.4.6.7 Survey & Markings 04/10/2012 01/05/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.4 Pipeline crossings 14/09/2013 21/11/2013 06:00:00 17:00:00 REHAB-1.2.4.6.8 Installation of 30/12/2013 temporary 09/03/2014 06:00:00 testing facilities 17:00:00 REHAB-1.2.4.6.8 Test section1 30/12/2013 13/02/2014 06:00:00 17:00:00 REHAB-1.2.4.6.8 Test section 15/02/2014 2 10/03/2014 06:00:00 17:00:00 REHAB-1.2.4.6.8 Test section 11/03/2014 3 03/04/2014 06:00:00 17:00:00 REHAB-1.2.4.6.5.1.1 Demolish existing 29/09/2013 valve 09/10/2013 06:00:00 and associated 17:00:00 facilities REHAB-1.2.4.6.5.1.1 Site grading 10/10/2013 17/10/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.1.1 Excavation 19/10/2013 ,compaction 03/11/2013 06:00:00 and foundation 17:00:00 REHAB-1.2.4.6.5.1.1 Concrete foundation 04/11/2013 erection 11/11/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.1.1 Structural steel 12/11/2013 support18/11/2013 06:00:00 erection 17:00:00 REHAB-1.2.4.6.5.1.2 Piping / jump 20/11/2013 over & valve 01/12/2013 06:00:00 installation 17:00:00 REHAB-1.2.4.6.5.1.2 Access platform 02/12/2013 07/12/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.1.2 Hydrotest valve 08/12/2013 & pipe 12/12/2013 assembly 06:00:00 17:00:00 REHAB-1.2.4.6.5.1.2 Tie-in to existing 14/12/2013 18/12/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.1.3 painting / Labelling 19/12/2013 24/12/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.1.3 Backfilling & 22/12/2013 compaction 28/12/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.1.3 Fencing & guardrail 15/12/2013 31/12/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.2.1 Demolish existing 10/10/2013 valve 21/10/2013 06:00:00 and associated 17:00:00 facilities REHAB-1.2.4.6.5.2.1 Site grading 22/10/2013 29/10/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.2.1 Excavation 30/10/2013 ,compaction 14/11/2013 06:00:00 and foundation 17:00:00 REHAB-1.2.4.6.5.2.1 Concrete foundation 16/11/2013 erection 23/11/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.2.1 Structural steel 24/11/2013 support30/11/2013 06:00:00 erection 17:00:00 REHAB-1.2.4.6.5.2.2 Piping / jump 01/12/2013 over & valve 11/12/2013 06:00:00 installation 17:00:00 REHAB-1.2.4.6.5.2.2 Access platform 12/12/2013 17/12/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.2.2 Hydrotest valve 18/12/2013 & pipe 23/12/2013 assembly 06:00:00 17:00:00 REHAB-1.2.4.6.5.2.2 Tie-in to existing 24/12/2013 29/12/2013 06:00:00 17:00:00 REHAB-1.2.4.6.5.2.3 painting / Labelling 30/12/2013 04/01/2014 06:00:00 17:00:00 REHAB-1.2.4.6.5.2.3 Backfilling & 28/12/2013 clean-up 07/01/2014 06:00:00 17:00:00 REHAB-1.2.4.6.5.2.3 Fencing & guardrail 24/12/2013 09/01/2014 06:00:00 17:00:00 REHAB-1.2.4.6.2 Existing mainline 17/10/2012 excavation 14/05/2013 06:00:00 17:00:00 REHAB-1.2.4.6.2 ROW New Sabkah 20/10/2012 pad 16/05/2013 06:00:00 construction 17:00:00 REHAB-1.2.4.6.2 Cold Cutting 25/10/2012 / removal / 22/05/2013 06:00:00 transport exist 17:00:00 pipe REHAB-1.2.4.6.2 Clean up / reshape 28/10/2012 trench 25/05/2013 06:00:00 / trenching 17:00:00 REHAB-1.2.4.6.2 Pipe hauling 03/11/2012 & stringing 30/05/2013 06:00:00 17:00:00 REHAB-1.2.4.6.2 Pipe bending 05/11/2012 02/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.2 Beveling / line-up 07/11/2012 & welding 04/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.2 NDE 10/11/2012 06/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.2 Ext field joint 12/11/2012 coating 09/06/2013 06:00:00 17:00:00

Page 13

TASK

CSJ1MW100 Not StartedPLNE CSJ1MW110 Not StartedPLNE CSJ1MW120 Not StartedPLNE CSJ1MW130 Not StartedPLNE CSJ1MW140 Not StartedPLNE CSJ1MW160 Not StartedPLNE CSJ1MW170 Not StartedPLNE CSJ1MW180 Not StartedPLNE CSJ1MW190 Not StartedPLNE CSJ1MW200 Not StartedPLNE CSJ1MW210 Not StartedPLNE CSJ1MW220 Not StartedPLNE CSJ1MW230 Not StartedPLNE CSJ1OFW010 Not StartedPLNE CSJ1OFW020 Not StartedPLNE CSJ1OFW030 Not StartedPLNE CSJ1OFW040 Not StartedPLNE CSJ1OFW050 Not StartedPLNE CSJ1PW010 Not StartedPLNE CSJ1PW020 Not StartedPLNE CSJ1RCO010 Not StartedPLNE CSJ1RCO020 Not StartedPLNE CSJ1RCO030 Not StartedPLNE CSJ1RCO040 Not StartedPLNE CSJ1RCO050 Not StartedPLNE CSJ1RCO060 Not StartedPLNE CSJ1RCO070 Not StartedPLNE CSJ1RCO080 Not StartedPLNE CSJ1RCO090 Not StartedPLNE CSJ1RCO100 Not StartedPLNE CSJ1RCO110 Not StartedPLNE CSJ1RCO130 Not StartedPLNE CSJ1RCO140 Not StartedPLNE CSJ1RCO150 Not StartedPLNE CSJ1RCO160 Not StartedPLNE CSJ1RCO170 Not StartedPLNE CSJ1RCO180 Not StartedPLNE CSJ1RCO190 Not StartedPLNE CSJ1RCT010 Not StartedPLNE CSJ1RCT020 Not StartedPLNE CSJ1RCT030 Not StartedPLNE CSJ1RCT040 Not StartedPLNE CSJ1RCT050 Not StartedPLNE CSJ1RCT070 Not StartedPLNE CSJ1RCT090 Not StartedPLNE CSJ1RCT100 Not StartedPLNE CSJ1RCT110 Not StartedPLNE CSJ1RCT120 Not StartedPLNE CSJ1RCT130 Not StartedPLNE CSJ1RCT140 Not StartedPLNE CSJ1RCT150 Not StartedPLNE CSJ1RCT160 Not StartedPLNE

REHAB-1.2.4.6.2 Pipe lowering 14/11/2012 11/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.2 CP works - 17/11/2012 test & bonding 13/06/2013 06:00:00 thermit weld 17:00:00 REHAB-1.2.4.6.2 Holiday test20/11/2012 / Sand Padding 17/06/2013 06:00:00 & Backfill 17:00:00 REHAB-1.2.4.6.2 String to string 24/11/2012 tie-in 20/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.2 Tie-in to existing 27/11/2012 pipeline 24/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.2 Berm construction 05/02/2013 24/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.2 CP works - 05/02/2013 test station 24/06/2013 & 06:00:00 bonding 17:00:00 REHAB-1.2.4.6.2 Install KM Marker 21/05/2013 & warning 24/06/2013 06:00:00 sign 17:00:00 REHAB-1.2.4.6.2 Clean up 23/05/2013 26/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.2 Replacement 23/05/2013 of Induction 26/06/2013 06:00:00 bend inside 17:00:00 Safaniyah GOSP-1 REHAB-1.2.7 Decruding & 14/11/2013 Purging 11/06/2014 06:00:00 17:00:00 REHAB-1.2.7 Cold Cutting 27/02/2014 / removal / 29/10/2014 06:00:00 transport exist 17:00:00 pipe REHAB-1.2.7 Clearing / Backfill 26/05/2014 & compaction 21/12/2014 06:00:00 17:00:00 REHAB-1.2.4.6.6 Concrete & 05/09/2013 pre-cast 09/10/2013 06:00:00 17:00:00 REHAB-1.2.4.6.6 Piping prefabrication 23/09/2013 27/10/2013 06:00:00 17:00:00 REHAB-1.2.4.6.6 Structural &10/10/2013 Access platform 03/11/2013 06:00:00 prefabrication 17:00:00 REHAB-1.2.4.6.6 Misc pre-fabrication 31/10/2013 17/11/2013 06:00:00 17:00:00 REHAB-1.2.4.6.6 Valves shop 03/11/2013 testing 19/11/2013 06:00:00 17:00:00 REHAB-1.2.4.6.9 Partial MCC 05/04/2014 walkthrough 07/04/2014 06:00:00 17:00:00 REHAB-1.2.4.6.9 PMCC Punchlist 08/04/2014 works12/05/2014 06:00:00 17:00:00 REHAB-1.2.4.6.3.2 Detour construction 09/07/2013 16/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.2 Sheet pile / 17/07/2013 Dewatering04/08/2013 06:00:00 System Installation 17:00:00& Operation REHAB-1.2.4.6.3.2 Excavation 21/07/2013 22/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.2 Install / weld 23/07/2013 pipe 24/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.2 NDE 23/07/2013 24/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.2 Field joint ext 25/07/2013 coating 28/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.2 Tie-in to existing 29/07/2013 30/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.2 Holiday test31/07/2013 / sand padding 07/08/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.4.6.3.2 Asphalt pavement 08/08/2013 restoration 12/08/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.2 Remove Sheet 05/08/2013 pile & dewatering 08/08/2013 06:00:00 system 17:00:00 REHAB-1.2.4.6.3.5 Detour construction 01/07/2013 08/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.5 Excavation 02/07/2013 08/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.5 Install / weld 09/07/2013 pipe 15/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.5 NDE 09/07/2013 15/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.5 Field joint ext 16/07/2013 coating 18/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.5 Tie-in to existing 20/07/2013 25/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.5 Holiday test27/07/2013 / sand padding 04/08/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.4.6.3.5 Asphalt pavement 05/08/2013 restoration 08/08/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.1 Sheet pile & 23/05/2013 dewatering 28/05/2013 06:00:00 system installation 17:00:00 REHAB-1.2.4.6.3.1 Sheet pile / 23/05/2013 Dewatering18/06/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.4.6.3.1 Construct Thrust 25/05/2013 pit & recieving 29/05/2013 06:00:00pit 17:00:00 REHAB-1.2.4.6.3.1 TB equipment 30/05/2013 setup 02/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.1 Install /weld03/06/2013 / NDE/ Coat 10/06/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.4.6.3.1 Dismantle / 11/06/2013 remove TB12/06/2013 06:00:00 setup 17:00:00 REHAB-1.2.4.6.3.1 Tie-in to existing 12/06/2013 18/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.1 Backfill & restoration 19/06/2013 30/06/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.1 Remove Sheet 19/06/2013 pile & dewatering 23/06/2013 06:00:00 system 17:00:00 REHAB-1.2.4.6.3.3 Sheet pile & 24/06/2013 dewatering 29/06/2013 06:00:00 system installation 17:00:00 REHAB-1.2.4.6.3.3 Sheet pile / 24/06/2013 Dewatering23/07/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.4.6.3.3 Construct Thrust 25/06/2013 pit & recieving 30/06/2013 06:00:00pit 17:00:00 REHAB-1.2.4.6.3.3 TB equipment 01/07/2013 setup 03/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.3 Install /weld04/07/2013 / NDE/ Coat 15/07/2013 06:00:00 /push pipe 17:00:00

Page 14

TASK

CSJ1RCT180 Not StartedPLNE CSJ1RCT200 Not StartedPLNE CSJ1RCT210 Not StartedPLNE CSJ1RCT220 Not StartedPLNE CSJ1RCUPV010 Not StartedPLNE CSK3CMW010 Not StartedPLNE CSK3FCO140 Not StartedPLNE CSK3HYD40 Not StartedPLNE CSK3HYD50 Not StartedPLNE CSK3HYD60 Not StartedPLNE CSK3MLV240 Not StartedPLNE CSK3MLV250 Not StartedPLNE CSK3MLV260 Not StartedPLNE CSK3MLV270 Not StartedPLNE CSK3MLV280 Not StartedPLNE CSK3MLV290 Not StartedPLNE CSK3MLV300 Not StartedPLNE CSK3MLV310 Not StartedPLNE CSK3MLV320 Not StartedPLNE CSK3MLV330 Not StartedPLNE CSK3MLV340 Not StartedPLNE CSK3MLV350 Not StartedPLNE CSK3MLV360 Not StartedPLNE CSK3MLV370 Not StartedPLNE CSK3MLV380 Not StartedPLNE CSK3MLV385 Not StartedPLNE CSK3MLV390 Not StartedPLNE CSK3MLV400 Not StartedPLNE CSK3MLV410 Not StartedPLNE CSK3MLV420 Not StartedPLNE CSK3MLV430 Not StartedPLNE CSK3MLV440 Not StartedPLNE CSK3MLV450 Not StartedPLNE CSK3MLV460 Not StartedPLNE CSK3MLV470 Not StartedPLNE CSK3MLV480 Not StartedPLNE CSK3MLV490 Not StartedPLNE CSK3MLV500 Not StartedPLNE CSK3MLV510 Not StartedPLNE CSK3MLV520 Not StartedPLNE CSK3MLV530 Not StartedPLNE CSK3MLV540 Not StartedPLNE CSK3MLV550 Not StartedPLNE CSK3MLV590 Not StartedPLNE CSK3MW220 Not StartedPLNE CSK3MW240 Not StartedPLNE CSK3MW250 Not StartedPLNE CSK3MW260 Not StartedPLNE CSK3MW270 Not StartedPLNE CSK3MW280 Not StartedPLNE CSK3MW290 Not StartedPLNE CSK3MW295 Not StartedPLNE

REHAB-1.2.4.6.3.3 Dismantle / 16/07/2013 remove TB17/07/2013 06:00:00 setup 17:00:00 REHAB-1.2.4.6.3.3 Tie-in to existing 17/07/2013 23/07/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.3 Backfill & restoration 24/07/2013 10/08/2013 06:00:00 17:00:00 REHAB-1.2.4.6.3.3 Remove Sheet 24/07/2013 pile & dewatering 28/07/2013 06:00:00 system 17:00:00 REHAB-1.2.4.6.3.6 Unpaved Road 10/08/2013 crossing 12/09/2013 06:00:00 17:00:00 REHAB-1.2.2.1.8 Survey & Markings 04/10/2012 01/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.4 Pipeline crossing 13/11/2013 13/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.4 Installation of 02/04/2014 temporary 10/06/2014 06:00:00 testing facilities 17:00:00 REHAB-1.2.2.1.4 Pressure testing 02/04/2014 18/05/2014 06:00:00 17:00:00 REHAB-1.2.2.1.4 Dewatering 19/05/2014 / drying / lay-up 11/06/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.1 Site grading 19/10/2013 04/11/2013 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.1 Excavation 05/11/2013 ,compaction 28/11/2013 06:00:00 and foundation 17:00:00 REHAB-1.2.2.1.1.1.1 Concrete foundation 30/11/2013 erection 07/12/2013 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.1 Structural steel 08/12/2013 support14/12/2013 06:00:00 erection 17:00:00 REHAB-1.2.2.1.1.1.2 Piping / jump 18/01/2014 over & valve 28/01/2014 06:00:00 installation 17:00:00 REHAB-1.2.2.1.1.1.2 Access platform 29/01/2014 03/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.2 Hydrotest valve 04/02/2014 & pipe 09/02/2014 assembly 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.2 Tie-in to existing 10/02/2014 (Hot Tap) 26/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.3 cable installation 07/12/2013 23/12/2013 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.3 Grounding system 24/12/2013 31/12/2013 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.3 task & area 01/01/2014 lighting 08/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.3 Field instrument 09/01/2014 JB & instrument 16/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.3 E & I Precommissioning 18/01/2014 25/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.4 painting / Labelling 26/01/2014 30/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.4 Backfilling /compaction 01/02/2014 16/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.4 Asphalt Pavement 09/02/2014 restoration 19/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.1.4 Fencing & guardrail 09/02/2014 19/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.1 Site grading 05/11/2013 21/11/2013 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.1 Excavation 23/11/2013 ,compaction 16/12/2013 06:00:00 and foundation 17:00:00 REHAB-1.2.2.1.1.2.2 Piping / jump 18/01/2014 over & valve 28/01/2014 06:00:00 installation 17:00:00 REHAB-1.2.2.1.1.2.2 Access platform 29/01/2014 03/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.2 Hydrotest valve 04/02/2014 & pipe 09/02/2014 assembly 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.3 cable installation 24/12/2013 09/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.2 Tie-in to existing 10/02/2014 (Hot Tap) 26/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.4 painting / Labelling 12/02/2014 17/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.4 Backfilling /compaction 18/02/2014 05/03/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.4 Asphalt Pavement 26/02/2014 restoration 09/03/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.1 Concrete foundation 14/12/2013 erection 21/12/2013 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.1 Structural steel 22/12/2013 support28/12/2013 06:00:00 erection 17:00:00 REHAB-1.2.2.1.1.2.3 Grounding system 11/01/2014 18/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.3 task & area 19/01/2014 lighting 26/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.3 Field instrument 27/01/2014 JB & instrument 03/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.3 E & I Precommissioning 04/02/2014 11/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.1.2.4 Fencing & guardrail 26/02/2014 09/03/2014 06:00:00 17:00:00 REHAB-1.2.2.1.9.1 ROW construction 28/10/2012 (Sabkah 01/05/2013 06:00:00 / Non Sabkah) 17:00:00 REHAB-1.2.2.1.9.1 Trenching 31/10/2012 05/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.1 Pipe hauling 03/11/2012 & stringing 07/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.1 Pipe bending 05/11/2012 09/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.1 Beveling / line-up 07/11/2012 & welding 12/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.1 NDE 07/11/2012 12/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.1 Ext field joint 10/11/2012 coating 14/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.1 Sand bedding 12/11/2012 16/05/2013 06:00:00 17:00:00

Page 15

TASK

CSK3MW300 Not StartedPLNE CSK3MW310 Not StartedPLNE CSK3MW320 Not StartedPLNE CSK3MW330 Not StartedPLNE CSK3MW360 Not StartedPLNE CSK3MW370 Not StartedPLNE CSK3MW380 Not StartedPLNE CSK3MW390 Not StartedPLNE CSK3MWT010 Not StartedPLNE CSK3MWT020 Not StartedPLNE CSK3MWT030 Not StartedPLNE CSK3MWT040 Not StartedPLNE CSK3MWT050 Not StartedPLNE CSK3MWT060 Not StartedPLNE CSK3MWT070 Not StartedPLNE CSK3MWT080 Not StartedPLNE CSK3MWT090 Not StartedPLNE CSK3MWT100 Not StartedPLNE CSK3MWT130 Not StartedPLNE CSK3MWT140 Not StartedPLNE CSK3MWT150 Not StartedPLNE CSK3MWT160 Not StartedPLNE CSK3MWT170 Not StartedPLNE CSK3MWT180 Not StartedPLNE CSK3MWT190 Not StartedPLNE CSK3OFW010 Not StartedPLNE CSK3OFW020 Not StartedPLNE CSK3OFW030 Not StartedPLNE CSK3OFW040 Not StartedPLNE CSK3OFW050 Not StartedPLNE CSK3PW010 Not StartedPLNE CSK3PW020 Not StartedPLNE CSK3RCO110 Not StartedPLNE CSK3RCO120 Not StartedPLNE CSK3RCO130 Not StartedPLNE CSK3RCO140 Not StartedPLNE CSK3RCO160 Not StartedPLNE CSK3RCO180 Not StartedPLNE CSK3RCO190 Not StartedPLNE CSK3RCO200 Not StartedPLNE CSK3RCT120 Not StartedPLNE CSK3RCT130 Not StartedPLNE CSK3RCT140 Not StartedPLNE CSK3RCT150 Not StartedPLNE CSK3RCT160 Not StartedPLNE CSK3RCT180 Not StartedPLNE CSK3RCT200 Not StartedPLNE CSK3RCT210 Not StartedPLNE CSK3RCT220 Not StartedPLNE CSK3RCT230 Not StartedPLNE CSK3RCT240 Not StartedPLNE CSK3RCT250 Not StartedPLNE

REHAB-1.2.2.1.9.1 Pipe lowering 15/11/2012 20/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.1 CP works - 18/11/2012 test & bonding 22/05/2013 06:00:00 thermit weld 17:00:00 REHAB-1.2.2.1.9.1 Holiday test21/11/2012 / Sand Padding 26/05/2013 06:00:00 & Backfill 17:00:00 REHAB-1.2.2.1.9.1 String to string 25/11/2012 tie-in 29/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.1 Berm construction 10/01/2013 29/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.1 CP works - 10/01/2013 test station 29/05/2013 & 06:00:00 bonding 17:00:00 REHAB-1.2.2.1.9.1 Install KM Marker 06/05/2013 & warning 29/05/2013 06:00:00 sign 17:00:00 REHAB-1.2.2.1.9.1 Clean up 08/05/2013 01/06/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.2 Sheet pile & 09/01/2013 dewatering 14/01/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.1.9.2 Sheet pile / 15/01/2013 Dewatering27/02/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.1.9.2 Excavation 19/01/2013 & Base compaction 26/01/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.2 Lean concrete 27/01/2013 28/01/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.2 Rebar/formwork/Anchor 29/01/2013 13/02/2013 06:00:00 flange & sleeve 17:00:00 fab/erection REHAB-1.2.2.1.9.2 Cast in situ 14/02/2013 & curing 23/02/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.2 Surface touch 24/02/2013 up/Concrete 28/02/2013 06:00:00 coating 17:00:00 & painting REHAB-1.2.2.1.9.2 Install magnesium 26/02/2013 anode 26/02/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.2 Backfill / compact 27/02/2013 & berming 16/03/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.2 Remove Sheet 28/02/2013 pile & dewatering 04/03/2013 06:00:00 system 17:00:00 REHAB-1.2.2.1.9.4 Excavation 27/01/2013 03/02/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.4 Lean concrete 04/02/2013 05/02/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.4 Rebar/formwork/Anchor 06/02/2013 21/02/2013 06:00:00 flange & sleeve 17:00:00 fab/erection REHAB-1.2.2.1.9.4 Cast in situ 23/02/2013 & curing 03/03/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.4 Surface touch 04/03/2013 up/Concrete 09/03/2013 06:00:00 coating 17:00:00 & painting REHAB-1.2.2.1.9.4 Install magnesium 06/03/2013 anode 06/03/2013 06:00:00 17:00:00 REHAB-1.2.2.1.9.4 Backfill / compact 09/03/2013 & berming 25/03/2013 06:00:00 17:00:00 REHAB-1.2.2.1.7 Concrete & 21/08/2013 pre-cast 24/09/2013 06:00:00 17:00:00 REHAB-1.2.2.1.7 Piping prefabrication 08/09/2013 12/10/2013 06:00:00 17:00:00 REHAB-1.2.2.1.7 Structural &25/09/2013 Access platform 19/10/2013 06:00:00 prefabrication 17:00:00 REHAB-1.2.2.1.7 Misc pre-fabrication 16/10/2013 02/11/2013 06:00:00 17:00:00 REHAB-1.2.2.1.7 Valves shop 31/12/2013 testing 16/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.5 Partial MCC 12/06/2014 walkthrough 15/06/2014 06:00:00 17:00:00 REHAB-1.2.2.1.5 PMCC punchlist 16/06/2014 works 20/07/2014 06:00:00 17:00:00 REHAB-1.2.2.1.2.2 Detour construction 14/07/2013 21/07/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.2 Sheet pile / 22/07/2013 Dewatering12/08/2013 06:00:00 System Installation 17:00:00& Operation REHAB-1.2.2.1.2.2 Excavation 23/07/2013 29/07/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.2 Install /weld30/07/2013 / NDE/ Coat 06/08/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.2 Tie-in to existing 07/08/2013 12/08/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.2 Holiday test13/08/2013 / sand padding 21/08/2013 06:00:00 / backfil 17:00:00 / compact REHAB-1.2.2.1.2.2 Asphalt pavement 22/08/2013 restoration 02/09/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.2 Remove Sheet 13/08/2013 pile & dewatering 17/08/2013 06:00:00 system 17:00:00 REHAB-1.2.2.1.2.1 Sheet pile & 18/11/2012 dewatering 22/11/2012 06:00:00 system installation 17:00:00 REHAB-1.2.2.1.2.1 Sheet pile / 24/11/2012 Dewatering23/12/2012 06:00:00 System Operation 17:00:00 REHAB-1.2.2.1.2.1 Construct Thrust 25/11/2012 pit & recieving 02/12/2012 06:00:00pit 17:00:00 REHAB-1.2.2.1.2.1 TB equipment 03/12/2012 setup 05/12/2012 06:00:00 17:00:00 REHAB-1.2.2.1.2.1 Install /weld06/12/2012 / NDE/ Coat 15/12/2012 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.1.2.1 Dismantle / 16/12/2012 remove TB17/12/2012 06:00:00 setup 17:00:00 REHAB-1.2.2.1.2.1 Tie-in to existing 17/12/2012 22/12/2012 06:00:00 17:00:00 REHAB-1.2.2.1.2.1 Backfill & restoration 23/12/2012 02/01/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.1 Remove Sheet 24/12/2012 pile & dewatering 27/12/2012 06:00:00 system 17:00:00 REHAB-1.2.2.1.2.5 Sheet pile & 29/12/2012 dewatering 02/01/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.1.2.5 Sheet pile / 29/12/2012 Dewatering24/01/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.1.2.5 Construct Thrust 30/12/2012 pit & recieving 06/01/2013 06:00:00pit 17:00:00

Page 16

TASK

CSK3RCT260 Not StartedPLNE CSK3RCT270 Not StartedPLNE CSK3RCT290 Not StartedPLNE CSK3RCT310 Not StartedPLNE CSK3RCT320 Not StartedPLNE CSK3RCT330 Not StartedPLNE CSK3RCT560 Not StartedPLNE CSK3RCT570 Not StartedPLNE CSK3RCT580 Not StartedPLNE CSK3RCT590 Not StartedPLNE CSK3RCT600 Not StartedPLNE CSK3RCT620 Not StartedPLNE CSK3RCT640 Not StartedPLNE CSK3RCT650 Not StartedPLNE CSK3RCT660 Not StartedPLNE CSK3RCT670 Not StartedPLNE CSK3RCT680 Not StartedPLNE CSK3RCT690 Not StartedPLNE CSK3RCT700 Not StartedPLNE CSK3RCT710 Not StartedPLNE CSK3RCT730 Not StartedPLNE CSK3RCT750 Not StartedPLNE CSK3RCT760 Not StartedPLNE CSK3RCT770 Not StartedPLNE CSK3RCT780 Not StartedPLNE CSK3RCT790 Not StartedPLNE CSK3RCT800 Not StartedPLNE CSK3RCT810 Not StartedPLNE CSK3RCT820 Not StartedPLNE CSK3RCT840 Not StartedPLNE CSK3RCT860 Not StartedPLNE CSK3RCT870 Not StartedPLNE CSK3RCT880 Not StartedPLNE CSK3RCT890 Not StartedPLNE CSK3RCT900 Not StartedPLNE CSK3RCT910 Not StartedPLNE CSK3RCT920 Not StartedPLNE CSK3RCT930 Not StartedPLNE CSK3RCT950 Not StartedPLNE CSK3RCT970 Not StartedPLNE CSK3RCT980 Not StartedPLNE CSK3RCT990 Not StartedPLNE CSK3RCUP010 Not StartedPLNE CSK3ST010 Not StartedPLNE CSK3ST020 Not StartedPLNE CSK3ST025 Not StartedPLNE CSK3ST030 Not StartedPLNE CSK3ST040 Not StartedPLNE CSK3ST050 Not StartedPLNE CSK3ST060 Not StartedPLNE CSK3ST080 Not StartedPLNE CSK3ST085 Not StartedPLNE

REHAB-1.2.2.1.2.5 TB equipment 07/01/2013 setup 09/01/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.5 Install /weld10/01/2013 / NDE/ Coat 16/01/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.1.2.5 Dismantle / 17/01/2013 remove TB19/01/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.1.2.5 Tie-in to existing 19/01/2013 23/01/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.5 Backfill & restoration 24/01/2013 02/02/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.5 Remove Sheet 26/01/2013 pile & dewatering 29/01/2013 06:00:00 system 17:00:00 REHAB-1.2.2.1.2.6 Sheet pile & 30/01/2013 dewatering 04/02/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.1.2.6 Sheet pile / 30/01/2013 Dewatering12/03/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.1.2.6 Construct Thrust 31/01/2013 pit & recieving 07/02/2013 06:00:00pit 17:00:00 REHAB-1.2.2.1.2.6 TB equipment 09/02/2013 setup 13/02/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.6 Install /weld14/02/2013 / NDE/ Coat 02/03/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.1.2.6 Dismantle / 03/03/2013 remove TB05/03/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.1.2.6 Tie-in to existing 04/03/2013 09/03/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.6 Backfill & restoration 12/03/2013 27/03/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.6 Remove Sheet 13/03/2013 pile & dewatering 17/03/2013 06:00:00 system 17:00:00 REHAB-1.2.2.1.2.7 Sheet pile & 18/03/2013 dewatering 23/03/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.1.2.7 Sheet pile / 24/03/2013 Dewatering20/04/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.1.2.7 Construct Thrust 25/03/2013 pit & recieving 01/04/2013 06:00:00pit 17:00:00 REHAB-1.2.2.1.2.7 TB equipment 02/04/2013 setup 04/04/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.7 Install /weld06/04/2013 / NDE/ Coat 11/04/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.1.2.7 Dismantle / 13/04/2013 remove TB14/04/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.1.2.7 Tie-in to existing 14/04/2013 18/04/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.7 Backfill & restoration 20/04/2013 28/04/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.7 Remove Sheet 21/04/2013 pile & dewatering 24/04/2013 06:00:00 system 17:00:00 REHAB-1.2.2.1.2.3 Sheet pile & 25/04/2013 dewatering 30/04/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.1.2.3 Sheet pile / 01/05/2013 Dewatering29/05/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.1.2.3 Construct Thrust 02/05/2013 pit & recieving 09/05/2013 06:00:00pit 17:00:00 REHAB-1.2.2.1.2.3 TB equipment 11/05/2013 setup 13/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.3 Install /weld14/05/2013 / NDE/ Coat 21/05/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.1.2.3 Dismantle / 22/05/2013 remove TB23/05/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.1.2.3 Tie-in to existing 23/05/2013 28/05/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.3 Backfill & restoration 29/05/2013 06/06/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.3 Remove Sheet 30/05/2013 pile & dewatering 03/06/2013 06:00:00 system 17:00:00 REHAB-1.2.2.1.2.8 Sheet pile & 04/06/2013 dewatering 09/06/2013 06:00:00 system installation 17:00:00 REHAB-1.2.2.1.2.8 Sheet pile / 10/06/2013 Dewatering08/07/2013 06:00:00 System Operation 17:00:00 REHAB-1.2.2.1.2.8 Construct Thrust 11/06/2013 pit & recieving 18/06/2013 06:00:00pit 17:00:00 REHAB-1.2.2.1.2.8 TB equipment 19/06/2013 setup 22/06/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.8 Install /weld23/06/2013 / NDE/ Coat 30/06/2013 06:00:00 /push pipe 17:00:00 REHAB-1.2.2.1.2.8 Dismantle / 01/07/2013 remove TB02/07/2013 06:00:00 setup 17:00:00 REHAB-1.2.2.1.2.8 Tie-in to existing 02/07/2013 07/07/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.8 Backfill & restoration 08/07/2013 16/07/2013 06:00:00 17:00:00 REHAB-1.2.2.1.2.8 Remove Sheet 09/07/2013 pile & dewatering 13/07/2013 06:00:00 system 17:00:00 REHAB-1.2.2.1.2.9 Unpaved Road 18/08/2013 crossing 12/11/2013 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.1 Clearing & grading 19/10/2013 04/11/2013 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.1 Excavation 05/11/2013 ,base compaction 09/12/2013 06:00:00 for foundation 17:00:00 REHAB-1.2.2.1.6.1.1 Install precast 28/11/2013 foundation 22/12/2013 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.1 Cast in place 28/11/2013 conc foundation 22/12/2013 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.1 Structural steel 16/12/2013 supports 08/01/2014 06:00:00 erection 17:00:00 REHAB-1.2.2.1.6.1.2 Scraper trap 09/01/2014 /Jib crane 11/01/2014 06:00:00 installation 17:00:00 REHAB-1.2.2.1.6.1.2 Cast in place 12/01/2014 trap containment 28/01/2014 06:00:00 pond 17:00:00 REHAB-1.2.2.1.6.1.2 AG/ UG piping 15/01/2014 works 01/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.2 Scraper trap 23/01/2014 valve installtn 16/02/2014 06:00:00 & associated 17:00:00 piping

Page 17

TASK

CSK3ST090 Not StartedPLNE CSK3ST100 Not StartedPLNE CSK3ST120 Not StartedPLNE CSK3ST130 Not StartedPLNE CSK3ST140 Not StartedPLNE CSK3ST150 Not StartedPLNE CSK3ST155 Not StartedPLNE CSK3ST160 Not StartedPLNE CSK3ST165 Not StartedPLNE CSK3ST170 Not StartedPLNE CSK3ST175 Not StartedPLNE CSK3ST180 Not StartedPLNE CSK3ST190 Not StartedPLNE CSK3ST200 Not StartedPLNE CSK3ST210 Not StartedPLNE CSK3ST220 Not StartedPLNE CSK3ST225 Not StartedPLNE CSK3ST230 Not StartedPLNE CSK3ST240 Not StartedPLNE CSK3ST250 Not StartedPLNE CSK3ST260 Not StartedPLNE CSK3ST265 Not StartedPLNE CSK3ST270 Not StartedPLNE CSK3ST275 Not StartedPLNE CSK3ST280 Not StartedPLNE CSK3ST290 Not StartedPLNE CSK3ST300 Not StartedPLNE CSK3ST310 Not StartedPLNE CSK3ST320 Not StartedPLNE CSK3ST330 Not StartedPLNE CSK3ST370 Not StartedPLNE CSK3ST380 Not StartedPLNE CSK3ST390 Not StartedPLNE GEN010 Not StartedPLNE GEN020 Not StartedPLNE GEN030 Not StartedPLNE GEN040 Not StartedPLNE GEN050 Not StartedPLNE PROC010 Not StartedPLNE

REHAB-1.2.2.1.6.1.2 Access platform 01/02/2014 erection 17/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.2 Hydrotesting 02/02/2014 18/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.3 Cable installation 10/12/2013 26/12/2013 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.3 Install power 28/12/2013 panel 20/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.3 Task & area 21/01/2014 lighting 28/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.3 Field instruments 29/01/2014 JB & 03/02/2014 instruments 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.3 Conduit stub 04/02/2014 up 15/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.3 Cable termination 16/02/2014 & tagging 26/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.3 E & I Precomissioning 27/02/2014 16/03/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.4 Painting / coating 19/02/2014 02/03/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.1.4 Backfilling restoration 03/03/2014 & 13/03/2014 06:00:00 clean up 17:00:00 REHAB-1.2.2.1.6.1.4 Fencing & Guardrail 23/01/2014 16/03/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.1 Clearing & grading 05/11/2013 09/12/2013 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.1 Excavation 22/12/2013 ,base compaction 05/02/2014 06:00:00 for foundation 17:00:00 REHAB-1.2.2.1.6.2.1 Install precast 02/01/2014 foundation 26/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.1 Cast in place 02/01/2014 conc foundation 26/01/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.1 Structural steel 27/01/2014 supports 19/02/2014 06:00:00 erection 17:00:00 REHAB-1.2.2.1.6.2.2 Scraper trap 20/02/2014 /Jib crane 22/02/2014 06:00:00 installation 17:00:00 REHAB-1.2.2.1.6.2.2 Cast in place 23/02/2014 trap containment 11/03/2014 06:00:00 pond 17:00:00 REHAB-1.2.2.1.6.2.2 AG/ UG piping 26/02/2014 works 15/03/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.2 Scraper trap 06/03/2014 valve installtn 30/03/2014 06:00:00 & associated 17:00:00 piping REHAB-1.2.2.1.6.2.2 Access platform 15/03/2014 erection 31/03/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.3 Cable installation 06/02/2014 23/02/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.2 Hydrotesting 16/03/2014 01/04/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.3 Install power 24/02/2014 panel 19/03/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.3 Task & area 20/03/2014 lighting 27/03/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.3 Field instruments 29/03/2014 JB & 02/04/2014 instruments 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.3 Conduit stub 03/04/2014 up 14/04/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.4 Painting / coating 02/04/2014 13/04/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.4 Backfilling restoration 14/04/2014 & 18/05/2014 06:00:00 clean up 17:00:00 REHAB-1.2.2.1.6.2.3 Cable termination 15/04/2014 & tagging 26/04/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.3 E & I Precomissioning 27/04/2014 13/05/2014 06:00:00 17:00:00 REHAB-1.2.2.1.6.2.4 Fencing & Guardrail 30/03/2014 20/05/2014 06:00:00 17:00:00 REHAB-1.1 Project Award 07/07/2012 06:00:00 REHAB-1.1 Mobilize Key 07/07/2012 Personnel22/11/2012 06:00:00 17:00:00 REHAB-1.1 Submission07/07/2012 of main deliverables 31/07/2012 06:00:00 17:00:00 REHAB-1.1 Notice to proceed 01/08/2012 09/08/2012 06:00:00 17:00:00 REHAB-1.1 Kick Off Meeting 18/08/2012 18/08/2012 06:00:00 17:00:00 REHAB-1.3 Procurement 11/08/2012 of contractors 30/12/2013 06:00:00 supplied 17:00:00 material

Page 18

TASKPRED

pred_task_id task_id pred_type PREDTASK__status_code TASK__status_code pred_proj_id proj_id predtask__projwbs__wbs_full_name task__projwbs__wbs_full_name Predecessor Successor Relationship (*)Predecessor Type (*)Successor Activity (*)Predecessor Status Activity Status (*)Successor Project (*)Predecessor Project (*)Successor WBS WBS CSJ1MW010 CSJ1MW020 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW020 CSJ1MW030 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW030 CSJ1MW040 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW040 CSJ1MW050 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW050 CSJ1MW060 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW060 CSJ1MW070 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW070 CSJ1MW080 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW080 CSJ1MW090 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW090 CSJ1MW100 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW100 CSJ1MW110 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW110 CSJ1MW120 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW120 CSJ1MW130 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW130 CSJ1MW140 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW160 CSJ1MW170 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW170 CSJ1MW180 FF Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1MW180 CSJ1MW190 FF Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P CSJ1OFW010 CSJ1OFW020 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.6 PLNE REHAB-1.2.4.6.6 Offsite Work Offsite Wo CSJ1OFW020 CSJ1OFW030 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.6 PLNE REHAB-1.2.4.6.6 Offsite Work Offsite Wo CSJ1OFW030 CSJ1OFW040 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.6 PLNE REHAB-1.2.4.6.6 Offsite Work Offsite Wo CSJ1OFW040 CSJ1OFW050 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.6 PLNE REHAB-1.2.4.6.6 Offsite Work Offsite Wo GEN030 GEN040 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.1 PLNE REHAB-1.1 GENERAL GENERAL GEN040 GEN050 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.1 PLNE REHAB-1.1 GENERAL GENERAL GEN020 GEN030 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.1 PLNE REHAB-1.1 GENERAL GENERAL CSJ1RCT010 CSJ1RCT020 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.1 PLNE REHAB-1.2.4.6.3.1 Road Crossing Road @Cr K CSJ1RCT020 CSJ1RCT030 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.1 PLNE REHAB-1.2.4.6.3.1 Road Crossing Road @Cr K CSJ1RCT030 CSJ1RCT040 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.1 PLNE REHAB-1.2.4.6.3.1 Road Crossing Road @Cr K CSJ1RCT040 CSJ1RCT050 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.1 PLNE REHAB-1.2.4.6.3.1 Road Crossing Road @Cr K CSJ1RCT090 CSJ1RCT100 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.1 PLNE REHAB-1.2.4.6.3.1 Road Crossing Road @Cr K CSJ1RCO010 CSJ1RCO020 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K CSJ1RCO020 CSJ1RCO030 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K CSJ1RCO030 CSJ1RCO040 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K CSJ1RCO040 CSJ1RCO050 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K CSJ1RCO050 CSJ1RCO060 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K CSJ1RCO060 CSJ1RCO070 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K CSJ1RCO070 CSJ1RCO080 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K CSJ1RCO080 CSJ1RCO090 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K CSJ1MLV010 CSJ1MLV020 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.5.1.1 PLNE REHAB-1.2.4.6.5.1.1 Civil & structural Civil & CSJ1MLV020 CSJ1MLV030 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.5.1.1 PLNE REHAB-1.2.4.6.5.1.1 Civil & structural Civil & CSJ1MLV130 CSJ1MLV140 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.5.2.1 PLNE REHAB-1.2.4.6.5.2.1 Civil & structural Civil & CSJ1MLV140 CSJ1MLV150 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.5.2.1 PLNE REHAB-1.2.4.6.5.2.1 Civil & structural Civil & CSJ1HYD020 CSJ1HYD030 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.8 PLNE REHAB-1.2.4.6.8 Hydrostatic Hydrostati testing / D CSJ1HYD030 CSJ1HYD040 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.8 PLNE REHAB-1.2.4.6.8 Hydrostatic Hydrostati testing / D CSJ1PW010 CSJ1PW020 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.9 PLNE REHAB-1.2.4.6.9 PMCC Walkthrough PMCC Wa & CSJ1HYD040 CSJ1PW010 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.4.6.8 PLNE REHAB-1.2.4.6.8 Hydrostatic Hydrostati testing / D CSK3OFW010 CSK3OFW020 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.2.1.7 PLNE REHAB-1.2.2.1.7 Offsite work Offsite wo CSK3OFW020 CSK3OFW030 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.2.1.7 PLNE REHAB-1.2.2.1.7 Offsite work Offsite wo CSK3OFW030 CSK3OFW040 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.2.1.7 PLNE REHAB-1.2.2.1.7 Offsite work Offsite wo CSK3OFW040 CSK3OFW050 FS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.2.1.7 PLNE REHAB-1.2.2.1.7 Offsite work Offsite wo CSK3MW240 CSK3MW250 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline CSK3MW250 CSK3MW260 SS Not StartedNot StartedPLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline

Page 19

TASKPRED

CSK3MW260 CSK3MW270 SS CSK3MW270 CSK3MW280 FF CSK3MW280 CSK3MW290 FF CSK3MW300 CSK3MW310 SS CSK3MW310 CSK3MW320 SS CSK3MW320 CSK3MW330 SS CSK3MW360 CSK3MW370 SS CSK3MW370 CSK3MW380 FF CSK3MW380 CSK3MW390 FF CSK3RCT120 CSK3RCT130 FS CSK3RCT130 CSK3RCT140 SS CSK3RCT140 CSK3RCT150 FS CSK3RCT150 CSK3RCT160 FS CSK3RCT200 CSK3RCT210 FS CSK3RCO110 CSK3RCO120 FS CSK3RCO120 CSK3RCO130 SS CSK3RCO130 CSK3RCO140 FS CSK3RCO180 CSK3RCO190 FS CSK3RCO120 CSK3RCO200 FS CSK3RCT130 CSK3RCT220 FS CSK3MLV240 CSK3MLV250 FS CSK3MLV370 CSK3MLV380 FS CSK3HYD50 CSK3HYD60 FS CSK3PW010 CSK3PW020 FS CSK3MW330 CSK3MW360 FF CSK3MWT010 CSK3MWT020 FS CSK3MWT020 CSK3MWT030 SS CSK3MWT040 CSK3MWT050 FS CSK3MWT050 CSK3MWT060 FS CSK3MWT060 CSK3MWT070 FS CSK3MWT070 CSK3MWT080 SS CSK3MWT080 CSK3MWT090 FS CSK3MWT130 CSK3MWT140 FS CSK3MWT140 CSK3MWT150 FS CSK3MWT150 CSK3MWT160 FS CSK3MWT160 CSK3MWT170 FS CSK3MWT170 CSK3MWT180 SS CSK3MWT180 CSK3MWT190 SS CSK3MLV320 CSK3MLV330 FS CSK3MLV330 CSK3MLV340 FS CSK3MLV340 CSK3MLV350 FS CSK3MLV350 CSK3MLV360 FS CSK3MLV260 CSK3MLV270 FS CSK3MLV250 CSK3MLV260 FS CSK3MLV360 CSK3MLV370 FS CSK3ST010 CSK3ST020 FS CSK3ST030 CSK3ST040 SS CSK3ST120 CSK3ST130 FS CSK3ST130 CSK3ST140 FS CSK3ST140 CSK3ST150 FS CKRT3XOFW50 CKRT3XOFW60 SS CKRT3XOFW60 CKRT3XOFW70 SS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.2.1 PLNE REHAB-1.2.2.1.2.1 Road Crossing Road @Cr K REHAB-1.2.2.1.2.1 PLNE REHAB-1.2.2.1.2.1 Road Crossing Road @Cr K REHAB-1.2.2.1.2.1 PLNE REHAB-1.2.2.1.2.1 Road Crossing Road @Cr K REHAB-1.2.2.1.2.1 PLNE REHAB-1.2.2.1.2.1 Road Crossing Road @Cr K REHAB-1.2.2.1.2.1 PLNE REHAB-1.2.2.1.2.1 Road Crossing Road @Cr K REHAB-1.2.2.1.2.2 PLNE REHAB-1.2.2.1.2.2 Road Crossing Road @Cr K REHAB-1.2.2.1.2.2 PLNE REHAB-1.2.2.1.2.2 Road Crossing Road @Cr K REHAB-1.2.2.1.2.2 PLNE REHAB-1.2.2.1.2.2 Road Crossing Road @Cr K REHAB-1.2.2.1.2.2 PLNE REHAB-1.2.2.1.2.2 Road Crossing Road @Cr K REHAB-1.2.2.1.2.2 PLNE REHAB-1.2.2.1.2.2 Road Crossing Road @Cr K REHAB-1.2.2.1.2.1 PLNE REHAB-1.2.2.1.2.1 Road Crossing Road @Cr K REHAB-1.2.2.1.1.1.1 PLNE REHAB-1.2.2.1.1.1.1 Civil & structural Civil & REHAB-1.2.2.1.1.1.4 PLNE REHAB-1.2.2.1.1.1.4 MIscellaneous MIscel REHAB-1.2.2.1.4 PLNE REHAB-1.2.2.1.4 Hydrostatic Hydrostati testing / D REHAB-1.2.2.1.5 PLNE REHAB-1.2.2.1.5 PMCC Walkthrough PMCC Wa & REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.2 PLNE REHAB-1.2.2.1.9.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.2 PLNE REHAB-1.2.2.1.9.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.2 PLNE REHAB-1.2.2.1.9.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.2 PLNE REHAB-1.2.2.1.9.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.2 PLNE REHAB-1.2.2.1.9.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.2 PLNE REHAB-1.2.2.1.9.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.2 PLNE REHAB-1.2.2.1.9.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.4 PLNE REHAB-1.2.2.1.9.4 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.4 PLNE REHAB-1.2.2.1.9.4 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.4 PLNE REHAB-1.2.2.1.9.4 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.4 PLNE REHAB-1.2.2.1.9.4 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.4 PLNE REHAB-1.2.2.1.9.4 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.4 PLNE REHAB-1.2.2.1.9.4 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.1.1.3 PLNE REHAB-1.2.2.1.1.1.3 Electrical & Electri Instrum REHAB-1.2.2.1.1.1.3 PLNE REHAB-1.2.2.1.1.1.3 Electrical & Electri Instrum REHAB-1.2.2.1.1.1.3 PLNE REHAB-1.2.2.1.1.1.3 Electrical & Electri Instrum REHAB-1.2.2.1.1.1.3 PLNE REHAB-1.2.2.1.1.1.3 Electrical & Electri Instrum REHAB-1.2.2.1.1.1.1 PLNE REHAB-1.2.2.1.1.1.1 Civil & structural Civil & REHAB-1.2.2.1.1.1.1 PLNE REHAB-1.2.2.1.1.1.1 Civil & structural Civil & REHAB-1.2.2.1.1.1.3 PLNE REHAB-1.2.2.1.1.1.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.1.1 PLNE REHAB-1.2.2.1.6.1.1 Civil & Structural Civil & REHAB-1.2.2.1.6.1.1 PLNE REHAB-1.2.2.1.6.1.1 Civil & Structural Civil & REHAB-1.2.2.1.6.1.3 PLNE REHAB-1.2.2.1.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.1.3 PLNE REHAB-1.2.2.1.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.1.3 PLNE REHAB-1.2.2.1.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.8 PLNE REHAB-1.2.2.2.8 Offsite Work Offsite Wo REHAB-1.2.2.2.8 PLNE REHAB-1.2.2.2.8 Offsite Work Offsite Wo

Page 20

TASKPRED

CKRT3XOFW70 CKRT3XOFW80 SS CKRT3XOFW80 CKRT3XOFW90 FF CKRT3XMW410 CKRT3XMW420 SS CKRT3XMW420 CKRT3XMW430 SS CKRT3XMW430 CKRT3XMW440 SS CKRT3XMW440 CKRT3XMW450 FF CKRT3XMW450 CKRT3XMW460 FF CKRT3XMW480 CKRT3XMW490 SS CKRT3XMW490 CKRT3XMW500 SS CKRT3XMW500 CKRT3XMW510 FF CKRT3XMW520 CKRT3XMW530 FF CKRT3XMW530 CKRT3XMW540 FF CKRT3XMW540 CKRT3XMW550 FF CKRT3XRCO230 CKRT3XRCO240 FS CKRT3XRCO270 CKRT3XRCO280 FS CKRT3XRCO280 CKRT3XRCO290 FS CKRT3XMW460 CKRT3XMW470 SS CKRT3XMW510 CKRT3XMW520 FF CKRT3YOFW100 CKRT3YOFW110 SS CKRT3YOFW110 CKRT3YOFW120 SS CKRT3YOFW120 CKRT3YOFW130 FF CKRT3YOFW130 CKRT3YOFW140 FF CKRT3YCMW20 CKRT3YOFW100 SS CKRT3YMW570 CKRT3YMW580 SS CKRT3YMW580 CKRT3YMW590 SS CKRT3YMW590 CKRT3YMW600 SS CKRT3YMW600 CKRT3YMW610 FF CKRT3YMW610 CKRT3YMW620 FF CKRT3YMW620 CKRT3YMW640 FF CKRT3YMW640 CKRT3YMW650 SS CKRT3YMW650 CKRT3YMW660 SS CKRT3YMW660 CKRT3YMW670 SS CKRT3YMW680 CKRT3YMW690 SS CKRT3YMW690 CKRT3YMW700 FF CKRT3YMW700 CKRT3YMW710 FF CKRT3YRCT340 CKRT3YRCT350 FS CKRT3YRCT350 CKRT3YRCT360 SS CKRT3YRCT360 CKRT3YRCT370 FS CKRT3YRCT370 CKRT3YRCT380 FS CKRT3YRCT380 CKRT3YRCT390 FS CKRT3YRCT400 CKRT3YRCT410 FS CKRT3YRCT410 CKRT3YRCT420 FS CKRT3YRCT420 CKRT3YRCT430 FS CKRT3YRCT380 CKRT3YRCT400 SS CKRT3YRWCT450 CKRT3YRWCT460 FS CKRT3YRWCT460 CKRT3YRWCT470 SS CKRT3YRWCT470 CKRT3YRWCT480 FS CKRT3YRWCT480 CKRT3YRWCT490 FS CKRT3YRWCT490 CKRT3YRWCT500 FS CKRT3YRWCT510 CKRT3YRWCT520 FS CKRT3YRWCT520 CKRT3YRWCT530 FS CKRT3YRWCT530 CKRT3YRWCT540 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.2.8 PLNE REHAB-1.2.2.2.8 Offsite Work Offsite Wo REHAB-1.2.2.2.8 PLNE REHAB-1.2.2.2.8 Offsite Work Offsite Wo REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.2.2 PLNE REHAB-1.2.2.2.2.2 Road Crossing Road @Cr K REHAB-1.2.2.2.2.2 PLNE REHAB-1.2.2.2.2.2 Road Crossing Road @Cr K REHAB-1.2.2.2.2.2 PLNE REHAB-1.2.2.2.2.2 Road Crossing Road @Cr K REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.8 PLNE REHAB-1.2.2.3.8 Offsite Work Offsite Wo REHAB-1.2.2.3.8 PLNE REHAB-1.2.2.3.8 Offsite Work Offsite Wo REHAB-1.2.2.3.8 PLNE REHAB-1.2.2.3.8 Offsite Work Offsite Wo REHAB-1.2.2.3.8 PLNE REHAB-1.2.2.3.8 Offsite Work Offsite Wo REHAB-1.2.2.3.7 PLNE REHAB-1.2.2.3.7 Common Work Common W REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T

Page 21

TASKPRED

CKRT3YRWCT490 CKRT3YRWCT510 SS CKRT3YRCO310 CKRT3YRCO320 FS CKRT3YRCO320 CKRT3YRCO330 SS CKRT3YRCO330 CKRT3YRCO340 FS CKRT3YRCO340 CKRT3YRCO350 FS CKRT3YRCO350 CKRT3YRCO360 FS CKRT3YRCO360 CKRT3YRCO370 FS CKRT3YRCO370 CKRT3YRCO380 FS CKRT3YRCO380 CKRT3YRCO390 FS CKRT3YRCT350 CKRT3YRCT440 FS CKRT3YHYD100 CKRT3YHYD110 FS CKRT3YHYD110 CKRT3YHYD120 FS CKRT3YMW620 CKRT3YMW630 SS CKRT3YMW670 CKRT3YMW680 FF CKRT3YMWT410 CKRT3YMWT420 FS CKRT3YMWT420 CKRT3YMWT430 FS CKRT3YMWT430 CKRT3YMWT440 SS CKRT3YMWT440 CKRT3YMWT450 SS CKRT3YMWT450 CKRT3YMWT460 SS CKRT3YMWT460 CKRT3YMWT470 FS CKRT3YMWT470 CKRT3YMWT480 SS CKRT3YMWT480 CKRT3YMWT490 FS CKRT3YMWT510 CKRT3YMWT520 FS CKRT3YMWT520 CKRT3YMWT530 FS CKRT3YMWT530 CKRT3YMWT540 SS CKRT3YMWT540 CKRT3YMWT550 SS CKRT3YMWT550 CKRT3YMWT560 SS CKRT3YMWT560 CKRT3YMWT570 FS CKRT3YMWT570 CKRT3YMWT580 SS CKRT3YMWT580 CKRT3YMWT590 FS CKRT3YMWT500 CKRT3YMWT510 FS CKRT3YST700 CKRT3YST710 FS CKRT3YST710 CKRT3YST720 FS CKRT3YST720 CKRT3YST730 FS CKRT3YST730 CKRT3YST740 FS CKRT3YST740 CKRT3YST750 FS CKRT3YST750 CKRT3YST760 FS CKRT3YST760 CKRT3YST770 FS CKRT3YST770 CKRT3YST780 FS CKRT3YST780 CKRT3YST790 FS CKRT3YST800 CKRT3YST810 FS CKRT3YST810 CKRT3YST820 FS CKRT3YST820 CKRT3YST830 FS CKRT3YST830 CKRT3YST840 FS CKRT3YST850 CKRT3YST860 FS CKRT3YST840 CKRT3YST850 FS CKRT3YST870 CKRT3YST880 FS CKRT3YST880 CKRT3YST890 FS CKRT3YST890 CKRT3YST900 FS CKRT3YST900 CKRT3YST910 FS CKRT3YST910 CKRT3YST920 FS CKRT3YST920 CKRT3YST930 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T REHAB-1.2.2.3.2.2 PLNE REHAB-1.2.2.3.2.2 Road Crossing Road @Cr K REHAB-1.2.2.3.2.2 PLNE REHAB-1.2.2.3.2.2 Road Crossing Road @Cr K REHAB-1.2.2.3.2.2 PLNE REHAB-1.2.2.3.2.2 Road Crossing Road @Cr K REHAB-1.2.2.3.2.2 PLNE REHAB-1.2.2.3.2.2 Road Crossing Road @Cr K REHAB-1.2.2.3.2.2 PLNE REHAB-1.2.2.3.2.2 Road Crossing Road @Cr K REHAB-1.2.2.3.2.2 PLNE REHAB-1.2.2.3.2.2 Road Crossing Road @Cr K REHAB-1.2.2.3.2.2 PLNE REHAB-1.2.2.3.2.2 Road Crossing Road @Cr K REHAB-1.2.2.3.2.2 PLNE REHAB-1.2.2.3.2.2 Road Crossing Road @Cr K REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.5 PLNE REHAB-1.2.2.3.5 Hydrostatic Hydrostati testing / D REHAB-1.2.2.3.5 PLNE REHAB-1.2.2.3.5 Hydrostatic Hydrostati testing / D REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.1.2 PLNE REHAB-1.2.2.3.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.2 PLNE REHAB-1.2.2.3.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.2 PLNE REHAB-1.2.2.3.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.2 PLNE REHAB-1.2.2.3.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.2 PLNE REHAB-1.2.2.3.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.2 PLNE REHAB-1.2.2.3.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.2 PLNE REHAB-1.2.2.3.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.2 PLNE REHAB-1.2.2.3.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.3 PLNE REHAB-1.2.2.3.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.3 PLNE REHAB-1.2.2.3.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.3 PLNE REHAB-1.2.2.3.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.3 PLNE REHAB-1.2.2.3.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.3 PLNE REHAB-1.2.2.3.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.3 PLNE REHAB-1.2.2.3.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.3 PLNE REHAB-1.2.2.3.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.3 PLNE REHAB-1.2.2.3.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.2 PLNE REHAB-1.2.2.3.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.6.1.1 PLNE REHAB-1.2.2.3.6.1.1 Earthworks Earthw REHAB-1.2.2.3.6.1.1 PLNE REHAB-1.2.2.3.6.1.1 Earthworks Earthw REHAB-1.2.2.3.6.1.1 PLNE REHAB-1.2.2.3.6.1.1 Earthworks Earthw REHAB-1.2.2.3.6.1.2 PLNE REHAB-1.2.2.3.6.1.2 Scraper launcher Scrape REHAB-1.2.2.3.6.1.2 PLNE REHAB-1.2.2.3.6.1.2 Scraper launcher Scrape REHAB-1.2.2.3.6.1.2 PLNE REHAB-1.2.2.3.6.1.2 Scraper launcher Scrape REHAB-1.2.2.3.6.1.2 PLNE REHAB-1.2.2.3.6.1.2 Scraper launcher Scrape REHAB-1.2.2.3.6.1.2 PLNE REHAB-1.2.2.3.6.1.2 Scraper launcher Scrape REHAB-1.2.2.3.6.1.2 PLNE REHAB-1.2.2.3.6.1.2 Scraper launcher Scrape REHAB-1.2.2.3.6.1.3 PLNE REHAB-1.2.2.3.6.1.3 Electrical & Electri instrum REHAB-1.2.2.3.6.1.3 PLNE REHAB-1.2.2.3.6.1.3 Electrical & Electri instrum REHAB-1.2.2.3.6.1.3 PLNE REHAB-1.2.2.3.6.1.3 Electrical & Electri instrum REHAB-1.2.2.3.6.1.3 PLNE REHAB-1.2.2.3.6.1.3 Electrical & Electri instrum REHAB-1.2.2.3.6.1.4 PLNE REHAB-1.2.2.3.6.1.4 Backfill / fence/coa Backfil REHAB-1.2.2.3.6.1.3 PLNE REHAB-1.2.2.3.6.1.3 Electrical & Electri instrum REHAB-1.2.2.3.6.2.1 PLNE REHAB-1.2.2.3.6.2.1 Earthworks Earthw REHAB-1.2.2.3.6.2.1 PLNE REHAB-1.2.2.3.6.2.1 Earthworks Earthw REHAB-1.2.2.3.6.2.1 PLNE REHAB-1.2.2.3.6.2.1 Earthworks Earthw REHAB-1.2.2.3.6.2.2 PLNE REHAB-1.2.2.3.6.2.2 Scraper Reciever Scrape REHAB-1.2.2.3.6.2.2 PLNE REHAB-1.2.2.3.6.2.2 Scraper Reciever Scrape REHAB-1.2.2.3.6.2.2 PLNE REHAB-1.2.2.3.6.2.2 Scraper Reciever Scrape

Page 22

TASKPRED

CKRT3YST930 CKRT3YST940 FS CKRT3YST940 CKRT3YST950 FS CKRT3YST950 CKRT3YST960 FS CKRT3YST0970 CKRT3YST0980 FS CKRT3YST0980 CKRT3YST0990 FS CKRT3YST1000 CKRT3YST1010 FS CKRT3YST1020 CKRT3YST1030 FS CKRT3YST1010 CKRT3YST1020 FS CKRT3YPW110 CKRT3YPW120 FS CKRTJ1OFW150 CKRTJ1OFW160 SS CKRTJ1OFW160 CKRTJ1OFW170 SS CKRTJ1OFW170 CKRTJ1OFW180 SS CKRTJ1OFW180 CKRTJ1OFW190 FF CKRTJ1MW730 CKRTJ1MW740 SS CKRTJ1MW740 CKRTJ1MW750 SS CKRTJ1MW750 CKRTJ1MW760 SS CKRTJ1MW760 CKRTJ1MW770 FF CKRTJ1MW770 CKRTJ1MW780 FF CKRTJ1MW780 CKRTJ1MW800 SS CKRTJ1MW800 CKRTJ1MW810 SS CKRTJ1MW810 CKRTJ1MW820 SS CKRTJ1MW820 CKRTJ1MW830 SS CKRTJ1MW840 CKRTJ1MW850 SS CKRTJ1MW850 CKRTJ1MW860 FF CKRTJ1MW860 CKRTJ1MW870 FF CKRTJ1RCT480 CKRTJ1RCT490 FS CKRTJ1RCT490 CKRTJ1RCT500 FS CKRTJ1RCO430 CKRTJ1RCO440 FS CKRTJ1RCO480 CKRTJ1RCO490 FS CKRTJ1HYD140 CKRTJ1HYD150 FS CKRTJ1MW780 CKRTJ1MW790 SS CKRTJ1MW830 CKRTJ1MW840 FF CKRTJ1MWT730 CKRTJ1MWT740 FS CKRTJ1MWT740 CKRTJ1MWT750 FS CKRTJ1MWT750 CKRTJ1MWT760 FS CKRTJ1MWT760 CKRTJ1MWT770 FS CKRTJ1MWT770 CKRTJ1MWT780 FS CKRTJ1MWT780 CKRTJ1MWT790 FS CKRTJ1MWT810 CKRTJ1MWT820 FS CKRTJ1MWT820 CKRTJ1MWT830 SS CKRTJ1MWT830 CKRTJ1MWT840 FS CKRTJ1MWT840 CKRTJ1MWT850 FS CKRTJ1MWT850 CKRTJ1MWT860 FS CKRTJ1MWT860 CKRTJ1MWT870 FS CKRTJ1MWT870 CKRTJ1MWT880 FS CKRTJ1MWT880 CKRTJ1MWT890 FS CKRTJ1RCT560 CKRTJ1RCT570 FS CKRTJ1RCT570 CKRTJ1RCT580 SS CKRTJ1RCT580 CKRTJ1RCT590 FS CKRTJ1RCT590 CKRTJ1RCT600 FS CKRTJ1RCT600 CKRTJ1RCT610 FS CKRTJ1RCT670 CKRTJ1RCT680 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.3.6.2.2 PLNE REHAB-1.2.2.3.6.2.2 Scraper Reciever Scrape REHAB-1.2.2.3.6.2.2 PLNE REHAB-1.2.2.3.6.2.2 Scraper Reciever Scrape REHAB-1.2.2.3.6.2.2 PLNE REHAB-1.2.2.3.6.2.2 Scraper Reciever Scrape REHAB-1.2.2.3.6.2.3 PLNE REHAB-1.2.2.3.6.2.3 Electrical & Electri instrum REHAB-1.2.2.3.6.2.3 PLNE REHAB-1.2.2.3.6.2.3 Electrical & Electri instrum REHAB-1.2.2.3.6.2.3 PLNE REHAB-1.2.2.3.6.2.3 Electrical & Electri instrum REHAB-1.2.2.3.6.2.4 PLNE REHAB-1.2.2.3.6.2.4 Backfill / fence/coa Backfil REHAB-1.2.2.3.6.2.3 PLNE REHAB-1.2.2.3.6.2.3 Electrical & Electri instrum REHAB-1.2.2.3.9 PLNE REHAB-1.2.2.3.9 PMCC Walkthrough PMCC Wa & REHAB-1.2.2.4.7 PLNE REHAB-1.2.2.4.7 Offsite Work Offsite Wo REHAB-1.2.2.4.7 PLNE REHAB-1.2.2.4.7 Offsite Work Offsite Wo REHAB-1.2.2.4.7 PLNE REHAB-1.2.2.4.7 Offsite Work Offsite Wo REHAB-1.2.2.4.7 PLNE REHAB-1.2.2.4.7 Offsite Work Offsite Wo REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.4.1 PLNE REHAB-1.2.2.4.4.1 Road Crossing Road @Cr K REHAB-1.2.2.4.4.1 PLNE REHAB-1.2.2.4.4.1 Road Crossing Road @Cr K REHAB-1.2.2.4.4.2 PLNE REHAB-1.2.2.4.4.2 Road Crossing Road @Cr K REHAB-1.2.2.4.4.2 PLNE REHAB-1.2.2.4.4.2 Road Crossing Road @Cr K REHAB-1.2.2.4.5 PLNE REHAB-1.2.2.4.5 Hydrostatic Hydrostati testing / D REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.2.2 PLNE REHAB-1.2.2.4.2.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.4.2.2 PLNE REHAB-1.2.2.4.2.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.4.2.2 PLNE REHAB-1.2.2.4.2.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.4.2.2 PLNE REHAB-1.2.2.4.2.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.4.2.2 PLNE REHAB-1.2.2.4.2.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.4.2.2 PLNE REHAB-1.2.2.4.2.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.4.2.3 PLNE REHAB-1.2.2.4.2.3 Thrust Anchor Thrust @ JT A REHAB-1.2.2.4.2.3 PLNE REHAB-1.2.2.4.2.3 Thrust Anchor Thrust @ JT A REHAB-1.2.2.4.2.3 PLNE REHAB-1.2.2.4.2.3 Thrust Anchor Thrust @ JT A REHAB-1.2.2.4.2.3 PLNE REHAB-1.2.2.4.2.3 Thrust Anchor Thrust @ JT A REHAB-1.2.2.4.2.3 PLNE REHAB-1.2.2.4.2.3 Thrust Anchor Thrust @ JT A REHAB-1.2.2.4.2.3 PLNE REHAB-1.2.2.4.2.3 Thrust Anchor Thrust @ JT A REHAB-1.2.2.4.2.3 PLNE REHAB-1.2.2.4.2.3 Thrust Anchor Thrust @ JT A REHAB-1.2.2.4.2.3 PLNE REHAB-1.2.2.4.2.3 Thrust Anchor Thrust @ JT A REHAB-1.2.2.4.4.3 PLNE REHAB-1.2.2.4.4.3 Road Crossing Road @Cr K REHAB-1.2.2.4.4.3 PLNE REHAB-1.2.2.4.4.3 Road Crossing Road @Cr K REHAB-1.2.2.4.4.3 PLNE REHAB-1.2.2.4.4.3 Road Crossing Road @Cr K REHAB-1.2.2.4.4.3 PLNE REHAB-1.2.2.4.4.3 Road Crossing Road @Cr K REHAB-1.2.2.4.4.3 PLNE REHAB-1.2.2.4.4.3 Road Crossing Road @Cr K REHAB-1.2.2.4.4.5 PLNE REHAB-1.2.2.4.4.5 Road Crossing Road @Cr K

Page 23

TASKPRED

CKRTJ1RCT680 CKRTJ1RCT690 SS CKRTJ1RCT690 CKRTJ1RCT700 FS CKRTJ1RCT700 CKRTJ1RCT710 FS CKRTJ1RCT710 CKRTJ1RCT720 FS CSJ1RCO130 CSJ1RCO140 FS CSJ1RCO140 CSJ1RCO150 SS CSJ1RCO150 CSJ1RCO160 FS CSJ1RCO160 CSJ1RCO170 FS CSJ1RCO170 CSJ1RCO180 FS CSJ1RCO180 CSJ1RCO190 FS CSK3RCT230 CSK3RCT240 SS CSK3RCT240 CSK3RCT250 SS CSK3RCT250 CSK3RCT260 FS CSK3RCT260 CSK3RCT270 FS CSK3RCT310 CSK3RCT320 FS CSK3RCT270 CSK3RCT290 FS CSK3RCT240 CSK3RCT330 FS CKRT3YRCT450 CKRT3YRCT460 FS CKRT3YRCT460 CKRT3YRCT470 SS CKRT3YRCT470 CKRT3YRCT480 FS CKRT3YRCT480 CKRT3YRCT490 FS CKRT3YRCT490 CKRT3YRCT500 FS CKRT3YRCT510 CKRT3YRCT520 FS CKRT3YRCT520 CKRT3YRCT530 FS CKRT3YRCT530 CKRT3YRCT540 FS CKRT3YRCT490 CKRT3YRCT510 SS CKRT3YRCT560 CKRT3YRCT570 FS CKRT3YRCT570 CKRT3YRCT580 SS CKRT3YRCT580 CKRT3YRCT590 FS CKRT3YRCT590 CKRT3YRCT600 FS CKRT3YRCT600 CKRT3YRCT610 FS CKRT3YRCT620 CKRT3YRCT630 FS CKRT3YRCT630 CKRT3YRCT640 FS CKRT3YRCT640 CKRT3YRCT650 FS CKRT3YRCT600 CKRT3YRCT620 SS CKRT3YRCT670 CKRT3YRCT680 FS CKRT3YRCT680 CKRT3YRCT690 SS CKRT3YRCT690 CKRT3YRCT700 FS CKRT3YRCT700 CKRT3YRCT710 FS CKRT3YRCT710 CKRT3YRCT720 FS CKRT3YRCT730 CKRT3YRCT740 FS CKRT3YRCT740 CKRT3YRCT750 FS CKRT3YRCT750 CKRT3YRCT760 FS CKRT3YRCT710 CKRT3YRCT730 SS CKRT3YRCT680 CKRT3YRCT770 FS CKRT3YRCT780 CKRT3YRCT790 FS CKRT3YRCT790 CKRT3YRCT800 SS CKRT3YRCT800 CKRT3YRCT810 FS CKRT3YRCT810 CKRT3YRCT820 FS CKRT3YRCT820 CKRT3YRCT830 FS CKRT3YRCT840 CKRT3YRCT850 FS CKRT3YRCT850 CKRT3YRCT860 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.4.4.5 PLNE REHAB-1.2.2.4.4.5 Road Crossing Road @Cr K REHAB-1.2.2.4.4.5 PLNE REHAB-1.2.2.4.4.5 Road Crossing Road @Cr K REHAB-1.2.2.4.4.5 PLNE REHAB-1.2.2.4.4.5 Road Crossing Road @Cr K REHAB-1.2.2.4.4.5 PLNE REHAB-1.2.2.4.4.5 Road Crossing Road @Cr K REHAB-1.2.4.6.3.5 PLNE REHAB-1.2.4.6.3.5 Road Crossing Road @Cr K REHAB-1.2.4.6.3.5 PLNE REHAB-1.2.4.6.3.5 Road Crossing Road @Cr K REHAB-1.2.4.6.3.5 PLNE REHAB-1.2.4.6.3.5 Road Crossing Road @Cr K REHAB-1.2.4.6.3.5 PLNE REHAB-1.2.4.6.3.5 Road Crossing Road @Cr K REHAB-1.2.4.6.3.5 PLNE REHAB-1.2.4.6.3.5 Road Crossing Road @Cr K REHAB-1.2.4.6.3.5 PLNE REHAB-1.2.4.6.3.5 Road Crossing Road @Cr K REHAB-1.2.2.1.2.5 PLNE REHAB-1.2.2.1.2.5 Road Crossing Road @Cr K REHAB-1.2.2.1.2.5 PLNE REHAB-1.2.2.1.2.5 Road Crossing Road @Cr K REHAB-1.2.2.1.2.5 PLNE REHAB-1.2.2.1.2.5 Road Crossing Road @Cr K REHAB-1.2.2.1.2.5 PLNE REHAB-1.2.2.1.2.5 Road Crossing Road @Cr K REHAB-1.2.2.1.2.5 PLNE REHAB-1.2.2.1.2.5 Road Crossing Road @Cr K REHAB-1.2.2.1.2.5 PLNE REHAB-1.2.2.1.2.5 Road Crossing Road @Cr K REHAB-1.2.2.1.2.5 PLNE REHAB-1.2.2.1.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.7 PLNE REHAB-1.2.2.3.2.7 Road Crossing Road @Cr K REHAB-1.2.2.3.2.7 PLNE REHAB-1.2.2.3.2.7 Road Crossing Road @Cr K REHAB-1.2.2.3.2.7 PLNE REHAB-1.2.2.3.2.7 Road Crossing Road @Cr K REHAB-1.2.2.3.2.7 PLNE REHAB-1.2.2.3.2.7 Road Crossing Road @Cr K REHAB-1.2.2.3.2.7 PLNE REHAB-1.2.2.3.2.7 Road Crossing Road @Cr K REHAB-1.2.2.3.2.7 PLNE REHAB-1.2.2.3.2.7 Road Crossing Road @Cr K REHAB-1.2.2.3.2.7 PLNE REHAB-1.2.2.3.2.7 Road Crossing Road @Cr K REHAB-1.2.2.3.2.7 PLNE REHAB-1.2.2.3.2.7 Road Crossing Road @Cr K REHAB-1.2.2.3.2.7 PLNE REHAB-1.2.2.3.2.7 Road Crossing Road @Cr K REHAB-1.2.2.3.2.7 PLNE REHAB-1.2.2.3.2.7 Road Crossing Road @Cr K REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K

Page 24

TASKPRED

CKRT3YRCT860 CKRT3YRCT870 FS CKRT3YRCT820 CKRT3YRCT840 SS CKRT3YRCT790 CKRT3YRCT880 FS CKRT3YRCT890 CKRT3YRCT900 FS CKRT3YRCT900 CKRT3YRCT910 SS CKRT3YRCT910 CKRT3YRCT920 FS CKRT3YRCT920 CKRT3YRCT930 FS CKRT3YRCT930 CKRT3YRCT940 FS CKRT3YRCT950 CKRT3YRCT960 FS CKRT3YRCT960 CKRT3YRCT970 FS CKRT3YRCT970 CKRT3YRCT980 FS CKRT3YRCT930 CKRT3YRCT950 SS CKRT3YRCT900 CKRT3YRCT990 FS CKRT3YRCO410 CKRT3YRCO420 FS CKRT3YRCO420 CKRT3YRCO430 SS CKRT3YRCO430 CKRT3YRCO440 FS CKRT3YRCO440 CKRT3YRCO450 FS CKRT3YRCO450 CKRT3YRCO460 FS CKRT3YRCO460 CKRT3YRCO470 FS CKRT3YRCO470 CKRT3YRCO480 FS CKRT3YRCO480 CKRT3YRCO490 FS CKRT3YRCO420 CKRT3YRCO500 FS CKRT3YRCT1000 CKRT3YRCT1010 FS CKRT3YRCT1010 CKRT3YRCT1020 SS CKRT3YRCT1020 CKRT3YRCT1030 FS CKRT3YRCT1030 CKRT3YRCT1040 FS CKRT3YRCT1040 CKRT3YRCT1050 FS CKRT3YRCT1060 CKRT3YRCT1070 FS CKRT3YRCT1070 CKRT3YRCT1080 FS CKRT3YRCT1080 CKRT3YRCT1090 FS CKRT3YRCT1040 CKRT3YRCT1060 SS CKRT3YRCT1010 CKRT3YRCT1100 FS CKRT3YRCO510 CKRT3YRCO520 FS CKRT3YRCO520 CKRT3YRCO530 SS CKRT3YRCO530 CKRT3YRCO540 FS CKRT3YRCO540 CKRT3YRCO550 FS CKRT3YRCO550 CKRT3YRCO560 FS CKRT3YRCO560 CKRT3YRCO570 FS CKRT3YRCO570 CKRT3YRCO580 FS CKRT3YRCO580 CKRT3YRCO590 FS CKRT3YRCO610 CKRT3YRCO620 FS CKRT3YRCO620 CKRT3YRCO630 SS CKRT3YRCO630 CKRT3YRCO640 FS CKRT3YRCO640 CKRT3YRCO650 FS CKRT3YRCO650 CKRT3YRCO660 FS CKRT3YRCO660 CKRT3YRCO670 FS CKRT3YRCO670 CKRT3YRCO680 FS CKRT3YRCO680 CKRT3YRCO690 FS CKRT3YRCO710 CKRT3YRCO720 FS CKRT3YRCO720 CKRT3YRCO730 SS CKRT3YRCO730 CKRT3YRCO740 FS CKRT3YRCO740 CKRT3YRCO750 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.10 PLNE REHAB-1.2.2.3.2.10 Road Crossing Road @C REHAB-1.2.2.3.2.10 PLNE REHAB-1.2.2.3.2.10 Road Crossing Road @C REHAB-1.2.2.3.2.10 PLNE REHAB-1.2.2.3.2.10 Road Crossing Road @C REHAB-1.2.2.3.2.10 PLNE REHAB-1.2.2.3.2.10 Road Crossing Road @C REHAB-1.2.2.3.2.10 PLNE REHAB-1.2.2.3.2.10 Road Crossing Road @C REHAB-1.2.2.3.2.10 PLNE REHAB-1.2.2.3.2.10 Road Crossing Road @C REHAB-1.2.2.3.2.10 PLNE REHAB-1.2.2.3.2.10 Road Crossing Road @C REHAB-1.2.2.3.2.10 PLNE REHAB-1.2.2.3.2.10 Road Crossing Road @C REHAB-1.2.2.3.2.10 PLNE REHAB-1.2.2.3.2.10 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.12 PLNE REHAB-1.2.2.3.2.12 Road Crossing Road @C REHAB-1.2.2.3.2.12 PLNE REHAB-1.2.2.3.2.12 Road Crossing Road @C REHAB-1.2.2.3.2.12 PLNE REHAB-1.2.2.3.2.12 Road Crossing Road @C REHAB-1.2.2.3.2.12 PLNE REHAB-1.2.2.3.2.12 Road Crossing Road @C REHAB-1.2.2.3.2.12 PLNE REHAB-1.2.2.3.2.12 Road Crossing Road @C REHAB-1.2.2.3.2.12 PLNE REHAB-1.2.2.3.2.12 Road Crossing Road @C REHAB-1.2.2.3.2.12 PLNE REHAB-1.2.2.3.2.12 Road Crossing Road @C REHAB-1.2.2.3.2.12 PLNE REHAB-1.2.2.3.2.12 Road Crossing Road @C REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.3.2.14 PLNE REHAB-1.2.2.3.2.14 Road Crossing Road @ C REHAB-1.2.2.3.2.14 PLNE REHAB-1.2.2.3.2.14 Road Crossing Road @ C REHAB-1.2.2.3.2.14 PLNE REHAB-1.2.2.3.2.14 Road Crossing Road @ C REHAB-1.2.2.3.2.14 PLNE REHAB-1.2.2.3.2.14 Road Crossing Road @ C

Page 25

TASKPRED

CKRT3YRCO750 CKRT3YRCO760 FS CKRT3YRCO760 CKRT3YRCO770 FS CKRT3YRCO770 CKRT3YRCO780 FS CKRT3YRCO780 CKRT3YRCO790 FS CKRT3YRCO720 CKRT3YRCO800 FS CKRT3YRCT1110 CKRT3YRCT1120 FS CKRT3YRCT1120 CKRT3YRCT1130 SS CKRT3YRCT1130 CKRT3YRCT1140 FS CKRT3YRCT1140 CKRT3YRCT1150 FS CKRT3YRCT1150 CKRT3YRCT1160 FS CKRT3YRCT1170 CKRT3YRCT1180 FS CKRT3YRCT1180 CKRT3YRCT1190 FS CKRT3YRCT1190 CKRT3YRCT1200 FS CKRT3YRCT1150 CKRT3YRCT1170 SS CKRT3YRCT1120 CKRT3YRCT1210 FS CSJ1MW190 CSJ1MW200 FF CSK3MW220 CSK3MW240 SS CSK3HYD60 CSK3PW010 FS CSJ1MLV040 CSJ1MLV050 FS CSJ1MLV160 CSJ1MLV170 FS CSJ1MLV150 CSJ1MLV160 FS CSK3MLV270 CSK3MLV280 FS CSJ1MLV030 CSJ1MLV040 FS CSJ1MLV050 CSJ1MLV060 FS CKRT3XHYD90 CKRT3XPW40 FS CKRT3YMWT490 CKRT3YMWT500 FF CKRT3YMWT590 CKRT3YMWT600 FF CKRT3YMWT600 CKRT3YRCO710 FS CKRT3YRCO800 CKRT3YRCO610 FS CKRT3YRCO690 CKRT3YRCO700 FS CKRT3YRCO700 CKRT3YRCT1110 FS CKRT3YRCT1210 CKRT3YRCT340 FS CKRT3YRCT440 CKRT3YRCT450 FS CKRT3YRCT540 CKRT3YRCT550 FS CKRT3YRCT550 CKRT3YRCT560 FS CKRT3YRCT650 CKRT3YRCT660 FS CKRT3YRCT660 CKRT3YRCT670 FS CKRT3YRCO390 CKRT3YRCO400 FS CKRT3YRCO400 CKRT3YRCT890 FS CKRT3YRCT990 CKRT3YRCT780 FS CKRT3YRCT880 CKRT3YRCO410 FS CKRT3YRCO500 CKRT3YRCT1000 FS CKRT3YRCT1100 CKRT3YRCO510 FS CKRT3YRCO590 CKRT3YRCO600 FS CKRT3YRCO600 CKRT3YRWCT450 FS CKRT3YRWCT540 CKRT3YRWCT550 FS CKRT3YRWCT550 CKRT3YFCO400 FS CKRT3YST790 CKRT3YST800 FS CKRT3YST860 CKRT3YST870 FS CKRT3YST960 CKRT3YST0970 FS CKRT3YST0990 CKRT3YST1000 FS CKRT3YST1030 CKRT3YHYD100 FF

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.3.2.14 PLNE REHAB-1.2.2.3.2.14 Road Crossing Road @ C REHAB-1.2.2.3.2.14 PLNE REHAB-1.2.2.3.2.14 Road Crossing Road @ C REHAB-1.2.2.3.2.14 PLNE REHAB-1.2.2.3.2.14 Road Crossing Road @ C REHAB-1.2.2.3.2.14 PLNE REHAB-1.2.2.3.2.14 Road Crossing Road @ C REHAB-1.2.2.3.2.14 PLNE REHAB-1.2.2.3.2.14 Road Crossing Road @ C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.4 PLNE REHAB-1.2.2.1.4 Hydrostatic Hydrostati testing / D REHAB-1.2.4.6.5.1.1 PLNE REHAB-1.2.4.6.5.1.1 Civil & structural Civil & REHAB-1.2.4.6.5.2.1 PLNE REHAB-1.2.4.6.5.2.1 Civil & structural Civil & REHAB-1.2.4.6.5.2.1 PLNE REHAB-1.2.4.6.5.2.1 Civil & structural Civil & REHAB-1.2.2.1.1.1.1 PLNE REHAB-1.2.2.1.1.1.1 Civil & structural Civil & REHAB-1.2.4.6.5.1.1 PLNE REHAB-1.2.4.6.5.1.1 Civil & structural Civil & REHAB-1.2.4.6.5.1.1 PLNE REHAB-1.2.4.6.5.1.1 Civil & structural Civil & REHAB-1.2.2.2.5 PLNE REHAB-1.2.2.2.5 Hydrostatic Hydrostati testing / D REHAB-1.2.2.3.1.2 PLNE REHAB-1.2.2.3.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.3 PLNE REHAB-1.2.2.3.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.1.3 PLNE REHAB-1.2.2.3.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.3.2.14 PLNE REHAB-1.2.2.3.2.14 Road Crossing Road @ C REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.3.2.15 PLNE REHAB-1.2.2.3.2.15 Road Crossing Road @C REHAB-1.2.2.3.2.1 PLNE REHAB-1.2.2.3.2.1 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.5 PLNE REHAB-1.2.2.3.2.5 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.6 PLNE REHAB-1.2.2.3.2.6 Road Crossing Road @Cr K REHAB-1.2.2.3.2.2 PLNE REHAB-1.2.2.3.2.2 Road Crossing Road @Cr K REHAB-1.2.2.3.2.2 PLNE REHAB-1.2.2.3.2.2 Road Crossing Road @Cr K REHAB-1.2.2.3.2.9 PLNE REHAB-1.2.2.3.2.9 Road Crossing Road @Cr K REHAB-1.2.2.3.2.8 PLNE REHAB-1.2.2.3.2.8 Road Crossing Road @Cr K REHAB-1.2.2.3.2.10 PLNE REHAB-1.2.2.3.2.10 Road Crossing Road @C REHAB-1.2.2.3.2.11 PLNE REHAB-1.2.2.3.2.11 Road Crossing Road @C REHAB-1.2.2.3.2.12 PLNE REHAB-1.2.2.3.2.12 Road Crossing Road @C REHAB-1.2.2.3.2.12 PLNE REHAB-1.2.2.3.2.12 Road Crossing Road @C REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T REHAB-1.2.2.3.2.3 PLNE REHAB-1.2.2.3.2.3 Railway Crossing Railway (T REHAB-1.2.2.3.6.1.2 PLNE REHAB-1.2.2.3.6.1.2 Scraper launcher Scrape REHAB-1.2.2.3.6.1.4 PLNE REHAB-1.2.2.3.6.1.4 Backfill / fence/coa Backfil REHAB-1.2.2.3.6.2.2 PLNE REHAB-1.2.2.3.6.2.2 Scraper Reciever Scrape REHAB-1.2.2.3.6.2.3 PLNE REHAB-1.2.2.3.6.2.3 Electrical & Electri instrum REHAB-1.2.2.3.6.2.4 PLNE REHAB-1.2.2.3.6.2.4 Backfill / fence/coa Backfil

Page 26

TASKPRED

CKRT3YPW100 CKRT3YPW110 FS CKRTJ1RCT550 CKRTJ1RCT670 FS CKRTJ1RCT770 CKRTJ1RCT560 FS CKRTJ1HYD150 CKRTJ1PW120 FS CCWOP050 CCWOP060 SS CCWOP060 CCWOP070 SS CCWOP080 CCWOP090 SS CCWIP300CCWIP310SS CCWIP310CCWIP320FS CCWIP330CCWIP340FS CCWOP090 CCWOP660 FS CCWIP340CCWIP650FS CKRT3YPW080 CKRT3YPW100 FS CKRT3YHYD120 CKRT3YPW080 FS CSJ1MW210 CSJ1MW220 SS CSJ1MW220 CSJ1MW230 FF CCWIP295CCWIP300SS GEN010 GEN020 FS GEN010 PROC010 FS GEN050 CMOB020 FS CMOB020 CMOB030 SS CMOB030 CSJ1CMW010 SS CSJ1OFW050 CSJ1MLV060 FS CSJ1MLV170 CSJ1MLV180 FS CSJ1CMW010 CSJ1MW010 SS CSJ1MLV060 CSJ1MLV070 FS CSJ1MLV070 CSJ1MLV080 FS CSJ1MLV080 CSJ1MLV090 FS CSJ1MLV090 CSJ1MLV100 FS CSJ1MLV100 CSJ1MLV110 FF CSJ1MLV110 CSJ1MLV120 FF CSJ1MLV180 CSJ1MLV190 FS CSJ1MLV190 CSJ1MLV200 FS CSJ1MLV200 CSJ1MLV210 FS CSJ1MLV210 CSJ1MLV2201 FS CSJ1MLV2201 CSJ1MLV230 FF CSJ1MLV230 CSJ1MLV240 FF CSJ1OFW050 CSJ1MLV080 FS CSJ1MW200 CSJ1MLV010 FS CSJ1MW140 CSJ1MW160 FF CSJ1MW140 CSJ1HYD020 FS CSJ1RCO060 CSJ1HYD020 FS CSJ1RCO160 CSJ1HYD020 FS CSJ1MLV090 CSJ1HYD020 FS CSJ1MLV210 CSJ1HYD020 FS CSJ1HYD020 CSJ1HYD010 SS CSK3MW295 CSK3MW300 SS CSK3MW290 CSK3MW295 SS CSK3MW310 CSK3RCT120 SS CSK3MLV280 CSK3MLV290 FS CSK3MLV290 CSK3MLV300 FS CSK3MLV300 CSK3MLV310 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.3.9 PLNE REHAB-1.2.2.3.9 PMCC Walkthrough PMCC Wa & REHAB-1.2.2.4.4.1 PLNE REHAB-1.2.2.4.4.1 Road Crossing Road @Cr K REHAB-1.2.2.4.4.5 PLNE REHAB-1.2.2.4.4.5 Road Crossing Road @Cr K REHAB-1.2.2.4.5 PLNE REHAB-1.2.2.4.5 Hydrostatic Hydrostati testing / D REHAB-1.2.5.19.5 PLNE REHAB-1.2.5.19.5 Communication Commun work REHAB-1.2.5.19.5 PLNE REHAB-1.2.5.19.5 Communication Commun work REHAB-1.2.5.19.5 PLNE REHAB-1.2.5.19.5 Communication Commun work REHAB-1.2.5.19.4 PLNE REHAB-1.2.5.19.4 Communication Commun work REHAB-1.2.5.19.4 PLNE REHAB-1.2.5.19.4 Communication Commun work REHAB-1.2.5.19.4 PLNE REHAB-1.2.5.19.4 Communication Commun work REHAB-1.2.5.19.5 PLNE REHAB-1.2.5.19.5 Communication Commun work REHAB-1.2.5.19.4 PLNE REHAB-1.2.5.19.4 Communication Commun work REHAB-1.2.2.3.9 PLNE REHAB-1.2.2.3.9 PMCC Walkthrough PMCC Wa & REHAB-1.2.2.3.5 PLNE REHAB-1.2.2.3.5 Hydrostatic Hydrostati testing / D REHAB-1.2.7 PLNE REHAB-1.2.7 COMPLETE COMPLETE ISOLATION IS REHAB-1.2.7 PLNE REHAB-1.2.7 COMPLETE COMPLETE ISOLATION IS REHAB-1.2.5.19.4 PLNE REHAB-1.2.5.19.4 Communication Commun work REHAB-1.1 PLNE REHAB-1.1 GENERAL GENERAL REHAB-1.1 PLNE REHAB-1.1 GENERAL GENERAL REHAB-1.1 PLNE REHAB-1.1 GENERAL GENERAL REHAB-1.2.1 PLNE REHAB-1.2.1 TCF TCF REHAB-1.2.1 PLNE REHAB-1.2.1 TCF TCF REHAB-1.2.4.6.6 PLNE REHAB-1.2.4.6.6 Offsite Work Offsite Wo REHAB-1.2.4.6.5.2.1 PLNE REHAB-1.2.4.6.5.2.1 Civil & structural Civil & REHAB-1.2.4.6.7 PLNE REHAB-1.2.4.6.7 Common Work Common W REHAB-1.2.4.6.5.1.2 PLNE REHAB-1.2.4.6.5.1.2 Piping & Mechanic Piping REHAB-1.2.4.6.5.1.2 PLNE REHAB-1.2.4.6.5.1.2 Piping & Mechanic Piping REHAB-1.2.4.6.5.1.2 PLNE REHAB-1.2.4.6.5.1.2 Piping & Mechanic Piping REHAB-1.2.4.6.5.1.2 PLNE REHAB-1.2.4.6.5.1.2 Piping & Mechanic Piping REHAB-1.2.4.6.5.1.3 PLNE REHAB-1.2.4.6.5.1.3 Miscellaneous Miscel REHAB-1.2.4.6.5.1.3 PLNE REHAB-1.2.4.6.5.1.3 Miscellaneous Miscel REHAB-1.2.4.6.5.2.2 PLNE REHAB-1.2.4.6.5.2.2 Piping & Mechanic Piping REHAB-1.2.4.6.5.2.2 PLNE REHAB-1.2.4.6.5.2.2 Piping & Mechanic Piping REHAB-1.2.4.6.5.2.2 PLNE REHAB-1.2.4.6.5.2.2 Piping & Mechanic Piping REHAB-1.2.4.6.5.2.2 PLNE REHAB-1.2.4.6.5.2.2 Piping & Mechanic Piping REHAB-1.2.4.6.5.2.3 PLNE REHAB-1.2.4.6.5.2.3 Miscellaneous Miscel REHAB-1.2.4.6.5.2.3 PLNE REHAB-1.2.4.6.5.2.3 Miscellaneous Miscel REHAB-1.2.4.6.6 PLNE REHAB-1.2.4.6.6 Offsite Work Offsite Wo REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K REHAB-1.2.4.6.3.5 PLNE REHAB-1.2.4.6.3.5 Road Crossing Road @Cr K REHAB-1.2.4.6.5.1.2 PLNE REHAB-1.2.4.6.5.1.2 Piping & Mechanic Piping REHAB-1.2.4.6.5.2.2 PLNE REHAB-1.2.4.6.5.2.2 Piping & Mechanic Piping REHAB-1.2.4.6.8 PLNE REHAB-1.2.4.6.8 Hydrostatic Hydrostati testing / D REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.1.1.2 PLNE REHAB-1.2.2.1.1.1.2 Piping & Mechanic Piping REHAB-1.2.2.1.1.1.2 PLNE REHAB-1.2.2.1.1.1.2 Piping & Mechanic Piping REHAB-1.2.2.1.1.1.2 PLNE REHAB-1.2.2.1.1.1.2 Piping & Mechanic Piping

Page 27

TASKPRED

CSK3MLV250 CSK3MLV320 FS CSK3CMW010 CSK3MW220 SS CSK3ST020 CSK3ST120 FS CSK3ST060 CSK3ST080 SS CSK3ST090 CSK3ST100 SS CSK3ST040 CSK3ST050 FS CSK3MLV310 CSK3HYD50 FS CSJ1CMW010 CSJ1OFW010 FS CSK3HYD50 CSK3HYD40 SS CSK3ST050 CSK3ST060 FS CSK3ST100 CSK3HYD50 FS CSK3OFW050 CSK3MLV280 FS CKRT3XCMW10 CKRT3XMW400 SS CKRT3XMW400 CKRT3XMW410 FF CKRT3XMW470 CKRT3XMW480 SS CKRT3XPW40 CKRT3XPW70 FS CSK3MWT030 CSK3MWT040 FS CSK3RCT560 CSK3RCT570 SS CSK3RCT570 CSK3RCT580 SS CSK3RCT580 CSK3RCT590 FS CSK3RCT590 CSK3RCT600 FS CSK3RCT640 CSK3RCT650 FS CSK3RCT600 CSK3RCT620 FS CSK3RCT570 CSK3RCT660 FS CSK3RCT670 CSK3RCT680 FS CSK3RCT680 CSK3RCT690 SS CSK3RCT690 CSK3RCT700 FS CSK3RCT700 CSK3RCT710 FS CSK3RCT750 CSK3RCT760 FS CSK3RCT710 CSK3RCT730 FS CSK3RCT680 CSK3RCT770 FS CSK3RCT780 CSK3RCT790 FS CSK3RCT790 CSK3RCT800 SS CSK3RCT800 CSK3RCT810 FS CSK3RCT810 CSK3RCT820 FS CSK3RCT860 CSK3RCT870 FS CSK3RCT820 CSK3RCT840 FS CSK3RCT790 CSK3RCT880 FS CSK3RCT890 CSK3RCT900 FS CSK3RCT900 CSK3RCT910 SS CSK3RCT910 CSK3RCT920 FS CSK3RCT920 CSK3RCT930 FS CSK3RCT970 CSK3RCT980 FS CSK3RCT930 CSK3RCT950 FS CSK3RCT900 CSK3RCT990 FS CSK3RCT990 CSK3RCO110 FS CSK3RCO200 CSK3RCUP010 FS CSK3RCUP010 CSK3FCO140 FS CSK3RCT880 CSK3RCT890 FS CSK3RCT770 CSK3RCT780 FS CSK3RCT660 CSK3RCT670 FS CSK3RCT330 CSK3RCT560 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.1.1.1.1 PLNE REHAB-1.2.2.1.1.1.1 Civil & structural Civil & REHAB-1.2.2.1.8 PLNE REHAB-1.2.2.1.8 Common Work Common W REHAB-1.2.2.1.6.1.1 PLNE REHAB-1.2.2.1.6.1.1 Civil & Structural Civil & REHAB-1.2.2.1.6.1.2 PLNE REHAB-1.2.2.1.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.1.2 PLNE REHAB-1.2.2.1.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.1.1 PLNE REHAB-1.2.2.1.6.1.1 Civil & Structural Civil & REHAB-1.2.2.1.1.1.2 PLNE REHAB-1.2.2.1.1.1.2 Piping & Mechanic Piping REHAB-1.2.4.6.7 PLNE REHAB-1.2.4.6.7 Common Work Common W REHAB-1.2.2.1.4 PLNE REHAB-1.2.2.1.4 Hydrostatic Hydrostati testing / D REHAB-1.2.2.1.6.1.2 PLNE REHAB-1.2.2.1.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.1.2 PLNE REHAB-1.2.2.1.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.1.7 PLNE REHAB-1.2.2.1.7 Offsite work Offsite wo REHAB-1.2.2.2.7 PLNE REHAB-1.2.2.2.7 Common Work Common W REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.9 PLNE REHAB-1.2.2.2.9 PMCC Walkthrough PMCC Wa & REHAB-1.2.2.1.9.2 PLNE REHAB-1.2.2.1.9.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.2.6 PLNE REHAB-1.2.2.1.2.6 Road Crossing Road @Cr K REHAB-1.2.2.1.2.6 PLNE REHAB-1.2.2.1.2.6 Road Crossing Road @Cr K REHAB-1.2.2.1.2.6 PLNE REHAB-1.2.2.1.2.6 Road Crossing Road @Cr K REHAB-1.2.2.1.2.6 PLNE REHAB-1.2.2.1.2.6 Road Crossing Road @Cr K REHAB-1.2.2.1.2.6 PLNE REHAB-1.2.2.1.2.6 Road Crossing Road @Cr K REHAB-1.2.2.1.2.6 PLNE REHAB-1.2.2.1.2.6 Road Crossing Road @Cr K REHAB-1.2.2.1.2.6 PLNE REHAB-1.2.2.1.2.6 Road Crossing Road @Cr K REHAB-1.2.2.1.2.7 PLNE REHAB-1.2.2.1.2.7 Road Crossing Road @Cr K REHAB-1.2.2.1.2.7 PLNE REHAB-1.2.2.1.2.7 Road Crossing Road @Cr K REHAB-1.2.2.1.2.7 PLNE REHAB-1.2.2.1.2.7 Road Crossing Road @Cr K REHAB-1.2.2.1.2.7 PLNE REHAB-1.2.2.1.2.7 Road Crossing Road @Cr K REHAB-1.2.2.1.2.7 PLNE REHAB-1.2.2.1.2.7 Road Crossing Road @Cr K REHAB-1.2.2.1.2.7 PLNE REHAB-1.2.2.1.2.7 Road Crossing Road @Cr K REHAB-1.2.2.1.2.7 PLNE REHAB-1.2.2.1.2.7 Road Crossing Road @Cr K REHAB-1.2.2.1.2.3 PLNE REHAB-1.2.2.1.2.3 Road Crossing Road @Cr K REHAB-1.2.2.1.2.3 PLNE REHAB-1.2.2.1.2.3 Road Crossing Road @Cr K REHAB-1.2.2.1.2.3 PLNE REHAB-1.2.2.1.2.3 Road Crossing Road @Cr K REHAB-1.2.2.1.2.3 PLNE REHAB-1.2.2.1.2.3 Road Crossing Road @Cr K REHAB-1.2.2.1.2.3 PLNE REHAB-1.2.2.1.2.3 Road Crossing Road @Cr K REHAB-1.2.2.1.2.3 PLNE REHAB-1.2.2.1.2.3 Road Crossing Road @Cr K REHAB-1.2.2.1.2.3 PLNE REHAB-1.2.2.1.2.3 Road Crossing Road @Cr K REHAB-1.2.2.1.2.8 PLNE REHAB-1.2.2.1.2.8 Road Crossing Road @Cr K REHAB-1.2.2.1.2.8 PLNE REHAB-1.2.2.1.2.8 Road Crossing Road @Cr K REHAB-1.2.2.1.2.8 PLNE REHAB-1.2.2.1.2.8 Road Crossing Road @Cr K REHAB-1.2.2.1.2.8 PLNE REHAB-1.2.2.1.2.8 Road Crossing Road @Cr K REHAB-1.2.2.1.2.8 PLNE REHAB-1.2.2.1.2.8 Road Crossing Road @Cr K REHAB-1.2.2.1.2.8 PLNE REHAB-1.2.2.1.2.8 Road Crossing Road @Cr K REHAB-1.2.2.1.2.8 PLNE REHAB-1.2.2.1.2.8 Road Crossing Road @Cr K REHAB-1.2.2.1.2.8 PLNE REHAB-1.2.2.1.2.8 Road Crossing Road @Cr K REHAB-1.2.2.1.2.2 PLNE REHAB-1.2.2.1.2.2 Road Crossing Road @Cr K REHAB-1.2.2.1.2.9 PLNE REHAB-1.2.2.1.2.9 Road Crossing Road (Unp Cr REHAB-1.2.2.1.2.3 PLNE REHAB-1.2.2.1.2.3 Road Crossing Road @Cr K REHAB-1.2.2.1.2.7 PLNE REHAB-1.2.2.1.2.7 Road Crossing Road @Cr K REHAB-1.2.2.1.2.6 PLNE REHAB-1.2.2.1.2.6 Road Crossing Road @Cr K REHAB-1.2.2.1.2.5 PLNE REHAB-1.2.2.1.2.5 Road Crossing Road @Cr K

Page 28

TASKPRED

CSK3RCT220 CSK3RCT230 FS CSK3OFW010 CSK3MLV240 FS CSK3MLV380 CSK3MLV385 SS CSK3MLV385 CSK3MLV390 FF CSK3MLV400 CSK3MLV410 FS CSK3MLV470 CSK3MLV480 FS CSK3MLV450 CSK3MLV520 FS CSK3MLV520 CSK3MLV530 FS CSK3MLV530 CSK3MLV540 FS CSK3MLV540 CSK3MLV550 FS CSK3MLV500 CSK3MLV510 FS CSK3MLV410 CSK3MLV500 SS CSK3MLV550 CSK3MLV470 FS CSK3MLV510 CSK3MLV420 FS CSK3MLV420 CSK3MLV430 FS CSK3MLV430 CSK3MLV440 FS CSK3MLV440 CSK3MLV460 FS CSK3MLV410 CSK3MLV450 FS CSK3MLV460 CSK3HYD50 FS CSK3OFW050 CSK3MLV420 FS CSK3MLV480 CSK3MLV490 SS CSK3MLV490 CSK3MLV590 FF CSJ1RCT020 CSJ1RCT110 FS CSJ1RCO020 CSJ1RCO100 FS CSJ1RCO110 CSJ1RCO130 SS CSJ1MW200 CSJ1RCT010 SS CSJ1RCT120 CSJ1RCT130 SS CSJ1RCT130 CSJ1RCT140 SS CSJ1RCT140 CSJ1RCT150 FS CSJ1RCT150 CSJ1RCT160 FS CSJ1RCT200 CSJ1RCT210 FS CSJ1RCT130 CSJ1RCT220 FS CSK3ST025 CSK3ST030 SS CSK3ST020 CSK3ST025 SS CSK3ST080 CSK3ST085 SS CSK3ST085 CSK3ST090 SS CSK3ST150 CSK3ST155 FS CSK3ST155 CSK3ST160 FS CSK3ST160 CSK3ST165 FS CSK3ST100 CSK3ST170 FS CSK3ST170 CSK3ST175 FS CSK3ST175 CSK3ST180 FF CSK3ST190 CSK3ST200 SS CSK3ST220 CSK3ST225 FS CSK3ST270 CSK3ST280 FS CSK3ST280 CSK3ST290 FS CSK3ST290 CSK3ST300 FS CSK3ST200 CSK3ST270 FS CSK3ST240 CSK3ST250 SS CSK3ST265 CSK3ST275 SS CSK3ST225 CSK3ST230 FS CSK3ST230 CSK3ST240 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.1.2.1 PLNE REHAB-1.2.2.1.2.1 Road Crossing Road @Cr K REHAB-1.2.2.1.7 PLNE REHAB-1.2.2.1.7 Offsite work Offsite wo REHAB-1.2.2.1.1.1.4 PLNE REHAB-1.2.2.1.1.1.4 MIscellaneous MIscel REHAB-1.2.2.1.1.1.4 PLNE REHAB-1.2.2.1.1.1.4 MIscellaneous MIscel REHAB-1.2.2.1.1.2.1 PLNE REHAB-1.2.2.1.1.2.1 Civil & structural Civil & REHAB-1.2.2.1.1.2.4 PLNE REHAB-1.2.2.1.1.2.4 MIscellaneous MIscel REHAB-1.2.2.1.1.2.3 PLNE REHAB-1.2.2.1.1.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.1.2.3 PLNE REHAB-1.2.2.1.1.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.1.2.3 PLNE REHAB-1.2.2.1.1.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.1.2.3 PLNE REHAB-1.2.2.1.1.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.1.2.1 PLNE REHAB-1.2.2.1.1.2.1 Civil & structural Civil & REHAB-1.2.2.1.1.2.1 PLNE REHAB-1.2.2.1.1.2.1 Civil & structural Civil & REHAB-1.2.2.1.1.2.3 PLNE REHAB-1.2.2.1.1.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.1.2.1 PLNE REHAB-1.2.2.1.1.2.1 Civil & structural Civil & REHAB-1.2.2.1.1.2.2 PLNE REHAB-1.2.2.1.1.2.2 Piping & Mechanic Piping REHAB-1.2.2.1.1.2.2 PLNE REHAB-1.2.2.1.1.2.2 Piping & Mechanic Piping REHAB-1.2.2.1.1.2.2 PLNE REHAB-1.2.2.1.1.2.2 Piping & Mechanic Piping REHAB-1.2.2.1.1.2.1 PLNE REHAB-1.2.2.1.1.2.1 Civil & structural Civil & REHAB-1.2.2.1.1.2.2 PLNE REHAB-1.2.2.1.1.2.2 Piping & Mechanic Piping REHAB-1.2.2.1.7 PLNE REHAB-1.2.2.1.7 Offsite work Offsite wo REHAB-1.2.2.1.1.2.4 PLNE REHAB-1.2.2.1.1.2.4 MIscellaneous MIscel REHAB-1.2.2.1.1.2.4 PLNE REHAB-1.2.2.1.1.2.4 MIscellaneous MIscel REHAB-1.2.4.6.3.1 PLNE REHAB-1.2.4.6.3.1 Road Crossing Road @Cr K REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K REHAB-1.2.4.6.3.5 PLNE REHAB-1.2.4.6.3.5 Road Crossing Road @Cr K REHAB-1.2.4.6.2 PLNE REHAB-1.2.4.6.2 Mainline Pipeline Mainline Wor P REHAB-1.2.4.6.3.3 PLNE REHAB-1.2.4.6.3.3 Railway Crossing Railway @ REHAB-1.2.4.6.3.3 PLNE REHAB-1.2.4.6.3.3 Railway Crossing Railway @ REHAB-1.2.4.6.3.3 PLNE REHAB-1.2.4.6.3.3 Railway Crossing Railway @ REHAB-1.2.4.6.3.3 PLNE REHAB-1.2.4.6.3.3 Railway Crossing Railway @ REHAB-1.2.4.6.3.3 PLNE REHAB-1.2.4.6.3.3 Railway Crossing Railway @ REHAB-1.2.4.6.3.3 PLNE REHAB-1.2.4.6.3.3 Railway Crossing Railway @ REHAB-1.2.2.1.6.1.1 PLNE REHAB-1.2.2.1.6.1.1 Civil & Structural Civil & REHAB-1.2.2.1.6.1.1 PLNE REHAB-1.2.2.1.6.1.1 Civil & Structural Civil & REHAB-1.2.2.1.6.1.2 PLNE REHAB-1.2.2.1.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.1.2 PLNE REHAB-1.2.2.1.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.1.3 PLNE REHAB-1.2.2.1.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.1.3 PLNE REHAB-1.2.2.1.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.1.3 PLNE REHAB-1.2.2.1.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.1.2 PLNE REHAB-1.2.2.1.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.1.4 PLNE REHAB-1.2.2.1.6.1.4 Miscellaneous Miscel REHAB-1.2.2.1.6.1.4 PLNE REHAB-1.2.2.1.6.1.4 Miscellaneous Miscel REHAB-1.2.2.1.6.2.1 PLNE REHAB-1.2.2.1.6.2.1 Civil & Structural Civil & REHAB-1.2.2.1.6.2.1 PLNE REHAB-1.2.2.1.6.2.1 Civil & Structural Civil & REHAB-1.2.2.1.6.2.3 PLNE REHAB-1.2.2.1.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.2.3 PLNE REHAB-1.2.2.1.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.2.3 PLNE REHAB-1.2.2.1.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.2.1 PLNE REHAB-1.2.2.1.6.2.1 Civil & Structural Civil & REHAB-1.2.2.1.6.2.2 PLNE REHAB-1.2.2.1.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.2.2 PLNE REHAB-1.2.2.1.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.2.1 PLNE REHAB-1.2.2.1.6.2.1 Civil & Structural Civil & REHAB-1.2.2.1.6.2.2 PLNE REHAB-1.2.2.1.6.2.2 Piping & Mechanic Piping

Page 29

TASKPRED

CSK3ST275 CSK3HYD50 FS CSK3ST210 CSK3ST220 SS CSK3ST200 CSK3ST210 SS CSK3ST250 CSK3ST260 SS CSK3ST260 CSK3ST265 SS CSK3ST300 CSK3ST310 FS CSK3ST310 CSK3ST370 FS CSK3ST370 CSK3ST380 FS CSK3ST275 CSK3ST320 FS CSK3ST320 CSK3ST330 FS CSK3ST330 CSK3ST390 FF CSJ1RCUPV010 CSJ1FCO010 FS CSJ1RCO100 CSJ1RCUPV010 FS CSK3MLV240 CSK3ST010 SS CKRT3XMWT200 CKRT3XMWT210 FS CKRT3XMWT210 CKRT3XMWT220 FS CKRT3XMWT220 CKRT3XMWT230 FS CKRT3XMWT230 CKRT3XMWT240 FS CKRT3XMWT240 CKRT3XMWT250 SS CKRT3XMWT250 CKRT3XMWT260 SS CKRT3XMWT270 CKRT3XMWT280 FS CKRT3XMWT280 CKRT3XMWT290 FS CKRT3XMWT290 CKRT3XMWT300 FS CKRT3XMWT300 CKRT3XMWT310 FS CKRT3XMWT310 CKRT3XMWT320 SS CKRT3XMWT320 CKRT3XMWT330 SS CKRT3XRCT1000 CKRT3XRCT1010 FS CKRT3XRCT1010 CKRT3XRCT1020 SS CKRT3XRCT1020 CKRT3XRCT1030 FS CKRT3XRCT1030 CKRT3XRCT1040 FS CKRT3XRCT1080 CKRT3XRCT1090 FS CKRT3XRCT1010 CKRT3XRCT1100 FS CKRT3XMW490 CKRT3XRCT1000 SS CKRT3XRCT1110 CKRT3XRCT1120 FS CKRT3XRCT1160 CKRT3XRCT1170 FS CKRT3XRCT1180 CKRT3XRCT1190 FS CKRT3XRCT1230 CKRT3XRCT1240 FS CKRT3XRCT1250 CKRT3XRCT1260 FS CKRT3XRCT1320 CKRT3XRCT1330 FS CKRT3XRCT1340 CKRT3XRCT1350 FS CKRT3XRCT1350 CKRT3XRCT1360 FS CKRT3XRCT1400 CKRT3XRCT1410 FS CKRT3XRCT1330 CKRT3XRCT1420 FS CKRT3XRCT1330 CKRT3XRCT1340 SS CKRT3XRCT1430 CKRT3XRCT1440 FS CKRT3XRCT1440 CKRT3XRCT1450 SS CKRT3XRCT1450 CKRT3XRCT1460 FS CKRT3XRCT1460 CKRT3XRCT1470 FS CKRT3XRCT1510 CKRT3XRCT1520 FS CKRT3XRCT1440 CKRT3XRCT1530 FS CKRT3XRCT1540 CKRT3XRCT1550 FS CKRT3XRCT1560 CKRT3XRCT1570 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.1.6.2.2 PLNE REHAB-1.2.2.1.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.2.1 PLNE REHAB-1.2.2.1.6.2.1 Civil & Structural Civil & REHAB-1.2.2.1.6.2.1 PLNE REHAB-1.2.2.1.6.2.1 Civil & Structural Civil & REHAB-1.2.2.1.6.2.2 PLNE REHAB-1.2.2.1.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.2.2 PLNE REHAB-1.2.2.1.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.2.3 PLNE REHAB-1.2.2.1.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.2.3 PLNE REHAB-1.2.2.1.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.2.3 PLNE REHAB-1.2.2.1.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.1.6.2.2 PLNE REHAB-1.2.2.1.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.1.6.2.4 PLNE REHAB-1.2.2.1.6.2.4 Miscellaneous Miscel REHAB-1.2.2.1.6.2.4 PLNE REHAB-1.2.2.1.6.2.4 Miscellaneous Miscel REHAB-1.2.4.6.3.6 PLNE REHAB-1.2.4.6.3.6 Road Crossing Road (Unp Cr REHAB-1.2.4.6.3.2 PLNE REHAB-1.2.4.6.3.2 Road Crossing Road @Cr K REHAB-1.2.2.1.1.1.1 PLNE REHAB-1.2.2.1.1.1.1 Civil & structural Civil & REHAB-1.2.2.2.1.2 PLNE REHAB-1.2.2.2.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.2 PLNE REHAB-1.2.2.2.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.2 PLNE REHAB-1.2.2.2.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.2 PLNE REHAB-1.2.2.2.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.2 PLNE REHAB-1.2.2.2.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.2 PLNE REHAB-1.2.2.2.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.3 PLNE REHAB-1.2.2.2.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.3 PLNE REHAB-1.2.2.2.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.3 PLNE REHAB-1.2.2.2.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.3 PLNE REHAB-1.2.2.2.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.3 PLNE REHAB-1.2.2.2.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.1.3 PLNE REHAB-1.2.2.2.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.2.1 PLNE REHAB-1.2.2.2.2.1 Railway Crossing Railway @ REHAB-1.2.2.2.2.1 PLNE REHAB-1.2.2.2.2.1 Railway Crossing Railway @ REHAB-1.2.2.2.2.1 PLNE REHAB-1.2.2.2.2.1 Railway Crossing Railway @ REHAB-1.2.2.2.2.1 PLNE REHAB-1.2.2.2.2.1 Railway Crossing Railway @ REHAB-1.2.2.2.2.1 PLNE REHAB-1.2.2.2.2.1 Railway Crossing Railway @ REHAB-1.2.2.2.2.1 PLNE REHAB-1.2.2.2.2.1 Railway Crossing Railway @ REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.2.2.12 PLNE REHAB-1.2.2.2.2.12 Road Crossing Road @C REHAB-1.2.2.2.2.12 PLNE REHAB-1.2.2.2.2.12 Road Crossing Road @C REHAB-1.2.2.2.2.5 PLNE REHAB-1.2.2.2.2.5 Road Crossing Road @Cr K REHAB-1.2.2.2.2.5 PLNE REHAB-1.2.2.2.2.5 Road Crossing Road @Cr K REHAB-1.2.2.2.2.3 PLNE REHAB-1.2.2.2.2.3 Road Crossing Road @Cr K REHAB-1.2.2.2.2.6 PLNE REHAB-1.2.2.2.2.6 Road Crossing Road @Cr K REHAB-1.2.2.2.2.6 PLNE REHAB-1.2.2.2.2.6 Road Crossing Road @Cr K REHAB-1.2.2.2.2.6 PLNE REHAB-1.2.2.2.2.6 Road Crossing Road @Cr K REHAB-1.2.2.2.2.6 PLNE REHAB-1.2.2.2.2.6 Road Crossing Road @Cr K REHAB-1.2.2.2.2.6 PLNE REHAB-1.2.2.2.2.6 Road Crossing Road @Cr K REHAB-1.2.2.2.2.6 PLNE REHAB-1.2.2.2.2.6 Road Crossing Road @Cr K REHAB-1.2.2.2.2.7 PLNE REHAB-1.2.2.2.2.7 Road Crossing Road @Cr K REHAB-1.2.2.2.2.7 PLNE REHAB-1.2.2.2.2.7 Road Crossing Road @Cr K REHAB-1.2.2.2.2.7 PLNE REHAB-1.2.2.2.2.7 Road Crossing Road @Cr K REHAB-1.2.2.2.2.7 PLNE REHAB-1.2.2.2.2.7 Road Crossing Road @Cr K REHAB-1.2.2.2.2.7 PLNE REHAB-1.2.2.2.2.7 Road Crossing Road @Cr K REHAB-1.2.2.2.2.7 PLNE REHAB-1.2.2.2.2.7 Road Crossing Road @Cr K REHAB-1.2.2.2.2.8 PLNE REHAB-1.2.2.2.2.8 Road Crossing Road @Cr K REHAB-1.2.2.2.2.8 PLNE REHAB-1.2.2.2.2.8 Road Crossing Road @Cr K

Page 30

TASKPRED

CKRT3XRCT1570 CKRT3XRCT1580 FS CKRT3XRCT1620 CKRT3XRCT1630 FS CKRT3XRCT1550 CKRT3XRCT1640 FS CKRT3XRCT1550 CKRT3XRCT1560 SS CKRT3XRCT1650 CKRT3XRCT1660 FS CKRT3XRCT1670 CKRT3XRCT1680 FS CKRT3XRCT1680 CKRT3XRCT1690 FS CKRT3XRCT1730 CKRT3XRCT1740 FS CKRT3XRCT1660 CKRT3XRCT1750 FS CKRT3XRCT1660 CKRT3XRCT1670 SS CKRT3XRCT1640 CKRT3XRCT1650 FS CKRT3XRCO210 CKRT3XRCO230 SS CKRT3XRCO1015 CKRT3XRCO1025 FS CKRT3XRCO1055 CKRT3XRCO1065 FS CKRT3XRCO1065 CKRT3XRCO1075 FS CKRT3XRCO1005 CKRT3XRCO1015 SS CKRT3XRCO1095 CKRT3XRCO1105 FS CKRT3XRCO1135 CKRT3XRCO1145 FS CKRT3XRCO1145 CKRT3XRCO1155 FS CKRT3XRCO1085 CKRT3XRCO1095 SS CKRT3XRC0215 CKRT3XRC0220 SS CKRT3XRC0220 CKRT3XRC0235 SS CKRT3XRC0235 CKRT3XRC0245 FS CKRT3XRC0275 CKRT3XRC0285 FS CKRT3XRC0285 CKRT3XRC0295 FS CKRT3XRC0220 CKRT3XRC0300 FS CKRT3XRCO310 CKRT3XRCO320 SS CKRT3XRCO320 CKRT3XRCO330 SS CKRT3XRCO330 CKRT3XRCO340 FS CKRT3XRCO370 CKRT3XRCO380 FS CKRT3XRCO380 CKRT3XRCO390 FS CKRT3XRCO320 CKRT3XRCO400 FS CKRT3XRCO410 CKRT3XRCO420 SS CKRT3XRCO420 CKRT3XRCO430 SS CKRT3XRCO430 CKRT3XRCO440 FS CKRT3XRCO470 CKRT3XRCO480 FS CKRT3XRCO480 CKRT3XRCO490 FS CKRT3XRCO420 CKRT3XRCO500 FS CKRT3XRCO400 CKRT3XRCO410 FS CKRT3XRCO500 CKRT3XFCO0040 FS CKRT3XMLV600 CKRT3XMLV610 FS CKRT3XMLV670 CKRT3XMLV680 FS CKRT3XMLV650 CKRT3XMLV720 FS CKRT3XMLV720 CKRT3XMLV730 FS CKRT3XMLV730 CKRT3XMLV740 FS CKRT3XMLV740 CKRT3XMLV750 FS CKRT3XMLV700 CKRT3XMLV710 FS CKRT3XMLV610 CKRT3XMLV700 FS CKRT3XMLV750 CKRT3XMLV670 FS CKRT3XMLV710 CKRT3XMLV620 FS CKRT3XMLV620 CKRT3XMLV630 FS CKRT3XMLV630 CKRT3XMLV640 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.2.2.8 PLNE REHAB-1.2.2.2.2.8 Road Crossing Road @Cr K REHAB-1.2.2.2.2.8 PLNE REHAB-1.2.2.2.2.8 Road Crossing Road @Cr K REHAB-1.2.2.2.2.8 PLNE REHAB-1.2.2.2.2.8 Road Crossing Road @Cr K REHAB-1.2.2.2.2.8 PLNE REHAB-1.2.2.2.2.8 Road Crossing Road @Cr K REHAB-1.2.2.2.2.9 PLNE REHAB-1.2.2.2.2.9 Road Crossing Road @Cr K REHAB-1.2.2.2.2.9 PLNE REHAB-1.2.2.2.2.9 Road Crossing Road @Cr K REHAB-1.2.2.2.2.9 PLNE REHAB-1.2.2.2.2.9 Road Crossing Road @Cr K REHAB-1.2.2.2.2.9 PLNE REHAB-1.2.2.2.2.9 Road Crossing Road @Cr K REHAB-1.2.2.2.2.9 PLNE REHAB-1.2.2.2.2.9 Road Crossing Road @Cr K REHAB-1.2.2.2.2.9 PLNE REHAB-1.2.2.2.2.9 Road Crossing Road @Cr K REHAB-1.2.2.2.2.8 PLNE REHAB-1.2.2.2.2.8 Road Crossing Road @Cr K REHAB-1.2.2.2.2.2 PLNE REHAB-1.2.2.2.2.2 Road Crossing Road @Cr K REHAB-1.2.2.2.2.11 PLNE REHAB-1.2.2.2.2.11 Road Crossing Road @C REHAB-1.2.2.2.2.11 PLNE REHAB-1.2.2.2.2.11 Road Crossing Road @C REHAB-1.2.2.2.2.11 PLNE REHAB-1.2.2.2.2.11 Road Crossing Road @C REHAB-1.2.2.2.2.11 PLNE REHAB-1.2.2.2.2.11 Road Crossing Road @C REHAB-1.2.2.2.2.14 PLNE REHAB-1.2.2.2.2.14 Road Crossing Road @C REHAB-1.2.2.2.2.14 PLNE REHAB-1.2.2.2.2.14 Road Crossing Road @C REHAB-1.2.2.2.2.14 PLNE REHAB-1.2.2.2.2.14 Road Crossing Road @C REHAB-1.2.2.2.2.14 PLNE REHAB-1.2.2.2.2.14 Road Crossing Road @C REHAB-1.2.2.2.2.13 PLNE REHAB-1.2.2.2.2.13 Road Crossing Road @C REHAB-1.2.2.2.2.13 PLNE REHAB-1.2.2.2.2.13 Road Crossing Road @C REHAB-1.2.2.2.2.13 PLNE REHAB-1.2.2.2.2.13 Road Crossing Road @C REHAB-1.2.2.2.2.13 PLNE REHAB-1.2.2.2.2.13 Road Crossing Road @C REHAB-1.2.2.2.2.13 PLNE REHAB-1.2.2.2.2.13 Road Crossing Road @C REHAB-1.2.2.2.2.13 PLNE REHAB-1.2.2.2.2.13 Road Crossing Road @C REHAB-1.2.2.2.2.15 PLNE REHAB-1.2.2.2.2.15 Road Crossing Road @C REHAB-1.2.2.2.2.15 PLNE REHAB-1.2.2.2.2.15 Road Crossing Road @C REHAB-1.2.2.2.2.15 PLNE REHAB-1.2.2.2.2.15 Road Crossing Road @C REHAB-1.2.2.2.2.15 PLNE REHAB-1.2.2.2.2.15 Road Crossing Road @C REHAB-1.2.2.2.2.15 PLNE REHAB-1.2.2.2.2.15 Road Crossing Road @C REHAB-1.2.2.2.2.15 PLNE REHAB-1.2.2.2.2.15 Road Crossing Road @C REHAB-1.2.2.2.2.16 PLNE REHAB-1.2.2.2.2.16 Road Crossing Road @C REHAB-1.2.2.2.2.16 PLNE REHAB-1.2.2.2.2.16 Road Crossing Road @C REHAB-1.2.2.2.2.16 PLNE REHAB-1.2.2.2.2.16 Road Crossing Road @C REHAB-1.2.2.2.2.16 PLNE REHAB-1.2.2.2.2.16 Road Crossing Road @C REHAB-1.2.2.2.2.16 PLNE REHAB-1.2.2.2.2.16 Road Crossing Road @C REHAB-1.2.2.2.2.16 PLNE REHAB-1.2.2.2.2.16 Road Crossing Road @C REHAB-1.2.2.2.2.15 PLNE REHAB-1.2.2.2.2.15 Road Crossing Road @C REHAB-1.2.2.2.2.16 PLNE REHAB-1.2.2.2.2.16 Road Crossing Road @C REHAB-1.2.2.2.4.3.1 PLNE REHAB-1.2.2.2.4.3.1 Civil & structural Civil & REHAB-1.2.2.2.4.3.4 PLNE REHAB-1.2.2.2.4.3.4 MIscellaneous MIscel REHAB-1.2.2.2.4.3.3 PLNE REHAB-1.2.2.2.4.3.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.3.3 PLNE REHAB-1.2.2.2.4.3.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.3.3 PLNE REHAB-1.2.2.2.4.3.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.3.3 PLNE REHAB-1.2.2.2.4.3.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.3.1 PLNE REHAB-1.2.2.2.4.3.1 Civil & structural Civil & REHAB-1.2.2.2.4.3.1 PLNE REHAB-1.2.2.2.4.3.1 Civil & structural Civil & REHAB-1.2.2.2.4.3.3 PLNE REHAB-1.2.2.2.4.3.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.3.1 PLNE REHAB-1.2.2.2.4.3.1 Civil & structural Civil & REHAB-1.2.2.2.4.3.2 PLNE REHAB-1.2.2.2.4.3.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.3.2 PLNE REHAB-1.2.2.2.4.3.2 Piping & Mechanic Piping

Page 31

TASKPRED

CKRT3XMLV640 CKRT3XMLV660 FS CKRT3XMLV610 CKRT3XMLV650 FS CKRT3XMLV680 CKRT3XMLV690 SS CKRT3XMLV690 CKRT3XMLV695 FF CKRT3XMLV770 CKRT3XMLV780 FS CKRT3XMLV840 CKRT3XMLV850 FS CKRT3XMLV820 CKRT3XMLV890 FS CKRT3XMLV890 CKRT3XMLV900 FS CKRT3XMLV900 CKRT3XMLV910 FS CKRT3XMLV910 CKRT3XMLV920 FS CKRT3XMLV870 CKRT3XMLV880 FS CKRT3XMLV780 CKRT3XMLV870 FS CKRT3XMLV920 CKRT3XMLV840 FS CKRT3XMLV880 CKRT3XMLV790 FS CKRT3XMLV790 CKRT3XMLV800 FS CKRT3XMLV800 CKRT3XMLV810 FS CKRT3XMLV810 CKRT3XMLV830 FS CKRT3XMLV780 CKRT3XMLV820 FS CKRT3XMLV850 CKRT3XMLV860 SS CKRT3XMLV860 CKRT3XMLV930 FF CKRT3XMLV0940 CKRT3XMLV0950 FS CKRT3XMLV1010 CKRT3XMLV1020 FS CKRT3XMLV1000 CKRT3XMLV1060 FS CKRT3XMLV1060 CKRT3XMLV1070 FS CKRT3XMLV1070 CKRT3XMLV1080 FS CKRT3XMLV1080 CKRT3XMLV1090 FS CKRT3XMLV1040 CKRT3XMLV1050 FS CKRT3XMLV1090 CKRT3XMLV1010 FS CKRT3XMLV1050 CKRT3XMLV0960 FS CKRT3XMLV0960 CKRT3XMLV0970 FS CKRT3XMLV0970 CKRT3XMLV0980 FS CKRT3XMLV0980 CKRT3XMLV0990 FS CKRT3XMLV0950 CKRT3XMLV1000 FS CKRT3XMLV1020 CKRT3XMLV1030 SS CKRT3XMLV1030 CKRT3XMLV1100 FF CKRT3XOFW50 CKRT3XMLV600 SS CKRT3XMLV0950 CKRT3XMLV1040 FS CKRT3XST420 CKRT3XST560 SS CKRT3XST480 CKRT3XST490 FS CKRT3XST490 CKRT3XST500 FS CKRT3XST500 CKRT3XST510 FS CKRT3XST410 CKRT3XST480 FS CKRT3XST450 CKRT3XST460 SS CKRT3XST475 CKRT3XST485 SS CKRT3XST560 CKRT3XST440 FS CKRT3XST440 CKRT3XST450 FS CKRT3XST430 CKRT3XST420 SS CKRT3XST410 CKRT3XST430 SS CKRT3XST460 CKRT3XST470 SS CKRT3XST470 CKRT3XST475 SS CKRT3XST510 CKRT3XST520 FS CKRT3XST520 CKRT3XST580 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.2.4.3.2 PLNE REHAB-1.2.2.2.4.3.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.3.1 PLNE REHAB-1.2.2.2.4.3.1 Civil & structural Civil & REHAB-1.2.2.2.4.3.4 PLNE REHAB-1.2.2.2.4.3.4 MIscellaneous MIscel REHAB-1.2.2.2.4.3.4 PLNE REHAB-1.2.2.2.4.3.4 MIscellaneous MIscel REHAB-1.2.2.2.4.1.1 PLNE REHAB-1.2.2.2.4.1.1 Civil & structural Civil & REHAB-1.2.2.2.4.1.4 PLNE REHAB-1.2.2.2.4.1.4 MIscellaneous MIscel REHAB-1.2.2.2.4.1.3 PLNE REHAB-1.2.2.2.4.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.1.3 PLNE REHAB-1.2.2.2.4.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.1.3 PLNE REHAB-1.2.2.2.4.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.1.3 PLNE REHAB-1.2.2.2.4.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.1.1 PLNE REHAB-1.2.2.2.4.1.1 Civil & structural Civil & REHAB-1.2.2.2.4.1.1 PLNE REHAB-1.2.2.2.4.1.1 Civil & structural Civil & REHAB-1.2.2.2.4.1.3 PLNE REHAB-1.2.2.2.4.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.1.1 PLNE REHAB-1.2.2.2.4.1.1 Civil & structural Civil & REHAB-1.2.2.2.4.1.2 PLNE REHAB-1.2.2.2.4.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.1.2 PLNE REHAB-1.2.2.2.4.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.1.2 PLNE REHAB-1.2.2.2.4.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.1.1 PLNE REHAB-1.2.2.2.4.1.1 Civil & structural Civil & REHAB-1.2.2.2.4.1.4 PLNE REHAB-1.2.2.2.4.1.4 MIscellaneous MIscel REHAB-1.2.2.2.4.1.4 PLNE REHAB-1.2.2.2.4.1.4 MIscellaneous MIscel REHAB-1.2.2.2.4.2.1 PLNE REHAB-1.2.2.2.4.2.1 Civil & structural Civil & REHAB-1.2.2.2.4.2.4 PLNE REHAB-1.2.2.2.4.2.4 MIscellaneous MIscel REHAB-1.2.2.2.4.2.3 PLNE REHAB-1.2.2.2.4.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.2.3 PLNE REHAB-1.2.2.2.4.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.2.3 PLNE REHAB-1.2.2.2.4.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.2.3 PLNE REHAB-1.2.2.2.4.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.2.1 PLNE REHAB-1.2.2.2.4.2.1 Civil & structural Civil & REHAB-1.2.2.2.4.2.3 PLNE REHAB-1.2.2.2.4.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.2.1 PLNE REHAB-1.2.2.2.4.2.1 Civil & structural Civil & REHAB-1.2.2.2.4.2.2 PLNE REHAB-1.2.2.2.4.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.2.2 PLNE REHAB-1.2.2.2.4.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.2.2 PLNE REHAB-1.2.2.2.4.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.2.1 PLNE REHAB-1.2.2.2.4.2.1 Civil & structural Civil & REHAB-1.2.2.2.4.2.4 PLNE REHAB-1.2.2.2.4.2.4 MIscellaneous MIscel REHAB-1.2.2.2.4.2.4 PLNE REHAB-1.2.2.2.4.2.4 MIscellaneous MIscel REHAB-1.2.2.2.8 PLNE REHAB-1.2.2.2.8 Offsite Work Offsite Wo REHAB-1.2.2.2.4.2.1 PLNE REHAB-1.2.2.2.4.2.1 Civil & structural Civil & REHAB-1.2.2.2.6.1.1 PLNE REHAB-1.2.2.2.6.1.1 Civil & Structural Civil & REHAB-1.2.2.2.6.1.3 PLNE REHAB-1.2.2.2.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.1.3 PLNE REHAB-1.2.2.2.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.1.3 PLNE REHAB-1.2.2.2.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.1.1 PLNE REHAB-1.2.2.2.6.1.1 Civil & Structural Civil & REHAB-1.2.2.2.6.1.2 PLNE REHAB-1.2.2.2.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.1.2 PLNE REHAB-1.2.2.2.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.1.1 PLNE REHAB-1.2.2.2.6.1.1 Civil & Structural Civil & REHAB-1.2.2.2.6.1.2 PLNE REHAB-1.2.2.2.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.1.1 PLNE REHAB-1.2.2.2.6.1.1 Civil & Structural Civil & REHAB-1.2.2.2.6.1.1 PLNE REHAB-1.2.2.2.6.1.1 Civil & Structural Civil & REHAB-1.2.2.2.6.1.2 PLNE REHAB-1.2.2.2.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.1.2 PLNE REHAB-1.2.2.2.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.1.3 PLNE REHAB-1.2.2.2.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.1.3 PLNE REHAB-1.2.2.2.6.1.3 Electrical & Electri Instrum

Page 32

TASKPRED

CKRT3XST580 CKRT3XST590 FS CKRT3XST485 CKRT3XST530 FS CKRT3XST530 CKRT3XST540 FS CKRT3XST540 CKRT3XST545 FF CKRT3XST610 CKRT3XST620 SS CKRT3XST640 CKRT3XST770 SS CKRT3XST690 CKRT3XST700 FS CKRT3XST700 CKRT3XST710 FS CKRT3XST710 CKRT3XST720 FS CKRT3XST620 CKRT3XST690 FS CKRT3XST660 CKRT3XST670 SS CKRT3XST685 CKRT3XST695 SS CKRT3XST770 CKRT3XST650 FS CKRT3XST650 CKRT3XST660 FS CKRT3XST630 CKRT3XST640 SS CKRT3XST620 CKRT3XST630 SS CKRT3XST670 CKRT3XST680 SS CKRT3XST680 CKRT3XST685 SS CKRT3XST720 CKRT3XST730 FS CKRT3XST730 CKRT3XST790 FS CKRT3XST790 CKRT3XST800 FS CKRT3XST695 CKRT3XST740 FS CKRT3XST740 CKRT3XST750 FS CKRT3XST750 CKRT3XST810 FF CKRT3XMLV1110 CKRT3XMLV1120 FS CKRT3XMLV1180 CKRT3XMLV1190 FS CKRT3XMLV1160 CKRT3XMLV1230 FS CKRT3XMLV1230 CKRT3XMLV1240 FS CKRT3XMLV1240 CKRT3XMLV1250 FS CKRT3XMLV1250 CKRT3XMLV1260 FS CKRT3XMLV1210 CKRT3XMLV1220 FS CKRT3XMLV1260 CKRT3XMLV1180 FS CKRT3XMLV1220 CKRT3XMLV1130 FS CKRT3XMLV1130 CKRT3XMLV1140 FS CKRT3XMLV1140 CKRT3XMLV1150 FS CKRT3XMLV1150 CKRT3XMLV1170 FS CKRT3XMLV1120 CKRT3XMLV1160 FS CKRT3XMLV1190 CKRT3XMLV1200 SS CKRT3XMLV1200 CKRT3XMLV1270 FF CKRT3XMLV1120 CKRT3XMLV1210 FS CKRTJ1CMW30 CKRTJ1MW720 SS CKRTJ1MW720 CKRTJ1MW730 SS CKRT3XHYD80 CKRT3XHYD70 SS CKRT3XST695 CKRT3XHYD80 FS CKRT3XST485 CKRT3XHYD80 FS CKRT3XMLV1170 CKRT3XHYD80 FS CKRT3XMLV0990 CKRT3XHYD80 FS CKRT3XMLV830 CKRT3XHYD80 FS CKRT3XMLV660 CKRT3XHYD80 FS CKRT3XRCO470 CKRT3XHYD80 FS CKRT3XRCO370 CKRT3XHYD80 FS CKRT3XRC0275 CKRT3XHYD80 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.2.6.1.3 PLNE REHAB-1.2.2.2.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.1.2 PLNE REHAB-1.2.2.2.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.1.4 PLNE REHAB-1.2.2.2.6.1.4 Miscellaneous Miscel REHAB-1.2.2.2.6.1.4 PLNE REHAB-1.2.2.2.6.1.4 Miscellaneous Miscel REHAB-1.2.2.2.6.2.1 PLNE REHAB-1.2.2.2.6.2.1 Civil & Structural Civil & REHAB-1.2.2.2.6.2.1 PLNE REHAB-1.2.2.2.6.2.1 Civil & Structural Civil & REHAB-1.2.2.2.6.2.3 PLNE REHAB-1.2.2.2.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.2.3 PLNE REHAB-1.2.2.2.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.2.3 PLNE REHAB-1.2.2.2.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.2.1 PLNE REHAB-1.2.2.2.6.2.1 Civil & Structural Civil & REHAB-1.2.2.2.6.2.2 PLNE REHAB-1.2.2.2.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.2.2 PLNE REHAB-1.2.2.2.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.2.1 PLNE REHAB-1.2.2.2.6.2.1 Civil & Structural Civil & REHAB-1.2.2.2.6.2.2 PLNE REHAB-1.2.2.2.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.2.1 PLNE REHAB-1.2.2.2.6.2.1 Civil & Structural Civil & REHAB-1.2.2.2.6.2.1 PLNE REHAB-1.2.2.2.6.2.1 Civil & Structural Civil & REHAB-1.2.2.2.6.2.2 PLNE REHAB-1.2.2.2.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.2.2 PLNE REHAB-1.2.2.2.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.2.3 PLNE REHAB-1.2.2.2.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.2.3 PLNE REHAB-1.2.2.2.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.2.3 PLNE REHAB-1.2.2.2.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.2.6.2.2 PLNE REHAB-1.2.2.2.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.2.4 PLNE REHAB-1.2.2.2.6.2.4 Miscellaneous Miscel REHAB-1.2.2.2.6.2.4 PLNE REHAB-1.2.2.2.6.2.4 Miscellaneous Miscel REHAB-1.2.2.2.4.4.1 PLNE REHAB-1.2.2.2.4.4.1 Civil & structural Civil & REHAB-1.2.2.2.4.4.4 PLNE REHAB-1.2.2.2.4.4.4 MIscellaneous MIscel REHAB-1.2.2.2.4.4.3 PLNE REHAB-1.2.2.2.4.4.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.4.3 PLNE REHAB-1.2.2.2.4.4.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.4.3 PLNE REHAB-1.2.2.2.4.4.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.4.3 PLNE REHAB-1.2.2.2.4.4.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.4.1 PLNE REHAB-1.2.2.2.4.4.1 Civil & structural Civil & REHAB-1.2.2.2.4.4.3 PLNE REHAB-1.2.2.2.4.4.3 Electrical & Electri Instrum REHAB-1.2.2.2.4.4.1 PLNE REHAB-1.2.2.2.4.4.1 Civil & structural Civil & REHAB-1.2.2.2.4.4.2 PLNE REHAB-1.2.2.2.4.4.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.4.2 PLNE REHAB-1.2.2.2.4.4.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.4.2 PLNE REHAB-1.2.2.2.4.4.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.4.1 PLNE REHAB-1.2.2.2.4.4.1 Civil & structural Civil & REHAB-1.2.2.2.4.4.4 PLNE REHAB-1.2.2.2.4.4.4 MIscellaneous MIscel REHAB-1.2.2.2.4.4.4 PLNE REHAB-1.2.2.2.4.4.4 MIscellaneous MIscel REHAB-1.2.2.2.4.4.1 PLNE REHAB-1.2.2.2.4.4.1 Civil & structural Civil & REHAB-1.2.2.4.1 PLNE REHAB-1.2.2.4.1 Common Work Common W REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.2.5 PLNE REHAB-1.2.2.2.5 Hydrostatic Hydrostati testing / D REHAB-1.2.2.2.6.2.2 PLNE REHAB-1.2.2.2.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.6.1.2 PLNE REHAB-1.2.2.2.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.4.2 PLNE REHAB-1.2.2.2.4.4.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.2.2 PLNE REHAB-1.2.2.2.4.2.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.1.2 PLNE REHAB-1.2.2.2.4.1.2 Piping & Mechanic Piping REHAB-1.2.2.2.4.3.2 PLNE REHAB-1.2.2.2.4.3.2 Piping & Mechanic Piping REHAB-1.2.2.2.2.16 PLNE REHAB-1.2.2.2.2.16 Road Crossing Road @C REHAB-1.2.2.2.2.15 PLNE REHAB-1.2.2.2.2.15 Road Crossing Road @C REHAB-1.2.2.2.2.13 PLNE REHAB-1.2.2.2.2.13 Road Crossing Road @C

Page 33

TASKPRED

CKRT3XRCO1135 CKRT3XHYD80 FS CKRT3XRCO1055 CKRT3XHYD80 FS CKRT3XRCO270 CKRT3XHYD80 FS CKRT3XRCT1730 CKRT3XHYD80 FS CKRT3XRCT1620 CKRT3XHYD80 FS CKRT3XRCT1510 CKRT3XHYD80 FS CKRT3XRCT1400 CKRT3XHYD80 FS CKRT3XRCT1300 CKRT3XHYD80 FS CKRT3XRCT1230 CKRT3XHYD80 FS CKRT3XRCT1160 CKRT3XHYD80 FS CKRT3XMW510 CKRT3XHYD80 FS CKRT3YRCO700 CKRT3YRCO310 FS CKRT3XCMW10 CKRT3XOFW50 FS CKRT3XMLV600 CKRT3XST410 FS CKRT3XHYD80 CKRT3XHYD90 FS CKRT3XMLV600 CKRT3XMLV770 FS CKRT3XMLV770 CKRT3XMLV0940 FS CKRT3XMLV0940 CKRT3XMLV1110 FS CKRT3YCMW20 CKRT3YMW560 SS CKRT3YMW560 CKRT3YMW570 SS CMOB030 CKRT3YCMW20 SS CMOB030 CSK3CMW010 SS CKRT3XMW410 CKRT3XMWT200 SS CSK3MW240 CSK3MWT010 SS CSK3RCT160 CSK3RCT180 FS CSK3RCT180 CSK3RCT200 SS CSK3RCT290 CSK3RCT310 SS CSK3RCT620 CSK3RCT640 SS CSK3RCT730 CSK3RCT750 SS CSK3RCT840 CSK3RCT860 SS CSK3RCT950 CSK3RCT970 SS CSK3RCO160 CSK3RCO180 FS CSK3RCO140 CSK3RCO160 FS CSK3CMW010 CSK3OFW010 FS PROC010 CSK3OFW050 FS CSJ1RCT070 CSJ1RCT090 SS CSJ1RCT050 CSJ1RCT070 FS CSJ1RCT180 CSJ1RCT200 SS CSJ1RCT160 CSJ1RCT180 FS CSJ1RCT110 CSJ1RCT120 FS CSK3MWT020 CSK3MWT100 FS CMOB030 CKRT3XCMW10 SS CKRT3XRCT1060 CKRT3XRCT1080 FS CKRT3XRCT1040 CKRT3XRCT1060 FS CKRT3XRCT1140 CKRT3XRCT1160 FS CKRT3XRCT1120 CKRT3XRCT1140 FS CKRT3XRCT1100 CKRT3XRCT1105 FS CKRT3XRCT1170 CKRT3XRCT1760 SS CKRT3XRCT1240 CKRT3XRCT1245 SS CKRT3XRCT1760 CKRT3XRCT1175 FS CKRT3XRCT1190 CKRT3XRCT1210 FS CKRT3XRCT1210 CKRT3XRCT1230 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.2.2.14 PLNE REHAB-1.2.2.2.2.14 Road Crossing Road @C REHAB-1.2.2.2.2.11 PLNE REHAB-1.2.2.2.2.11 Road Crossing Road @C REHAB-1.2.2.2.2.2 PLNE REHAB-1.2.2.2.2.2 Road Crossing Road @Cr K REHAB-1.2.2.2.2.9 PLNE REHAB-1.2.2.2.2.9 Road Crossing Road @Cr K REHAB-1.2.2.2.2.8 PLNE REHAB-1.2.2.2.2.8 Road Crossing Road @Cr K REHAB-1.2.2.2.2.7 PLNE REHAB-1.2.2.2.2.7 Road Crossing Road @Cr K REHAB-1.2.2.2.2.6 PLNE REHAB-1.2.2.2.2.6 Road Crossing Road @Cr K REHAB-1.2.2.2.2.3 PLNE REHAB-1.2.2.2.2.3 Road Crossing Road @Cr K REHAB-1.2.2.2.2.5 PLNE REHAB-1.2.2.2.2.5 Road Crossing Road @Cr K REHAB-1.2.2.2.2.12 PLNE REHAB-1.2.2.2.2.12 Road Crossing Road @C REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.3.2.13 PLNE REHAB-1.2.2.3.2.13 Road Crossing Road @C REHAB-1.2.2.2.7 PLNE REHAB-1.2.2.2.7 Common Work Common W REHAB-1.2.2.2.4.3.1 PLNE REHAB-1.2.2.2.4.3.1 Civil & structural Civil & REHAB-1.2.2.2.5 PLNE REHAB-1.2.2.2.5 Hydrostatic Hydrostati testing / D REHAB-1.2.2.2.4.3.1 PLNE REHAB-1.2.2.2.4.3.1 Civil & structural Civil & REHAB-1.2.2.2.4.1.1 PLNE REHAB-1.2.2.2.4.1.1 Civil & structural Civil & REHAB-1.2.2.2.4.2.1 PLNE REHAB-1.2.2.2.4.2.1 Civil & structural Civil & REHAB-1.2.2.3.7 PLNE REHAB-1.2.2.3.7 Common Work Common W REHAB-1.2.2.3.1.1 PLNE REHAB-1.2.2.3.1.1 Pipeline installation Pipeline REHAB-1.2.1 PLNE REHAB-1.2.1 TCF TCF REHAB-1.2.1 PLNE REHAB-1.2.1 TCF TCF REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.1.9.1 PLNE REHAB-1.2.2.1.9.1 Pipeline installation Pipeline REHAB-1.2.2.1.2.1 PLNE REHAB-1.2.2.1.2.1 Road Crossing Road @Cr K REHAB-1.2.2.1.2.1 PLNE REHAB-1.2.2.1.2.1 Road Crossing Road @Cr K REHAB-1.2.2.1.2.5 PLNE REHAB-1.2.2.1.2.5 Road Crossing Road @Cr K REHAB-1.2.2.1.2.6 PLNE REHAB-1.2.2.1.2.6 Road Crossing Road @Cr K REHAB-1.2.2.1.2.7 PLNE REHAB-1.2.2.1.2.7 Road Crossing Road @Cr K REHAB-1.2.2.1.2.3 PLNE REHAB-1.2.2.1.2.3 Road Crossing Road @Cr K REHAB-1.2.2.1.2.8 PLNE REHAB-1.2.2.1.2.8 Road Crossing Road @Cr K REHAB-1.2.2.1.2.2 PLNE REHAB-1.2.2.1.2.2 Road Crossing Road @Cr K REHAB-1.2.2.1.2.2 PLNE REHAB-1.2.2.1.2.2 Road Crossing Road @Cr K REHAB-1.2.2.1.8 PLNE REHAB-1.2.2.1.8 Common Work Common W REHAB-1.3 PLNE REHAB-1.3 PROCUREMENT PROCUREMEN REHAB-1.2.4.6.3.1 PLNE REHAB-1.2.4.6.3.1 Road Crossing Road @Cr K REHAB-1.2.4.6.3.1 PLNE REHAB-1.2.4.6.3.1 Road Crossing Road @Cr K REHAB-1.2.4.6.3.3 PLNE REHAB-1.2.4.6.3.3 Railway Crossing Railway @ REHAB-1.2.4.6.3.3 PLNE REHAB-1.2.4.6.3.3 Railway Crossing Railway @ REHAB-1.2.4.6.3.1 PLNE REHAB-1.2.4.6.3.1 Road Crossing Road @Cr K REHAB-1.2.2.1.9.2 PLNE REHAB-1.2.2.1.9.2 Thrust Anchor Thrust @ KM A REHAB-1.2.1 PLNE REHAB-1.2.1 TCF TCF REHAB-1.2.2.2.2.1 PLNE REHAB-1.2.2.2.2.1 Railway Crossing Railway @ REHAB-1.2.2.2.2.1 PLNE REHAB-1.2.2.2.2.1 Railway Crossing Railway @ REHAB-1.2.2.2.2.12 PLNE REHAB-1.2.2.2.2.12 Road Crossing Road @C REHAB-1.2.2.2.2.12 PLNE REHAB-1.2.2.2.2.12 Road Crossing Road @C REHAB-1.2.2.2.2.1 PLNE REHAB-1.2.2.2.2.1 Railway Crossing Railway @ REHAB-1.2.2.2.2.12 PLNE REHAB-1.2.2.2.2.12 Road Crossing Road @C REHAB-1.2.2.2.2.5 PLNE REHAB-1.2.2.2.2.5 Road Crossing Road @Cr K REHAB-1.2.2.2.2.12 PLNE REHAB-1.2.2.2.2.12 Road Crossing Road @C REHAB-1.2.2.2.2.5 PLNE REHAB-1.2.2.2.2.5 Road Crossing Road @Cr K REHAB-1.2.2.2.2.5 PLNE REHAB-1.2.2.2.2.5 Road Crossing Road @Cr K

Page 34

TASKPRED

CKRT3XRCT1310 CKRT3XRCT1315 SS CKRT3XRCT1245 CKRT3XRCT1248 FS CKRT3XRCT1260 CKRT3XRCT1280 FS CKRT3XRCT1280 CKRT3XRCT1300 FS CKRT3XRCT1300 CKRT3XRCT1310 FS CKRT3XRCT1315 CKRT3XRCT1320 FS CKRT3XRCT1380 CKRT3XRCT1400 FS CKRT3XRCT1360 CKRT3XRCT1380 FS CKRT3XRCT1490 CKRT3XRCT1510 FS CKRT3XRCT1470 CKRT3XRCT1490 FS CKRT3XRCT1420 CKRT3XRCT1430 FS CKRT3XRCT1530 CKRT3XRCT1540 FS CKRT3XRCT1600 CKRT3XRCT1620 FS CKRT3XRCT1580 CKRT3XRCT1600 FS CKRT3XRCT1710 CKRT3XRCT1730 FS CKRT3XRCT1690 CKRT3XRCT1710 FS CKRT3XRCO240 CKRT3XRCO270 FS CKRT3XMWT330 CKRT3XRCO210 FS CKRT3XRCO1025 CKRT3XRCO1055 FS CKRT3XRCO1105 CKRT3XRCO1135 FS CKRT3XRCO270 CKRT3XRCO1005 FS CKRT3XRCO1055 CKRT3XRCO1085 FS CKRT3XRCO1135 CKRT3XRC0215 FS CKRT3XRC0245 CKRT3XRC0275 FS CKRT3XRC0300 CKRT3XRCO310 FS CKRT3XRCO340 CKRT3XRCO370 FS CKRT3XRCO440 CKRT3XRCO470 FS CKRTJ1ST840 CKRTJ1ST970 SS CKRTJ1ST0890 CKRTJ1ST0900 FS CKRTJ1ST0900 CKRTJ1ST0910 FS CKRTJ1ST0910 CKRTJ1ST0920 FS CKRTJ1ST820 CKRTJ1ST0890 FS CKRTJ1ST860 CKRTJ1ST870 SS CKRTJ1ST885 CKRTJ1ST980 SS CKRTJ1ST970 CKRTJ1ST8501 FS CKRTJ1ST8501 CKRTJ1ST860 FS CKRTJ1ST830 CKRTJ1ST840 SS CKRTJ1ST820 CKRTJ1ST830 SS CKRTJ1ST870 CKRTJ1ST880 SS CKRTJ1ST880 CKRTJ1ST885 SS CKRTJ1ST0920 CKRTJ1ST0930 FS CKRTJ1ST0930 CKRTJ1ST0990 FS CKRTJ1ST0990 CKRTJ1ST1000 FS CKRTJ1ST980 CKRTJ1ST0940 FS CKRTJ1ST0940 CKRTJ1ST0950 FS CKRTJ1ST0950 CKRTJ1ST1010 FF CKRTJ1ST1020 CKRTJ1ST1030 FS CKRTJ1ST1040 CKRTJ1ST1180 SS CKRTJ1ST1100 CKRTJ1ST1110 FS CKRTJ1ST1110 CKRTJ1ST1120 FS CKRTJ1ST1120 CKRTJ1ST1130 FS CKRTJ1ST1030 CKRTJ1ST1100 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.2.2.3 PLNE REHAB-1.2.2.2.2.3 Road Crossing Road @Cr K REHAB-1.2.2.2.2.5 PLNE REHAB-1.2.2.2.2.5 Road Crossing Road @Cr K REHAB-1.2.2.2.2.3 PLNE REHAB-1.2.2.2.2.3 Road Crossing Road @Cr K REHAB-1.2.2.2.2.3 PLNE REHAB-1.2.2.2.2.3 Road Crossing Road @Cr K REHAB-1.2.2.2.2.3 PLNE REHAB-1.2.2.2.2.3 Road Crossing Road @Cr K REHAB-1.2.2.2.2.3 PLNE REHAB-1.2.2.2.2.3 Road Crossing Road @Cr K REHAB-1.2.2.2.2.6 PLNE REHAB-1.2.2.2.2.6 Road Crossing Road @Cr K REHAB-1.2.2.2.2.6 PLNE REHAB-1.2.2.2.2.6 Road Crossing Road @Cr K REHAB-1.2.2.2.2.7 PLNE REHAB-1.2.2.2.2.7 Road Crossing Road @Cr K REHAB-1.2.2.2.2.7 PLNE REHAB-1.2.2.2.2.7 Road Crossing Road @Cr K REHAB-1.2.2.2.2.6 PLNE REHAB-1.2.2.2.2.6 Road Crossing Road @Cr K REHAB-1.2.2.2.2.7 PLNE REHAB-1.2.2.2.2.7 Road Crossing Road @Cr K REHAB-1.2.2.2.2.8 PLNE REHAB-1.2.2.2.2.8 Road Crossing Road @Cr K REHAB-1.2.2.2.2.8 PLNE REHAB-1.2.2.2.2.8 Road Crossing Road @Cr K REHAB-1.2.2.2.2.9 PLNE REHAB-1.2.2.2.2.9 Road Crossing Road @Cr K REHAB-1.2.2.2.2.9 PLNE REHAB-1.2.2.2.2.9 Road Crossing Road @Cr K REHAB-1.2.2.2.2.2 PLNE REHAB-1.2.2.2.2.2 Road Crossing Road @Cr K REHAB-1.2.2.2.1.3 PLNE REHAB-1.2.2.2.1.3 Thrust Anchor Thrust @ KM A REHAB-1.2.2.2.2.11 PLNE REHAB-1.2.2.2.2.11 Road Crossing Road @C REHAB-1.2.2.2.2.14 PLNE REHAB-1.2.2.2.2.14 Road Crossing Road @C REHAB-1.2.2.2.2.2 PLNE REHAB-1.2.2.2.2.2 Road Crossing Road @Cr K REHAB-1.2.2.2.2.11 PLNE REHAB-1.2.2.2.2.11 Road Crossing Road @C REHAB-1.2.2.2.2.14 PLNE REHAB-1.2.2.2.2.14 Road Crossing Road @C REHAB-1.2.2.2.2.13 PLNE REHAB-1.2.2.2.2.13 Road Crossing Road @C REHAB-1.2.2.2.2.13 PLNE REHAB-1.2.2.2.2.13 Road Crossing Road @C REHAB-1.2.2.2.2.15 PLNE REHAB-1.2.2.2.2.15 Road Crossing Road @C REHAB-1.2.2.2.2.16 PLNE REHAB-1.2.2.2.2.16 Road Crossing Road @C REHAB-1.2.2.4.6.1.1 PLNE REHAB-1.2.2.4.6.1.1 Civil & Structural Civil & REHAB-1.2.2.4.6.1.3 PLNE REHAB-1.2.2.4.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.1.3 PLNE REHAB-1.2.2.4.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.1.3 PLNE REHAB-1.2.2.4.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.1.1 PLNE REHAB-1.2.2.4.6.1.1 Civil & Structural Civil & REHAB-1.2.2.4.6.1.2 PLNE REHAB-1.2.2.4.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.1.2 PLNE REHAB-1.2.2.4.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.1.1 PLNE REHAB-1.2.2.4.6.1.1 Civil & Structural Civil & REHAB-1.2.2.4.6.1.2 PLNE REHAB-1.2.2.4.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.1.1 PLNE REHAB-1.2.2.4.6.1.1 Civil & Structural Civil & REHAB-1.2.2.4.6.1.1 PLNE REHAB-1.2.2.4.6.1.1 Civil & Structural Civil & REHAB-1.2.2.4.6.1.2 PLNE REHAB-1.2.2.4.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.1.2 PLNE REHAB-1.2.2.4.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.1.3 PLNE REHAB-1.2.2.4.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.1.3 PLNE REHAB-1.2.2.4.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.1.3 PLNE REHAB-1.2.2.4.6.1.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.1.2 PLNE REHAB-1.2.2.4.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.1.4 PLNE REHAB-1.2.2.4.6.1.4 Miscellaneous Miscel REHAB-1.2.2.4.6.1.4 PLNE REHAB-1.2.2.4.6.1.4 Miscellaneous Miscel REHAB-1.2.2.4.6.2.1 PLNE REHAB-1.2.2.4.6.2.1 Civil & Structural Civil & REHAB-1.2.2.4.6.2.1 PLNE REHAB-1.2.2.4.6.2.1 Civil & Structural Civil & REHAB-1.2.2.4.6.2.3 PLNE REHAB-1.2.2.4.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.2.3 PLNE REHAB-1.2.2.4.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.2.3 PLNE REHAB-1.2.2.4.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.2.1 PLNE REHAB-1.2.2.4.6.2.1 Civil & Structural Civil &

Page 35

TASKPRED

CKRTJ1ST1070 CKRTJ1ST1080 SS CKRTJ1ST1170 CKRTJ1ST1190 SS CKRTJ1ST1180 CKRTJ1ST1060 FS CKRTJ1ST1060 CKRTJ1ST1070 FS CKRTJ1ST1050 CKRTJ1ST1040 SS CKRTJ1ST1030 CKRTJ1ST1050 SS CKRTJ1ST1080 CKRTJ1ST1090 SS CKRTJ1ST1090 CKRTJ1ST1170 SS CKRTJ1ST1200 CKRTJ1ST1210 FS CKRTJ1ST1190 CKRTJ1ST1150 FS CKRTJ1ST1150 CKRTJ1ST1160 FS CKRTJ1ST1160 CKRTJ1ST1220 FF CKRTJ1ST820 CKRTJ1ST1020 FS CKRTJ1MWT820 CKRTJ1MWT900 FS CKRTJ1MW730 CKRTJ1MWT730 SS CKRTJ1RCT500 CKRTJ1RCT520 FS CKRTJ1RCT520 CKRTJ1RCT540 FS CKRTJ1RCT720 CKRTJ1RCT740 FS CKRTJ1RCT610 CKRTJ1RCT630 FS CKRTJ1RCT540 CKRTJ1RCT550 FS CKRTJ1RCT740 CKRTJ1RCT760 FS CKRTJ1RCT630 CKRTJ1RCT650 FS CKRTJ1RCO410 CKRTJ1RCO430 FS CKRTJ1RCO440 CKRTJ1RCO460 FS CKRTJ1RCO460 CKRTJ1RCO480 FS CKRTJ1RCO490 CKRTJ1FCO530 FS CKRTJ1MWT900 CKRTJ1RCT470 FS CKRTJ1ST1190 CKRTJ1HYD140 FS CKRTJ1ST980 CKRTJ1HYD140 FS CKRTJ1RCO460 CKRTJ1HYD140 FS CKRTJ1RCT630 CKRTJ1HYD140 FS CKRTJ1RCT740 CKRTJ1HYD140 FS CKRTJ1RCT520 CKRTJ1HYD140 FS CKRTJ1ST1140 CKRTJ1ST1200 FS CKRTJ1ST1130 CKRTJ1ST1140 FS CKRTJ1HYD140 CKRTJ1HYD130 SS CKRTJ1PW120 CKRTJ1PW140 FS CKRTJ1OFW150 CKRTJ1ST820 FS CKRTJ1RCT680 CKRTJ1RCT770 FS CKRTJ1RCT570 CKRTJ1RCT660 FS CKRTJ1FCO530 CKRTJ1OFW150 SS CMOB030 CKRTJ1CMW30 FS CKRT3XRCT1108 CKRT3XRCT1110 FS CKRT3XRCT1105 CKRT3XRCT1108 FS CKRT3XRCT1175 CKRT3XRCT1178 FS CKRT3XRCT1178 CKRT3XRCT1180 FS CKRT3XRCT1248 CKRT3XRCT1249 FS CKRT3XRCT1249 CKRT3XRCT1250 FS CKRTJ1RCT470 CKRTJ1RCT475 FS CKRTJ1RCT475 CKRTJ1RCT480 FS CCWIF010 CCWIF020 FS CCWIP320CCWIP325SS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.2.4.6.2.2 PLNE REHAB-1.2.2.4.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.2.2 PLNE REHAB-1.2.2.4.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.2.1 PLNE REHAB-1.2.2.4.6.2.1 Civil & Structural Civil & REHAB-1.2.2.4.6.2.2 PLNE REHAB-1.2.2.4.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.2.1 PLNE REHAB-1.2.2.4.6.2.1 Civil & Structural Civil & REHAB-1.2.2.4.6.2.1 PLNE REHAB-1.2.2.4.6.2.1 Civil & Structural Civil & REHAB-1.2.2.4.6.2.2 PLNE REHAB-1.2.2.4.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.2.2 PLNE REHAB-1.2.2.4.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.2.3 PLNE REHAB-1.2.2.4.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.2.2 PLNE REHAB-1.2.2.4.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.2.4 PLNE REHAB-1.2.2.4.6.2.4 Miscellaneous Miscel REHAB-1.2.2.4.6.2.4 PLNE REHAB-1.2.2.4.6.2.4 Miscellaneous Miscel REHAB-1.2.2.4.6.1.1 PLNE REHAB-1.2.2.4.6.1.1 Civil & Structural Civil & REHAB-1.2.2.4.2.3 PLNE REHAB-1.2.2.4.2.3 Thrust Anchor Thrust @ JT A REHAB-1.2.2.4.2.1 PLNE REHAB-1.2.2.4.2.1 Pipeline installation Pipeline REHAB-1.2.2.4.4.1 PLNE REHAB-1.2.2.4.4.1 Road Crossing Road @Cr K REHAB-1.2.2.4.4.1 PLNE REHAB-1.2.2.4.4.1 Road Crossing Road @Cr K REHAB-1.2.2.4.4.5 PLNE REHAB-1.2.2.4.4.5 Road Crossing Road @Cr K REHAB-1.2.2.4.4.3 PLNE REHAB-1.2.2.4.4.3 Road Crossing Road @Cr K REHAB-1.2.2.4.4.1 PLNE REHAB-1.2.2.4.4.1 Road Crossing Road @Cr K REHAB-1.2.2.4.4.5 PLNE REHAB-1.2.2.4.4.5 Road Crossing Road @Cr K REHAB-1.2.2.4.4.3 PLNE REHAB-1.2.2.4.4.3 Road Crossing Road @Cr K REHAB-1.2.2.4.4.2 PLNE REHAB-1.2.2.4.4.2 Road Crossing Road @Cr K REHAB-1.2.2.4.4.2 PLNE REHAB-1.2.2.4.4.2 Road Crossing Road @Cr K REHAB-1.2.2.4.4.2 PLNE REHAB-1.2.2.4.4.2 Road Crossing Road @Cr K REHAB-1.2.2.4.4.2 PLNE REHAB-1.2.2.4.4.2 Road Crossing Road @Cr K REHAB-1.2.2.4.2.3 PLNE REHAB-1.2.2.4.2.3 Thrust Anchor Thrust @ JT A REHAB-1.2.2.4.6.2.2 PLNE REHAB-1.2.2.4.6.2.2 Piping & Mechanic Piping REHAB-1.2.2.4.6.1.2 PLNE REHAB-1.2.2.4.6.1.2 Piping & Mechanic Piping REHAB-1.2.2.4.4.2 PLNE REHAB-1.2.2.4.4.2 Road Crossing Road @Cr K REHAB-1.2.2.4.4.3 PLNE REHAB-1.2.2.4.4.3 Road Crossing Road @Cr K REHAB-1.2.2.4.4.5 PLNE REHAB-1.2.2.4.4.5 Road Crossing Road @Cr K REHAB-1.2.2.4.4.1 PLNE REHAB-1.2.2.4.4.1 Road Crossing Road @Cr K REHAB-1.2.2.4.6.2.3 PLNE REHAB-1.2.2.4.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.4.6.2.3 PLNE REHAB-1.2.2.4.6.2.3 Electrical & Electri Instrum REHAB-1.2.2.4.5 PLNE REHAB-1.2.2.4.5 Hydrostatic Hydrostati testing / D REHAB-1.2.2.4.8 PLNE REHAB-1.2.2.4.8 PMCC Walkthrough PMCC Wa & REHAB-1.2.2.4.7 PLNE REHAB-1.2.2.4.7 Offsite Work Offsite Wo REHAB-1.2.2.4.4.5 PLNE REHAB-1.2.2.4.4.5 Road Crossing Road @Cr K REHAB-1.2.2.4.4.3 PLNE REHAB-1.2.2.4.4.3 Road Crossing Road @Cr K REHAB-1.2.2.4.4.4 PLNE REHAB-1.2.2.4.4.4 Facility crossing Facility c REHAB-1.2.1 PLNE REHAB-1.2.1 TCF TCF REHAB-1.2.2.2.2.12 PLNE REHAB-1.2.2.2.2.12 Road Crossing Road @C REHAB-1.2.2.2.2.12 PLNE REHAB-1.2.2.2.2.12 Road Crossing Road @C REHAB-1.2.2.2.2.5 PLNE REHAB-1.2.2.2.2.5 Road Crossing Road @Cr K REHAB-1.2.2.2.2.5 PLNE REHAB-1.2.2.2.2.5 Road Crossing Road @Cr K REHAB-1.2.2.2.2.3 PLNE REHAB-1.2.2.2.2.3 Road Crossing Road @Cr K REHAB-1.2.2.2.2.3 PLNE REHAB-1.2.2.2.2.3 Road Crossing Road @Cr K REHAB-1.2.2.4.4.1 PLNE REHAB-1.2.2.4.4.1 Road Crossing Road @Cr K REHAB-1.2.2.4.4.1 PLNE REHAB-1.2.2.4.4.1 Road Crossing Road @Cr K REHAB-1.2.5.20 PLNE REHAB-1.2.5.20 INTERFACE INTERFAC REHAB-1.2.5.19.4 PLNE REHAB-1.2.5.19.4 Communication Commun work

Page 36

TASKPRED

CCWIP325CCWIP330SS CCWOP070 CCWOP075 SS CCWOP075 CCWOP080 SS CCWIP325CCWOP045 FS CCWOP045 CCWOP050 SS CCWOP660 CCWIF010 FS CSJ1MLV010 CSJ1MLV130 FS CSK3MLV240 CSK3MLV400 FS CSK3ST010 CSK3ST190 FS CKRT3XST410 CKRT3XST610 FS CKRT3XMWT200 CKRT3XMWT270 FS CSK3MWT030 CSK3MWT130 FS CSJ1RCO110 CSJ1RCO010 FS CSJ1RCT140 CSJ1RCO110 FS CKRTJ1MWT730 CKRTJ1MWT810 FS CKRTJ1RCT580 CKRTJ1RCO410 FS CKRTJ1ST820 CCWIP295FS CKRT3XMW550 CSJ1MW210 FS CKRTJ1PW140 CFC010 FS CFC010 CFC020 FS CCWIF020 CFC010 FS

Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE Not StartedNot StartedPLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE REHAB-1 PLNE

REHAB-1.2.5.19.4 PLNE REHAB-1.2.5.19.4 Communication Commun work REHAB-1.2.5.19.5 PLNE REHAB-1.2.5.19.5 Communication Commun work REHAB-1.2.5.19.5 PLNE REHAB-1.2.5.19.5 Communication Commun work REHAB-1.2.5.19.4 PLNE REHAB-1.2.5.19.4 Communication Commun work REHAB-1.2.5.19.5 PLNE REHAB-1.2.5.19.5 Communication Commun work REHAB-1.2.5.19.5 PLNE REHAB-1.2.5.19.5 Communication Commun work REHAB-1.2.4.6.5.1.1 PLNE REHAB-1.2.4.6.5.1.1 Civil & structural Civil & REHAB-1.2.2.1.1.1.1 PLNE REHAB-1.2.2.1.1.1.1 Civil & structural Civil & REHAB-1.2.2.1.6.1.1 PLNE REHAB-1.2.2.1.6.1.1 Civil & Structural Civil & REHAB-1.2.2.2.6.1.1 PLNE REHAB-1.2.2.2.6.1.1 Civil & Structural Civil & REHAB-1.2.2.2.1.2 PLNE REHAB-1.2.2.2.1.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.1.9.2 PLNE REHAB-1.2.2.1.9.2 Thrust Anchor Thrust @ KM A REHAB-1.2.4.6.3.5 PLNE REHAB-1.2.4.6.3.5 Road Crossing Road @Cr K REHAB-1.2.4.6.3.3 PLNE REHAB-1.2.4.6.3.3 Railway Crossing Railway @ REHAB-1.2.2.4.2.2 PLNE REHAB-1.2.2.4.2.2 Thrust Anchor Thrust @ KM A REHAB-1.2.2.4.4.3 PLNE REHAB-1.2.2.4.4.3 Road Crossing Road @Cr K REHAB-1.2.2.4.6.1.1 PLNE REHAB-1.2.2.4.6.1.1 Civil & Structural Civil & REHAB-1.2.2.2.1.1 PLNE REHAB-1.2.2.2.1.1 Pipeline installation Pipeline REHAB-1.2.2.4.8 PLNE REHAB-1.2.2.4.8 PMCC Walkthrough PMCC Wa & REHAB-1.2.3 PLNE REHAB-1.2.3 OVER ALL OVER COMPLETION ALL CO REHAB-1.2.5.20 PLNE REHAB-1.2.5.20 INTERFACE INTERFAC

Page 37

TASKPRED

predtask__task_name task__task_name lag_hr_cnt predtask__rsrc_id task__rsrc_id delete_record_flag (*)Predecessor (*)Successor Activity Lag(d) Name Activity Name (*)Predecessor (*)Successor Primary Delete Resource Primary This Resource Row Existing mainline ROW excavation New Sabkah 2 pad construction ROW New Sabkah Cold Cutting pad 5construction / removal / transport exist pipe Cold Cutting Clean / removal up / reshape / 2transport trench exist/ pipe trenching Clean up / reshape Pipe hauling trench 5& / stringing trenching Pipe hauling Pipe & stringing bending 2 Pipe bending Beveling / line-up 2 & welding Beveling / line-up NDE & welding 2 NDE Ext field joint 2 coating Ext field joint Pipe coating lowering 2 Pipe lowering CP works - 2 test & bonding thermit weld CP works - Holiday test & bonding test3/ Sand thermit Padding weld & Backfill Holiday testString / Sand toPadding string 3 tie-in & Backfill String to string Tie-in tie-in to existing 3 pipeline Berm construction CP works - 0 test station & bonding CP works - Install test station KM Marker 0 & bonding & warning sign Install KM Marker Clean up & warning 2 sign Concrete & Piping pre-cast prefabrication 15 Piping prefabrication Structural &15 Access platform prefabrication Structural &Misc Access pre-fabrication platform 18 prefabrication Misc pre-fabrication Valves shop 2 testing SubmissionNotice of main to deliverables proceed 0 Notice to proceed Kick Off Meeting 6 Mobilize Key Submission Personnel0of main deliverables Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Detour construction Sheet pile / 0 Dewatering System Installation & Operation Sheet pile / Excavation Dewatering3System Installation & Operation Excavation Install / weld 0 pipe Install / weld NDE pipe 0 NDE Field joint ext 0 coating Field joint ext Tie-in coating to existing 0 Tie-in to existing Holiday test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Demolish existing Site grading valve 0and associated facilities Site grading Excavation 0 ,compaction and foundation Demolish existing Site grading valve 0and associated facilities Site grading Excavation 0 ,compaction and foundation Test section1 Test section 02 Test section Test 2 section 03 Partial MCC PMCC walkthrough Punchlist 0 works Test section Partial 3 MCC 0walkthrough Concrete & Piping pre-cast prefabrication 15 Piping prefabrication Structural &15 Access platform prefabrication Structural &Misc Access pre-fabrication platform 18 prefabrication Misc pre-fabrication Valves shop 0 testing Trenching Pipe hauling 2 & stringing Pipe hauling Pipe & stringing bending 2

Page 38

TASKPRED

Pipe bending Beveling / line-up 2 & welding Beveling / line-up NDE & welding 0 NDE Ext field joint 2 coating Pipe lowering CP works - 2 test & bonding thermit weld CP works - Holiday test & bonding test3/ Sand thermit Padding weld & Backfill Holiday testString / Sand toPadding string 3 tie-in & Backfill Berm construction CP works - 0 test station & bonding CP works - Install test station KM Marker 0 & bonding & warning sign Install KM Marker Clean up & warning 2 sign Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Detour construction Sheet pile / 0 Dewatering System Installation & Operation Sheet pile / Excavation Dewatering1System Installation & Operation Excavation Install /weld0/ NDE/ Coat Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Sheet pile / Remove Dewatering Sheet 0System pile & Installation dewatering & system Operation Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Site grading Excavation 0 ,compaction and foundation painting / Labelling Backfilling /compaction 0 Pressure testing Dewatering 0 / drying / lay-up Partial MCC PMCC walkthrough punchlist 0 works String to string Berm tie-in construction 0 Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Excavation Dewatering3 & System Base compaction Operation Lean concrete Rebar/formwork/Anchor 0 flange & sleeve fab/erection Rebar/formwork/Anchor Cast in situ 0 &flange curing& sleeve fab/erection Cast in situ Surface & curingtouch 0 up/Concrete coating & painting Surface touch Install up/Concrete magnesium 2 coating anode & painting Install magnesium Backfill anode / compact 0 & berming Excavation Lean concrete 0 Lean concrete Rebar/formwork/Anchor 0 flange & sleeve fab/erection Rebar/formwork/Anchor Cast in situ 0 &flange curing& sleeve fab/erection Cast in situ Surface & curingtouch 0 up/Concrete coating & painting Surface touch Install up/Concrete magnesium 2 coating anode & painting Install magnesium Backfill anode / compact 2 & berming cable installation Grounding system 0 Grounding system task & area 0 lighting task & area Field lighting instrument 0 JB & instrument Field instrument E & I JB Precommissioning & instrument 0 Concrete foundation Structuralerection steel 0 support erection Excavation Concrete ,compaction foundation 0 and foundation erection E & I Precommissioning painting / Labelling 0 Clearing & grading Excavation 0 ,base compaction for foundation Cast in place Structural conc foundation steel 15 supports erection Cable installation Install power 0 panel Install power Task panel & area 0 lighting Task & area Field lighting instruments 0 JB & instruments Concrete & Piping pre-cast prefabrication 15 Piping prefabrication Structural &15 Access platform prefabrication

Page 39

TASKPRED

Structural &Misc Access pre-fabrication platform 15 prefabrication Misc pre-fabrication Valves shop 10 testing Trenching Pipe hauling 2 & stringing Pipe hauling Pipe & stringing bending 2 Pipe bending Beveling / line-up 2 & welding Beveling / line-up NDE & welding 0 NDE Ext field joint 2 coating Pipe lowering CP works - 2 test & bonding thermit weld CP works - Holiday test & bonding test3/ Sand thermit Padding weld & Backfill Holiday testString / Sand toPadding string 0 tie-in & Backfill Berm construction CP works - 0 test station & bonding CP works - Install test station KM Marker 0 & bonding & warning sign Install KM Marker Clean up & warning 2 sign Excavation Install /weld0/ NDE/ Coat Pipe Tie-in to existing Holiday test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Ext field joint Sand coating bedding 2 String to string Berm tie-in construction 0 Concrete & Piping pre-cast prefabrication 2 Piping prefabrication Structural &2Access platform prefabrication Structural &Misc Access pre-fabrication platform 1 prefabrication Misc pre-fabrication Valves shop 2 testing Survey & Markings Concrete & 0 pre-cast Trenching Pipe hauling 3 & stringing Pipe hauling Pipe & stringing bending 2 Pipe bending Beveling / line-up 2 & welding Beveling / line-up NDE & welding 0 NDE Ext field joint 2 coating Ext field joint Pipe coating lowering 3 Pipe lowering CP works - 2 test & bonding thermit weld CP works - Holiday test & bonding test3/ Sand thermit Padding weld & Backfill Holiday testString / Sand toPadding string 3 tie-in & Backfill Berm construction CP works - 3 test station & bonding CP works - Install test station KM Marker 0 & bonding & warning sign Install KM Marker Clean up & warning 2 sign Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ push pipe Install /weldDismantle / push pipe /0 remove TB setup NDE Tie-in to existing 0 Tie-in to existing Field joint ext 0 coating Field joint ext Backfill coating & restoration 0 Install /weldNDE / push pipe1 Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ push pipe Install /weldDismantle / push pipe /0 remove TB setup NDE Tie-in to existing 0 Tie-in to existing Field joint ext 0 coating Field joint ext Backfill coating & restoration 0

Page 40

TASKPRED

Install /weldNDE / push pipe1 Detour construction Sheet pile / 0 Dewatering System Installation & Operation Sheet pile / Excavation Dewatering3System Installation & Operation Excavation Install / weld 0 pipe Install / weld NDE pipe 0 NDE Tie-in to existing 0 Tie-in to existing Ext field joint 0 coating Ext field joint Holiday coating test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Installation of Pressure temporary testing 0 testing facilities Pressure testing Dewatering 0 / drying / lay-up Ext field joint Sand coating bedding 2 String to string Berm tie-in construction 3 Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Excavation Dewatering0System Operation Excavation Formwork fabrication 7 & erection Formwork fabrication Anchor flange &7erection & sleeve fab/erection Anchor flange Cast & sleeve in situ 15 & fab/erection curing Cast in situ Concrete & curing coating 0 Concrete coating Install magnesium 2 anode Install magnesium Backfill anode & berming 0 Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Excavation Dewatering0System Operation Excavation Formwork fabrication 7 & erection Formwork fabrication Anchor flange &7erection & sleeve fab/erection Anchor flange Cast & sleeve in situ 15 & fab/erection curing Cast in situ Concrete & curing coating 0 Concrete coating Install magnesium 2 anode Install magnesium Backfill anode & berming 0 Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Clearing & grading Marl cap & compact 0 Marl cap & compact Excavation 0 Excavation Supports foundation 0 erection Supports foundation Structuralerection steel 0 supports erection Structural steel Scraper supports trap 0 /erection utility piping installation Scraper trap AG/ / utility UG piping 0 installation works AG/ UG piping Access works platform 0 erection Access platform Concrete erection pad 0 construction Concrete pad Hydrotesting construction 0 Cable installation Grounding system 0 Grounding system Task & area 0 lighting Task & area Field lighting instruments 0 JB & instruments Field instruments E & I Precomissioning JB & 0 instruments Painting / coating backfilling restoration 0 & clean up E & I Precomissioning Painting / coating 0 Clearing & grading Marl cap & compact 0 Marl cap & compact Excavation 0 Excavation Supports foundation 0 erection Supports foundation Structuralerection steel 0 supports erection Structural steel Scraper supports trap 0 /erection utility piping installation Scraper trap AG/ / utility UG piping 0 installation works

Page 41

TASKPRED

AG/ UG piping Access works platform 0 erection Access platform Concrete erection pad 0 construction Concrete pad Hydrotesting construction 0 Cable installation Grounding system 0 Grounding system Task & area 0 lighting Field instruments E & I Precomissioning JB & 0 instruments Painting / coating backfilling restoration 0 & clean up E & I Precomissioning Painting / coating 0 Mechanical Electrical punchlist & works 0 instrumentation punchlist works Concrete & Piping pre-cast prefabrication 15 Piping prefabrication Structural &15 Access platform prefabrication Structural &Misc Access pre-fabrication platform 15 prefabrication Misc pre-fabrication Valves shop 10 testing Trenching Pipe hauling 2 & stringing Pipe hauling Pipe & stringing bending 2 Pipe bending Beveling / line-up 2 & welding Beveling / line-up NDE & welding 0 NDE Ext field joint 2 coating Ext field joint Pipe coating lowering 2 Pipe lowering CP works - 2 test & bonding thermit weld CP works - Holiday test & bonding test3/ Sand thermit Padding weld & Backfill Holiday testString / Sand toPadding string 3 tie-in & Backfill Berm construction CP works - 0 test station & bonding CP works - Install test station KM Marker 0 & bonding & warning sign Install KM Marker Clean up & warning 2 sign TB equipment Install setup /weld0/ NDE/ Coat /push pipe Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Excavation Install /weld0/ NDE/ Coat /push pipe Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Pressure testing Dewatering 0 / drying / lay-up Ext field joint Sand coating bedding 2 String to string Berm tie-in construction 0 Excavation Lean concrete 0 Lean concrete Rebar/formwork/Anchor 0 flange & sleeve fab/erection Rebar/formwork/Anchor Cast in situ 0 &flange curing& sleeve fab/erection Cast in situ Surface & curingtouch 0 up/Concrete coating & painting Surface touch Install up/Concrete magnesium 0 coating anode & painting Install magnesium Backfill anode / compact 0 & berming Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Excavation Dewatering1 & System Base compaction Operation Excavation Formwork & Base compaction fabrication 0 & erection Formwork fabrication Anchor flange &0erection & sleeve fab/erection Anchor flange Cast & sleeve in situ 0 & fab/erection curing Cast in situ Surface & curingtouch 0 up/Concrete coating & painting Surface touch Install up/Concrete magnesium 0 coating anode & painting Install magnesium Backfill anode / compact 0 & berming Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation

Page 42

TASKPRED

Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Excavation Install / weld 0 pipe Install / weld NDE pipe 0 NDE Field joint ext 0 coating Field joint ext Tie-in coating to existing 0 Tie-in to existing Holiday test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ push pipe Install /weldDismantle / push pipe /0 remove TB setup NDE Tie-in to existing 0 Tie-in to existing Field joint ext 0 coating Field joint ext Backfill coating & restoration 0 Install /weldNDE / push pipe1 Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ push pipe Install /weldDismantle / push pipe /0 remove TB setup NDE Tie-in to existing 0 Tie-in to existing Field joint ext 0 coating Field joint ext Backfill coating & restoration 0 Install /weldNDE / push pipe1 Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ push pipe Install /weldDismantle / push pipe /0 remove TB setup NDE Tie-in to existing 0 Tie-in to existing Field joint ext 0 coating Field joint ext Backfill coating & restoration 0 Install /weldNDE / push pipe1 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ push pipe Install /weldDismantle / push pipe /0 remove TB setup NDE Tie-in to existing 0 Tie-in to existing Field joint ext 0 coating

Page 43

TASKPRED

Field joint ext Backfill coating & restoration 0 Install /weldNDE / push pipe1 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ push pipe Install /weldDismantle / push pipe /0 remove TB setup NDE Tie-in to existing 0 Tie-in to existing Field joint ext 0 coating Field joint ext Backfill coating & restoration 0 Install /weldNDE / push pipe1 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Detour construction Sheet pile / 0 Dewatering System Installation & Operation Sheet pile / Excavation Dewatering3System Installation & Operation Excavation Install / weld 0 pipe Install / weld NDE pipe 0 NDE Tie-in to existing 0 Tie-in to existing Ext field joint 0 coating Ext field joint Holiday coating test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Sheet pile / Remove Dewatering Sheet 0System pile & Installation dewatering & system Operation Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ push pipe Install /weldDismantle / push pipe /0 remove TB setup NDE Tie-in to existing 0 Tie-in to existing Field joint ext 0 coating Field joint ext Backfill coating & restoration 0 Install /weldNDE / push pipe1 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Detour construction Sheet pile / 0 Dewatering System Installation & Operation Sheet pile / Excavation Dewatering3System Installation & Operation Excavation Install / weld 0 pipe Install / weld NDE pipe 0 NDE Tie-in to existing 0 Tie-in to existing Ext field joint 0 coating Ext field joint Holiday coating test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Detour construction Sheet pile / 0 Dewatering System Installation & Operation Sheet pile / Excavation Dewatering3System Installation & Operation Excavation Install / weld 0 pipe Install / weld NDE pipe 0 NDE Tie-in to existing 0 Tie-in to existing Ext field joint 0 coating Ext field joint Holiday coating test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Detour construction Sheet pile / 0 Dewatering System Installation & Operation Sheet pile / Excavation Dewatering3System Installation & Operation Excavation Install / weld 0 pipe Install / weld NDE pipe 0

Page 44

TASKPRED

NDE Tie-in to existing 0 Tie-in to existing Ext field joint 0 coating Ext field joint Holiday coating test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Sheet pile / Remove Dewatering Sheet 0System pile & Installation dewatering & system Operation Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ push pipe Install /weldDismantle / push pipe /0 remove TB setup NDE Tie-in to existing 0 Tie-in to existing Field joint ext 0 coating Field joint ext Backfill coating & restoration 0 Install /weldNDE / push pipe1 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Clean up Replacement 0 of Induction bend inside Safaniyah GOSP-1 ROW construction Trenching (Sabkah 3 / Non Sabkah) Dewatering Partial / drying MCC / lay-up 0walkthrough Concrete foundation Structuralerection steel 0 support erection Concrete foundation Structuralerection steel 0 support erection Excavation Concrete ,compaction foundation 0 and foundation erection Structural steel Piping support / jump 0erection over & valve installation Excavation Concrete ,compaction foundation 0 and foundation erection Structural steel Piping support / jump 0erection over & valve installation Dewatering Partial / drying MCC / lay-up 0walkthrough Backfill & berming Remove Sheet 0 pile & dewatering system Backfill & berming Remove Sheet 0 pile & dewatering system Remove Sheet Detour pileconstruction & dewatering 0 system Remove Sheet Detour pileconstruction & dewatering 0 system Asphalt pavement Remove restoration Sheet 0 pile & dewatering system Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Backfill & restoration Remove Sheet 0 pile & dewatering system Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Backfill & restoration Remove Sheet 0 pile & dewatering system Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Asphalt pavement Remove restoration Sheet 0 pile & dewatering system Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Remove Sheet Detour pileconstruction & dewatering 0 system Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Remove Sheet Detour pileconstruction & dewatering 0 system Asphalt pavement Remove restoration Sheet 0 pile & dewatering system Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Backfill & restoration Remove Sheet 0 pile & dewatering system Remove Sheet Pipeline pile & crossing dewatering 0 system Hydrotesting Cable installation 0 backfilling restoration Clearing && grading 0clean up Hydrotesting Cable installation 0 Task & area Field lighting instruments 0 JB & instruments backfilling restoration Installation& of 0clean temporary up testing facilities

Page 45

TASKPRED

Civil punchlist Mechanical works 0 punchlist works Remove Sheet Sheet pile pile & 0dewatering system installation Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Dewatering Partial / drying MCC / lay-up 0walkthrough Excavation FOC & sand Installation bedding 15 FOC Installation Testing, Splicing, 25 & termination Fibre glass Distribution marker post 20 & installation Enclosure installation Excavation FOC & sand Installation bedding 4 FOC Installation Testing, Splicing, 0 & termination Fibre glass Distribution marker post 0 & installation Enclosure installation Distribution LDS & Enclosure Connectivity 0 installation Distribution LDS & Enclosure connectivity 0 installation Partial MCC Civil walkthrough punchlist 0 works Dewatering Partial / drying MCC / lay-up 0walkthrough Decruding & Cold Purging Cutting 90 / removal / transport exist pipe Cold Cutting Clearing / removal / Backfill / 45 transport & compaction exist pipe Survey Excavation 3 & sand bedding Project Award Mobilize Key 0 Personnel Project Award Procurement 30of contractors supplied material Kick Off Meeting Site office construction 0 Site office construction Camp construction 0 Camp construction Survey & Markings 40 Valves shop Piping testing / jump 0 over & valve installation Structural steel Piping support / jump 0erection over & valve installation Survey & Markings Existing mainline 11 excavation Piping / jump Access over & platform valve 0 installation Access platform Hydrotest valve 0 & pipe assembly Hydrotest valve Tie-in & to pipe existing 0 assembly Tie-in to existing painting / Labelling 0 painting / Labelling Backfilling & 3 compaction Backfilling & Fencing compaction & guardrail 3 Piping / jump Access over & platform valve 0 installation Access platform Hydrotest valve 0 & pipe assembly Hydrotest valve Tie-in & to pipe existing 0 assembly Tie-in to existing painting / Labelling 0 painting / Labelling Backfilling & 3 clean-up Backfilling & Fencing clean-up & guardrail 2 Valves shop Hydrotest testing valve 0 & pipe assembly Replacement Demolish of Induction existing 80 bend valve inside and Safaniyah associated GOSP-1 facilities Tie-in to existing Berm pipeline construction 0 Tie-in to existing Test section1 pipeline 0 Field joint ext Test coating section1 0 Field joint ext Test coating section1 0 Tie-in to existing Test section1 0 Tie-in to existing Test section1 0 Test section1 Installation of 0 temporary testing facilities Sand bedding Pipe lowering 3 Ext field joint Sand coating bedding 2 CP works - Sheet test & pile bonding & 0dewatering thermit weld system installation Piping / jump Access over & platform valve 0 installation Access platform Hydrotest valve 0 & pipe assembly Hydrotest valve Tie-in & to pipe existing 0 assembly (Hot Tap)

Page 46

TASKPRED

Excavation cable ,compaction installation 6 and foundation Survey & Markings ROW construction 20 (Sabkah / Non Sabkah) Excavation Cable ,base compaction installation 0 for foundation Cast in place AG/ trap UG containment piping 3 works pond Access platform Hydrotesting erection 1 Structural steel Scraper supports trap 0 /Jib erection crane installation Tie-in to existing Pressure (Hottesting Tap) 0 Survey & Markings Concrete & 108 pre-cast Pressure testing Installation of 0 temporary testing facilities Scraper trap Cast /Jib in crane place 0 installation trap containment pond Hydrotesting Pressure testing 0 Valves shop Piping testing / jump 0 over & valve installation Survey & Markings ROW construction 20 (Sabkah / Non Sabkah) ROW construction Trenching (Sabkah 3 / Non Sabkah) Sand bedding Pipe lowering 3 Partial MCC PMCC walkthrough punchlist 0 works Excavation Lean & Base concrete compaction 0 Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 2 Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Remove Sheet Detour pileconstruction & dewatering 0 system Remove Sheet Unpaved pile &Road dewatering 0 crossing system Unpaved Road Pipeline crossing crossing 0 Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation

Page 47

TASKPRED

Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Concrete & Site pre-cast grading 20 Backfilling /compaction Asphalt Pavement 7 restoration Asphalt Pavement Fencing restoration & guardrail 0 Site grading Excavation 0 ,compaction and foundation painting / Labelling Backfilling /compaction 0 cable installation Grounding system 0 Grounding system task & area 0 lighting task & area Field lighting instrument 0 JB & instrument Field instrument E & I JB Precommissioning & instrument 0 Concrete foundation Structuralerection steel 0 support erection Excavation Concrete ,compaction foundation 18 and foundation erection E & I Precommissioning painting / Labelling 0 Structural steel Piping support / jump 0erection over & valve installation Piping / jump Access over & platform valve 0 installation Access platform Hydrotest valve 0 & pipe assembly Hydrotest valve Tie-in & to pipe existing 0 assembly (Hot Tap) Excavation cable ,compaction installation 6 and foundation Tie-in to existing Pressure (Hottesting Tap) 0 Valves shop Piping testing / jump 0 over & valve installation Backfilling /compaction Asphalt Pavement 7 restoration Asphalt Pavement Fencing restoration & guardrail 0 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile / Remove Dewatering Sheet 0System pile & Installation dewatering & system Operation Detour construction Excavation 1 Replacement Sheet of Induction pile & 0dewatering bend inside system Safaniyah installation GOSP-1 Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Install precast Cast foundation in place 0 conc foundation Excavation Install ,base compaction precast 20 foundation for foundation AG/ UG piping Scraper works trap 7 valve installtn & associated piping Scraper trap Access valve installtn platform 7 &erection associated piping Field instruments Conduit JB stub &0 instruments up Conduit stub Cable up termination 0 & tagging Cable termination E & I Precomissioning & tagging 0 Hydrotesting Painting / coating 0 Painting / coating Backfilling restoration 0 & clean up Backfilling restoration Fencing & & Guardrail 2clean up Clearing & grading Excavation 40 ,base compaction for foundation Cast in place Structural conc foundation steel 0 supports erection Cable installation Install power 0 panel Install power Task panel & area 0 lighting Task & area Field lighting instruments 0 JB & instruments Excavation Cable ,base compaction installation 0 for foundation Cast in place AG/ trap UG containment piping 3 works pond Access platform Hydrotesting erection 1 Structural steel Scraper supports trap 0 /Jib erection crane installation Scraper trap Cast /Jib in crane place 0 installation trap containment pond

Page 48

TASKPRED

Hydrotesting Pressure testing 0 Install precast Cast foundation in place 0 conc foundation Excavation Install ,base compaction precast 10 foundation for foundation AG/ UG piping Scraper works trap 7 valve installtn & associated piping Scraper trap Access valve installtn platform 7 &erection associated piping Field instruments Conduit JB stub &0 instruments up Conduit stub Cable up termination 0 & tagging Cable termination E & I Precomissioning & tagging 0 Hydrotesting Painting / coating 0 Painting / coating Backfilling restoration 0 & clean up Backfilling restoration Fencing & & Guardrail 2clean up Unpaved Road Pipeline crossing crossings 0 Remove Sheet Unpaved pile &Road dewatering 0 crossing system Site grading Clearing & grading 0 Excavation Lean concrete 0 Lean concrete Rebar/formwork/Anchor 0 flange & sleeve fab/erection Rebar/formwork/Anchor Cast in situ 0 &flange curing& sleeve fab/erection Cast in situ Surface & curingtouch 0 up/Concrete coating & painting Surface touch Install up/Concrete magnesium 2 coating anode & painting Install magnesium Backfill anode / compact 2 & berming Excavation Lean concrete 0 Lean concrete Rebar/formwork/Anchor 0 flange & sleeve fab/erection Rebar/formwork/Anchor Cast in situ 0 &flange curing& sleeve fab/erection Cast in situ Surface & curingtouch 0 up/Concrete coating & painting Surface touch Install up/Concrete magnesium 2 coating anode & painting Install magnesium Backfill anode / compact 2 & berming Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system CP works - Sheet test & pile bonding & 0dewatering thermit weld system installation TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 TB equipment Install setup /weld0/ NDE/ Coat /push pipe Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Construct Thrust TB equipment pit & recieving 0 setup pit

Page 49

TASKPRED

TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Sheet pile & Sheet dewatering pile / 0 Dewatering system installation System Operation Construct Thrust TB equipment pit & recieving 0 setup pit TB equipment Install setup /weld0/ NDE/ Coat /push pipe Tie-in to existing Backfill & restoration 0 Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile / Construct Dewatering Thrust 1System pit & Operation recieving pit Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Detour construction Excavation 3 Excavation Install /weld0/ NDE/ Coat Pipe Tie-in to existing Holiday test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Detour construction Excavation 3 Excavation Install /weld0/ NDE/ Coat Pipe Tie-in to existing Holiday test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Detour construction Excavation 3 Detour construction Sheet pile / 1 Dewatering System Installation & Operation Sheet pile / Excavation Dewatering1System Installation & Operation Excavation Install /weld0/ NDE/ Coat Pipe Tie-in to existing Holiday test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Sheet pile / Remove Dewatering Sheet 0System pile & Installation dewatering & system Operation Detour construction Sheet pile / 1 Dewatering System Installation & Operation Sheet pile / Excavation Dewatering1System Installation & Operation Excavation Install /weld0/ NDE/ Coat Pipe Tie-in to existing Holiday test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Sheet pile / Remove Dewatering Sheet 0System pile & Installation dewatering & system Operation Detour construction Sheet pile / 1 Dewatering System Installation & Operation Sheet pile / Excavation Dewatering1System Installation & Operation Excavation Install /weld0/ NDE/ Coat Pipe Tie-in to existing Holiday test0/ sand padding / backfil / compact Holiday testAsphalt / sand padding pavement 0 / backfil restoration / compact Sheet pile / Remove Dewatering Sheet 0System pile & Installation dewatering & system Operation Remove Sheet Detour pileconstruction & dewatering 0 system Remove Sheet Pipeline pile & crossings dewatering 0 system Site grading Excavation 0 ,compaction and foundation painting / Labelling Backfilling /compaction 0 cable installation Grounding system 0 Grounding system task & area 0 lighting task & area Field lighting instrument 0 JB & instrument Field instrument E & I JB Precommissioning & instrument 0 Concrete foundation Structuralerection steel 0 support erection Excavation Concrete ,compaction foundation 0 and foundation erection E & I Precommissioning painting / Labelling 0 Structural steel Piping support / jump 0erection over & valve installation Piping / jump Access over & platform valve 0 installation Access platform Hydrotest valve 0 & pipe assembly

Page 50

TASKPRED

Hydrotest valve Tie-in & to pipe existing 0 assembly (Hot Tap) Excavation cable ,compaction installation 6 and foundation Backfilling /compaction Asphalt Pavement 10 restoration Asphalt Pavement Fencing restoration & guardrail 0 Site grading Excavation 0 ,compaction and foundation painting / Labelling Backfilling /compaction 0 cable installation Grounding system 0 Grounding system task & area 0 lighting task & area Field lighting instrument 0 JB & instrument Field instrument E & I JB Precommissioning & instrument 6 Concrete foundation Structuralerection steel 0 support erection Excavation Concrete ,compaction foundation 0 and foundation erection E & I Precommissioning painting / Labelling 0 Structural steel Piping support / jump 0erection over & valve installation Piping / jump Access over & platform valve 0 installation Access platform Hydrotest valve 0 & pipe assembly Hydrotest valve Tie-in & to pipe existing 0 assembly (Hot Tap) Excavation cable ,compaction installation 0 and foundation Backfilling /compaction Asphalt Pavement 10 restoration Asphalt Pavement Fencing restoration & guardrail 0 Site grading Excavation 0 ,compaction and foundation painting / Labelling Backfilling /compaction 0 cable installation Grounding system 0 Grounding system task & area 0 lighting task & area Field lighting instrument 0 JB & instrument Field instrument E & I JB Precommissioning & instrument 6 Concrete foundation Structuralerection steel 0 support erection E & I Precommissioning painting / Labelling 0 Structural steel Piping support / jump 0erection over & valve installation Piping / jump Access over & platform valve 0 installation Access platform Hydrotest valve 0 & pipe assembly Hydrotest valve Tie-in & to pipe existing 0 assembly (Hot Tap) Excavation cable ,compaction installation 0 and foundation Backfilling /compaction Asphalt Pavement 10 restoration Asphalt Pavement Fencing restoration & guardrail 0 Concrete & Site pre-cast grading 20 Excavation Concrete ,compaction foundation 0 and foundation erection Cast in place Structural conc foundation steel 15 supports erection Cable installation Install power 0 panel Install power Task panel & area 0 lighting Task & area Field lighting instruments 0 JB & instruments Excavation Cable ,base compaction installation 0 for foundation Cast in place AG/ trap UG containment piping 3 works pond Access platform Hydrotesting erection 1 Structural steel Scraper supports trap 0 /Jib erection crane installation Scraper trap Cast /Jib in crane place 0 installation trap containment pond Install precast Cast foundation in place 0 conc foundation Excavation Install ,base compaction precast 20 foundation for foundation AG/ UG piping Scraper works trap 7 valve installtn & associated piping Scraper trap Access valve installtn platform 7 &erection associated piping Field instruments Conduit JB stub &0 instruments up Conduit stub Cable up termination 0 & tagging

Page 51

TASKPRED

Cable termination E & I Precomissioning & tagging 0 Hydrotesting Painting / coating 0 Painting / coating Backfilling restoration 0 & clean up Backfilling restoration Fencing & & Guardrail 2clean up Clearing & grading Excavation 15 ,base compaction for foundation Cast in place Structural conc foundation steel 15 supports erection Cable installation Install power 0 panel Install power Task panel & area 0 lighting Task & area Field lighting instruments 0 JB & instruments Excavation Cable ,base compaction installation 0 for foundation Cast in place AG/ trap UG containment piping 3 works pond Access platform Hydrotesting erection 1 Structural steel Scraper supports trap 0 /Jib erection crane installation Scraper trap Cast /Jib in crane place 0 installation trap containment pond Install precast Cast foundation in place 0 conc foundation Excavation Install ,base compaction precast 20 foundation for foundation AG/ UG piping Scraper works trap 7 valve installtn & associated piping Scraper trap Access valve installtn platform 7 &erection associated piping Field instruments Conduit JB stub &0 instruments up Conduit stub Cable up termination 0 & tagging Cable termination E & I Precomissioning & tagging 0 Hydrotesting Painting / coating 0 Painting / coating Backfilling restoration 0 & clean up Backfilling restoration Fencing & & Guardrail 2clean up Site grading Excavation 0 ,compaction and foundation painting / Labelling Backfilling /compaction 0 cable installation Grounding system 0 Grounding system task & area 0 lighting task & area Field lighting instrument 0 JB & instrument Field instrument E & I JB Precommissioning & instrument 6 Concrete foundation Structuralerection steel 0 support erection E & I Precommissioning painting / Labelling 0 Structural steel Piping support / jump 0erection over & valve installation Piping / jump Access over & platform valve 0 installation Access platform Hydrotest valve 0 & pipe assembly Hydrotest valve Tie-in & to pipe existing 0 assembly (Hot Tap) Excavation cable ,compaction installation 0 and foundation Backfilling /compaction Asphalt Pavement 10 restoration Asphalt Pavement Fencing restoration & guardrail 0 Excavation Concrete ,compaction foundation 0 and foundation erection Survey & markings ROW construction 11 (Sabkah / Non Sabkah) ROW construction Trenching (Sabkah 0 / Non Sabkah) Pressure testing Installation of 0 temporary testing facilities Hydrotesting Pressure testing 0 Hydrotesting Pressure testing 0 Tie-in to existing Pressure (Hottesting Tap) 0 Tie-in to existing Pressure (Hottesting Tap) 0 Tie-in to existing Pressure (Hottesting Tap) 0 Tie-in to existing Pressure (Hottesting Tap) 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0

Page 52

TASKPRED

Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 String to string Pressure tie-in testing 0 Remove Sheet Detour pileconstruction & dewatering 0 system Survey & Markings Concrete & 80 pre-cast Site grading Excavation 20 ,base compaction for foundation Pressure testing Dewatering 0 / drying / lay-up Site grading Site grading 0 Site grading Site grading 0 Site grading Site grading 0 Survey & Markings ROW construction 30 (Sabkah / Non Sabkah) ROW construction Trenching (Sabkah 3 / Non Sabkah) Camp construction Survey & Markings 40 Camp construction Survey & Markings 40 Trenching Excavation 60 Trenching Sheet pile & 60 dewatering system installation Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Dismantle / Tie-in remove to TB existing 1 setup Dismantle / Tie-in remove to TB existing 1 setup Dismantle / Tie-in remove to TB existing 1 setup Dismantle / Tie-in remove to TB existing 1 setup Dismantle / Tie-in remove to TB existing 1 setup Dismantle / Tie-in remove to TB existing 1 setup Tie-in to existing Holiday test0/ sand padding / backfil / compact Install /weldTie-in / NDE/ toCoat existing 0 Survey & Markings Concrete & 95 pre-cast Procurement Valves of contractors shop 0 testing supplied material Dismantle / Tie-in remove to TB existing 1 setup Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Dismantle / Tie-in remove to TB existing 1 setup Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Camp construction Survey & Markings 40 Dismantle / Tie-in remove to TB existing 0 setup Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Dismantle / Tie-in remove to TB existing 0 setup Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Remove Sheet Sheet pile pile & dewatering installation 0 system Backfill & restoration Remove sheet 0 pile Backfill & restoration Remove sheet 0 pile Remove sheet Sheet pile pile installation 0 Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Dismantle / Tie-in remove to TB existing 0 setup

Page 53

TASKPRED

Backfill & restoration Remove sheet 0 pile Remove sheet Sheet pile pile installation 0 Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Dismantle / Tie-in remove to TB existing 0 setup Tie-in to existing Backfill & restoration 0 Remove sheet Sheet pile pile & 0dewatering system installation Dismantle / Tie-in remove to TB existing 0 setup Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Dismantle / Tie-in remove to TB existing 0 setup Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Remove Sheet Sheet pile pile & dewatering & 0dewatering system system installation Dismantle / Tie-in remove to TB existing 0 setup Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Dismantle / Tie-in remove to TB existing 0 setup Install /weldDismantle / NDE/ Coat /0 remove /push pipe TB setup Install /weldTie-in / NDE/ toCoat existing 0 Pipe Backfill / compact Detour& construction berming 0 Install /weldTie-in / NDE/ toCoat existing 0 Pipe Install /weldTie-in / NDE/ toCoat existing 0 Pipe Tie-in to existing Detour construction 0 Tie-in to existing Detour construction 0 Tie-in to existing Detour construction 0 Install /weldTie-in / NDE/ toCoat existing 0 Pipe Remove Sheet Detour pileconstruction & dewatering 0 system Install /weldTie-in / NDE/ toCoat existing 0 Pipe Install /weldTie-in / NDE/ toCoat existing 0 Pipe Cast in place Structural conc foundation steel 15 supports erection Cable installation Install power 0 panel Install power Task panel & area 0 lighting Task & area Field lighting instruments 0 JB & instruments Excavation Cable ,base compaction installation 0 for foundation Cast in place AG/ trap UG containment piping 3 works pond Access platform Hydrotesting erection 1 Structural steel Scraper supports trap 0 /Jib erection crane installation Scraper trap Cast /Jib in crane place 0 installation trap containment pond Install precast Cast foundation in place 0 conc foundation Excavation Install ,base compaction precast 20 foundation for foundation AG/ UG piping Scraper works trap 7 valve installtn & associated piping Scraper trap Access valve installtn platform 7 &erection associated piping Field instruments Conduit JB stub &0 instruments up Conduit stub Cable up termination 0 & tagging Cable termination E & I Precomissioning & tagging 0 Hydrotesting Painting / coating 0 Painting / coating Backfilling restoration 0 & clean up Backfilling restoration Fencing & & Guardrail 2clean up Clearing & grading Excavation 0 ,base compaction for foundation Cast in place Structural conc foundation steel 15 supports erection Cable installation Install power 0 panel Install power Task panel & area 0 lighting Task & area Field lighting instruments 0 JB & instruments Excavation Cable ,base compaction installation 0 for foundation

Page 54

TASKPRED

Cast in place AG/ trap UG containment piping 3 works pond Access platform Hydrotesting erection 1 Structural steel Scraper supports trap 0 /Jib erection crane installation Scraper trap Cast /Jib in crane place 0 installation trap containment pond Install precast Cast foundation in place 0 conc foundation Excavation Install ,base compaction precast 20 foundation for foundation AG/ UG piping Scraper works trap 7 valve installtn & associated piping Scraper trap Access valve installtn platform 7 &erection associated piping Cable termination E & I Precomissioning & tagging 0 Hydrotesting Painting / coating 0 Painting / coating Backfilling restoration 0 & clean up Backfilling restoration Fencing & & Guardrail 2clean up Excavation Clearing ,base compaction & grading 0 for foundation Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Trenching Excavation 10 Dismantle / Tie-in remove to TB existing 0 setup Tie-in to existing Backfill & restoration 0 Dismantle / Tie-in remove to TB existing 0 setup Dismantle / Tie-in remove to TB existing 0 setup Backfill & restoration Remove Sheet 0 pile Tie-in to existing Backfill & restoration 0 Tie-in to existing Backfill & restoration 0 Detour construction Excavation 0 Install /weldTie-in / NDE/ toCoat existing 0 /push pipe Tie-in to existing Holiday test0/ sand padding / backfil / compact Asphalt pavement Pipeline restoration crossing 0 Remove Sheet Sheet pile pile & dewatering installation 0 system Hydrotesting Pressure testing 0 Hydrotesting Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Tie-in to existing Pressure testing 0 Conduit stub Cable up termination 0 & tagging Field instruments Conduit JB stub &0 instruments up Pressure testing Installation of 0 temporary testing facilities Partial MCC PMCC walkthrough punchlist 0 work Concrete & Excavation pre-cast 10 ,base compaction for foundation Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Sheet pile / Remove Dewatering Sheet 0System pile & Operation dewatering system Pipeline crossing Concrete & 0 pre-cast Camp construction Survey & markings 113 Construct Thrust TB equipment pit & recieving 0 setup pit Sheet pile installation Construct Thrust 0 pit & recieving pit Sheet pile installation Construct Thrust 0 pit & recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit Sheet pile installation Construct Thrust 0 pit & recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit Sheet pile installation Construct Thrust 0 pit & recieving pit Construct Thrust TB equipment pit & recieving 0 setup pit Interface with FOC Saudi Precommissioning Aramco 0 Communication System Testing, Splicing, Backfill && termination compaction 3

Page 55

TASKPRED

Backfill & compaction Fibre glass 5 marker post installation Testing, Splicing, Backfill && termination compaction 20 Backfill & compaction Fibre glass 15 marker post installation Backfill & compaction Survey 0 Survey Excavation 7 & sand bedding LDS Connectivity Interface with 0 Saudi Aramco Communication System Demolish existing Demolish valve existing 0and associated valve and facilities associated facilities Site grading Site grading 0 Clearing & grading Clearing & grading 0 Excavation Clearing ,base compaction & grading 0 for foundation Excavation Excavation 0 Excavation Excavation & Base compaction 0 Detour construction Detour construction 0 Construct Thrust Detour pit construction & recieving 0 pit Excavation Sheet pile & 0dewatering system installation Construct Thrust Detour pit construction & recieving 0 pit Excavation Survey ,base compaction 0 for foundation Clean up Decruding & 0 Purging PMCC punchlist Final work Commissioning 0 Final Commissioning Project closeout 0 FOC Precommissioning Final Commissioning 0

Page 56

USERDATA

user_data UserSettings Do Not Edit DurationQtyType=QT_DayShowAsPercentage=0SmallScaleQtyType=QT_HourDateFormat=dd'-'mmm'-'yyCurrencyFormat=EU

Page 57

USERDATA

t=dd'-'mmm'-'yyCurrencyFormat=EURO

Page 58