5.

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal NietoRESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

CANTIDAD

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

FORMATO 03A

AVANCE ANTERIOR ACUMULADO


CANTIDAD

MONTO
VALORIZADO

AVANCE ACTUAL
CANTIDAD

MONTO
VALORIZADO

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ACUMULADO
%

CANTIDAD

MONTO
VALORIZADO

Moquegua
Mariscal Nieto
Cercado
Moquegua

SALDO POR EJECUTARSE


%

CANTIDAD

MONTO
VALORIZADO

I COMPONENTE: "Construccin"
6,291,917.03
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.01.04
01.01.01.05
01.02
01.02.01
01.02.01.01
01.02.02
01.02.02.01
01.02.02.02
01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.01.03
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.02.04
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.03
01.04.03.01
01.04.03.02
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.04.04
01.04.04.05
01.04.04.06
01.04.04.07
01.04.04.08
01.04.04.09
01.04.05
01.04.05.01
01.04.05.02
01.04.05.03
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.01.03
01.05.01.04
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.03
01.05.03.01
01.05.03.02
01.05.03.03
01.05.03.04
01.05.04

CONSTRUCCION DE LA INFRAESTRUCTURA
OBRAS PROVISIONALES
CONSTRUCCIONES PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
1.00
1,031.34
u
OFICINAS ADM. Y SUPERV. DE OBRA
150.00
392.69
m2
ALMACEN DE OBRA
150.00
39.65
m2
CASETA DE GUARDIANIA, VESTUARIOS Y COMEDOR PERSONAL
192.00
33.78
m2
CERCO PROVISIONAL DE LA CONSTRUCCION
120.00
19.52
m
OBRAS PRELIMINARES
TRANSPORTE DE EQUIPO Y HERRAMIENTAS
MOVILIZACION Y DESMOVILIZACION DE MATERIALES, HERRAMIENTAS Y EQUIPOS
EN OBRA
10.00
6,257.16
mes
TRAZO, NIVELES Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO PRELIMINAR C/EQUIPO
4,425.14
1.62
m2
TRAZO DURANTE LA EJECUCION DE LA OBRA
6.00
2,540.88
mes
MOVIMIENTO DE TIERRAS
CORTE Y EXCAVACIONES
CORTE EN TERRENO SEMIDURO C/MAQUINARIA
5,737.94
4.61
m3
CORTE EN TERRENO SEMIDURO C/EQUIPO
3,000.63
117.68
m3
EXCAVACION DE ZANJA EN TERRENO SEMIDURO C/EQUIPO
1,979.47
181.46
m3
NIVELACION Y RELLENO
REFINE Y COMPACTACION DE LA SUB RASANTE
3,414.77
2.50
m2
RELLENO Y COMPACTACION CON MATERIAL GRANULAR E=0.30m.
2,355.37
17.56
m2
RELLENO Y COMPACTACION CON MATERIAL GRANULAR E=0.20m.
2,069.77
12.92
m2
RELLENO Y COMPACTACION CON MATERIAL PRESTAMO
911.16
77.35
m3
ACARREO Y ELIMINACION
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=50m. (MANUAL) m3
3,483.36
19.63
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=100m. (MAQUINARIA)m3
10,450.09
7.30
m3
ELIMINACION DE MATERIAL EXCEDENTE Y ESCOMBROS D=4KM (MAQUINARIA)
13,933.46
12.43
m3
OBRAS DE CONCRETO SIMPLE
SOLADO
SOLADOS CONCRETO f'c=100 kg/cm2 h=2"
57.46
14.22
m2
SOLADOS CONCRETO f'c=100 kg/cm2 h=4"
813.34
28.90
m2
CIMIENTO CORRIDO
CONCRETO 1:10 + 30% DE PG EN CIMIENTOS CORRIDOS
325.41
224.44
m3
SOBRECIMIENTO SIMPLE
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS
15.44
245.09
m3
ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTAm2
201.55
62.61
VEREDAS DE CONCRETO
VEREDAS - CONCRETO F`c=175Kg/cm2 C/ACABADO DE CEMENTO PULIDOm3
Y m2GRAVILLA
E=0.10m.
2,355.37
62.36
VEREDAS - SARDINELES INVERTIDOS CONCRETO F`c=175Kg/cm2
5.37
374.29
m3
VEREDAS - ENCOFRADO Y DESENCOFRADO NORMAL
40.27
51.24
m2
VEREDAS - JUNTA DE DILATACION C/TECKNOPORT E=1", H=4"
409.20
2.39
m
VEREDAS - JUNTA DE DILATACION C/TECKNOPORT E=1/2", H=4"
1,177.69
2.06
m
VEREDAS - JUNTA DE DILATACION C/ASFALTO E=1"
409.20
4.06
m
VEREDAS - JUNTA DE DILATACION C/ASFALTO E=1/2"
1,177.69
3.21
m
RAMPAS EN VEREDAS 1.00 X 0.90 e=0.10m TIPO ABANICO
6.00
156.28
u
CURADO DEL CONCRETO CON ADITIVO
2,355.37
2.27
m2
GRADAS
GRADAS - CONCRETO F`c=175Kg/cm2 C/ACABADO DE CEMENTO PULIDO m3
10.63
502.49
GRADAS - ENCOFRADO Y DESENCOFRADO NORMAL
8.64
33.33
m2
CURADO DEL CONCRETO CON ADITIVO
46.51
2.27
m2
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTO ARMADO
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
4,302.16
5.90
kg
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA SOBRECIMIENTO
357.22
57.32
m2
CONCRETO f'c=210 kg/cm2 PARA SOBRECIMIENTO
44.65
383.31
m3
CURADO DEL CONCRETO CON ADITIVO
357.22
2.27
m2
ZAPATAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
kg
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA ZAPATAS
m2
CONCRETO f'c=210 kg/cm2 PARA ZAPATAS
m3
VIGAS DE CIMENTACION
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
kg
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA VIGAS DE CIMENTACION
m2
CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTACION
m3
CURADO DEL CONCRETO CON ADITIVO
m2
COLUMNAS

7,641.45
483.21
392.72

5.90
54.88
374.67

4,756.36
144.97
18.92
144.97

5.90
50.53
383.46
2.27

5,152,191.88
74,710.50
74,710.50
1,031.34
58,903.50
5,947.50
6,485.76
2,342.40
84,985.61
62,571.60
62,571.60
22,414.01
7,168.73
15,245.28
1,203,734.49
738,760.67
26,451.90
353,114.14
359,194.63
147,116.89
8,536.93
41,360.30
26,741.43
70,478.23
317,856.93
68,378.36
76,285.66
173,192.91
285,580.26
24,322.61
817.08
23,505.53
73,035.02
73,035.02
16,403.24
3,784.19
12,619.05
166,084.37
146,880.87
2,009.94
2,063.43
977.99
2,426.04
1,661.35
3,780.38
937.68
5,346.69
5,735.02
5,341.47
287.97
105.58
1,858,274.69
63,784.27
25,382.74
20,475.85
17,114.79
810.89
218,743.52
45,084.56
26,518.56
147,140.40
42,971.99
28,062.52
7,325.33
7,255.06
329.08
352,150.38

150.00
150.00
1.44
120.00
1.30
800.00
2.88
5,737.94
3,000.63
1,252.62
7.26
2,597.72
10,450.09
13,933.46
201.64
133.62
2.12
23.51
1,421.00
89.36
8.35
25.00
3,275.16
119.85
107.73
882.50
55.10
8.23
16.00
-

1,418,688.96

22.55

103,969.51

1.65

1,393,051.39
67,242.04
67,242.04
58,903.50
5,947.49
48.64
2,342.40
16,766.58
8,155.16
8,155.16
8,611.41
1,296.00
7,315.41
907,900.38
606,867.01
26,451.90
353,114.68
227,300.43
561.56
561.56
300,471.81
50,993.24
76,285.66
173,192.91
37,808.62
5,827.40
5,827.40
29,989.67
29,989.67
1,991.55
519.59
1,471.96
337,565.68
16,763.40
8,383.90
5,122.12
3,200.64
56.75
66,264.01
19,323.44
6,577.37
40,363.20
11,183.15
5,206.75
2,784.20
3,155.88
36.32
86,254.13

27.04
90.00
90.00
100.00
100.00
0.75
100.00
19.73
13.03
13.03
38.42
18.08
47.98
75.42
82.15
100.00
100.00
63.28
0.38
0.80
94.53
74.58
100.00
100.00
13.24
23.96
24.79
41.06
41.06
12.14
13.73
11.66
18.17
26.28
33.03
25.02
18.70
7.00
30.29
42.86
24.80
27.43
26.02
18.55
38.01
43.50
11.04
24.49

99,358.91
7,468.46
7,468.46
1,031.34
6,437.12
1,626.86
1,626.86
1,626.86
2,591.16
2,591.16
2,591.16
1,969.73
349.69
349.69
1,620.04
1,620.04
70,806.28
14,041.16
6,174.35
4,731.77
2,947.65
187.39
3,552.07
614.66
2,937.41
7,303.78
4,131.83
1,281.44
1,832.94
57.57
11,617.46

1.93
10.00
10.00
100.00
99.25
1.91
2.60
2.60
0.22
0.82
3.79
0.69
1.44
1.49
9.88
42.81
3.81
22.01
24.32
23.11
17.22
23.11
1.62
2.32
2.00
17.00
14.72
17.49
25.26
17.49
3.30

1.00

190.56

0.26

132.00

12.10

6.61

1,046.50
82.55
7.69
82.55

11.20
7.84
700.31
25.36
4.78
25.36

1.00
150.00
150.00
192.00
120.00
1.56
800.00
2.88
5,737.94
3,000.63
1,252.62
7.26
2,729.72
10,450.09
13,933.46
213.74
133.62
8.73
23.51
2,467.50
171.91
16.04
107.55
3,275.16
131.05
115.57
1,582.81
80.46
13.01
41.36
-

1,522,658.47

24.20

1,492,410.30
74,710.49
74,710.49
1,031.34
58,903.50
5,947.49
6,485.76
2,342.40
18,393.44
9,782.02
9,782.02
8,611.41
1,296.00
7,315.41
910,491.54
606,867.01
26,451.90
353,114.68
227,300.43
561.56
561.56
303,062.97
53,584.40
76,285.66
173,192.91
39,778.36
6,177.09
6,177.09
29,989.67
29,989.67
3,611.60
2,139.64
1,471.96
408,371.96
30,804.56
14,558.25
9,853.88
6,148.29
244.14
69,816.08
19,323.44
7,192.02
43,300.61
18,486.92
9,338.58
4,065.64
4,988.81
93.89
97,871.59

28.97
100.00
100.00
100.00
100.00
100.00
100.00
100.00
21.64
15.63
15.63
38.42
18.08
47.98
75.64
82.15
100.00
100.00
63.28
0.38
0.80
95.35
78.36
100.00
100.00
13.93
25.40
26.28
41.06
41.06
22.02
56.54
11.66
21.98
48.29
57.35
48.12
35.92
30.11
31.92
42.86
27.12
29.43
43.02
33.28
55.50
68.76
28.53
27.79

8.44
3,625.14
3.12
0.00
0.00
726.85
3,414.77
2,355.37
2,069.77
903.90
753.64
0.00
0.00
57.46
599.60
191.79
6.71
178.04
2,355.37
5.37
40.27
409.20
1,177.69
409.20
1,177.69
6.00
2,355.37
10.63
8.64
46.51
1,834.66
185.31
28.61
249.67
4,366.29
352.16
277.15
3,173.55
64.51
5.91
103.61
-

4,769,258.56

75.80

3,659,781.58
0.01
0.01
0.01
66,592.17
52,789.58
52,789.58
13,802.60
5,872.73
7,929.87
293,242.95
131,893.67
0.00
(0.53)
131,894.20
146,555.33
8,536.93
41,360.30
26,741.43
69,916.67
14,793.95
14,793.95
0.00
0.00
245,801.91
18,145.52
817.08
17,328.44
43,045.35
43,045.35
12,791.64
1,644.55
11,147.09
166,084.37
146,880.87
2,009.94
2,063.43
977.99
2,426.04
1,661.35
3,780.38
937.68
5,346.69
5,735.02
5,341.47
287.97
105.58
1,449,902.73
32,979.71
10,824.49
10,621.97
10,966.50
566.75
148,927.44
25,761.11
19,326.54
103,839.79
24,485.07
18,723.94
3,259.69
2,266.24
235.19
254,278.79

71.03
0.00
0.00
0.00
78.36
84.37
84.37
61.58
81.92
52.02
24.36
17.85
0.00
(0.00)
36.72
99.62
100.00
100.00
100.00
99.20
4.65
21.64
0.00
0.00
86.07
74.60
100.00
73.72
58.94
58.94
77.98
43.46
88.34
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
78.02
51.71
42.65
51.88
64.08
69.89
68.08
57.14
72.88
70.57
56.98
66.72
44.50
31.24
71.47
72.21

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal NietoRESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM
01.05.04.01
01.05.04.02
01.05.04.03
01.05.04.04
01.05.05
01.05.05.01
01.05.05.02
01.05.05.03
01.05.05.04
01.05.06
01.05.06.01
01.05.06.02
01.05.06.03
01.05.06.04
01.05.07
01.05.07.01
01.05.07.02
01.05.07.03
01.05.07.04
01.05.08
01.05.08.01
01.05.08.02
01.05.08.03
01.05.08.04
01.05.09
01.05.09.01
01.05.09.02
01.05.09.03
01.05.09.04
01.05.09.05
01.05.09.06
01.05.10
01.05.10.01
01.05.10.02
01.05.10.03
01.05.11
01.05.11.01
01.05.11.02
01.05.11.03
01.05.11.04
01.05.12
01.05.12.01
01.05.12.02
01.05.12.03
01.05.12.04
01.05.13
01.05.13.01
01.05.13.02
01.05.13.03
01.05.13.04
01.05.14
01.05.14.01
01.05.14.02
01.05.14.03
01.05.14.04
01.05.14.05
01.05.14.06
01.06
01.06.01
01.06.02
01.07
01.07.01
01.07.02
01.07.03
01.07.04
01.07.05
01.07.06
01.07.07
01.07.08
01.08
01.08.01
01.08.02

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

CANTIDAD

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60


27,887.17
kg
ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS
2,047.00
m2
I COMPONENTE: "Construccin"
CONCRETO f'c=210 kg/cm2 PARA COLUMNAS
167.94
m3
CURADO DEL CONCRETO CON ADITIVO
2,107.02
m2
PLACAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
5,601.60
kg
ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS
319.80
m2
CONCRETO f'c=210 kg/cm2 PARA PLACAS
40.76
m3
CURADO DEL CONCRETO CON ADITIVO
288.60
m2
COLUMNETAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
8,340.48
kg
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS
1,057.62
m2
CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS
52.70
m3
CURADO DEL CONCRETO CON ADITIVO
1,057.62
m2
VIGAS DE AMARRE
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
3,299.71
kg
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE AMARRE
389.12
m2
CONCRETO f'c=175 kg/cm2 PARA VIGAS DE AMARRE
29.18
m3
CURADO DEL CONCRETO CON ADITIVO
389.12
m2
VIGAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
28,619.40
kg
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
548.80
m2
CONCRETO f'c=210 kg/cm2 PARA VIGAS
87.89
m3
CURADO DEL CONCRETO CON ADITIVO
270.58
m2
LOSAS ALIGERADAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
17,517.30
kg
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
2,805.53
m2
CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS
308.61
m3
LADRILLO DE ARCILLA HUECO 15X30X30 cm
15,878.97
u
LADRILLO DE ARCILLA HUECO 20X30X30 cm
9,370.80
u
CURADO DEL CONCRETO CON ADITIVO
2,805.53
m2
LOSAS MACIZAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
1,039.28
kg
ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS
43.60
m2
CONCRETO f'c=210 kg/cm2 PARA LOSAS MACIZAS
8.72
m3
ESCALERAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
1,345.47
kg
ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS
104.52
m2
CONCRETO f'c=210 kg/cm2 PARA ESCALERAS
18.06
m3
CURADO DEL CONCRETO CON ADITIVO
104.52
m2
MURO DE CONTENCION
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
2,091.28
kg
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA MURO DE CONTENCION
286.75
m2
CONCRETO f'c=210 kg/cm2 PARA MUROS DE CONTENCION
82.66
m3
CURADO DEL CONCRETO CON ADITIVO
143.37
m2
RAMPAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
2,018.84
kg
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA RAMPA
269.79
m2
CONCRETO f'c=210 kg/cm2 PARA RAMPA
40.16
m3
CURADO DEL CONCRETO CON ADITIVO
269.79
m2
SARDINEL
SARDINEL - CONCRETO f'c=175 kg/cm2
110.14
m3
SARDINEL - ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
323.43
kg
SARDINEL - ENCOFRADO Y DESENCOFRADO CARAVISTA
105.19
m2
SARDINEL - JUNTAS DE DILATACIN C/TECKNOPORT E = 1"
1.58
m2
SARDINEL - JUNTAS DE DILATACIN C/MICROPOROSO E = 1"
1.20
m2
CURADO DEL CONCRETO CON ADITIVO
105.19
m2
MAMPOSTERIA
MURO DE SOGA LADRILLO KING KONG ARCILLA 14 X 24 X 9 CM. M 1:5, E=15
2,500.43
m2cm.
MURO DE CABEZA LADRILLO KING KONG ARCILLA 14 X 24 X 9 CM. M 1:5, E=15
157.42
m2 cm.
REVOQUES Y ENLUCIDOS
TARRAJEO PRIMARIO, MORTERO C:A 1:5
5,319.46
m2
TARRAJEO INTERIOR CON MORTERO 1:5 X1.5 cm
3,998.57
m2
TARRAJEO EN VIGAS C/MORTERO 1:5, E=1.5 CM.
541.46
m2
TARRAJEO EN COLUMNAS C/MORTERO 1:5, E=1.5 CM.
554.74
m2
TARRAJEO EXTERIOR CON MORTERO 1:5 X 1.5 cm (INCLUYE COLUMNAS EMPOTRADAS)
1,266.72
m2
TARRAJEO EN CIELO RASO E=1.5 CM; MEZCLA 1:4
2,805.53
m2
VEREDAS - SOLAQUEADO
40.27
m2
GRADAS - SOLAQUEADO
8.64
m2
PISOS
FALSO PISO DE 4" DE CONCRETO F'c=175 Kg/cm2
1,725.06
m2
CONTRAPISO DE 40 mm
1,080.47
m2

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)
5.90
56.34
401.96
2.27
5.90
67.84
400.74
2.27
5.90
63.59
367.81
2.27
5.90
61.21
367.81
2.27
5.90
63.59
400.74
2.27
5.90
59.29
402.01
2.93
3.46
2.27
5.90
87.53
415.12
5.90
57.34
426.63
2.27
5.90
63.36
402.01
2.27
5.90
61.65
422.99
2.27
383.52
5.90
66.09
13.51
59.21
2.27
93.27
129.50
24.19
30.01
46.38
40.23
35.86
36.03
5.59
6.04
38.93
24.36

164,534.30
115,327.98
67,505.16
4,782.94
71,733.95
33,049.44
21,695.23
16,334.16
655.12
138,247.28
49,208.83
67,254.06
19,383.59
2,400.80
54,902.33
19,468.29
23,818.04
10,732.70
883.30
239,587.91
168,854.46
34,898.19
35,221.04
614.22
479,073.15
103,352.07
166,339.87
124,064.31
46,525.38
32,422.97
6,368.55
13,567.91
6,131.75
3,816.31
3,619.85
21,873.65
7,938.27
5,993.18
7,704.94
237.26
64,062.63
12,338.55
18,168.48
33,230.15
325.45
46,143.41
11,911.16
16,632.55
16,987.28
612.42
51,432.32
42,240.89
1,908.24
6,952.01
21.35
71.05
238.78
253,601.00
233,215.11
20,385.89
442,890.06
128,677.74
119,997.09
25,112.92
22,317.19
45,424.58
101,083.25
225.11
52.19
175,830.26
67,156.59
26,320.25

FORMATO 03A

AVANCE ANTERIOR ACUMULADO


CANTIDAD
11,127.00
193.19
23.38
142.15
520.00
76.01
5.36
64.01
824.00
133.76
6,974.00
216.00
1,421.00
366.00
81.00
1,858.00
880.00
461.00
110.00
137.43
100.00
-

MONTO
VALORIZADO
65,649.30
10,884.32
9,397.82
322.68
10,018.24
3,068.00
4,833.48
1,971.46
145.30
13,049.05
4,861.60
8,187.45
54,882.04
41,146.60
13,735.44
72,182.06
8,383.90
21,700.14
32,562.81
5,443.94
3,044.80
1,046.47
6,969.60
6,969.60
25,768.10
12,818.10
12,950.00
-

%
143.81
9.44
13.92
6.75
7.25
6.23
7.19
10.17
6.05
23.77
24.97
34.37
22.91
24.37
39.36
15.07
8.11
13.05
26.25
11.70
9.39
16.43
10.88
38.36
10.16
5.50
63.52
-

AVANCE ACTUAL
CANTIDAD

130.32
9.90
130.32

580.00
19.50
3.61
19.50
80.00
2.16
0.16

2,521.00
65.17
4.62

71.00

6.06

155.35

MONTO
VALORIZADO
7,342.23
3,979.40
295.83
6,034.06
3,422.00
1,240.01
1,327.79
44.27
663.06
472.00
132.21
58.85
20,869.48
14,873.90
4,144.16
1,851.42
4,209.59
4,209.59
2,515.63
2,515.63
14,489.49
14,489.49
-

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ACUMULADO
%
68.00
6.37
5.89
6.19
4.36
6.95
1.84
6.85
1.84
1.21
2.42
0.56
0.55
8.71
8.81
11.87
5.26
0.88
2.53
18.54
69.50
5.71
6.21
-

CANTIDAD
11,127.00
323.51
33.28
272.47
1,100.00
95.51
8.97
83.51
904.00
135.92
0.16
9,495.00
281.17
4.62
1,421.00
437.00
81.00
1,858.00
880.00
461.00
6.06
110.00
292.78
100.00
-

MONTO
VALORIZADO
65,649.30
18,226.55
13,377.23
618.51
16,052.30
6,490.00
6,073.48
3,299.26
189.57
13,712.11
5,333.60
8,319.66
58.85
75,751.52
56,020.50
17,879.60
1,851.42
76,391.65
8,383.90
25,909.73
32,562.81
5,443.94
3,044.80
1,046.47
2,515.63
2,515.63
6,969.60
6,969.60
40,257.59
27,307.59
12,950.00
-

Moquegua
Mariscal Nieto
Cercado
Moquegua

SALDO POR EJECUTARSE


%
211.81
15.80
19.82
12.93
11.61
13.19
9.03
17.02
7.90
24.98
27.40
34.93
0.55
31.62
33.18
51.23
5.26
15.95
8.11
15.58
26.25
11.70
9.39
16.43
18.54
69.50
10.88
38.36
15.87
11.71
63.52
-

CANTIDAD
16,760.17
1,723.49
134.66
1,834.55
5,601.60
319.80
40.76
288.60
7,240.48
962.11
43.73
974.11
2,395.71
253.20
29.02
389.12
19,124.40
267.63
83.27
270.58
16,096.30
2,368.53
227.61
14,020.97
8,490.80
2,344.53
1,039.28
43.60
2.66
1,345.47
104.52
18.06
104.52
2,091.28
176.75
82.66
143.37
2,018.84
269.79
40.16
269.79
110.14
323.43
105.19
1.58
1.20
105.19
2,207.65
57.42
5,319.46
3,998.57
541.46
554.74
1,266.72
2,805.53
40.27
8.64
1,725.06
1,080.47

MONTO
VALORIZADO
98,885.00
97,101.43
54,127.93
4,164.43
71,733.95
33,049.44
21,695.23
16,334.16
655.12
122,194.97
42,718.83
61,180.58
16,084.33
2,211.23
41,190.21
14,134.69
15,498.38
10,673.85
883.30
163,836.39
112,833.96
17,018.59
33,369.62
614.22
402,681.50
94,968.17
140,430.14
91,501.50
41,081.44
29,378.17
5,322.08
11,052.28
6,131.75
3,816.31
1,104.22
21,873.65
7,938.27
5,993.18
7,704.94
237.26
57,093.03
12,338.55
11,198.88
33,230.15
325.45
46,143.41
11,911.16
16,632.55
16,987.28
612.42
51,432.32
42,240.89
1,908.24
6,952.01
21.35
71.05
238.78
213,343.41
205,907.52
7,435.89
442,890.06
128,677.74
119,997.09
25,112.92
22,317.19
45,424.58
101,083.25
225.11
52.19
175,830.26
67,156.59
26,320.25

%
60.10
84.20
80.18
87.07
100.00
100.00
100.00
100.00
100.00
88.39
86.81
90.97
82.98
92.10
75.02
72.60
65.07
99.45
100.00
68.38
66.82
48.77
94.74
100.00
84.05
91.89
84.42
73.75
88.30
90.61
83.57
81.46
100.00
100.00
30.50
100.00
100.00
100.00
100.00
100.00
89.12
100.00
61.64
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
84.13
88.29
36.48
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal NietoRESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM
01.08.03
01.09
01.09.01
01.09.02
01.10
01.10.01
01.10.02
01.11
01.11.01
01.11.02
01.11.03
01.11.04
01.11.05
01.11.06
01.11.07
01.12
01.12.01
01.13
01.13.01
01.14
01.14.01
01.14.02
01.14.03
01.14.04
01.15
01.15.01
01.15.02
01.15.03
01.15.04
01.15.05
01.16
01.16.01
01.16.02
01.16.03
01.16.04
01.17
01.17.01
01.17.02
01.17.03
01.18
01.18.01
01.18.01.01
01.18.01.02
01.18.01.03
01.18.02
01.18.02.01
01.18.02.02
01.18.02.03
01.18.03
01.18.03.01
01.18.03.02
01.18.03.03
01.18.03.04
01.18.03.05
01.18.03.06
01.18.03.07
01.18.03.08
01.18.03.09
01.18.03.10
01.18.03.11
01.18.04
01.18.04.01
01.18.05
01.18.05.01
01.18.05.02
01.18.05.03
01.18.05.04
01.18.05.05
01.18.05.06
01.18.05.07
01.18.06
01.18.06.01

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

PISO DE CERAMICO 30X30CM. DE COLOR


m2
ZOCALO Y CONTRAZOCALO
I COMPONENTE: "Construccin"
ZOCALO DE CERAMICA DE 20 X 30cm.
m2
CONTRAZOCALO MAD. CEDRO 3/4"x4" + RODON 3/4"
m
CARPINTERIA DE MADERA
PUERTAS DE MADERA TABLEROS REBAJADOS DE 4.5 mm DE CEDRO
m2
PUERTA CONTRAPLACADA DE 45 mm TRIPLAY
m2
CARPINTERIA METALICA
BARANDA DE TUBO DE FIERRO NEGRO PASAMANO 2" PARANTE 1 1/2" X 0.90m.
m
CONFECCION Y COLOCACION DE SOMBRILLA EN PASADIZOS
m2
CONFECCION Y COLOCACION DE BASUREROS DE FIBRA DE VIDRIO
u
CONFECCION DE BANCA ERGONOMETRICA
u
TIJERAL T-1
m
VIGUETA DE TUBO 2" X 2" X 2mm
m
ARRIOSTRE DE ACERO
m
CUBIERTAS
COBERTURA C/LAMINA TERMOACUSTICA CINDULIT
m2
CIELOS RASOS
CIELOS RASOS CON BALDOSAS
m2
CERRAJERIA
CERRADURA DOS GOLPES EN PUERTAS EXTERIORES
pza
CERRADURA PARA INTERIORES TIPO PERILLA
pza
PICAPORTE PARA PUERTAS
u
BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"
pza
PINTURA
PINTURAS LATEX EN EXTERIORES
m2
PINTURAS LATEX EN INTERIORES
m2
PINTURAS LATEX EN CIELO RASO
m2
PINTADO DE SARDINEL
m2
PINTADO DE MURO DE CONTENCION
m2
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS SEMIDOBLES
p2
BLOQUES DE VIDRIO DE 20cm x 20cm x 10cm
m2
MAMPARA DE VIDRIO
m2
VIDRIO TEMPLADO DE 8mm.
m2
TRATAMIENTO DE AREA VERDE
PREPARACION DE TERRENO PARA COLOCACION DE GRASS
m2
SUMINISTRO Y COLOCACION DE GRASS EN BLOQUE
m2
PLANTONES
u
INSTALACIONES SANITARIAS
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE EN PVC SAL 100mm
pto
SALIDA DE DESAGUE EN PVC SAL 50mm
pto
SALIDA DE VENTILACION EN PVC SAL 50mm
pto
REDES DE DISTRIBUCIN DE DESAGUE
TUBERIA PVC SAL - 100mm
m
TUBERIA PVC SAL - 50mm
m
SUBIDA DE VENTILACION DE 2"
m
ACCESORIOS PARA REDES DE DESAGUE
CODO DE PVC SAL 2"X90
u
CODO DE PVC SAL 4"X90
u
YEE PVC SAL DE 4"x4"
u
TEE PVC SAL 4"x 4"
u
CODO DE PVC SAL 2" X 45
u
YEE PVC SAL DE 2"x2"
u
REDUCCION DE PVC SAL DE 4" A 2"
u
TRAMPA "P" DE PVC SAL PARA DESAGUE DE 2"
u
SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION
u
REGISTRO DE BRONCE 4" PROVISION Y COLOCACION
u
SOMBRERO PARA VENTILACION DE PVC DE 2"
u
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24" C/TAPA CARMADO
u
APARATOS Y ACCESORIOS SANITARIOS
lNODORO DE LOSA VITRIFICADA
u
LAVATORIO DE SS.HH.
u
LAVATORIO DE COCINA
u
URINARIOS DE LOZA DE PICO
u
LLAVE MEZCLADORA PARA DUCHA C/ACCESORIOS
u
PAPELERA DE LOZA BLANCA DE 13 X 15 cm
pza
TOALLERA CON SOPORTE DE LOSA Y BARRA PLASTICA COLOR BLANCO u
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
pto

CANTIDAD

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

1,080.47

76.22

728.54
1,025.34

44.29
16.96

95.33
86.19

666.59
497.95

120.00
94.50
20.00
15.00
90.90
218.64
107.76

207.30
135.00
450.00
1,250.00
249.53
47.66
4.88

276.49

138.55

276.49

66.59

48.00
33.00
75.00
225.00

93.50
58.50
14.40
19.34

3,998.57
1,266.72
2,805.53
89.15
71.69

11.24
9.15
10.05
13.95
16.48

14,414.53
15.40
66.08
13.86

5.15
256.87
157.50
89.25

1,696.17
1,696.17
65.00

9.38
23.49
31.69

64.00
80.00
44.00

66.59
65.34
67.82

265.65
469.15
267.12

21.71
15.90
16.51

30.00
20.00
60.00
25.00
20.00
86.00
50.00
45.00
45.00
85.00
64.00

28.91
30.91
33.41
32.41
17.61
17.61
22.11
47.29
41.06
49.26
26.47

23.00

121.06

64.00
51.00
2.00
10.00
6.00
64.00
8.00

315.89
337.00
322.97
144.89
209.60
46.14
80.16

171.00

77.72

82,353.42
49,656.81
32,267.04
17,389.77
106,464.33
63,546.02
42,918.31
99,012.03
24,876.00
12,757.50
9,000.00
18,750.00
22,682.28
10,420.38
525.87
38,307.69
38,307.69
18,411.47
18,411.47
11,850.00
4,488.00
1,930.50
1,080.00
4,351.50
87,155.09
44,943.93
11,590.49
28,195.58
1,243.64
1,181.45
89,835.24
74,234.83
3,955.80
10,407.60
1,237.01
57,812.95
15,910.07
39,843.03
2,059.85
136,338.33
12,473.04
4,261.76
5,227.20
2,984.08
17,636.90
5,767.26
7,459.49
4,410.15
17,129.44
867.30
618.20
2,004.60
810.25
352.20
1,514.46
1,105.50
2,128.05
1,847.70
4,187.10
1,694.08
2,784.38
2,784.38
44,350.64
20,216.96
17,187.00
645.94
1,448.90
1,257.60
2,952.96
641.28
13,290.12
13,290.12

FORMATO 03A

AVANCE ANTERIOR ACUMULADO


CANTIDAD
-

MONTO
VALORIZADO

AVANCE ACTUAL

%
-

CANTIDAD
-

6.00

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

MONTO
VALORIZADO
406.92
406.92
406.92
-

AVANCE ACUMULADO
%
0.30
3.26
13.64
-

CANTIDAD
6.00
-

MONTO
VALORIZADO
406.92
406.92
406.92
-

Moquegua
Mariscal Nieto
Cercado
Moquegua

SALDO POR EJECUTARSE


%
0.30
3.26
13.64
-

CANTIDAD
1,080.47
728.54
1,025.34
95.33
86.19
120.00
94.50
20.00
15.00
90.90
218.64
107.76
276.49
276.49
48.00
33.00
75.00
225.00
3,998.57
1,266.72
2,805.53
89.15
71.69
14,414.53
15.40
66.08
13.86
1,696.17
1,696.17
65.00
64.00
80.00
38.00
265.65
469.15
267.12
30.00
20.00
60.00
25.00
20.00
86.00
50.00
45.00
45.00
85.00
64.00
23.00
64.00
51.00
2.00
10.00
6.00
64.00
8.00
171.00

MONTO
VALORIZADO
82,353.42
49,656.81
32,267.04
17,389.77
106,464.33
63,546.02
42,918.31
99,012.03
24,876.00
12,757.50
9,000.00
18,750.00
22,682.28
10,420.38
525.87
38,307.69
38,307.69
18,411.47
18,411.47
11,850.00
4,488.00
1,930.50
1,080.00
4,351.50
87,155.09
44,943.93
11,590.49
28,195.58
1,243.64
1,181.45
89,835.24
74,234.83
3,955.80
10,407.60
1,237.01
57,812.95
15,910.07
39,843.03
2,059.85
135,931.41
12,066.12
4,261.76
5,227.20
2,577.16
17,636.90
5,767.26
7,459.49
4,410.15
17,129.44
867.30
618.20
2,004.60
810.25
352.20
1,514.46
1,105.50
2,128.05
1,847.70
4,187.10
1,694.08
2,784.38
2,784.38
44,350.64
20,216.96
17,187.00
645.94
1,448.90
1,257.60
2,952.96
641.28
13,290.12
13,290.12

%
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
99.70
96.74
100.00
100.00
86.36
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal NietoRESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM
01.18.07
01.18.07.01
01.18.07.02
01.18.07.03
01.18.07.04
01.18.07.05
01.18.08
01.18.08.01
01.18.08.02
01.18.08.03
01.18.08.04
01.18.08.05
01.18.08.06
01.18.09
01.18.09.01
01.18.09.02
01.18.09.03
01.19
01.19.01
01.19.02
01.19.03
01.19.04
01.19.05
01.20
01.20.01
02
02.01
02.01.01
02.01.01.01
02.01.01.02
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.01.03
02.02.02
02.02.02.01
02.02.02.02
02.02.03
02.02.03.01
02.02.03.02
02.02.03.03
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.05
02.05.01
02.05.02
02.06
02.06.01
02.06.02
02.06.03
02.07
02.07.01
02.08
02.08.01
02.09
02.09.01
03
03.01
03.01.01
03.01.01.01
03.01.01.02

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

CANTIDAD

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

REDES DE DISTRIBUCION DE AGUA FRIA


TUBERIA PVC SAP PRESION C-10 C/R. .1/2" X 5m
390.10
9.15
m
I COMPONENTE: "Construccin"
TUBERIA PVC SAP PRESION C-10 C/R. .3/4" X 5m
371.57
12.26
m
CONEXION AGUA PVC-SAP 3/4" A MATRIZ DE 110MM
1.00
170.38
u
SUMINISTRO E INSTALACION DE CAJA DE CONCRETO PARA MEDIDOR DE AGUA
(Incluye
Marco y Tapa) 148.50
30.00
u
SUMINISTRO E INSTALACION DE CAJA DE CONCRETO PARA GRIFO DE RIEGO
10.00
148.26
u
ACCESORIOS PARA REDES DE AGUA
CODO PVC SAP 1/2"
90.00
15.40
u
CODO PVC SAP 3/4"
20.00
22.45
u
TEE PVC SAP DE 1/2"
120.00
15.40
u
TEE PVC SAP DE 3/4"
30.00
22.95
u
REDUCCION PVC SAP DE 3/4" A 1/2"
20.00
22.69
u
UNION UNIVERSAL PVC DE 1/2"
160.00
20.28
u
LLAVES Y VALVULAS
VALVULA DE COMPUERTA 1/2"
80.00
60.63
u
VALVULA DE COMPUERTA 3/4"
20.00
73.18
u
VALVULA CHECK DE BRONCE D=3/4"
1.00
56.85
u
VARIOS
TANQUE ELEVADO DE FIBRA DE VIDRIO DE 1100 lts.
3.00
587.16
pza
DIVISION DE BAOS DE MELAMINE CON MARCOS DE ALUMINIO
70.00
350.00
u
JUNTA DE CONSTRUCCION CON TEKNOPORT
151.90
14.33
m2
SELLADO DE JUNTA DE DILATACION SISMICA E=1"
607.60
9.16
m
LIMPIEZA FINAL DE OBRA
4,425.14
0.91
m2
MITIGACION DEL IMPACTO AMBIENTAL
COMPACTACION DE MATERIAL EXCEDENTE Y READECUACION MORFOLOGICA
BOTADERO
13,933.46
2.85
m3 DEL
CONSTRUCCION DE LA LOSA DEPORTIVA
OBRAS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO PRELIMINAR C/EQUIPO
789.00
1.62
m2
TRAZO DURANTE LA EJECUCION DE LA OBRA
2.00
2,540.88
mes
MOVIMIENTO DE TIERRAS
CORTE Y EXCAVACIONES
CORTE EN TERRENO SEMIDURO C/MAQUINARIA
441.84
4.61
m3
CORTE EN TERRENO SEMIDURO C/EQUIPO
186.36
117.68
m3
EXCAVACION DE ZANJA EN TERRENO SEMIDURO C/EQUIPO
19.02
181.46
m3
NIVELACION Y RELLENO
REFINE Y COMPACTACION DE LA SUB RASANTE
875.00
2.50
m2
RELLENO Y COMPACTACION CON MATERIAL GRANULAR E=0.20m.
789.00
12.92
m2
ACARREO Y ELIMINACION
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=50m. (MANUAL) m3
211.32
19.63
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=100m. (MAQUINARIA)m3
633.96
7.30
m3
ELIMINACION DE MATERIAL EXCEDENTE Y ESCOMBROS D=4KM (MAQUINARIA)
845.29
12.43
m3
LOSA DEPORTIVA
LOSA DEPORTIVA - CONCRETO f'c=175 kg/cm2 E=12.5 cm
789.00
53.54
m2
LOSA DEPORTIVA - SARDINEL INVERTIDO f'c=175 kg/cm2
4.64
369.96
m3
LOSA DEPORTIVA - ENCOFRADO Y DESENCOFRADO NORMAL
34.20
59.29
m2
LOSA DEPORTIVA - JUNTA DE DILATACION C/TEKNOPORT E=1", H=0.125m.m
333.60
3.15
LOSA DEPORTIVA - JUNTA ASFALTICA E=1", H= 1 1/2".
333.60
4.06
m
CURADO DEL CONCRETO CON ADITIVO
789.00
2.27
m2
GRADERIA
GRADERIA - CONCRETO f'c=140 kg/cm2+25% P.M.
3.01
263.34
m3
GRADERIA - CONCRETO f'c=175 kg/cm2
15.03
383.52
m3
GRADERIA - ENCOFRADO Y DESENCOFRADO CARAVISTA
40.08
65.30
m2
CURADO DEL CONCRETO CON ADITIVO
100.20
2.27
m2
REVOQUES Y ENLUCIDOS
LOSA DEPORTIVA - SOLAQUEADO
789.00
6.60
m2
GRADERIA - SOLAQUEADO
191.40
6.04
m2
CARPINTERIA METALICA
ARCO DE FULBITO CON TABLERO DE BASQUET
2.00
2,793.01
u
MALLA METALICA PROTECTORA GALVANIZ. N.12 COC.2" X 2 M.
35.00
318.00
m
CONFECCION Y COLOCACION DE PARANTES PARA LA COBERTURA DE GRADERIAS
4.00
1,800.00
u
PINTURA
DEMARCACION DE LA LOSA DEPORTIVA E=0.10m
476.36
1.58
m
VARIOS
LIMPIEZA FINAL DE OBRA
789.00
0.91
m2
MITIGACION DEL IMPACTO AMBIENTAL
COMPACTACION DE MATERIAL EXCEDENTE Y READECUACION MORFOLOGICA
845.29
2.85
m3 DEL BOTADERO
CONSTRUCCION DE LA ZONA DE ESTACIONAMIENTO
OBRAS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO PRELIMINAR C/EQUIPO
290.00
1.62
m2
TRAZO DURANTE LA EJECUCION DE LA OBRA
1.00
2,540.88
mes

14,232.85
3,569.42
4,555.45
170.38
4,455.00
1,482.60
8,070.10
1,386.00
449.00
1,848.00
688.50
453.80
3,244.80
6,370.85
4,850.40
1,463.60
56.85
38,030.71
1,761.48
24,500.00
2,176.73
5,565.62
4,026.88
39,710.36
39,710.36
159,187.99
6,359.94
6,359.94
1,278.18
5,081.76
59,083.55
27,419.09
2,036.88
21,930.84
3,451.37
12,381.38
2,187.50
10,193.88
19,283.07
4,148.21
4,627.91
10,506.95
50,183.68
42,243.06
1,716.61
2,027.72
1,050.84
1,354.42
1,791.03
9,401.63
792.65
5,764.31
2,617.22
227.45
6,363.46
5,207.40
1,156.06
23,916.02
5,586.02
11,130.00
7,200.00
752.65
752.65
717.99
717.99
2,409.08
2,409.08
24,289.09
3,010.68
3,010.68
469.80
2,540.88

FORMATO 03A

AVANCE ANTERIOR ACUMULADO


CANTIDAD
-

0.23
441.84
16.00
19.02
161.32
633.96
795.29
-

MONTO
VALORIZADO
25,637.57
586.36
586.36
586.36
25,051.21
7,371.13
2,036.88
1,882.88
3,451.37
17,680.07
3,166.71
4,627.91
9,885.45
-

%
16.11
11.54
3.19
6.87
100.00
8.59
100.00
76.34
100.00
94.08
-

AVANCE ACTUAL
CANTIDAD

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ACUMULADO

MONTO
VALORIZADO

%
-

CANTIDAD
-

0.23
441.84
16.00
19.02
161.32
633.96
795.29
-

MONTO
VALORIZADO

SALDO POR EJECUTARSE


%

25,637.57
586.36
586.36
586.36
25,051.21
7,371.13
2,036.88
1,882.88
3,451.37
17,680.07
3,166.71
4,627.91
9,885.45
-

Moquegua
Mariscal Nieto
Cercado
Moquegua

16.11
11.54
3.19
6.87
100.00
8.59
100.00
76.34
100.00
94.08
-

CANTIDAD
390.10
371.57
1.00
30.00
10.00
90.00
20.00
120.00
30.00
20.00
160.00
80.00
20.00
1.00
3.00
70.00
151.90
607.60
4,425.14
13,933.46
789.00
1.77
(0.00)
170.36
875.00
789.00
50.00
50.00
789.00
4.64
34.20
333.60
333.60
789.00
3.01
15.03
40.08
100.20
789.00
191.40
2.00
35.00
4.00
476.36
789.00
845.29
290.00
1.00

MONTO
VALORIZADO
14,232.85
3,569.42
4,555.45
170.38
4,455.00
1,482.60
8,070.10
1,386.00
449.00
1,848.00
688.50
453.80
3,244.80
6,370.85
4,850.40
1,463.60
56.85
38,030.71
1,761.48
24,500.00
2,176.73
5,565.62
4,026.88
39,710.36
39,710.36
133,550.42
5,773.58
5,773.58
1,278.18
4,495.40
34,032.34
20,047.96
(0.00)
20,047.96
12,381.38
2,187.50
10,193.88
1,603.00
981.50
621.50
50,183.68
42,243.06
1,716.61
2,027.72
1,050.84
1,354.42
1,791.03
9,401.63
792.65
5,764.31
2,617.22
227.45
6,363.46
5,207.40
1,156.06
23,916.02
5,586.02
11,130.00
7,200.00
752.65
752.65
717.99
717.99
2,409.08
2,409.08
24,289.09
3,010.68
3,010.68
469.80
2,540.88

%
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
83.89
90.78
90.78
100.00
88.46
57.60
73.12
(0.00)
91.41
100.00
100.00
100.00
8.31
23.66
5.92
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal NietoRESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM
03.02
03.02.01
03.02.01.01
03.02.02
03.02.02.01
03.02.03
03.02.03.01
03.02.03.02
03.02.03.03
03.03
03.03.01
03.04
03.04.01
03.04.02
03.04.03
03.04.04
03.05
03.05.01
03.05.01.01
03.05.01.02
03.05.01.03
03.06
03.06.01
03.07
03.07.01
03.08
03.08.01
04
04.01
04.01.01
04.01.01.01
04.01.01.02
04.02
04.02.01
04.02.01.01
04.02.02
04.02.02.01
04.02.02.02
04.02.03
04.02.03.01
04.02.03.02
04.02.03.03
04.03
04.03.01
04.03.01.01
04.03.02
04.03.02.01
04.03.03
04.03.03.01
04.03.03.02
04.04
04.04.01
04.04.01.01
04.04.01.02
04.04.01.03
04.04.01.04
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.02.04
04.04.03
04.04.03.01
04.04.03.02
04.04.03.03
04.04.03.04
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
04.04.04.04
04.05

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

CANTIDAD

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

MOVIMIENTO DE TIERRAS
CORTE Y EXCAVACIONES
I COMPONENTE: "Construccin"
CORTE EN TERRENO SEMIDURO C/MAQUINARIA
101.50
m3
NIVELACION Y RELLENO
PERFILADO, NIVELACION Y COMPACTACION DE LA SUB RASANTE
290.00
m2
ACARREO Y ELIMINACION
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=50m. (MANUAL) m3
32.99
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=100m. (MAQUINARIA)m3
98.96
ELIMINACION DE MATERIAL EXCEDENTE Y ESCOMBROS D=4KM
m3
131.95
SUB BASES Y BASES
BASE GRANULAR DE 0.20 m
290.00
m2
PAVIMENTO FLEXIBLES
IMPRIMACION ASFALTICA
290.00
m2
PREPARACION DE LA MEZCLA ASFALTICA EN FRIO E=2"
290.00
m2
CARGUIO Y TRANSPORTE DE MEZCLA ASFALTICA D=2KM
14.50
m3
ESPARCIDO Y COMPACTADO DE MEZCLA ASFALTICA EN FRIO E=2".
290.00
m2
SEGURIDAD VIAL
SEALIZACION HORIZONTAL
PINTADO LINEAL CONTINUA E=0.10m.
65.00
m
PINTADO LINEAL DISCONTINUA E=0.10m.
37.50
m
SEALIZACION EN PAVIMENTO
8.64
m2
SEGURIDAD VIAL
TACHAS REFLECTIVAS
14.00
u
VARIOS
LIMPIEZA FINAL DE OBRA
290.00
m2
MITIGACION DEL IMPACTO AMBIENTAL
COMPACTACION DE MATERIAL EXCEDENTE Y READECUACION MORFOLOGICA
131.95
m3 DEL BOTADERO
CONSTRUCCION DEL CERCO PERIMETRICO
OBRAS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO PRELIMINAR C/EQUIPO
253.14
m2
TRAZO DURANTE LA EJECUCION DE LA OBRA
1.50
mes
MOVIMIENTO DE TIERRAS
CORTE Y EXCAVACIONES
EXCAVACION DE ZANJA EN TERRENO SEMIDURO C/EQUIPO
405.02
m3
NIVELACION Y RELLENO
REFINE Y COMPACTACION DE LA SUB RASANTE
253.14
m2
RELLENO Y COMPACTACION CON MATERIAL PRESTAMO
166.25
m3
ACARREO Y ELIMINACION
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=50m. (MANUAL)
m3
131.63
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=100m. (MAQUINARIA)m3
394.90
ELIMINACION DE MATERIAL EXCEDENTE Y ESCOMBROS D=4KM
526.53
m3
OBRAS DE CONCRETO SIMPLE
SOLADO
SOLADOS CONCRETO f'c=100 kg/cm2 h=4"
161.10
m2
CIMIENTO CORRIDO
CONCRETO 1:10 + 30% DE PG EN CIMIENTOS CORRIDOS
151.49
m3
SOBRECIMIENTO SIMPLE
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS
9.47
m3
ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTAm2
0.30 m
126.24
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTO ARMADO
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
833.18
kg
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA SOBRECIMIENTO
126.24
m2
CONCRETO f'c=210 kg/cm2 PARA SOBRECIMIENTO
18.94
m3
CURADO DEL CONCRETO CON ADITIVO
126.24
m2
COLUMNAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
1,723.39
kg
ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS
176.80
m2
CONCRETO f'c=210 kg/cm2 PARA COLUMNAS
29.82
m3
CURADO DEL CONCRETO CON ADITIVO
176.80
m2
VIGAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
874.37
kg
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
70.23
m2
CONCRETO f'c=210 kg/cm2 PARA VIGAS
8.78
m3
CURADO DEL CONCRETO CON ADITIVO
70.23
m2
MURO DE CONTENCION
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
3,319.65
kg
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA MURO DE CONTENCION
685.58
m2
CONCRETO f'c=210 kg/cm2 PARA MUROS DE CONTENCION
108.78
m3
CURADO DEL CONCRETO CON ADITIVO
685.58
m2
MAMPOSTERIA

4.61
1.81
19.63
7.30
12.43
10.04
6.01
37.61
11.39
1.24

1.99
1.69
20.68
12.71
0.91
2.85

1.62
2,540.88

181.46
2.50
77.35
19.63
7.30
12.43

28.90
224.44
245.09
62.61

5.90
57.32
383.31
2.27
5.90
56.34
401.96
2.27
5.90
63.59
400.74
2.27
5.90
63.36
402.01
2.27

4,002.96
467.92
467.92
524.90
524.90
3,010.14
647.59
722.41
1,640.14
2,911.60
2,911.60
13,174.56
1,742.90
10,906.90
165.16
359.60
371.41
371.41
129.35
63.38
178.68
177.94
177.94
263.90
263.90
376.06
376.06
409,004.07
4,221.41
4,221.41
410.09
3,811.32
98,998.66
73,494.93
73,494.93
13,492.29
632.85
12,859.44
12,011.44
2,583.90
2,882.77
6,544.77
48,881.10
4,655.79
4,655.79
34,000.42
34,000.42
10,224.89
2,321.00
7,903.89
173,828.83
19,698.29
4,915.76
7,236.08
7,259.89
286.56
32,516.70
10,168.00
9,960.91
11,986.45
401.34
13,302.63
5,158.78
4,465.93
3,518.50
159.42
108,311.21
19,585.94
43,438.35
43,730.65
1,556.27
27,509.99

FORMATO 03A

AVANCE ANTERIOR ACUMULADO


CANTIDAD
-

MONTO
VALORIZADO

AVANCE ACTUAL

%
-

CANTIDAD
-

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ACUMULADO

MONTO
VALORIZADO

%
-

CANTIDAD
-

MONTO
VALORIZADO

SALDO POR EJECUTARSE


%

Moquegua
Mariscal Nieto
Cercado
Moquegua

CANTIDAD
-

101.50
290.00
32.99
98.96
131.95
290.00
290.00
290.00
14.50
290.00
65.00
37.50
8.64
14.00
290.00
131.95
253.14
1.50
405.02
253.14
166.25
131.63
394.90
526.53
161.10
151.49
9.47
126.24
833.18
126.24
18.94
126.24
1,723.39
176.80
29.82
176.80
874.37
70.23
8.78
70.23
3,319.65
685.58
108.78
685.58
-

MONTO
VALORIZADO
4,002.96
467.92
467.92
524.90
524.90
3,010.14
647.59
722.41
1,640.14
2,911.60
2,911.60
13,174.56
1,742.90
10,906.90
165.16
359.60
371.41
371.41
129.35
63.38
178.68
177.94
177.94
263.90
263.90
376.06
376.06
409,004.07
4,221.41
4,221.41
410.09
3,811.32
98,998.66
73,494.93
73,494.93
13,492.29
632.85
12,859.44
12,011.44
2,583.90
2,882.77
6,544.77
48,881.10
4,655.79
4,655.79
34,000.42
34,000.42
10,224.89
2,321.00
7,903.89
173,828.83
19,698.29
4,915.76
7,236.08
7,259.89
286.56
32,516.70
10,168.00
9,960.91
11,986.45
401.34
13,302.63
5,158.78
4,465.93
3,518.50
159.42
108,311.21
19,585.94
43,438.35
43,730.65
1,556.27
27,509.99

%
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal NietoRESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

CANTIDAD

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

04.05.01
04.06
04.06.01
04.06.02
04.06.03
04.07
04.07.01
04.07.02
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01

MURO DE SOGA LADRILLO KING KONG ARCILLA 14 X 24 X 9 CM. M 1:5, E=15


294.95
m2
REVOQUES Y ENLUCIDOS
I COMPONENTE: "Construccin"
TARRAJEO EN VIGAS C/MORTERO 1:5, E=1.5 CM.
70.23
m2
TARRAJEO EN COLUMNAS C/MORTERO 1:5, E=1.5 CM.
176.80
m2
TARRAJEO EXTERIOR CON MORTERO 1:5 X 1.5 cm (INCLUYE COLUMNAS m2
EMPOTRADAS)
589.89
CARPINTERIA METALICA
PUERTA METALICA DE INGRESO
2.00
u
CERCO METALICO
140.45
m
VARIOS
JUNTA DE CONSTRUCCION CON TEKNOPORT
42.75
m2
JUNTA DE DILATACION C/MICROPOROSO E=1"
17.10
m2
LIMPIEZA FINAL DE OBRA
253.14
m2
MITIGACION DEL IMPACTO AMBIENTAL
COMPACTACION DE MATERIAL EXCEDENTE Y READECUACION MORFOLOGICA
526.53
m3 DEL BOTADERO

01
1.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
1.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.02.12
01.02.13
1.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
1.04
01.04.01
01.04.02
01.04.03
1.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
01.05.06
01.05.07
1.06
01.06.01
01.06.02
01.06.03
01.06.04
01.06.05
01.06.06
01.06.07
01.06.08
01.06.09
01.06.10
01.06.11
01.06.12
01.06.13
1.07
01.07.01

INSTALACIONES ELECTRICAS
MOVIMIENTO DE TIERRAS
TRAZO Y NIVELACION Y REPLANTEO TOPOGRAFICO
529.00
m
EXCAVACION DE ZANJAS, BUZONES EN TERRENO NORMAL
73.30
m3
EXCAVACION DE HUECO PARA PUESTA A TIERRA
6.40
m3
RELLENO CONMATERIAL PROPIO SELECCIONADO
43.50
m3
EXCAVACION DE HUECO PARA INSTALACION DE POSTE METALICO TIPO PT-1
11.52
m3
EXCAVACION DE HUECO PARA INSTALACION DE POSTE METALICO ALUMBRADO
CANCHA
1.15
m3
SALIDA DE CIRCUITOS DERIVADOS
SALIDA DE TECHO CON C/TUBO PVC SAP 20 MM
369.00
pto
SALIDA DE PARED C/TUBO PVC SAP 20MM
36.00
pto
SALIDA PARA SPOT-LIGHT
128.00
pto
SALIDA DE LUZ DE EMERGENCIA
54.00
pto
INTERRUPTOR UNIPOLAR SIMPLE C/TUBO PVC SAP 20MM
79.00
pto
INTERRUPTOR UNIPOLAR DOBLE C/TUBO PVC SAP 20MM
9.00
pto
INTERRUPTOR UNIPOLAR TRIPLE C/TUBO PVC SAP 20MM
2.00
pto
INTERRUPTOR CONMUTACION SIMPLE C/TUBO PVC SAP 20MM
29.00
pto
INTERRUPTOR CONMUTACION DOBLE C/TUBO PVC SAP 20MM
5.00
pto
INTERRUPTOR CONMUTACION TRIPLE C/TUBO PVC SAP 20MM
2.00
pto
TOMACORRIENTE BIPOLAR DOBLE C/LINEA TIERRA 2-1X4MM2 THW-1X2.5/T
177.00
pto
TOMACORRIENTE BIPOLAR DOBLE PISO C/LINEA TIERRA 2-1X4MM2 THW-1X2.5/T
8.00
pto
TOMACORRIENTE TRIFASICO C/LINEA TIERRA 3-1X4MM2 THW-1X2.5/T
7.00
pto
BUZON, CANALIZACION Y/O TUBERIAS
TUBERIA PVC SAP (ELECTRICAS) D=65MM
92.50
m
TUBERIA PVC SAP (ELECTRICAS) D=50MM
246.70
m
TUBERIA PVC SAP (ELECTRICAS) D=35 MM
443.80
m
TUBERIA PVC SAP (ELECTRICAS) D=25MM
601.90
m
CINTA SEALIZADORA
150.00
m
BUZON ELECTRICO ARMADO DE 0.6X0.60M
12.00
u
CAJAS DE PASO
CAJA DE PASE 100 X 100 X 50 MM
16.00
u
CAJA DE PASE 150 X 150 X 100 MM
12.00
u
CAJA DE PASE 200 X 200 X 100 MM
10.00
u
ALIMENTADORES DE TABLEROS ELECTRICOS
ALIMENTADOR 3-1 X 35 mm2NYY-1X25mm2(N)
101.80
m
ALIMENTADOR 3-1 X 25 mm2NYY-1X16mm2(N)
206.70
m
ALIMENTADOR 3-1 X 16 mm2NYY-1X10mm2(N)-1X10mm2(T)
150.97
m
ALIMENTADOR 2-1 X 10 mm2THW-1X4mm2(T)
698.90
m
ALIMENTADOR 3-1 X 16 mm2THW-1X10mm2(N)-1X10mm2(T) TW
336.30
m
ALIMENTADOR 3-1 X 10 mm2THW-1X10mm2(N)-1X10mm2(T) TW
45.80
m
CABLE DE COBRE DESNUDO 1 X 25 mm2 TEMPLE BLANDO P/TIERRA
47.50
m
TABLEROS DE DISTRIBUCION
TABLERO GENERAL TG-100
1.00
u
TABLERO DE DISTRIBUCION TD-110
1.00
u
TABLERO DE DISTRIBUCION TD-120
1.00
u
SUBTABLERO DE DISTRIBUCION STD-101
1.00
u
SUBTABLERO DE DISTRIBUCION STD-102
1.00
u
TABLERO GENERAL TG-200
1.00
u
TABLERO DE DISTRIBUCION TD-210
1.00
u
TABLERO DE DISTRIBUCION TD-220
1.00
u
TABLERO DE DISTRIBUCION TD-230
1.00
u
TABLERO DE DISTRIBUCION TD-240
1.00
u
TABLERO GENERAL TG-300
1.00
u
TABLERO DE DISTRIBUCION TD-310
1.00
u
TABLERO DE DISTRIBUCION TD-320
1.00
u
ARTEFACTOS DE ILUMINACION
ARTEFACTO MODELO GALAXIE 2 X 26W-G1
55.00
u

93.27
46.38
40.23
35.86
2,600.00
110.25
14.33
59.21
0.91
2.85

7.15
33.67
68.63
53.01
68.63
68.63
86.84
99.40
99.40
109.42
78.68
101.70
124.72
85.44
175.72
175.72
129.07
1,483.39
159.85
20.24
21.42
8.77
11.81
1.14
296.77
25.98
31.85
37.35
76.92
78.40
72.64
13.61
39.53
23.75
15.10
3,689.21
1,451.97
1,751.97
1,123.49
1,123.49
3,072.21
1,751.97
1,751.97
1,751.97
2,451.97
3,072.21
1,751.97
2,451.97
293.39

27,509.99
31,523.39
3,257.27
7,112.66
21,153.46
20,684.61
5,200.00
15,484.61
1,855.46
612.61
1,012.49
230.36
1,500.61
1,500.61
547,244.00
9,865.07
3,782.35
2,468.01
439.23
2,305.94
790.62
78.92
101,173.96
32,043.96
3,578.40
12,723.20
5,908.68
6,215.72
915.30
249.44
2,477.76
878.60
351.44
22,845.39
11,867.12
1,118.95
21,889.32
1,872.20
5,284.31
3,892.13
7,108.44
171.00
3,561.24
1,171.38
415.68
382.20
373.50
59,613.17
7,830.46
16,205.28
10,966.46
9,512.03
13,293.94
1,087.75
717.25
27,196.37
3,689.21
1,451.97
1,751.97
1,123.49
1,123.49
3,072.21
1,751.97
1,751.97
1,751.97
2,451.97
3,072.21
1,751.97
2,451.97
142,605.67
16,136.45

FORMATO 03A

AVANCE ANTERIOR ACUMULADO


CANTIDAD
46.00
24.00
9.00
2.00
-

MONTO
VALORIZADO

AVANCE ACTUAL

%
-

3,994.64
2,385.60
894.60
51.96
-

CANTIDAD
-

12.47
66.67
7.03
12.50
-

AVANCE ACUMULADO

MONTO
VALORIZADO

%
-

3.00
3.00

17.00
23.00
2.00

17.00
17.00
17.00

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

4,610.60
260.04
101.01
159.03
3,981.32
1,476.28
2,286.20
218.84
369.24
149.09
200.77
19.38
-

CANTIDAD
-

0.84
2.64
4.09
6.90
3.94
4.61
63.89
3.70
1.69
3.83
2.82
11.33
-

3.00
3.00
63.00
47.00
9.00
2.00
17.00
17.00
17.00
2.00
-

MONTO
VALORIZADO

SALDO POR EJECUTARSE


%

4,610.60
260.04
101.01
159.03
3,981.32
5,470.92
4,671.80
894.60
218.84
369.24
149.09
200.77
19.38
51.96
-

Moquegua
Mariscal Nieto
Cercado
Moquegua

CANTIDAD
-

0.84
2.64
4.09
6.90
3.94
17.07
130.56
7.03
3.70
1.69
3.83
2.82
11.33
12.50
-

MONTO
VALORIZADO

294.95
70.23
176.80
589.89
2.00
140.45
42.75
17.10
253.14
526.53

27,509.99
31,523.39
3,257.27
7,112.66
21,153.46
20,684.61
5,200.00
15,484.61
1,855.46
612.61
1,012.49
230.36
1,500.61
1,500.61

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

529.00
70.30
6.40
40.50
11.52
1.15
306.00
(11.00)
119.00
52.00
79.00
9.00
2.00
29.00
5.00
2.00
177.00
8.00
7.00
92.50
246.70
426.80
584.90
133.00
12.00
14.00
12.00
10.00
101.80
206.70
150.97
698.90
336.30
45.80
47.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
55.00

542,633.40
9,605.03
3,782.35
2,367.00
439.23
2,146.91
790.62
78.92
97,192.64
26,573.04
(1,093.40)
11,828.60
5,689.84
6,215.72
915.30
249.44
2,477.76
878.60
351.44
22,845.39
11,867.12
1,118.95
21,520.08
1,872.20
5,284.31
3,743.04
6,907.67
151.62
3,561.24
1,171.38
363.72
382.20
373.50
59,613.17
7,830.46
16,205.28
10,966.46
9,512.03
13,293.94
1,087.75
717.25
27,196.37
3,689.21
1,451.97
1,751.97
1,123.49
1,123.49
3,072.21
1,751.97
1,751.97
1,751.97
2,451.97
3,072.21
1,751.97
2,451.97
142,605.67
16,136.45

99.16
97.36
100.00
95.91
100.00
93.10
100.00
100.00
96.06
82.93
(30.56)
92.97
96.30
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
98.31
100.00
100.00
96.17
97.18
88.67
100.00
100.00
87.50
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal NietoRESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM
01.07.02
01.07.03
01.07.04
01.07.05
01.07.06
01.07.07
01.07.08
01.07.09
01.07.10
01.07.11
01.07.12
01.07.13
1.08
01.08.01
01.08.02
1.09
01.09.01
1.10
01.10.01
1.11
01.11.01

02
2.01
02.01.01
2.02
02.02.01
2.03
02.03.01
02.03.02
02.03.03
02.03.04
2.04
02.04.01
02.04.01.01
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
02.04.02.04
02.04.02.05
02.04.02.06
02.04.02.07
02.04.02.08
02.04.03
02.04.03.01
2.05
02.05.01
2.06
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05
02.06.06
02.06.07
02.06.08
02.06.09
2.07
02.07.01
02.07.02
02.07.03
02.07.04

03
3.01
03.01.01
03.01.02

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES


ARTEFACTO FLUORESCENTE REGILLA MODELO RAS-A 2X36W
ARTEFACTO FLUORESCENTE REGILLA MODELO RAS-A 2X18W
I COMPONENTE: "Construccin"
ARTEFACTO FLUORESCENTE REGILLA MODELO RBL-A 4X18W
ARTEFACTO FLUORESCENTE REGILLA MODELO RBL-E 4X18W
BRAQUETE MOD. PTI 2 X 18W TITANIUM P/ADOSAR NC.LUMINARIA
ARTEFACTO ALPHA SPOT DE 2X26W
ARTEFACTO SPOT LIGH FBS261 1xPL-C/2P18W M (EMPOTRABLE)
INSTALACION DE LUCES DE EMERGENCIA
ARTEFACTO LUZ DE GUARDIA LGV 1TC-S 9W (EMPOTRADO EN PARED)
ARTEFACTO MODELO E-35 C/LAMP. VAPOR DE SODIO DE 70W
INSTALACION DE BRAQUETE TIPO BRAZO P/FAROLA E-35
ARTEFACTO REFLECTOR SWF-400W-TEMPO
POSTES DE C.A.C Y METALICOS
POSTE METALICO TIPO 1 DE 8M
POSTE METALICO TIPO P1 DE 6M
SISTEMA DE PUESTA A TIERRA
POZO DE PUESTA A TIERRA
INSTALACIONES MECANICAS
SUMINISTRO Y MONTAJE DE ASCENSOR ELECTROMECANICO
PRUEBA Y ENERGIZACIN
PRUEBA Y ENERGIZACIN

UND

CANTIDAD

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

u
u
u
u
u
u
u
u
u
u
u
u

152.00
32.00
15.00
36.00
26.00
112.00
21.00
54.00
10.00
112.00
10.00
8.00

201.39
191.39
341.39
341.39
151.39
186.39
186.39
170.94
91.39
256.39
149.51
405.14

u
u

4.00
51.00

1,083.78
1,008.70

II COMPONENTE: "Implementacin"

727,611.90

IMPLEMENTACION
EQUIPAMIENTO AMBIENTES DE ALOJAMIENTO
AMBIENTES DE ALOJAMIENTO
1.00
u
EQUIPAMIENTO SALON DE JUEGOS
SALON DE JUEGOS
1.00
u
EQUIPAMIENTO DE TALLERES
TALLER N 01 DE PANADERIA Y PASTELERIA
1.00
u
TALLER N 02 DE CONFECCION (ROPA)
1.00
u
TALLER N 03 DE TAPICERIA
1.00
u
TALLER N 04 DE HELADERIA
1.00
u
EQUIPAMIENTO DE AUDITORIO
AUDITORIO
AUDITORIO
1.00
u
FUENTES DE AUDIO (AUDITORIO)
FUENTES DE SEAL, PROCESO Y MONITORAJE DE CABINA CONTROL (SALA
u PRINCIPAL)1.00
PACK DE MICROFONIA ALAMBRICA (GENERAL)
1.00
u
PACK DE MICROFONIA INALAMBRICA (SALA PRINCIPAL)
1.00
u
PROYECCION DE SONIDO (AUDITORIO)
1.00
u
SISTEMA DE REFUERZO O RETARDO
1.00
u
SISTEMA DE FRONT - FILL
1.00
u
SISTEMA DE SUBGRAVES
1.00
u
SISTEMA DE PROCESADO
1.00
u
PROYECCION VIDEO Y MULTIMEDIA (AUDITORIO)
PROYECCION GIGANTE
1.00
u
EQUIPAMIENTO DE AREAS DE RECREACION
AREAS DE RECREACION
1.00
u
EQUIPAMIENTO DE AREAS DE SERVICIOS COMPLEMENTARIOS
COMERDOR
1.00
u
COCINA
1.00
u
SERVICIOS HIGIENICOS
1.00
u
VESTIDOR DE SERVICIO
1.00
u
DEPOSITO
1.00
u
LAVANDERIA
1.00
u
CUARTO DE BASURA
1.00
u
CUARTO DE LIMPIEZA
1.00
u
CUARTO DE EMERGENCIA
1.00
u
EQUIPAMIENTO DE AREA ADMINISTRATIVA
SALA DE ESPERA
1.00
u
ADMINISTRACION
1.00
u
SECRETARIA
1.00
u
CONTABILIDAD
1.00
u

727,611.90
75,719.90
75,719.90
15,014.40
15,014.40
287,179.30
97,467.30
85,768.00
26,975.50
76,968.50
197,161.90
51,700.00
51,700.00
92,528.80
9,367.80
16,153.90
16,202.30
12,814.80
6,407.40
15,534.60
10,031.60
6,016.40
52,933.10
52,933.10
5,617.90
5,617.90
126,231.50
21,251.50
25,501.20
23,199.00
4,978.00
3,435.60
17,963.60
2,190.00
21,097.60
6,615.00
20,687.00
4,588.00
3,693.00
8,377.00
4,029.00

III COMPONENTE: "Desarrollo de Capacidades"

674,600.00

DESARROLLO DE CAPACIDADES
CAPACITACION ASISTENCIA TECNICA
MODULO DE DESARROLLO DE HABILIDADES PARA LA VIDA
MODULO DE DESARROLLO DE HABILIDADES DEPORTIVAS

674,600.00
674,600.00
262,500.00
86,000.00

4.00

913.03

1.00

117,379.88

glb

3.00

2,306.08

mes
mes

3.00
4.00

75,719.90
15,014.40
97,467.30
85,768.00
26,975.50
76,968.50

51,700.00
9,367.80
16,153.90
16,202.30
12,814.80
6,407.40
15,534.60
10,031.60
6,016.40
52,933.10
5,617.90
21,251.50
25,501.20
23,199.00
4,978.00
3,435.60
17,963.60
2,190.00
21,097.60
6,615.00
4,588.00
3,693.00
8,377.00
4,029.00

87,500.00
21,500.00

MONTO
VALORIZADO

AVANCE ACTUAL

%
-

CANTIDAD

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ANTERIOR ACUMULADO


CANTIDAD

30,611.28
6,124.48
5,120.85
12,290.04
3,936.14
20,875.68
3,914.19
9,230.76
913.90
28,715.68
1,495.10
3,241.12
55,778.82
4,335.12
51,443.70
3,652.12
3,652.12
117,379.88
117,379.88
6,918.24
6,918.24

glb

FORMATO 03A

AVANCE ACUMULADO

MONTO
VALORIZADO

CANTIDAD

MONTO
VALORIZADO

SALDO POR EJECUTARSE


%

Moquegua
Mariscal Nieto
Cercado
Moquegua

MONTO
VALORIZADO

CANTIDAD

152.00
32.00
15.00
36.00
26.00
112.00
21.00
54.00
10.00
112.00
10.00
8.00
4.00
51.00
4.00
1.00
3.00

30,611.28
6,124.48
5,120.85
12,290.04
3,936.14
20,875.68
3,914.19
9,230.76
913.90
28,715.68
1,495.10
3,241.12
55,778.82
4,335.12
51,443.70
3,652.12
3,652.12
117,379.88
117,379.88
6,918.24
6,918.24

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

727,611.90

100.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

727,611.90
75,719.90
75,719.90
15,014.40
15,014.40
287,179.30
97,467.30
85,768.00
26,975.50
76,968.50
197,161.90
51,700.00
51,700.00
92,528.80
9,367.80
16,153.90
16,202.30
12,814.80
6,407.40
15,534.60
10,031.60
6,016.40
52,933.10
52,933.10
5,617.90
5,617.90
126,231.50
21,251.50
25,501.20
23,199.00
4,978.00
3,435.60
17,963.60
2,190.00
21,097.60
6,615.00
20,687.00
4,588.00
3,693.00
8,377.00
4,029.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

674,600.00

100.00

3.00
4.00

674,600.00
674,600.00
262,500.00
86,000.00

100.00
100.00
100.00
100.00

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal NietoRESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.01.08

04
4.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES


MODULO DE CAPACITACIN TALLER DE PANADERA Y PASTELERIA
MODULO DE CAPACITACIN DE ANLISIS DE NECESIDADES
I COMPONENTE: "Construccin"
MODULO DE CAPACITACIN DE EVENTOS ESPECIALES
MODULO DE CAPACITACIN DE TALLER DE CONFECCION DE ROPA
MODULO DE CAPACITACIN DE TALLER DE HELADERIA
MODULO DE CAPACITACIN DE TALLER DE TAPICERIA

UND

CANTIDAD

mes
mes
mes
mes
mes
mes

3.00
3.00
2.00
3.00
2.00
2.00

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

IV COMPONENTE: "Sensibilizacin"

307,830.00

SENSIBILIZACION
DESARROLLO Y EMISIN DE LOS MENSAJES
ELABORACION DE MATERIAL GRAFICO, SPOT RADIALES Y SPOT TELEVISIVOS
glb
DIFUSION DE SPOT RADIAL
u
DIFUSION DE MICRONOTICIERO RADIAL
u
DIFUSION DE SPOT Y MICRONOTICIERO TELEVISIVO
u
PUBLICIDAD IMPRESA EN MEDIOS ESCRITOS
u

307,830.00
307,830.00
67,450.00
147,600.00
14,000.00
67,680.00
11,100.00

67,450.00
36,900.00
3,500.00
33,840.00
3,700.00

EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO

Avance
COSTO
PARCIAL

(%) SEGN
EXPEDIENTE
TECNICO

MONTOS APROBADO SEGN


EXPEDIENTE TECNICO

MONTO
VALORIZADO

AVANCE ACTUAL

%
-

CANTIDAD

S/.

AVANCE ACUMULADO

MONTO
VALORIZADO

CANTIDAD

Acumulado Anterior

Acumulado Actual
%

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ANTERIOR ACUMULADO


CANTIDAD

67,500.00
66,000.00
45,000.00
63,600.00
42,400.00
41,600.00

1.00
4.00
4.00
2.00
3.00

22,500.00
22,000.00
22,500.00
21,200.00
21,200.00
20,800.00

FORMATO 03A

S/.

MONTO
VALORIZADO

SALDO POR EJECUTARSE


%

MONTO
VALORIZADO

CANTIDAD

3.00
3.00
2.00
3.00
2.00
2.00

67,500.00
66,000.00
45,000.00
63,600.00
42,400.00
41,600.00

100.00
100.00
100.00
100.00
100.00
100.00

307,830.00

100.00

1.00
4.00
4.00
2.00
3.00

307,830.00
307,830.00
67,450.00
147,600.00
14,000.00
67,680.00
11,100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00

Acumulado
S/.

Moquegua
Mariscal Nieto
Cercado
Moquegua

SALDO
%

S/.

8,001,958.94

760,217.14

9.50

103,969.51

1.30

1,522,658.47

19.03

6,479,300.47

80.97

12.00
4.00
4.00
2.00
100.00

960,235.07
320,078.36
320,078.36
160,039.18
1,760,430.97

70,337.15
248,703.79
66,352.18
385,393.12

0.88
3.11
0.83
21.89

12,476.34
4,158.78
4,158.78
2,079.39
22,873.29

0.16
0.05
0.05
0.01
1.30

82,813.49
252,862.57
70,510.96
2,079.39
408,266.41

1.03
3.16
0.88
0.01
23.19

877,421.58
67,215.79
249,567.40
157,959.79
1,352,164.56

10.97
0.84
3.12
1.97
76.81

100.00

9,762,389.91

1,145,610.26

11.73

126,842.80

1.30

1,930,924.88

19.78

7,831,465.02

80.22

Avance
DIRECCI
Gastos Generales 12%
Gastos de Adminsitracin 4%
Gastos de Supervisin 4%
Gastos de Liquidaciones 2%
PARCIAL
TOTAL

CONSTRUCCION DE LA INFRAESTRUCTURA
OBRAS PROVISIONALES
CONSTRUCCIONES PROVISIONALES
OBRAS PRELIMINARES
TRANSPORTE DE EQUIPO Y HERRAMIENTAS

mes
MOVILIZACION Y DESMOVILIZACION DE MATERIALES, HERRAMIENTAS Y EQUIPOS EN OBRA

0.77

MOVIMIENTO DE TIERRAS
CORTE Y EXCAVACIONES
EXCAVACION DE ZANJA EN TERRENO SEMIDURO C/EQUIPO

m3

406.00

m3

7.26

m3

362.00

m2

82.20

m3

50.95

kg
m2
m3

1,539.59
37.70
60.84

kg
m2
m3
m2

6,980.00
52.15
6.06
52.15

m2
m3
m2

21.40
1.45
21.40

kg
m2

824.00
133.76

kg

1,559.00

kg
m2
m3
u
u
m2

1,421.00
315.00
81.00
1,858.00
880.00
461.00

m2

39.24

NIVELACION Y RELLENO
RELLENO Y COMPACTACION CON MATERIAL PRESTAMO
ACARREO Y ELIMINACION
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=50m. (MANUAL)
OBRAS DE CONCRETO SIMPLE
SOLADO
SOLADOS CONCRETO f'c=100 kg/cm2 h=4"
CIMIENTO CORRIDO
CONCRETO 1:10 + 30% DE PG EN CIMIENTOS CORRIDOS
ZAPATAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA ZAPATAS
CONCRETO f'c=210 kg/cm2 PARA ZAPATAS
COLUMNAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS
CONCRETO f'c=210 kg/cm2 PARA COLUMNAS
CURADO DEL CONCRETO CON ADITIVO
COLUMNETAS
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS
CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS
CURADO DEL CONCRETO CON ADITIVO
VIGAS DE AMARRE
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE AMARRE
VIGAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
LOSAS ALIGERADAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS
LADRILLO DE ARCILLA HUECO 15X30X30 cm
LADRILLO DE ARCILLA HUECO 20X30X30 cm
CURADO DEL CONCRETO CON ADITIVO
MAMPOSTERIA
MURO DE SOGA LADRILLO KING KONG ARCILLA 14 X 24 X 9 CM. M 1:5, E=15 cm.

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal Nieto RESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

CANTIDAD

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

FORMATO 03A

AVANCE ANTERIOR ACUMULADO


CANTIDAD

MONTO
VALORIZADO

AVANCE ACTUAL
CANTIDAD

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ACUMULADO

MONTO
VALORIZADO

CANTIDAD

MONTO
VALORIZADO

Moquegua
Mariscal Nieto
Cercado
Moquegua

SALDO POR EJECUTARSE


%

CANTIDAD

MONTO
VALORIZADO

I COMPONENTE: "Construccin"
#REF!
01
01.01
01.01.01
01.01.01.01
01.01.01.01.01
01.01.01.01.02
01.01.01.01.03
01.01.01.01.04
01.01.01.01.05
01.01.01.01.06
01.01.01.01.07
01.01.02
01.01.02.01
01.01.02.01.01
01.01.02.02
01.01.02.02.01
01.01.02.02.02
01.01.03
01.01.03.01
01.01.03.01.01
01.01.03.01.02
01.01.03.01.03
01.01.03.01.04
01.01.03.01.05
01.01.03.01.06
01.01.03.02
01.01.03.02.01
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.04
01.01.05
01.01.05.01
01.01.05.01.01
01.01.05.01.02
01.01.05.02
01.01.05.02.01
01.01.05.02.02
01.01.05.03
01.01.05.03.01
01.01.05.03.02
01.01.06
01.01.06.01
01.01.06.02
01.01.06.03
01.01.06.04
01.01.07
01.01.07.01
01.01.07.01.01
01.01.07.01.02
01.01.07.01.03
01.01.07.01.04
01.01.07.02
01.01.07.02.01
01.01.07.02.02
01.01.07.02.03

COMPONENTE N 01 - CONSTRUCCION DE INFRAESTRUCTURA


CONSTRUCCION DEL HOGAR REFUGIO
OBRAS PROVISIONALES
CONSTRUCCIONES PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
OFICINAS ADM. Y SUPERV. DE OBRA
ALMACEN DE OBRA
CASETA DE GUARDIANIA, VESTUARIOS Y COMEDOR PERSONAL
CERCO PROVISIONAL DE LA CONSTRUCCION
AGUA PARA LA CONSTRUCCION
INSTALACION PROVISIONAL DE SERVICIOS BASICOS
OBRAS PRELIMINARES
TRANSPORTE DE EQUIPO Y HERRAMIENTAS
MOVILIZACION Y DESMOVILIZACION DE MATERIALES, HERRAMIENTAS Y EQUIPOS EN OBRA
TRAZO, NIVELES Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO PRELIMINAR C/EQUIPO
TRAZO DURANTE LA EJECUCION DE LA OBRA
SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
DESARRROLLO DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
EQUIPOS DE PROTECCIN INDIVIDUAL
EQUIPOS DE PROTECCIN COLECTIVA
EXAMENES PRE OCUPACIONALES
SEALIZACIN TEMPORAL DE SEGURIDAD
CAPACITACIN EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO
RECURSOS ANTE EMERGENCIAS
DEMOLICION Y DESMONTAJE
DEMOLICION DE PISO DE CONCRETO E=0.15m.
DEMOLICION DE MURO DE ADOBE
DESMONTAJE DE MODULOS DE TRIPLAY
DESMONTAJE DE PUERTAS DE MADERA
MOVIMIENTO DE TIERRAS
CORTE Y EXCAVACIONES
CORTE EN TERRENO SEMIDURO C/EQUIPO
EXCAVACION DE ZANJA EN TERRENO SEMIDURO C/EQUIPO
NIVELACION Y RELLENO
REFINE Y COMPACTACION DE LA SUB RASANTE
RELLENO Y COMPACTACION CON MATERIAL GRANULAR E=0.20m.
ACARREO Y ELIMINACION
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=50m. (MANUAL)
ELIMINACION DE MATERIAL EXCEDENTE Y ESCOMBROS D=4KM (MAQUINARIA)
OBRAS DE CONCRETO SIMPLE
SOLADOS CONCRETO f'c=100 kg/cm2 h=4"
CONCRETO 1:10 + 30% DE PG EN CIMIENTOS CORRIDOS
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTO ARMADO
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA SOBRECIMIENTO
CONCRETO f'c=210 kg/cm2 PARA SOBRECIMIENTO
CURADO DEL CONCRETO CON ADITIVO
ZAPATAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA ZAPATAS
CONCRETO f'c=210 kg/cm2 PARA ZAPATAS

01.01.07.03

COLUMNAS

01.01.07.03.01
01.01.07.03.02
01.01.07.03.03
01.01.07.04
01.01.07.04.01
01.01.07.04.02
01.01.07.04.03
01.01.07.04.04
01.01.07.05

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60


ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS
CONCRETO f'c=210 kg/cm2 PARA COLUMNAS
PLACAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS
CONCRETO f'c=210 kg/cm2 PARA PLACAS
CURADO DEL CONCRETO CON ADITIVO
VIGAS

150.00
150.00
1.44
120.00
1.30
800.00
2.88
5,737.94
3,000.63
1,252.62
7.26
2,597.72
10,450.09
13,933.46
201.64
133.62
2.12
23.51
1,421.00
89.36
8.35
25.00
3,275.16
119.85
107.73
882.50
55.10
8.23
16.00
-

1,418,688.96

22.55

1,393,051.39
67,242.04
67,242.04
58,903.50
5,947.50
48.64
2,342.40
16,766.58
8,155.16
8,155.16
8,611.41
1,296.00
7,315.41
907,900.38
606,867.01
26,451.90
353,114.68
227,300.43
561.56
561.56
300,471.81
50,993.24
76,285.66
173,192.91
37,808.62
5,827.40
5,827.40
29,989.67
29,989.67
1,991.55
519.59
1,471.96
337,565.68
16,763.40
8,383.90
5,122.12
3,200.64
56.75
66,264.01
19,323.44
6,577.37
40,363.20
11,183.15
5,206.75
2,784.20
3,155.88
36.32
86,254.13

27.04
90.00
90.00
100.00
100.00
0.75
100.00
19.73
13.03
13.03
38.42
18.08
47.98
75.42
82.15
100.00
100.00
63.28
0.38
0.80
94.53
74.58
100.00
100.00
13.24
23.96
24.79
41.06
41.06
12.14
13.73
11.66
18.17
26.28
33.03
25.02
18.70
7.00
30.29
42.86
24.80
27.43
26.02
18.55
38.01
43.50
11.04
24.49

#REF!

1.00

190.56

0.26

132.00

12.10
6.61

1,046.50
82.55
7.69
82.55

11.20
7.84
700.31
25.36
4.78
25.36

#REF!
-

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

1.00
150.00
150.00
192.00
120.00
1.56
800.00
2.88
5,737.94
3,000.63
1,252.62
7.26
2,729.72
10,450.09
13,933.46
213.74
140.23
2.12
23.51
2,467.50
171.91
16.04
107.55
3,275.16
131.05
115.57
1,582.81
80.46
13.01
41.36
-

#REF!

#REF!

1,393,051.40
67,242.04
67,242.04
58,903.50
5,947.50
48.64
2,342.40
16,766.58
8,155.16
8,155.16
8,611.41
1,296.00
7,315.41
907,900.38
606,867.01
26,451.90
353,114.68
227,300.43
561.56
561.56
300,471.81
50,993.24
76,285.66
173,192.91
37,808.62
5,827.40
5,827.40
29,989.67
29,989.67
1,991.55
519.59
1,471.96
337,565.68
16,763.40
8,383.90
5,122.12
3,200.64
56.75
66,264.01
19,323.44
6,577.37
40,363.20
11,183.15
5,206.75
2,784.20
3,155.88
36.32
86,254.13

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#REF!
(1.00)
(150.00)
(150.00)
(192.00)
(120.00)
(1.56)
(800.00)
(2.88)
(5,737.94)
(3,000.63)
(1,252.62)
(7.26)
(2,729.72)
(10,450.09)
(13,933.46)
(213.74)
(140.23)
(2.12)
(23.51)
(2,467.50)
(171.91)
(16.04)
(107.55)
(3,275.16)
(131.05)
(115.57)
(1,582.81)
(80.46)
(13.01)
(41.36)
-

(1,393,051.40)
(67,242.04)
(67,242.04)
0.00
0.00
0.00
0.00
0.00
(16,766.58)
(8,155.16)
(8,155.16)
(8,611.41)
(1,296.00)
(7,315.41)
(907,900.38)
(606,867.01)
(26,451.90)
(353,114.68)
(227,300.43)
(561.56)
(561.56)
(300,471.81)
(50,993.24)
(76,285.66)
(173,192.91)
(37,808.62)
(5,827.40)
(5,827.40)
(29,989.67)
(29,989.67)
(1,991.55)
(519.59)
(1,471.96)
(337,565.68)
(16,763.40)
(8,383.90)
(5,122.12)
(3,200.64)
(56.75)
(66,264.01)
(19,323.44)
(6,577.37)
(40,363.20)
(11,183.15)
(5,206.75)
(2,784.20)
(3,155.88)
(36.32)
(86,254.13)

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal Nieto RESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM
01.01.07.05.01
01.01.07.05.02
01.01.07.05.03
01.01.07.06
01.01.07.06.01
01.01.07.06.02
01.01.07.06.03
01.01.07.06.04
01.01.07.06.05
01.01.07.07
01.01.07.07.01
01.01.07.07.02
01.01.07.07.03
01.01.07.08
01.01.07.08.01
01.01.07.08.02
01.01.07.08.03
01.01.07.08.04
01.01.07.09
01.01.07.09.01
01.01.07.09.02
01.01.07.09.03
01.01.08
01.01.08.01
01.01.08.02
01.01.09
01.01.09.01
01.01.09.02
01.01.09.03
01.01.09.04
01.01.10
01.01.10.01
01.01.10.02
01.01.10.03
01.01.10.04
01.01.10.05
01.01.11
01.01.11.01
01.01.11.02
01.01.11.03
01.01.12
01.01.12.01
01.01.12.02
01.01.12.03
01.01.13
01.01.13.01
01.01.13.02
01.01.13.03
01.01.14
01.01.14.01
01.01.14.02
01.01.14.03
01.01.15
01.01.15.01
01.01.15.02
01.01.15.03
01.01.16
01.01.16.01
01.01.16.02
01.01.16.03
01.01.16.04
01.01.17
01.01.17.01
01.01.17.01.01
01.01.17.01.02
01.01.17.01.03
01.01.17.02
01.01.17.02.01
01.01.17.02.02
01.01.17.03
01.01.17.03.01
01.01.17.03.02

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

CANTIDAD

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60


ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
I COMPONENTE: "Construccin"
CONCRETO f'c=210 kg/cm2 PARA VIGAS
LOSAS ALIGERADAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS
LADRILLO DE ARCILLA HUECO 15X30X30 cm
CURADO DEL CONCRETO CON ADITIVO
ESCALERAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS
CONCRETO f'c=210 kg/cm2 PARA ESCALERAS
RAMPAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA RAMPA
CONCRETO f'c=210 kg/cm2 PARA RAMPA
CURADO DEL CONCRETO CON ADITIVO
LOSAS MACIZAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS
CONCRETO f'c=210 kg/cm2 PARA LOSAS MACIZAS
MAMPOSTERIA
MURO DE SOGA LADRILLO KING KONG ARCILLA 14 X 24 X 9 CM. M 1:5, E=15 cm.
MURO DE CABEZA LADRILLO KING KONG ARCILLA 14 X 24 X 9 CM. M 1:5, E=25 cm.
REVOQUES Y ENLUCIDOS
TARRAJEO PRIMARIO, MORTERO C:A 1:5
TARRAJEO INTERIOR CON MORTERO 1:5 X1.5 cm
TARRAJEO EXTERIOR CON MORTERO 1:5 X 1.5 cm (INCLUYE COLUMNAS EMPOTRADAS)
TARRAJEO EN CIELO RASO E=1.5 CM; MEZCLA 1:4
PISOS
FALSO PISO DE 4" DE CONCRETO F'c=175 Kg/cm2
CONTRAPISO DE 40 mm
PISO DE CERAMICO 30X30CM. DE COLOR
PISO DE PORCELANATO ANTIDESLIZANTE COLOR 60X60 CM ALTO TRANSITO
PISO DE MADERA LAMINADO DE ALTO TRANSITO
ZOCALO Y CONTRAZOCALO
ZOCALO DE CERAMICA DE 20 X 30cm.
CONTRAZOCALO DE CERAMICO H=10cm.
CONTRAZOCALO MAD. CEDRO 3/4"x4" + RODON 3/4"
CARPINTERIA DE MADERA
PUERTAS DE MADERA TABLEROS REBAJADOS DE 4.5 mm DE CEDRO
PUERTA CONTRAPLACADA DE 45 mm TRIPLAY
VENTANA DE MADERA CEDRO
CARPINTERIA METALICA
BARANDA DE FIERRO EN LA RAMPA
BARANDA DE FIERRO EN EL PASADIZO
COLUMNAS METALICAS
CERRAJERIA
CERRADURA DOS GOLPES EN PUERTAS EXTERIORES
CERRADURA PARA INTERIORES TIPO PERILLA
BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"
PINTURA
PINTURAS LATEX EN EXTERIORES
PINTURAS LATEX EN INTERIORES
PINTURAS LATEX EN CIELO RASO
VIDRIOS, CRISTALES Y SIMILARES
BLOQUES DE VIDRIO DE 20cm x 20cm x 10cm
MAMPARA DE VIDRIO
VIDRIO TEMPLADO DE 8mm.
VIDRIOS SEMIDOBLES
INSTALACIONES SANITARIAS
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE EN PVC SAL 100mm
SALIDA DE DESAGUE EN PVC SAL 50mm
SALIDA DE VENTILACION EN PVC SAL 50mm
REDES DE DISTRIBUCIN DE DESAGUE
TUBERIA PVC SAL - 100mm
TUBERIA PVC SAL - 50mm
ACCESORIOS PARA REDES DE DESAGUE
CODO DE PVC SAL 2"X90
CODO PVC SAL 4"X90

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

FORMATO 03A

AVANCE ANTERIOR ACUMULADO


CANTIDAD
11,127.00
193.19
23.38
142.15
520.00
76.01
5.36
64.01
824.00
133.76
6,974.00
216.00
1,421.00
366.00
81.00
1,858.00
880.00
461.00
110.00
137.43
100.00
-

MONTO
VALORIZADO
65,649.30
10,884.32
9,397.82
322.68
10,018.24
3,068.00
4,833.48
1,971.46
145.30
13,049.05
4,861.60
8,187.45
54,882.04
41,146.60
13,735.44
72,182.06
8,383.90
21,700.14
32,562.81
5,443.94
3,044.80
1,046.47
6,969.60
6,969.60
25,768.10
12,818.10
12,950.00
-

%
143.81
9.44
13.92
6.75
7.25
6.23
7.19
10.17
6.05
23.77
24.97
34.37
22.91
24.37
39.36
15.07
8.11
13.05
26.25
11.70
9.39
16.43
10.88
38.36
10.16
5.50
63.52
-

AVANCE ACTUAL
CANTIDAD

130.32
9.90
130.32

580.00
19.50
3.61
19.50
80.00
2.16
0.16

2,521.00
65.17
4.62

71.00

6.06

155.35

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ACUMULADO

MONTO
VALORIZADO

%
-

68.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

CANTIDAD
11,127.00
323.51
33.28
272.47
1,100.00
95.51
8.97
83.51
904.00
135.92
0.16
9,495.00
281.17
4.62
1,421.00
437.00
81.00
1,858.00
880.00
461.00
6.06
110.00
292.78
100.00
-

MONTO
VALORIZADO
65,649.30
10,884.32
9,397.82
322.68
10,018.24
3,068.00
4,833.48
1,971.46
145.30
13,049.05
4,861.60
8,187.45
54,882.04
41,146.60
13,735.44
72,182.06
8,383.90
21,700.14
32,562.81
5,443.94
3,044.80
1,046.47
6,969.60
6,969.60
25,768.10
12,818.10
12,950.00
-

Moquegua
Mariscal Nieto
Cercado
Moquegua

SALDO POR EJECUTARSE


%
211.81
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

CANTIDAD
(11,127.00)
(323.51)
(33.28)
(272.47)
(1,100.00)
(95.51)
(8.97)
(83.51)
(904.00)
(135.92)
(0.16)
(9,495.00)
(281.17)
(4.62)
(1,421.00)
(437.00)
(81.00)
(1,858.00)
(880.00)
(461.00)
(6.06)
(110.00)
(292.78)
(100.00)
-

MONTO
VALORIZADO
(65,649.30)
(10,884.32)
(9,397.82)
(322.68)
(10,018.24)
(3,068.00)
(4,833.48)
(1,971.46)
(145.30)
(13,049.05)
(4,861.60)
(8,187.45)
(54,882.04)
(41,146.60)
(13,735.44)
(72,182.06)
(8,383.90)
(21,700.14)
(32,562.81)
(5,443.94)
(3,044.80)
(1,046.47)
(6,969.60)
(6,969.60)
(25,768.10)
(12,818.10)
(12,950.00)
-

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal Nieto RESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM
01.01.17.03.03
01.01.17.03.04
01.01.17.03.05
01.01.17.03.06
01.01.17.03.07
01.01.17.03.08
01.01.17.03.09
01.01.17.03.10
01.01.17.03.11
01.01.17.04
01.01.17.04.01
01.01.17.05
01.01.17.05.01
01.01.17.05.02
01.01.17.05.03
01.01.17.05.04
01.01.17.05.05
01.01.17.05.06
01.01.17.05.07
01.01.17.06
01.01.17.06.01
01.01.17.07
01.01.17.07.01
01.01.17.07.02
01.01.17.07.03
01.01.17.08
01.01.17.08.01
01.01.17.09
01.01.17.09.01
01.01.17.09.02
01.01.17.09.03
01.01.17.10
01.01.17.10.01
01.01.18
01.01.18.01
01.01.18.02
01.01.18.03
01.01.19
01.01.19.01
01.02
01.02.01
01.02.01.01
01.02.01.01.01
01.02.02
01.02.02.01
01.02.02.01.01
01.02.02.02
01.02.02.02.01
01.02.02.02.02
01.02.02.03
01.02.02.03.01
01.02.02.03.02
01.02.03
01.02.03.01
01.02.03.01.01
01.02.03.02
01.02.03.02.01
01.02.03.02.02
01.02.03.02.03
01.02.04
01.02.04.01
01.02.04.01.01
01.02.04.01.02
01.02.04.01.03
01.02.04.01.04
01.02.04.02
01.02.04.02.01
01.02.04.02.02
01.02.04.02.03
01.02.04.02.04
01.02.05
01.02.05.01

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

CANTIDAD

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

YEE PVC SAL DE 4"x4"


TEE PVC SAL 4"x 4"
I COMPONENTE: "Construccin"
CODO DE PVC SAL 2" X 45
YEE DE PVC SAL 2" X 2"
REDUCCION DE PVC SAL DE 4" A 2"
TRAMPA "P" DE PVC SAL PARA DESAGUE DE 2"
SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION
REGISTRO DE BRONCE 4" PROVISION Y COLOCACION
SOMBRERO PARA VENTILACION DE PVC DE 2"
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24"
APARATOS Y ACCESORIOS SANITARIOS
lNODORO DE LOSA VITRIFICADA
LAVATORIO DE SS.HH.
LAVATORIO DE COCINA
URINARIOS DE LOZA DE PICO
LLAVE MEZCLADORA PARA DUCHA C/ACCESORIOS
PAPELERA DE LOZA BLANCA DE 13 X 15 cm
TOALLERA CON SOPORTE DE LOSA Y BARRA PLASTICA COLOR BLANCO
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
REDES DE DISTRIBUCION DE AGUA FRIA
TUBERIA PVC SAP PRESION C-10 C/R. .1/2" X 5m
SUMINISTRO E INSTALACION DE CAJA DE CONCRETO PARA MEDIDOR DE AGUA (Incluye Marco y Tapa)
SUMINISTRO E INSTALACION DE CAJA DE CONCRETO PARA GRIFO DE RIEGO
REDES DE DISTRIBUCION DE AGUA CALIENTE
TUBERIA HIDRO 3 C-10 1/2"
ACCESORIOS PARA REDES DE AGUA
CODO PVC SAP 1/2"
TEE PVC SAP DE 1/2"
UNION UNIVERSAL PVC DE 1/2"
LLAVES Y VALVULAS
VALVULA DE COMPUERTA 1/2"
OBRAS COMPLEMENTARIAS
LIMPIEZA FINAL DE OBRA
DIVISION DE BAOS DE MELAMINE CON MARCOS DE ALUMINIO
THERMA ELECTRO SOLAR CAP. 1000 Lt. ACERO INOXIDABLE 3mm.
MITIGACION DEL IMPACTO AMBIENTAL
COMPACTACION DE MATERIAL EXCEDENTE Y READECUACION MORFOLOGICA DEL BOTADERO
CONSTRUCCION DEL CERCO PERIMETRICO
OBRAS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO PRELIMINAR C/EQUIPO
MOVIMIENTO DE TIERRAS
CORTE Y EXCAVACIONES
EXCAVACION DE ZANJA EN TERRENO SEMIDURO C/EQUIPO
NIVELACION Y RELLENO
REFINE Y COMPACTACION DE LA SUB RASANTE
RELLENO Y COMPACTACION CON MATERIAL PRESTAMO
ACARREO Y ELIMINACION
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=50m. (MANUAL)
ELIMINACION DE MATERIAL EXCEDENTE Y ESCOMBROS D=4KM (MAQUINARIA)
OBRAS DE CONCRETO SIMPLE
SOLADO
SOLADOS CONCRETO f'c=100 kg/cm2 h=4"
MURO DE CONTENCION
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA MURO DE CONTENCION
CONCRETO f'c=175 kg/cm2+25%P.M. - MURO DE CONTENCION
CURADO DEL CONCRETO CON ADITIVO
OBRAS DE CONCRETO ARMADO
COLUMNAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS
CONCRETO f'c=210 kg/cm2 PARA COLUMNAS
CURADO DEL CONCRETO CON ADITIVO
VIGAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
CONCRETO f'c=210 kg/cm2 PARA VIGAS
CURADO DEL CONCRETO CON ADITIVO
MAMPOSTERIA
MURO DE SOGA LADRILLO KING KONG ARCILLA 14 X 24 X 9 CM. M 1:5, E=15 cm.

FORMATO 03A

AVANCE ANTERIOR ACUMULADO


CANTIDAD
-

MONTO
VALORIZADO

AVANCE ACTUAL

%
-

CANTIDAD
-

6.00

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ACUMULADO

MONTO
VALORIZADO

%
-

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

CANTIDAD
6.00
-

MONTO
VALORIZADO

SALDO POR EJECUTARSE


%

Moquegua
Mariscal Nieto
Cercado
Moquegua

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

CANTIDAD
(6.00)
-

MONTO
VALORIZADO
-

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal Nieto RESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM
01.02.06
01.02.06.01
01.02.06.02
01.02.06.03
01.02.07
01.02.07.01
01.02.07.02
01.02.07.03
01.02.08
01.02.08.01
01.03
01.03.01
01.03.01.01
01.03.01.01.01
01.03.02
01.03.02.01
01.03.02.01.01
01.03.02.02
01.03.02.02.01
01.03.02.02.02
01.03.02.02.03
01.03.02.03
01.03.02.03.01
01.03.02.03.02
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.04
01.03.04.01
01.03.04.02
01.03.04.03
01.03.04.04
01.03.04.05
01.03.04.06
01.03.04.07
01.03.04.08
01.03.04.09
01.03.04.10
01.03.04.11
01.03.05
01.03.05.01
01.03.05.02
01.03.06
01.03.06.01
01.03.07
01.03.07.01
01.03.08
01.03.08.01
01.04
01.04.01
01.05
01.05.01
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

CANTIDAD

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

REVOQUES Y ENLUCIDOS
TARRAJEO EN COLUMNAS C/MORTERO 1:5, E=1.5 CM.
I COMPONENTE: "Construccin"
TARRAJEO EN VIGAS C/MORTERO 1:5, E=1.5 CM.
TARRAJEO DEL TIPO ESCARCHADO CON MORTERO 1:5
VARIOS
JUNTA DE CONSTRUCCION CON TEKNOPORT
JUNTA DE DILATACION C/MICROPOROSO E=1"
LIMPIEZA FINAL DE OBRA
MITIGACION DEL IMPACTO AMBIENTAL
COMPACTACION DE MATERIAL EXCEDENTE Y READECUACION MORFOLOGICA DEL BOTADERO
TRATAMIENTO DE AREA VERDE
OBRAS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
TRAZO, NIVELACION Y REPLANTEO PRELIMINAR C/EQUIPO
MOVIMIENTO DE TIERRAS
CORTE Y EXCAVACIONES
CORTE EN TERRENO SEMIDURO C/EQUIPO
NIVELACION Y RELLENO
REFINE Y COMPACTACION DE LA SUB RASANTE
RELLENO CON TIERRA DE CHACRA C/EQUIPO
RELLENO Y COMPACTACION CON MATERIAL GRANULAR E=0.20m.
ACARREO Y ELIMINACION
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=50m. (MANUAL)
ELIMINACION DE MATERIAL EXCEDENTE Y ESCOMBROS D=4KM (MAQUINARIA)
TRATAMIENTO DE AREA VERDE
PREPARACION DE TERRENO PARA COLOCACION DE GRASS
SUMINISTRO Y COLOCACION DE GRASS EN BLOQUE
PLANTONES
CAMINERIA
CAMINERIA - CONCRETO F`c=175Kg/cm2 C/ACABADO DE CEMENTO PULIDO Y GRAVILLA E=0.10m.
CAMINERIA - CONCRETO F`c=175Kg/cm2 C/ACABADO DE PIEDRA LAJA E=0.10m.
CAMINERIA - ADOQUIN DE CONCRETO DE COLORES
CAMINERIA - SARDINELES INVERTIDOS CONCRETO F`c=175Kg/cm2
CAMINERIA - ENCOFRADO Y DESENCOFRADO NORMAL
CAMINERIA - JUNTA DE DILATACION C/TECKNOPORT E=1", H=4"
CAMINERIA - JUNTA DE DILATACION C/ASFALTO E=1"
SARDINEL - CONCRETO f'c=140 kg/cm2+25%P.M.
SARDINEL - CONCRETO f'c=175 kg/cm2
SARDINEL - ENCOFRADO Y DESENCOFRADO CARAVISTA
CURADO DEL CONCRETO CON ADITIVO
REVOQUES Y ENLUCIDOS
CAMINERIA - SOLAQUEADO
SARDINEL - SOLAQUEADO
PINTURA
PINTADO DE SARDINEL
VARIOS
LIMPIEZA FINAL DE OBRA
MITIGACION DEL IMPACTO AMBIENTAL
COMPACTACION DE MATERIAL EXCEDENTE Y READECUACION MORFOLOGICA DEL BOTADERO
ESTUDIO DE IMPACTO AMBIENTAL
ESTUDIO DE IMPACTO AMBIENTAL
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS
COMPONENTE N 02 - IMPLEMENTACION Y EQUIPAMIENTO
EQUIPAMIENTO EN DORMITORIOS
EQUIPAMIENTO EN COCINA Y COMEDOR
EQUIPAMIENTO EN AREA DE ESPARCIMIENTO
EQUIPAMIENTO EN AREA DE ATENCION
EQUIPAMIENTO DE TALLER DE CONFECCION (ROPA)
EQUIPAMIENTO EN OFICINA
COMPONENTE N 03 - CAPACITACION
CAPACITACION DE PERSONAS CON VIOLENCIA FAMILIAR

FORMATO 03A

AVANCE ANTERIOR ACUMULADO


CANTIDAD
-

0.23
441.84
16.00
19.02
161.32
633.96
795.29
-

MONTO
VALORIZADO
25,637.57
586.36
586.36
586.36
25,051.21
7,371.13
2,036.88
1,882.88
3,451.37
17,680.07
3,166.71
4,627.91
9,885.45
-

%
16.11
11.54
3.19
6.87
100.00
8.59
100.00
76.34
100.00
94.08
-

AVANCE ACTUAL
CANTIDAD

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ACUMULADO

MONTO
VALORIZADO

%
-

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

CANTIDAD
0.23
441.84
16.00
19.02
161.32
633.96
795.29
-

MONTO
VALORIZADO

Moquegua
Mariscal Nieto
Cercado
Moquegua

SALDO POR EJECUTARSE


%

- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
25,637.57 #DIV/0!
586.36 #DIV/0!
586.36 #DIV/0!
- #DIV/0!
586.36 #DIV/0!
25,051.21 #DIV/0!
7,371.13 #DIV/0!
2,036.88 #DIV/0!
1,882.88 #DIV/0!
3,451.37 #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
17,680.07 #DIV/0!
3,166.71 #DIV/0!
4,627.91 #DIV/0!
9,885.45 #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!

CANTIDAD
(0.23)
(441.84)
(16.00)
(19.02)
(161.32)
(633.96)
(795.29)
-

MONTO
VALORIZADO
(25,637.57)
(586.36)
(586.36)
(586.36)
(25,051.21)
(7,371.13)
(2,036.88)
(1,882.88)
(3,451.37)
(17,680.07)
(3,166.71)
(4,627.91)
(9,885.45)
-

5.-

VALORIZACIN

DE

PROYECTO

MES: ENERO 2014


MUNICIPALIDAD PROVINCIAL
MARISCAL NIETO
:Creacin del Hogar Refugio Temporal para Victimas de Violencia Familiar en los Distritos de la Provincia Mariscal Nieto-moquegua"
PROYECTO
:Municipalidad Provincial Mariscal Nieto RESPONSABLE DEL PROYECTO
: Ing. Civil Edwin Efrain Mamani Arocutipa
ENTIDAD EJECUTORA
:Ejecucin Presupuestaria Directa
: Arq. Gladys L. Ramirez Charres
MODALIDAD DE EJECUCION
INSPECTOR DE OBRA
:0100
SECUENCIA FUNCIONAL
EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO
ITEM

COMPONENTES/ ACTIVIDADES/ SUB-ACTIVIDADES

UND

CANTIDAD

COSTO
COSTO PARCIAL
UNITARIO (S/.)
(S/.)

I COMPONENTE: "Construccin"

EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO

Avance
COSTO
PARCIAL

MONTOS APROBADO SEGN


EXPEDIENTE TECNICO

#REF!

MONTO
VALORIZADO

AVANCE ACTUAL

%
-

CANTIDAD

AVANCE ACUMULADO

MONTO
VALORIZADO

CANTIDAD

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Acumulado Anterior
S/.

Acumulado Actual
%

760,217.14

S/.

#REF!

:
:
:
:

REGION
PROVINCIA
SECTOR
LOCALIDAD

F. INICIO
F.TERMINO

AVANCE ANTERIOR ACUMULADO


CANTIDAD
-

(%) SEGN
EXPEDIENTE
TECNICO

FORMATO 03A

MONTO
VALORIZADO

SALDO POR EJECUTARSE


%

MONTO
VALORIZADO

CANTIDAD

- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
-

Moquegua
Mariscal Nieto
Cercado
Moquegua

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Acumulado
%

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

S/.

SALDO
%

#REF!

S/.

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

Avance
DIRECCIN
Gastos Generales 12%
Gastos de Adminsitracin 4%
Gastos de Supervisin 4%
Gastos de Liquidaciones 2%
PARCIAL C.I. TOTAL (S/.)

12.00
4.00
4.00
2.00
100.00
100.00

960,235.07
320,078.36
320,078.36
160,039.18
1,760,430.97
#REF!

70,337.15
248,703.79
66,352.18
385,393.12
1,145,610.26

0.88
3.11
0.83
21.89
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

ECUTARSE
%

#REF!
#DIV/0!

0.00
0.00
0.00
0.00
0.00

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

ECUTARSE
%
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

ECUTARSE
%
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

ECUTARSE
%

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!

ECUTARSE
%

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

O
%

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

ITEM

PARTIDA

01
01.01
01.01.01
01.01.01.01
01.01.01.04
01.01.01.05
01.02
01.02.01
01.02.01.01
01.03
01.03.03
01.03.03.01
01.04
01.04.01
01.04.01.02
01.04.02
01.04.02.01
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.01.03
01.05.01.04
01.05.02
01.05.02.02
01.05.02.03
01.05.03
01.05.03.01
01.05.03.02
01.05.03.03
01.05.03.04
01.05.04
01.05.04.02
01.05.04.03
01.05.04.04
01.05.06
01.05.06.01
01.05.06.02
01.05.06.03
01.05.06.04
01.05.07
01.05.07.01
01.05.07.02
01.05.07.03
01.05.08
01.05.08.01
01.05.08.02
01.05.08.03
01.05.09
01.05.09.02
01.05.10
01.05.10.03
01.06
01.06.01

CONSTRUCCION DE LA INFRAESTRUCTURA
OBRAS PROVISIONALES
CONSTRUCCIONES PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
CASETA DE GUARDIANIA, VESTUARIOS Y COMEDOR PERSONAL
CERCO PROVISIONAL DE LA CONSTRUCCION
OBRAS PRELIMINARES
TRANSPORTE DE EQUIPO Y HERRAMIENTAS
MOVILIZACION Y DESMOVILIZACION DE MATERIALES, HERRAMIENTAS Y EQUIPOS EN OBRA
MOVIMIENTO DE TIERRAS
ACARREO Y ELIMINACION
ACARREO DE MATERIAL EXCEDENTE Y ESCOMBROS D=50m. (MANUAL)
OBRAS DE CONCRETO SIMPLE
SOLADO
SOLADOS CONCRETO f'c=100 kg/cm2 h=4"
CIMIENTO CORRIDO
CONCRETO 1:10 + 30% DE PG EN CIMIENTOS CORRIDOS
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTO ARMADO
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA SOBRECIMIENTO
CONCRETO f'c=210 kg/cm2 PARA SOBRECIMIENTO
CURADO DEL CONCRETO CON ADITIVO
ZAPATAS
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA ZAPATAS
CONCRETO f'c=210 kg/cm2 PARA ZAPATAS
VIGAS DE CIMENTACION
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO CARAVISTA PARA VIGAS DE CIMENTACION
CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTACION
CURADO DEL CONCRETO CON ADITIVO
COLUMNAS
ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS
CONCRETO f'c=210 kg/cm2 PARA COLUMNAS
CURADO DEL CONCRETO CON ADITIVO
COLUMNETAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS
CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS
CURADO DEL CONCRETO CON ADITIVO
VIGAS DE AMARRE
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE AMARRE
CONCRETO f'c=175 kg/cm2 PARA VIGAS DE AMARRE
VIGAS
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
CONCRETO f'c=210 kg/cm2 PARA VIGAS
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
LOSAS MACIZAS
CONCRETO f'c=210 kg/cm2 PARA LOSAS MACIZAS
MAMPOSTERIA
MURO DE SOGA LADRILLO KING KONG ARCILLA 14 X 24 X 9 CM. M 1:5, E=15 cm.

01.18
01.18.01.03
01
1.01
01.01.01
01.01.02
01.01.03
01.01.04
1.02
01.02.01
01.02.02
01.02.03
01.02.04
1.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05

INSTALACIONES SANITARIAS
SALIDA DE VENTILACION EN PVC SAL 50mm
INSTALACIONES ELECTRICAS
MOVIMIENTO DE TIERRAS
TRAZO Y NIVELACION Y REPLANTEO TOPOGRAFICO
EXCAVACION DE ZANJAS, BUZONES EN TERRENO NORMAL
EXCAVACION DE HUECO PARA PUESTA A TIERRA
RELLENO CONMATERIAL PROPIO SELECCIONADO
SALIDA DE CIRCUITOS DERIVADOS
SALIDA DE TECHO CON C/TUBO PVC SAP 20 MM
SALIDA DE PARED C/TUBO PVC SAP 20MM
SALIDA PARA SPOT-LIGHT
SALIDA DE LUZ DE EMERGENCIA
BUZON, CANALIZACION Y/O TUBERIAS
TUBERIA PVC SAP (ELECTRICAS) D=65MM
TUBERIA PVC SAP (ELECTRICAS) D=50MM
TUBERIA PVC SAP (ELECTRICAS) D=35 MM
TUBERIA PVC SAP (ELECTRICAS) D=25MM
CINTA SEALIZADORA

METRADO

1.00
190.56

0.26

132.00

12.10
6.61

1046.50
82.55
7.69
82.55
11.20
7.84
700.31
25.36
4.78
25.36
130.32
9.90
130.32
580.00
19.50
3.61
19.50
80.00
2.16
0.16
2521.00
65.17
4.62
71.00
6.06
155.35

6.00

3.00
3.00
17.00
23.00
2.00

17.00
17.00
17.00