Вы находитесь на странице: 1из 2

BEAM SHEAR VERIFICATION (BS 8110 ; 1997)

GEOMETRY:
D =
equivalent square:
L =

39.370 in

0.85 m

REINFORCEMENT:
Tens reinf (half long reinf)
12
As =
d' =
Shear links
sv =
f =
arms =

20
3770 mm
122 mm

5.843 in2
4.803 in

150 mm
12 mm
2

5.906 in
0.472 in

35 Mpa
1.25
500 MPa
1.15

5.076 ksi

MATERIAL:
fck =
gmc =
fy =
gms =
ACTIONS:
T =

445 kN

72.519 ksi

100.04 kipf

CALCULATION:
v =
As
bv
d
100As/bvd =
400/d =
vc =
0,5 x vc =
vc + 0,4 =
v limit =

0.713
3769.911
853.553
731.553
0.604
1.000
0.598
0.299
0.998
4.733

N/mm
mm
mm
mm

103.363
5.843
33.604
28.801

psi

N/mm
N/mm
N/mm
N/mm

86.668
43.334
144.683
686.444

psi
psi
psi
psi

in2
in
in

Minimum links
Asv_min =

124 mm

0.192 in2

Links required
Asv_req =

36 mm

0.055 in2

0,5 x vc < v < vc + 0,4


Minimum links required
Asv_req =

124 mm

0.192 in2

Asv_prov =

226 mm

0.351 in2

OK Section Verified

WORD:
Pile radius:
R =
Considering an equivalent square:

L R

Cover
A
v = T / A
tense reinforcement (12 T
100 x As / A
->

2
2

0.5 m

= 0.122 m
section =
section =
20) =
section =
vc =

0,5 x vc < v < vc + 0,4


Provided 2 T 12/150

0.85

6244
0.71
3770
0.60
0.60

mm
MPa
mm

9.679 in2
0.103 ksi
5.843 in2

MPa

0.087 ksi

Minimum links required


VERIFIED

Вам также может понравиться