Вы находитесь на странице: 1из 159

BAGAN GOLDEN STAR HOTEL

Location: Nyaung Oo Road, Bagan City, Myanmar

DESIGN DEVELOPMENT REPORT

BAGANGOLDENSTARHOTELFOUNDATION&
SUPERSTRUCTUREREPORT

Ho Chi Minh City, 02-2014


By: Do Quoc Dung
Chan Phuong Engineering (CPE)
123 Nguyen Dinh Chieu Str District 3
Ho Chi Minh City Viet Nam
Tel: (84-8) 3930 1983/86
Fax: (84-8) 3930 1987

Project : Bagan Golden Star Hotel

Design Development Report

Contents

Page
Executive Summary

1.1

Introduction

1.2

Structure

Structural Design

2.1

Design Requirements

2.2

Structural System

14

Durability, Fire Resistance and Deflection

16

3.1

Durability

16

3.2

Fire Resistance

16

3.3

Deflection

17

Calculating reinforced steel

20

4.1

Calculating foundations

20

4.2

Calculating columns

26

4.3

Calculating beams

60

4.4

Calculating slabs

79

Appendices (analysis results from model Etabs)

Appendix A
Displacement data
Appendix B
Support reactions
Appendix C
Column forces
Appendix D
Beam forces

Page

87

90

105

142

Chan Phuong Engineering (CPE)

Page 2

Project : Bagan Golden Star Hotel

Design Development Report

Executive Summary
1.1

Introduction

Project description: 3 star hotel, intended capacity of 70 rooms with commercial areas.
Project location: Nyaung Oo Road, Bagan City, Myanmar.
Client: Myanmar Golden Star.
Main Architect: T3 Architecture Asia.
1.2

Structure

The structural design included in this report is based on the design criteria and functional
agreements as discussed during the design meetings between T3 Architecture Asia and CPE
Engineering in Ho Chi Minh City. The design is also based on the requirements of the British
Standards and relevant compulsory Myanmar Standards and Building Codes of Myanmar,
where appropriate. In areas where the consultant considers the requirement of the British
Standards are more stringent than that of the Myanmar standards then the former will be
applied.
The project comprises of 3 floors (the height of the building is approximately 12m) as per
Bagan regulation on Urbanism, including Ground Floor (Level 1 Floor), First Floor ( Level 2
Floor), Second Floor (Level 3 Floor) and Roof with GFA is approximately 4700m2.
Base on the data about geological which was supplied by owner, the suggested safe soil
bearing capacities is 1.30 Ton/Sq.Ft at 8 to 12 feet depths.

Chan Phuong Engineering (CPE)

Page 3

Project : Bagan Golden Star Hotel

Design Development Report

Structural Design
2.1

Design Requirements

2.1.1

Introduction

The design of the structural system will be in accordance with but not limited to the
requirements of the Building Code of Myanmar and British Standards.
2.1.2

Design Codes

The design of the proposed development will comply with the following code of practices:
Code of Practices

No.

Structural Use of Concrete

BS8110: 1985

Structural Use of Steel in Building

BS5950: 1990

Loadings for buildings Code of practice for dead and imposed loads

BS6399-1: 1996

Loadings for buildings Code of practice for wind loads

BS6399-2: 1993

Loadings for buildings Code of practice for imposed roof loads

BS6399-3: 1988

Uniform Building Code

UBC 97

Design of Structures for Earthquake Resistance. General rules, seismic


actions and rules for buildings

BS EN 1998-1: 2004
Eurocode 8

2.1.3

Design Information

These softwares was used for designing:


9

Etabs 9.7.0: used to analyze the overall structure and calculated the internal force
value of column, beam.

Safe 12.3.0: used to calculate the internal force value of foundation, slab.

All concrete is normal weight concrete, unit weight 24kN/m3.Scheduleofstructuralconcrete

28dayminimumcompressivecubestrength:
Pad foundations, trip foundations, raft foundations

Fc = 30 N/mm2

Retaining walls, R.C walls of tank

Fc = 30 N/mm2

Beams, columns, slabs, staircases

Fc = 30 N/mm2

Built-up slabs, architectural fill

Fc = 25 N/mm2

Lean concrete

Fc = 10 N/mm2

All reinforcing steel with unit weight 78.5kN/m3shallbenewbillet,hotrolled,deformedbars

conformingtoBS4449:2005withminimumyieldstrengthFy=390N/mm2.
AllstructuralsteelshallbeconformingtoBS14491.1:1991withminimumyieldstrengthFy
=248N/mm2.

Chan Phuong Engineering (CPE)

Page 4

Project : Bagan Golden Star Hotel


2.1.4

Design Development Report

Design Loads

2.1.4.1

Gravity Loads

All gravity loads are derived from the British standard: BS6399-1: 1996 and are listed below.
For those which are not covered in the local code, reference is made to relevant British
Standards.
(A) Construction Materials
Material

Density (kN/m3)

Steel

78.50

Reinforced Concrete

24.00

Brick wall

18.00

Soil

18.00

Water

10.00

(B) Super Imposed Dead Load


Category

Superimposed Dead Load (kN/m2)

Finishes (50mm)

1.0

Service suspended under slabs + ceiling


finishes

0.5

Partition

0.5

Brick wall 100mm THK

1.8

Brick wall 200mm THK

3.6

(C) Super Imposed Live Load


Area

Superimposed Live Load (kN/m2)

Kitchen, laundry

3.0

Restaurant

4.0

Cold room, storage room

7.5

Staircase

4.0

Lobby, corridor, couryard

4.0

Boutique, business center

4.0

Office

3.0

Toilet

2.0

Generator room, pump room

7.5

Residential

2.0

Fire command center & communication

3.0

Staff canteen

3.0

Rest room

2.0

Chan Phuong Engineering (CPE)

Page 5

Project : Bagan Golden Star Hotel

Design Development Report


Superimposed Live Load (kN/m2)

Area
Roof terrace

4.0

Cleaning and maintenance roof load

1.5

Water tank load on roof

10.0

2.1.4.2

Wind Loads

Not applicable.
2.1.4.3

Seismic Performance Requirement

SITE

SEISMIC

Town (City)

Country

Soil
Type

Scale MSK-64

Bagan

Myanmar

VIII (6.9 Richter Scale)

Response Spectrum Horizonal motion


S

TB(s)

TC(s)

TD(s)

Important Factor (Appendix F)

1.15

0.2

0.6

1.250

Peak ground acceleration type A: (Appnedix I) a(g)


Design Ground Acceration a (g)

Viscosity
(%):
5%
0.24
0.3

Design ground acceleration a: (m/s2)

2.943

Behaviour Factor q (Section 5.2.2.1):

3.900

Chan Phuong Engineering (CPE)

Page 6

Project : Bagan Golden Star Hotel

Design Development Report

Calculated
Period

For Period
between 0-B

For Period
between B-C

For Period
between C-D

For Period
between D-4s

Design Period T
for spectrum
(m/s2)

0.010

2.252

2.170

130.171

26034.231

2.252

0.020

2.248

2.170

65.086

6508.558

2.248

0.030

2.243

2.170

43.390

2892.692

2.243

0.040

2.239

2.170

32.543

1627.139

2.239

0.050

2.235

2.170

26.034

1041.369

2.235

0.060

2.230

2.170

21.695

723.173

2.230

0.070

2.226

2.170

18.596

531.311

2.226

0.080

2.222

2.170

16.271

406.785

2.222

0.090

2.217

2.170

14.463

321.410

2.217

0.100

2.213

2.170

13.017

260.342

2.213

0.110

2.209

2.170

11.834

215.159

2.209

0.120

2.204

2.170

10.848

180.793

2.204

0.130

2.200

2.170

10.013

154.049

2.200

0.140

2.196

2.170

9.298

132.828

2.196

0.150

2.191

2.170

8.678

115.708

2.191

0.160

2.187

2.170

8.136

101.696

2.187

0.170

2.183

2.170

7.657

90.084

2.183

0.180

2.178

2.170

7.232

80.353

2.178

0.190

2.174

2.170

6.851

72.117

2.174

0.200

2.170

2.170

6.509

65.086

2.170

0.210

2.165

2.170

6.199

59.035

2.170

0.220

2.161

2.170

5.917

53.790

2.170

0.230

2.157

2.170

5.660

49.214

2.170

0.240

2.152

2.170

5.424

45.198

2.170

0.250

2.148

2.170

5.207

41.655

2.170

0.260

2.143

2.170

5.007

38.512

2.170

0.270

2.139

2.170

4.821

35.712

2.170

0.280

2.135

2.170

4.649

33.207

2.170

0.290

2.130

2.170

4.489

30.956

2.170

0.300

2.126

2.170

4.339

28.927

2.170

0.310

2.122

2.170

4.199

27.091

2.170

0.320

2.117

2.170

4.068

25.424

2.170

0.330

2.113

2.170

3.945

23.907

2.170

0.340

2.109

2.170

3.829

22.521

2.170

0.350

2.104

2.170

3.719

21.252

2.170

0.360

2.100

2.170

3.616

20.088

2.170

0.370

2.096

2.170

3.518

19.017

2.170

0.380

2.091

2.170

3.426

18.029

2.170

0.390

2.087

2.170

3.338

17.117

2.170

0.400

2.083

2.170

3.254

16.271

2.170

Chan Phuong Engineering (CPE)

Page 7

Project : Bagan Golden Star Hotel

Design Development Report

Calculated
Period

For Period
between 0-B

For Period
between B-C

For Period
between C-D

For Period
between D-4s

Design Period T
for spectrum
(m/s2)

0.410

2.078

2.170

3.175

15.487

2.170

0.420

2.074

2.170

3.099

14.759

2.170

0.430

2.070

2.170

3.027

14.080

2.170

0.440

2.065

2.170

2.958

13.447

2.170

0.450

2.061

2.170

2.893

12.856

2.170

0.460

2.057

2.170

2.830

12.304

2.170

0.470

2.052

2.170

2.770

11.786

2.170

0.480

2.048

2.170

2.712

11.300

2.170

0.490

2.044

2.170

2.657

10.843

2.170

0.500

2.039

2.170

2.603

10.414

2.170

0.510

2.035

2.170

2.552

10.009

2.170

0.520

2.031

2.170

2.503

9.628

2.170

0.530

2.026

2.170

2.456

9.268

2.170

0.540

2.022

2.170

2.411

8.928

2.170

0.550

2.018

2.170

2.367

8.606

2.170

0.560

2.013

2.170

2.324

8.302

2.170

0.570

2.009

2.170

2.284

8.013

2.170

0.580

2.005

2.170

2.244

7.739

2.170

0.590

2.000

2.170

2.206

7.479

2.170

0.600

1.996

2.170

2.170

7.232

2.170

0.610

1.992

2.170

2.134

6.997

2.134

0.620

1.987

2.170

2.100

6.773

2.100

0.630

1.983

2.170

2.066

6.559

2.066

0.640

1.979

2.170

2.034

6.356

2.034

0.650

1.974

2.170

2.003

6.162

2.003

0.660

1.970

2.170

1.972

5.977

1.972

0.670

1.966

2.170

1.943

5.800

1.943

0.680

1.961

2.170

1.914

5.630

1.914

0.690

1.957

2.170

1.887

5.468

1.887

0.700

1.953

2.170

1.860

5.313

1.860

0.710

1.948

2.170

1.833

5.164

1.833

0.720

1.944

2.170

1.808

5.022

1.808

0.730

1.940

2.170

1.783

4.885

1.783

0.740

1.935

2.170

1.759

4.754

1.759

0.750

1.931

2.170

1.736

4.628

1.736

0.760

1.927

2.170

1.713

4.507

1.713

0.770

1.922

2.170

1.691

4.391

1.691

0.780

1.918

2.170

1.669

4.279

1.669

0.790

1.914

2.170

1.648

4.171

1.648

0.800

1.909

2.170

1.627

4.068

1.627

Chan Phuong Engineering (CPE)

Page 8

Project : Bagan Golden Star Hotel

Design Development Report

Calculated
Period

For Period
between 0-B

For Period
between B-C

For Period
between C-D

For Period
between D-4s

Design Period T
for spectrum
(m/s2)

0.810

1.905

2.170

1.607

3.968

1.607

0.820

1.900

2.170

1.587

3.872

1.587

0.830

1.896

2.170

1.568

3.779

1.568

0.840

1.892

2.170

1.550

3.690

1.550

0.850

1.887

2.170

1.531

3.603

1.531

0.860

1.883

2.170

1.514

3.520

1.514

0.870

1.879

2.170

1.496

3.440

1.496

0.880

1.874

2.170

1.479

3.362

1.479

0.890

1.870

2.170

1.463

3.287

1.463

0.900

1.866

2.170

1.446

3.214

1.446

0.910

1.861

2.170

1.430

3.144

1.430

0.920

1.857

2.170

1.415

3.076

1.415

0.930

1.853

2.170

1.400

3.010

1.400

0.940

1.848

2.170

1.385

2.946

1.385

0.950

1.844

2.170

1.370

2.885

1.370

0.960

1.840

2.170

1.356

2.825

1.356

0.970

1.835

2.170

1.342

2.767

1.342

0.980

1.831

2.170

1.328

2.711

1.328

0.990

1.827

2.170

1.315

2.656

1.315

1.000

1.822

2.170

1.302

2.603

1.302

1.010

1.818

2.170

1.289

2.552

1.289

1.020

1.814

2.170

1.276

2.502

1.276

1.030

1.809

2.170

1.264

2.454

1.264

1.040

1.805

2.170

1.252

2.407

1.252

1.050

1.801

2.170

1.240

2.361

1.240

1.060

1.796

2.170

1.228

2.317

1.228

1.070

1.792

2.170

1.217

2.274

1.217

1.080

1.788

2.170

1.205

2.232

1.205

1.090

1.783

2.170

1.194

2.191

1.194

1.100

1.779

2.170

1.183

2.152

1.183

1.110

1.775

2.170

1.173

2.113

1.173

1.120

1.770

2.170

1.162

2.075

1.162

1.130

1.766

2.170

1.152

2.039

1.152

1.140

1.762

2.170

1.142

2.003

1.142

1.150

1.757

2.170

1.132

1.969

1.132

1.160

1.753

2.170

1.122

1.935

1.122

1.170

1.749

2.170

1.113

1.902

1.113

1.180

1.744

2.170

1.103

1.870

1.103

1.190

1.740

2.170

1.094

1.838

1.094

1.200

1.736

2.170

1.085

1.808

1.085

Chan Phuong Engineering (CPE)

Page 9

Project : Bagan Golden Star Hotel

Design Development Report

Calculated
Period

For Period
between 0-B

For Period
between B-C

For Period
between C-D

For Period
between D-4s

Design Period T
for spectrum
(m/s2)

1.210

1.731

2.170

1.076

1.778

1.076

1.220

1.727

2.170

1.067

1.749

1.067

1.230

1.723

2.170

1.058

1.721

1.058

1.240

1.718

2.170

1.050

1.693

1.050

1.250

1.714

2.170

1.041

1.666

1.041

1.260

1.710

2.170

1.033

1.640

1.033

1.270

1.705

2.170

1.025

1.614

1.025

1.280

1.701

2.170

1.017

1.589

1.017

1.290

1.697

2.170

1.009

1.564

1.009

1.300

1.692

2.170

1.001

1.540

1.001

1.310

1.688

2.170

0.994

1.517

0.994

1.320

1.684

2.170

0.986

1.494

0.986

1.330

1.679

2.170

0.979

1.472

0.979

1.340

1.675

2.170

0.971

1.450

0.971

1.350

1.671

2.170

0.964

1.428

0.964

1.360

1.666

2.170

0.957

1.408

0.957

1.370

1.662

2.170

0.950

1.387

0.950

1.380

1.658

2.170

0.943

1.367

0.943

1.390

1.653

2.170

0.936

1.347

0.936

1.400

1.649

2.170

0.930

1.328

0.930

1.410

1.644

2.170

0.923

1.310

0.923

1.420

1.640

2.170

0.917

1.291

0.917

1.430

1.636

2.170

0.910

1.273

0.910

1.440

1.631

2.170

0.904

1.256

0.904

1.450

1.627

2.170

0.898

1.238

0.898

1.460

1.623

2.170

0.892

1.221

0.892

1.470

1.618

2.170

0.886

1.205

0.886

1.480

1.614

2.170

0.880

1.189

0.880

1.490

1.610

2.170

0.874

1.173

0.874

1.500

1.605

2.170

0.868

1.157

0.868

1.510

1.601

2.170

0.862

1.142

0.862

1.520

1.597

2.170

0.856

1.127

0.856

1.530

1.592

2.170

0.851

1.112

0.851

1.540

1.588

2.170

0.845

1.098

0.845

1.550

1.584

2.170

0.840

1.084

0.840

1.560

1.579

2.170

0.834

1.070

0.834

1.570

1.575

2.170

0.829

1.056

0.829

1.580

1.571

2.170

0.824

1.043

0.824

1.590

1.566

2.170

0.819

1.030

0.819

1.600

1.562

2.170

0.814

1.017

0.814

Chan Phuong Engineering (CPE)

Page 10

Project : Bagan Golden Star Hotel

Design Development Report

Calculated
Period

For Period
between 0-B

For Period
between B-C

For Period
between C-D

For Period
between D-4s

Design Period T
for spectrum
(m/s2)

1.610

1.558

2.170

0.809

1.004

0.809

1.620

1.553

2.170

0.804

0.992

0.804

1.630

1.549

2.170

0.799

0.980

0.799

1.640

1.545

2.170

0.794

0.968

0.794

1.650

1.540

2.170

0.789

0.956

0.789

1.660

1.536

2.170

0.784

0.945

0.784

1.670

1.532

2.170

0.779

0.933

0.779

1.680

1.527

2.170

0.775

0.922

0.775

1.690

1.523

2.170

0.770

0.912

0.770

1.700

1.519

2.170

0.766

0.901

0.766

1.710

1.514

2.170

0.761

0.890

0.761

1.720

1.510

2.170

0.757

0.880

0.757

1.730

1.506

2.170

0.752

0.870

0.752

1.740

1.501

2.170

0.748

0.860

0.748

1.750

1.497

2.170

0.744

0.850

0.744

1.760

1.493

2.170

0.740

0.840

0.740

1.770

1.488

2.170

0.735

0.831

0.735

1.780

1.484

2.170

0.731

0.822

0.731

1.790

1.480

2.170

0.727

0.813

0.727

1.800

1.475

2.170

0.723

0.804

0.723

1.810

1.471

2.170

0.719

0.795

0.719

1.820

1.467

2.170

0.715

0.786

0.715

1.830

1.462

2.170

0.711

0.777

0.711

1.840

1.458

2.170

0.707

0.769

0.707

1.850

1.454

2.170

0.704

0.761

0.704

1.860

1.449

2.170

0.700

0.753

0.700

1.870

1.445

2.170

0.696

0.744

0.696

1.880

1.441

2.170

0.692

0.737

0.692

1.890

1.436

2.170

0.689

0.729

0.689

1.900

1.432

2.170

0.685

0.721

0.685

1.910

1.428

2.170

0.682

0.714

0.682

1.920

1.423

2.170

0.678

0.706

0.678

1.930

1.419

2.170

0.674

0.699

0.674

1.940

1.415

2.170

0.671

0.692

0.671

1.950

1.410

2.170

0.668

0.685

0.668

1.960

1.406

2.170

0.664

0.678

0.664

1.970

1.402

2.170

0.661

0.671

0.661

1.980

1.397

2.170

0.657

0.664

0.657

1.990

1.393

2.170

0.654

0.657

0.654

2.000

1.388

2.170

0.651

0.651

0.651

Chan Phuong Engineering (CPE)

Page 11

Project : Bagan Golden Star Hotel

Design Development Report

Calculated
Period

For Period
between 0-B

For Period
between B-C

For Period
between C-D

For Period
between D-4s

Design Period T
for spectrum
(m/s2)

2.010

1.384

2.170

0.648

0.644

0.644

2.020

1.380

2.170

0.644

0.638

0.638

2.030

1.375

2.170

0.641

0.632

0.632

2.040

1.371

2.170

0.638

0.626

0.626

2.050

1.367

2.170

0.635

0.619

0.619

2.060

1.362

2.170

0.632

0.613

0.613

2.070

1.358

2.170

0.629

0.608

0.608

2.080

1.354

2.170

0.626

0.602

0.602

2.090

1.349

2.170

0.623

0.596

0.596

2.100

1.345

2.170

0.620

0.590

0.590

2.110

1.341

2.170

0.617

0.589

0.589

2.120

1.336

2.170

0.614

0.589

0.589

2.130

1.332

2.170

0.611

0.589

0.589

2.140

1.328

2.170

0.608

0.589

0.589

2.150

1.323

2.170

0.605

0.589

0.589

2.160

1.319

2.170

0.603

0.589

0.589

2.170

1.315

2.170

0.600

0.589

0.589

2.180

1.310

2.170

0.597

0.589

0.589

2.190

1.306

2.170

0.594

0.589

0.589

2.200

1.302

2.170

0.592

0.589

0.589

2.210

1.297

2.170

0.589

0.589

0.589

2.220

1.293

2.170

0.589

0.589

0.589

2.230

1.289

2.170

0.589

0.589

0.589

2.240

1.284

2.170

0.589

0.589

0.589

2.250

1.280

2.170

0.589

0.589

0.589

2.260

1.276

2.170

0.589

0.589

0.589

2.270

1.271

2.170

0.589

0.589

0.589

2.280

1.267

2.170

0.589

0.589

0.589

2.290

1.263

2.170

0.589

0.589

0.589

2.300

1.258

2.170

0.589

0.589

0.589

2.310

1.254

2.170

0.589

0.589

0.589

2.320

1.250

2.170

0.589

0.589

0.589

2.330

1.245

2.170

0.589

0.589

0.589

2.340

1.241

2.170

0.589

0.589

0.589

2.350

1.237

2.170

0.589

0.589

0.589

2.360

1.232

2.170

0.589

0.589

0.589

2.370

1.228

2.170

0.589

0.589

0.589

2.380

1.224

2.170

0.589

0.589

0.589

2.390

1.219

2.170

0.589

0.589

0.589

2.400

1.215

2.170

0.589

0.589

0.589

Chan Phuong Engineering (CPE)

Page 12

Project : Bagan Golden Star Hotel

Design Development Report

SUMMARY OF BASE SHEARS AND OVERTURNING MOMENTS


FOR SEISMIC CASES

Building
SEISMIC
Seismic X (X-direction)
Base Shear (kN)

8,528

Overturning Moment (kNm)

75,300

Seismic Y (Y-direction)
Base Shear (kN)

8,018

Overturning Moment (kNm)

70,050

Drift Limitations: (CL.16310.2 of UBC 1997) requires that:

M 0.020h
Where:

maximumInelasticResponseDisplacementand M = 0.7 R S
S designLevelResponseDisplacement
h storeyHeight
Below is the comparison table between storey drift taken from the dynamic analysis and
permissible value for different storey heights:
Direction

Floor level

Storey
height

Drift from
Dynamic
analysis

X-direction

Y-direction

Level 3

Maximum Inelastic
Response
Displacement

Limiting
value

Remarks

M 0.020h

= 0.7RS

(m)

(mm)

(mm)

(mm)

3.3

2.742

15.081

66

Complied

66

Complied

Level 2

3.3

5.228

28.754

Level 1

3.5

4.667

25.669

70

Complied

Level 3

3.3

2.720

14.960

66

Complied

Level 2

3.3

4.589

25.240

66

Complied

Level 1

3.5

5.080

27.940

70

Complied

Chan Phuong Engineering (CPE)

Page 13

Project : Bagan Golden Star Hotel


2.2

Design Development Report

Structural System

Bagan Golden Star Hotel is mainly a residential building having rectangular shaped on plan
and measures approximately 68.8m x 41.3m. Total building height from ground level is set at
11.8m and comprised of 3 levels including: ground floor, first floor, second floor and roof.
Space for M&E equipments is provided in the roof void.
The structural system adopted for this building is reinforced concrete frame comprising of the
traditional beam/slab system. The gravity loads on each floor is transmitted to the flat
slab/columns system which in turn will transmit these loads down to the foundations.
In order to produce an effective design in terms of column sizes, there are three structural
zones being adopted from foundations to the roof of the building corresponding the three
level of the building.
The systems of beam-columns frame skeleton will act as main lateral resisting elements for
the building against seismic load. The lateral loads induced by seismic loads at each floor
level will be transmitted to the columns systems by the plate action, and subsequently being
transferred down to foundations.
Depending on the loads transferred down the foundations from columns and the overall soil
test results, pad foundations or trip foundations was be chosen. Only raft foundation
(Foundation F2) was used for swimming pool due to having the slabs for pool.
The building superstructure on the space-resolved model was analyzed by ETABS software
mentioned above. In model, the columns and beams are modeled by frame elements, and
the floors and walls are modeled by shell elements.

Chan Phuong Engineering (CPE)

Page 14

Project : Bagan Golden Star Hotel

Design Development Report

The kind of work load on the building was entered into the model as following:
9

Self weight of reinforced concrete strucutres: calculated automatically by the program.

Super imposed dead loads such as tiles, mortar lining and plastering, service
suspended under slab: entered as distributed load on the floor.

Super imposed dead loads such as brick wall, partitions: calcultated and entered as
distributed on the floor (if it wasnt support by beam) or directly on the beam.

Super imposed live loads: entered as distributed load on the floor.

Wind loads: not applicable.

Seismic loads: entered as spectral response into the model.

Chan Phuong Engineering (CPE)

Page 15

Project : Bagan Golden Star Hotel

Design Development Report

Durability, Fire Resistance and Deflection


3.1

Durability

3.1.1

Reinforced Concrete

Conditions of Exposure***

Nominal Cover to All Reinforcement (including Links) (mm)

Mild

25

20

20*

20*

20*

Moderate

35

30

25

20

Severe

40**

30

25

Very Severe

50**

40**

30

Extreme

60**

50**

Maximum Free Water/ Cement


Ratio

0.65

0.60

0.55

0.50

0.45

Minimum Cement Content


(kg/m)

275

300

325

350

400

Lowest Grade of Concrete


(cube strength)

C30

C35

C40

C45

C50

*These covers may be reduced to 15mm provided that the nominal maximum size of aggregate
does not exceed 15mm.
**Reinforcement consisting of expanded metal lath or a wire fabric not lighter than 0.5kg/m with
2mm diameter wire at not more than 100mm centres or a continuous arrangement of links at not
more than 200mm centres shall be incorporated into the concrete cover at a distance not exceeding
20mm from the face.
***Refer to Table 3.2 of BS8110 for the definition of the conditions of exposure.
Minimum cover to reinforcement of element cast directly against soil to be 75mm
Minimum cover to reinforcement of water tank and basement walls to be 40mm.

The above nominal covers have to be checked against those derived from the provisions for
fire resistance. The more onerous values will be applied.
3.2

Fire Resistance

3.2.1

Reinforced Concrete

Based on the provisions in BS8110, fire resistance requirements may be achieved by


meeting the following nominal cover to reinforcement.

Chan Phuong Engineering (CPE)

Page 16

Project : Bagan Golden Star Hotel


Fire
Resistanc
e (h)

Design Development Report


Nominal Cover to All Reinforcement (Including Links)

Beams*

Floors

Ribs

Columns
*

SS

Cont

SS

Cont

SS

Cont

40**

30

35

25

45**

35

25

70**

50**

55**

45**

65**

55**

25

*For the purposes of assessing a nominal cover for beams and columns, the cover to
main bars which would have been obtained from Tables 4.2 and 4.3 of BS8110: Part 2:
1985 have been reduced by a notional allowance for stirrups of 10mm to cover the range
8mm to 12mm.
** Reinforcement consisting of expanded metal lath or a wire fabric not lighter than
0.5kg/m with 2mm diameter wire at not more than 100mm centres or a continuous
arrangement of links at not more than 200mm centres shall be incorporated into the
concrete cover at a distance not exceeding 20mm from the face.

The above nominal covers have to be checked against those derived from the provisions for
durability. The more onerous values will be applied.

Column width (mm)

Min. Wall Thk. (mm)

Fire
Resistance
(h)

Min.
Beam
Width
(mm)

Rib
Width
(mm)

Min.
Thk. of
Floors
(mm)

Fully
exposed

50%
exposed

One
face
exposed

< 0.4%

0.4% < < 1%

>1%

200

125

125

300

200

160

160

100

280

175

170

450

350

240

240

180

: area of steel relative to that of concrete


This table should be read in conjunction with Figure 3.2 of BS8110: 1985.

The assumed fire ratings adopted for this project is generally 2 hours and 4 hours for above
and below ground structure respectively.
3.3

Deflection

3.3.1

Reinforced Concrete

Deflections of the structural elements have to be checked in accordance with the provisions
of BS8110 to meet the following limits:
Total Deflection

Span/250

Deflection Occurring after the Construction of


Finishes and Partitions

Span/500 or 20mm for spans up to 10m

Chan Phuong Engineering (CPE)

Page 17

Project : Bagan Golden Star Hotel

Design Development Report

Calculation of Deflection
Rule A:

total = DL (LT + ST) +SDL (LT + ST) + LL,TEMP (ST) + LL, PERM (LT +ST) < Span/250
Rule B:

total = DL (LT) + SDL (LT) + LL,TEMP (ST) + LL, PERM (LT) < Span/500 or 20mm
LT: Long Term Component of the Deflection ;
ST: Short Term Component of the Deflection .
Short Term Deflection
The short term component of deflection, ST, shall be calculated from the short term modulus
of elasticity of concrete and the moment of inertia as derived from one of the following section
types:

Entire concrete section

Gross section: the entire concrete cross section, including the reinforcement on the basis
of modular ratio

Transformed section: the compression area of the concrete cross section combined with
the reinforcement on the basis of modular ratio

Long Term Deflection


The long term component of deflection, LT, shall be calculated with due account of the creep
effect as follows:

where

cc =

stress

Et

: creep coefficient as derived from Figure 7.1 of BS8110-2.

Chan Phuong Engineering (CPE)

Page 18

Project : Bagan Golden Star Hotel

Design Development Report

Effective Section Thickness 2 x Section Area / Perimeter


Ambient Humidity (Indoor): 45% (subject to the local climate data and MEP settings)
Ambient Humidity (Outdoor): 85% (subject to the local climate data)
Age at Loading:

DL -

28 days

SDL -

60 days (subject to the local construction programme and

sequence)

: modulus of elasticity at the age of loading


For the calculation of the long term component of deflection, LT, the following formula shall apply:

LongTermComponent

3.3.2

LongTermDeflection
(Basedonareduced
effectivemodulusof

ShortTermComponent

Structural Steelwork

Deflections of the structural elements have to be checked in accordance with the provisions
of BS5950 to meet the following limits:
Deflection due to Unfactored Imposed Load
Cantilever

Span/180

Beams carrying plaster or other brittle finish

Span/360

All other beams

Span/200

Chan Phuong Engineering (CPE)

Page 19

Project : Bagan Golden Star Hotel

Design Development Report

Calculating reinforced steel


4.1

Calculating foundations

Chan Phuong Engineering (CPE)

Page 20

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 21

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 22

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 23

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 24

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 25

Project : Bagan Golden Star Hotel


4.2

Design Development Report

Calculating columns

Chan Phuong Engineering (CPE)

Page 26

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 27

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 28

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 29

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 30

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 31

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 32

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 33

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 34

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 35

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 36

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 37

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 38

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 39

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 40

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 41

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 42

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 43

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 44

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 45

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 46

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 47

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 48

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 49

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 50

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 51

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 52

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 53

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 54

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 55

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 56

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 57

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 58

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 59

Project : Bagan Golden Star Hotel


4.3

Design Development Report

Calculating beams

Chan Phuong Engineering (CPE)

Page 60

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 61

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 62

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 63

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 64

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 65

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 66

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 67

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 68

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 69

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 70

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 71

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 72

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 73

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 74

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 75

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 76

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 77

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 78

Project : Bagan Golden Star Hotel


4.4

Design Development Report

Calculating slabs

Chan Phuong Engineering (CPE)

Page 79

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 80

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 81

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 82

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 83

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 84

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 85

Project : Bagan Golden Star Hotel

Chan Phuong Engineering (CPE)

Design Development Report

Page 86

Project : Bagan Golden Star Hotel

Design Development Report

Appendix A
Displacement data

Chan Phuong Engineering (CPE)

Page 87

Project : Bagan Golden Star Hotel

Design Development Report

Table B.1 Diaphragm CM displacements


Story
10M
6.6M
3.5M
0.6M
-0.6M
-1.5M
10M
6.6M
3.5M
0.6M
-0.6M
-1.5M

Diaphrg
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1

Load
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY

UX
0.0393
0.0314
0.018
0.0057
0.0032
0.0018
0.0019
0.0015
0.0009
0.0003
0.0002
0.0007

UY
0.0031
0.0019
0.0014
0.0007
0.0003
0.0002
0.026
0.0186
0.0126
0.0052
0.0024
0.0015

RZ
0.00015
0.00012
0.00007
0.00004
0.00002
0.00001
0.00097
0.00077
0.00047
0.00017
0.00009
0.00003

Point
840
841
842
843
844
845
840
841
842
843
844
845

X
-24.022
-30.617
-27.249
-59.126
-25.938
-61.404
-24.022
-30.617
-27.249
-59.126
-25.938
-61.404

Y
27.126
27.4
27.051
29.326
27.148
41.977
27.126
27.4
27.051
29.326
27.148
41.977

Z
10
6.6
3.5
0.6
-0.6
-1.5
10
6.6
3.5
0.6
-0.6
-1.5

Table B.2 Story drift


Story

Item

Load

Point

DriftX

10M

Max Drift X

DEAD

526

-0.28 47.493

10

10M

Max Drift Y

DEAD

604

-60.636 46.861

10

10M

Max Drift X

LIVE

526

-0.28 47.493

10

10M

Max Drift Y

LIVE

571

10M

Max Drift X

SEISX

526

10M

Max Drift Y

SEISX

571

4.5

6.523

10

10M

Max Drift X

SEISY

571

4.5

6.523

10

10M

Max Drift Y

SEISY

571

4.5

6.523

10

6.6M

Max Drift X

DEAD

634

-65.31 36.717

6.6

6.6M

Max Drift Y

DEAD

638

-57.107 32.553

6.6

6.6M

Max Drift X

LIVE

634

-65.31 36.717

6.6

6.6M

Max Drift Y

LIVE

638

-57.107 32.553

6.6

6.6M

Max Drift X

SEISX

473

-57.322 37.096

6.6

6.6M

Max Drift Y

SEISX

571

4.5

6.523

6.6

6.6M

Max Drift X

SEISY

641

-57.95

50.39

6.6

6.6M

Max Drift Y

SEISY

571

4.5

6.523

6.6

3.5M

Max Drift X

DEAD

473

-57.322 37.096

3.5

3.5M

Max Drift Y

DEAD

638

-57.107 32.553

3.5

3.5M

Max Drift X

LIVE

527

0.617 39.802

3.5

3.5M

Max Drift Y

LIVE

638

-57.107 32.553

3.5

3.5M

Max Drift X

SEISX

641

-57.95

50.39

3.5

3.5M

Max Drift Y

SEISX

525

4.249

8.673

3.5

3.5M

Max Drift X

SEISY

641

-57.95

50.39

3.5

Chan Phuong Engineering (CPE)

4.5

6.523

10

-0.28 47.493

10

DriftY

0.000093
0.000111
0.000039
0.000046
0.002742
0.000383
0.001301
0.00272
0.000345
0.000185
0.000107
0.000076
0.005228
0.000654
0.002232
0.004589
0.000293
0.00021
0.000106
0.000088
0.004667
0.000735
0.002471

Page 88

Project : Bagan Golden Star Hotel


Story

Item

Load

Design Development Report


Point

DriftX

3.5M

Max Drift Y

SEISY

525

8.673

3.5

0.6M

Max Drift X

DEAD

661

-64.894 27.879

0.6

0.6M

Max Drift Y

DEAD

682

-59.987

8.855

0.6

0.6M

Max Drift X

LIVE

661

-64.894 27.879

0.6

0.6M

Max Drift Y

LIVE

528

-5.9 47.434

0.6

0.6M

Max Drift X

SEISX

495

-10 37.791

0.6

0.6M

Max Drift Y

SEISX

525

4.249

8.673

0.6

0.6M

Max Drift X

SEISY

526

-0.28 47.493

0.6

0.6M

Max Drift Y

SEISY

525

4.249

8.673

0.6

-0.6M

Max Drift X

DEAD

527

0.617 39.802

-0.6

-0.6M

Max Drift Y

DEAD

526

-0.28 47.493

-0.6

-0.6M

Max Drift X

LIVE

635

-65.54 41.563

-0.6

-0.6M

Max Drift Y

LIVE

715

-28.786 30.362

-0.6

-0.6M

Max Drift X

SEISX

682

-59.987

8.855

-0.6

-0.6M

Max Drift Y

SEISX

525

4.249

8.673

-0.6

-0.6M

Max Drift X

SEISY

689

-65.79 50.308

-0.6

-0.6M

Max Drift Y

SEISY

525

8.673

-0.6

-1.5M

Max Drift X

DEAD

661

-64.894 27.879

-1.5

-1.5M

Max Drift Y

DEAD

682

-59.987

8.855

-1.5

-1.5M

Max Drift X

LIVE

661

-64.894 27.879

-1.5

-1.5M

Max Drift Y

LIVE

714

-28.863 24.648

-1.5

-1.5M

Max Drift X

SEISX

682

-59.987

8.855

-1.5

-1.5M

Max Drift Y

SEISX

536

0.122 29.396

-1.5

-1.5M

Max Drift X

SEISY

689

-65.79 50.308

-1.5

-1.5M

Max Drift Y

SEISY

535

-0.367 33.591

-1.5

Chan Phuong Engineering (CPE)

4.249

4.249

DriftY
0.00508

0.000594
0.000334
0.00032
0.000132
0.003075
0.000596
0.001506
0.003989
0.000253
0.000176
0.000306
0.000153
0.002708
0.000434
0.001524
0.002722
0.000312
0.000178
0.000162
0.000095
0.001773
0.000289
0.000937
0.001736

Page 89

Project : Bagan Golden Star Hotel

Design Development Report

Appendix B
Support reactions

Chan Phuong Engineering (CPE)

Page 90

Project : Bagan Golden Star Hotel

Design Development Report

Table B.3 Support reactions due by dead load


Story

Point

Load

FX

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510

DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD

-56.22
-69.65
-66.37
5.83
7.75
-1.91
-2.32
-0.54
-0.76
-0.49
-0.95
-0.62
-0.93
-0.59
-0.92
-0.6
-0.93
-0.58
-0.9
-0.62
-1.27
-0.49
2.62
-0.65
-4.02
14.34
0.13
-1.7
-1.38
2.88
1.12
-2.81
0.39
-1.28
0.66
0.47
-1.26
-0.72
0.56
0.52

Chan Phuong Engineering (CPE)

FY
-22
2.34
33.07
-17.13
19.98
-23.58
17.67
-24.47
17.92
-24.39
17.99
-23.08
17.89
-22.84
17.89
-22.82
17.9
-22.78
17.94
-22.64
17.98
-21.54
19.61
-22.8
24.7
42.97
9.55
-3.52
19.17
-2.9
23.46
-18.53
26.12
-22.16
25.33
24.4
-16.45
-17.44
24.24
24.34

FZ
1117.09
1401.67
1160.22
863.14
943.98
894.14
867.25
882.42
857.98
883.67
859.33
869.48
860.45
868.51
861.1
868.16
861.74
868.03
863.88
867.51
855.11
854.45
866.24
929.09
678.69
1738.18
707.81
1018.31
1384.15
785.96
903.65
871.1
913.71
836.25
912.28
898.62
844.72
841.75
897.71
899.57

MX
8.767
-2.251
-12.865
11.492
-15.574
16.119
-13.947
16.608
-14.288
16.394
-14.495
15.28
-14.58
14.95
-14.741
14.779
-14.904
14.592
-15.095
14.329
-15.278
13.373
-16.626
14.13
-20.489
-34.015
-7.753
1.225
-21.224
1.118
-18.163
12.437
-20.262
14.926
-19.845
-19.324
10.451
11.331
-19.362
-19.593

MY
-28.579
-34.553
-31.695
3.852
5.525
-2.16
-2.403
-1.084
-1.173
-1.051
-1.324
-1.148
-1.311
-1.131
-1.308
-1.137
-1.314
-1.129
-1.293
-1.157
-1.59
-1.059
1.471
-1.182
-3.727
10.722
-0.19
-1.795
-1.747
1.905
0.554
-2.5
-0.019
-1.285
0.202
0.061
-1.271
-0.851
0.135
0.109

MZ
0.125
0.204
0.204
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.016
0.032
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013

Page 91

Project : Bagan Golden Star Hotel


Story

Point

Load

FX

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
613
629
630
631
632
633
634
635
636
637

DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD

-1.06
-0.96
0.53
-1.03
-1.59
0.39
1.91
-5.71
-4.11
4.58
-1.26
0.65
1.68
-9.34
-15.08
-11.71
-34.99
10.43
9.33
0.76
1.09
2.09
2.52
2.55
-5.31
7.82
5.02
4.31
11.9
4.32
8.25
0.37
0.98
12.86
16.44
22.26
21.93
52.07
62.41
47.03
-7.58

Chan Phuong Engineering (CPE)

Design Development Report


FY
-16.37
-16.46
24.38
-16.31
-16.29
24.29
25.33
41.91
-35.91
-0.19
-13.93
-14.01
-9.86
-8.35
11.31
-53.56
39.44
-59.22
-2.54
2.57
7.98
0.98
0.54
0.6
6.76
-9.42
5.11
0.68
1.76
-18.96
8.03
-0.81
4.16
-1.71
11.23
-10.87
5.68
14.6
5.55
-34.53
-24.08

FZ
856.51
857.6
900.17
856.89
842.98
895.96
947.16
895.45
763.41
808.35
1077.71
1058.22
996.1
709.55
628.11
582.08
1098.48
911.5
940.64
351.18
1461.06
350.52
349.45
345.98
926.43
1207.67
870.57
717.06
850.58
905.53
916.77
190.91
339.61
542.3
713.56
783.46
485.69
557.4
880.22
700.2
1294.55

MX
10.08
10.298
-19.779
9.879
9.706
-19.876
-20.79
-33.074
23.648
-2.522
7.497
7.393
4.362
3.084
-11.23
36.108
-31.603
40.54
1.34
-2.528
-6.898
-1.283
-0.936
-0.98
-5.905
6.823
-4.661
-1.181
-2.03
11.505
-6.863
0.425
-4.421
2.712
-12.228
13.279
-5.813
-0.936
2.553
17.327
28.009

MY
-1.107
-1.034
0.126
-1.073
-1.512
0.022
1.219
-4.777
-3.595
3.304
-1.337
0.162
1.032
-7.997
-12.31
-10.45
-28.076
7.533
5.206
-0.358
-0.113
0.553
0.784
0.711
-5.194
4.769
1.582
1.224
6.92
3.14
6.098
0.216
1.149
15.29
19.575
26.435
25.881
24.413
28.34
20.274
-9.428

MZ
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.013
0.013
0.013
0.013
0.013
0.003
0.019
0.025
0.025
0.025
0.025
0.164
0.164
0.125
0.032

Page 92

Project : Bagan Golden Star Hotel


Story

Point

Load

FX

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

638
639
640
641
642
661
662
663
667
670
682
686
689
693
698
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726

DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD

-10.55
-6.59
1.68
-3.3
1.51
5.13
0.36
-2
0.52
-0.3
-0.28
-1.05
0.63
-1.2
-0.4
-2.66
-2.61
-2.49
-2.05
0.38
-0.15
-0.27
0.04
-0.52
-0.35
-0.24
-0.17
0.16
-2.13
-2.26
-0.29
-2.34
-2.06
0.3
0.19
0.81
-6.07
-6.01
0.98
2.35
5.12

Chan Phuong Engineering (CPE)

Design Development Report


FY
13.08
-21.02
-0.22
-3.61
-9.12
-0.16
0.64
-0.4
-1.18
3.06
11.35
3.47
-4.76
4.03
-2.86
-6.09
-0.44
1.72
8.51
9.32
1.91
-0.72
-7.78
-7.09
-0.9
1.99
8.46
7.98
2.42
-1.39
-6.77
-6.63
7.45
1.86
-1.08
-3.89
-2.29
2.98
4.93
4.01
4.08

FZ
904.5
396.16
360.91
245.42
371.97
162.1
51.83
250.76
248.54
247.85
160.89
72.02
43.06
205.57
184.73
81.02
213.32
220.01
87.99
98.75
281.67
278.56
97.11
91.64
251.65
254.11
93.6
89.47
302.61
300.25
88.33
101.8
102.96
98.71
98.35
96.99
195.34
197.59
99.3
64.61
200.15

MX
-14.234
24.363
-0.821
4.355
10.945
0.335
-0.684
0.549
0.733
-2.52
-13.295
-2.858
5.781
-3.269
2.029
4.468
0.046
-1.645
-6.961
-7.566
-1.772
0.29
5.821
5.301
0.459
-1.807
-6.867
-6.462
-2.119
0.867
5.075
4.997
-6.023
-1.627
0.673
2.882
1.632
-2.501
-4.021
-3.278
-3.338

MY
-12.971
-8.128
0.765
-4.103
1.727
6.132
0.189
-2.481
0.349
-0.369
-0.332
-0.959
0.642
-1.075
-0.394
-2.345
-2.293
-2.173
-1.803
0.103
-0.335
-0.457
-0.233
-0.673
-0.525
-0.408
-0.334
-0.077
-1.893
-2.02
-0.496
-2.094
-1.81
0.016
-0.095
0.371
-5.002
-4.93
0.562
1.64
3.788

MZ
0.032
0.025
0.013
0.005
0.005
0.005
0.003
0.005
0.003
0.003
0.005
0.003
0.005
0.003
0.003
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004

Page 93

Project : Bagan Golden Star Hotel


Story

Point

Load

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

727
728
729
730
731
732
733
734
727
728
729
730
731
732
733
734

DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD
DEAD

FX
4.35
1.34
-0.35
-1.11
-1.78
-1.19
2.21
2.12
4.35
1.34
-0.35
-1.11
-1.78
-1.19
2.21
2.12

Design Development Report


FY
-3.62
-3.48
-0.84
-1.38
1.48
1.28
2.13
-1.32
-3.62
-3.48
-0.84
-1.38
1.48
1.28
2.13
-1.32

FZ
206.27
70.54
42.86
140.1
140.88
43.75
264.3
264.03
206.27
70.54
42.86
140.1
140.88
43.75
264.3
264.03

MX

MY

MZ

2.701
2.582
0.607
1.035
-1.224
-1.066
-1.862
0.844
2.701
2.582
0.607
1.035
-1.224
-1.066
-1.862
0.844

3.16
0.781
-0.403
-0.999
-1.516
-1.033
1.511
1.41
3.16
0.781
-0.403
-0.999
-1.516
-1.033
1.511
1.41

0.004
0.004
0.002
0.002
0.002
0.002
0.004
0.004
0.004
0.004
0.002
0.002
0.002
0.002
0.004
0.004

MY

MZ

Table B.4 Support reactions due by live load


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489

Load

FX

LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE

-75.89
-127.3
-85.46
1.47
4.89
0.27
-0.02
0.6
0.6
0.58
0.53
0.59
0.54
0.59
0.54
0.59
0.54
0.59
0.54

Chan Phuong Engineering (CPE)

FY
-29.5
-1.65
35.17
3.22
2.62
0.92
1.16
0.88
0.92
0.72
0.81
0.58
0.67
0.44
0.53
0.3
0.38
0.17
0.23

FZ
419.44
702.36
507.37
352.97
345.65
377.71
366.97
365.02
365.21
365.6
365.22
365.29
365.5
365.03
365.72
364.76
366.01
364.8
367

MX
12.254
0.095
-12.869
-3.242
-2.816
-1.543
-1.719
-1.472
-1.501
-1.313
-1.376
-1.168
-1.235
-1.024
-1.09
-0.874
-0.937
-0.735
-0.784

-40.367
-65.379
-44.412
1.346
4.013
0.428
0.179
0.684
0.668
0.672
0.612
0.675
0.62
0.674
0.622
0.676
0.624
0.675
0.626

0.109
0.178
0.178
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004

Page 94

Project : Bagan Golden Star Hotel


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530

Load

FX

LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE

0.63
0.47
0.31
1.7
3.49
-0.02
11.39
0.24
-0.37
0.41
0.42
0.62
-0.04
0.24
0.34
0.37
0.31
0.37
0.39
0.33
0.31
0.36
0.37
0.3
0.34
0.28
0.29
0.58
-0.03
0.23
0.71
0.53
0.67
1.76
-4.26
-5.51
-6.62
-23.35
7.18
11.11
3.38

Chan Phuong Engineering (CPE)

Design Development Report


FY
0.12
0.04
-0.5
1.05
-11.3
7.15
24.87
4.2
2.71
5.79
-2.48
0.85
1.83
0.93
0.85
0.8
0.67
0.57
0.7
0.52
0.38
0.29
0.43
0.24
0.16
0.07
0.04
0.14
8.16
-8.32
4.53
-0.12
-1.87
1.48
-1.54
-0.61
-33.88
19.29
-45.69
-3.49
0.49

FZ
363.9
360.75
362.55
391.61
396.45
317.18
703.37
202.58
359.59
498
334.54
361.97
383.53
365.82
364.67
363.86
365.45
365.15
364.13
365.64
366.39
364.92
365.18
366.7
365.11
358.21
363.7
386.5
376.32
323.84
281.69
420.77
351.34
338.95
168.47
161.86
188.94
349.35
344.63
402.51
148.58

MX
-0.657
-0.601
-0.165
-1.295
7.753
-5.695
-18.599
-4.005
-3.397
-6.405
0.921
-1.501
-2.213
-1.518
-1.455
-1.377
-1.236
-1.163
-1.304
-1.084
-0.943
-0.876
-1.02
-0.797
-0.738
-0.63
-0.604
-0.633
-6.426
5.591
-3.737
-0.354
0.969
-1.475
0.853
0.188
24.449
-14.235
32.861
2.632
-0.488

MY
0.711
0.565
0.456
1.535
2.952
0.188
9.197
0.286
-0.18
0.561
0.412
0.639
0.135
0.335
0.432
0.434
0.392
0.453
0.472
0.401
0.387
0.44
0.448
0.378
0.427
0.373
0.37
0.593
0.101
0.321
0.679
0.557
0.667
1.508
-3.233
-4.22
-5.208
-18.025
5.863
8.724
2.895

MZ
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
0.067
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
-0.003

Page 95

Project : Bagan Golden Star Hotel


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

531
532
533
534
535
536
537
538
539
540
541
613
629
630
631
632
633
634
635
636
637
638
639
640
641
642
661
662
663
667
670
682
686
689
693
698
701
702
703
704
705

Load

FX

LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE

-6.15
3.4
4.17
4.28
-7.53
-1.15
7.95
7.23
13.68
1.32
2.98
0.1
0.42
4.27
5.04
7.92
9.1
53.02
100.55
54.29
-2.52
-4.92
-3.66
3.1
-0.87
0.08
2.71
0.73
-1.04
0.56
0.33
0.02
-0.16
-0.08
-0.39
0.01
-0.46
-1.29
-1.25
-0.43
0.49

Chan Phuong Engineering (CPE)

Design Development Report


FY
2.8
0.4
-0.15
0.39
4.16
-6.71
3.28
-0.38
0.98
-1.42
3.91
-0.58
0.35
-1.22
0.98
-1.83
1.3
28.4
2.47
-40.51
-4.81
3.48
-4.54
0.52
-1.07
-2.71
-0.29
0.24
-0.18
0
1.27
4.1
2.46
-1.35
2.16
-1.14
-2.11
-1.57
1.83
2.89
2.41

FZ
500.2
146.96
146.43
145.76
310.21
399.21
367.25
297.86
345.16
386.22
358.18
44.78
69.77
158.13
217.72
235.05
160.07
262.72
482.96
262.33
477.43
366.42
127.94
114.38
46.16
79.5
55.14
26.41
133.57
76.37
84.6
34.83
22.97
3.41
78.35
59.6
22.27
96.29
98.75
24.95
25.98

MX

MY

MZ

-2.296
-0.414
0.017
-0.411
-3.354
5.195
-2.685
0.188
-0.88
0.502
-3.752
0.27
0.127
2.341
-0.192
3.056
-0.551
-6.547
3.285
19.68
5.666
-3.741
4.801
-1.276
1.297
3.373
0.527
-0.359
0.242
-0.187
-1.159
-4.737
-2.067
1.809
-1.847
0.695
1.589
1.163
-1.501
-2.323
-1.955

-4.266
2.935
3.539
3.646
-5.229
-0.451
6.546
5.98
10.639
1.193
2.46
0.099
0.72
5.281
6.111
9.376
10.54
21.692
43.213
21.198
-3.211
-6.303
-4.537
2.586
-1.222
-0.071
3.221
0.603
-1.304
0.462
0.298
0.081
-0.086
-0.256
-0.269
0.03
-0.263
-0.92
-0.898
-0.262
0.459

-0.003
-0.003
-0.003
-0.003
-0.003
-0.003
-0.004
-0.004
-0.004
-0.004
-0.004
-0.001
0.041
0.054
0.054
0.054
0.054
0.144
0.144
0.109
0.067
0.067
0.054
-0.004
0.011
0.011
0.011
-0.001
0.011
-0.001
-0.001
0.011
-0.001
0.011
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001

Page 96

Project : Bagan Golden Star Hotel


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
471
472
473
474
475
476
477
478

Load

FX

LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE

-0.59
-0.72
0.47
0.32
0.54
0.73
0.3
0.14
-1.7
-1.9
0.11
0.13
0.11
1.19
1.13
0.08
-2.09
-2.1
0.07
1.27
2.48
2.22
0.99
0.09
-0.24
-0.52
-0.27
3.52
3.38
-75.89
-127.3
-85.46
1.47
4.89
0.27
-0.02
0.6

Design Development Report


FY

FZ

5.56
-5.2
-1.95
-0.98
-7.5
7.88
1.43
1.26
8.65
-8.17
-0.82
-1.42
1.77
3.1
-2.69
-1.32
-1.08
1.52
1.89
1.68
1.76
-1.34
-1.26
-0.25
-0.44
0.64
0.54
7.19
-6.8
-29.5
-1.65
35.17
3.22
2.62
0.92
1.16
0.88

223.15
221.93
25.12
19.81
259.66
260.34
20.77
18.92
314.46
313.57
18.21
21.07
21.54
53.11
52.88
25.89
69.44
70.25
26.92
18.55
72.33
74.87
20.44
10.51
47.35
47.23
11.03
269.98
270.04
419.44
702.36
507.37
352.97
345.65
377.71
366.97
365.02

MX
-4.43
4.007
1.455
0.691
5.802
-6.253
-1.197
-1.072
-6.87
6.325
0.553
1.018
-1.48
-2.528
2.004
0.93
0.744
-1.293
-1.583
-1.421
-1.491
0.939
0.875
0.14
0.295
-0.557
-0.478
-5.728
5.238
12.254
0.095
-12.869
-3.242
-2.816
-1.543
-1.719
-1.472

MY
-0.377
-0.473
0.462
0.343
0.515
0.656
0.313
0.185
-1.25
-1.399
0.182
0.199
0.164
1.011
0.972
0.16
-1.551
-1.564
0.129
1.071
2.029
1.827
0.872
0.114
-0.144
-0.371
-0.177
2.839
2.736
-40.367
-65.379
-44.412
1.346
4.013
0.428
0.179
0.684

MZ
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
0.109
0.178
0.178
-0.004
-0.004
-0.004
-0.004
-0.004

Chan Phuong Engineering (CPE)

Page 97

Project : Bagan Golden Star Hotel

Design Development Report

Table B.5 Support reactions due by seismic X load


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510

Load
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX

FX
125.6
160.58
143.95
77.07
67.99
76.27
76.53
76.71
75.03
76.69
75.19
76.72
75.2
76.76
75.2
76.77
75.22
76.77
75.17
76.71
75.56
77
72.36
76.96
56.35
87.81
49.56
84.46
59.09
81.07
78.6
76.8
78.12
76.11
78.31
78.31
76.4
76.36
78.45
78.5

Chan Phuong Engineering (CPE)

FY
24.94
57.42
47.87
16.09
21.86
9.87
10.81
7.84
7.83
6.2
6.16
4.77
4.76
5.4
5.42
7.68
7.71
10.06
10.19
12.4
12.21
15.4
15.21
28.99
33.68
36.27
23.64
34.22
20.27
14.59
10.2
9.66
8.01
7.99
6.38
4.92
4.87
6.35
6.66
8.87

FZ
102.32
156.16
48.32
23.8
22.75
15.75
18.8
14.47
15.38
11.41
11.46
9.51
9.49
12.89
12.95
16.27
16.22
19.89
19.45
23.41
27.66
36.86
19.54
30.08
52.48
16.68
111.27
195.97
64.26
20.69
17.88
24.95
27.31
22
19.57
21.57
21.29
21.56
24.03
27.17

MX
26.874
65.648
62.24
27.699
31.595
22.074
22.765
17.979
17.967
14.319
14.277
11.277
11.308
16.462
16.494
21.824
21.861
27.32
27.412
32.844
32.721
38.802
36.706
52.287
56.377
62.217
38.022
57.58
46.933
26.93
26.247
25.138
21.95
21.91
18.524
18.673
18.769
18.48
23.841
29.132

MY
119.475
158.537
149.529
111.721
103.625
111.27
110.428
111.64
109.33
111.655
109.474
111.69
109.509
111.749
109.541
111.784
109.586
111.815
109.569
111.79
109.901
112.035
107.386
112.091
94.135
120.461
91.615
127.623
121.137
116.296
114.088
111.395
113.841
110.976
114.1
114.209
111.438
111.287
114.431
114.589

MZ
0.244
0.399
0.399
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.421
0.724
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339

Page 98

Project : Bagan Golden Star Hotel


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
613
629
630
631
632
633
634
635
636
637

Load
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX

FX
76.52
76.48
78.53
76.6
76.92
78.73
77.64
81.29
59.82
79.89
85.72
100.37
78.69
73.25
55.12
53.46
65.92
70.84
164.32
126.63
99.92
107.82
108.36
121.65
94.44
91.68
168.21
162.92
150.99
75.51
63.2
21.29
32.83
38.61
36.76
35.8
40.94
147.86
163.69
132.54
58.56

Chan Phuong Engineering (CPE)

Design Development Report


FY
8.95
6.74
11.19
11.1
13.62
13.5
15.85
22.44
32.84
19.18
29.93
28.59
23.54
36.19
25.9
23.65
35.12
30.85
17.24
15.22
18.35
12.43
13.31
13.19
16.01
16.94
17.13
17.06
16.87
27.51
19.87
6.77
11.69
22.81
21.46
20.5
22.53
36.99
51.73
28.13
17.99

FZ
27.28
24.42
30.61
31.17
34.92
35.51
25.68
81.82
39.48
51.45
31.39
73.81
50.31
275.45
188.56
118.02
205.02
51.88
265.45
446.61
354.06
521.24
510.4
437.13
293.18
469.1
161.61
202.73
370.17
24.69
31.4
94.7
166.39
153.79
187.23
143.63
58.58
118.01
212.83
203.31
44.93

MX
29.243
23.953
34.534
34.511
40.095
39.953
45.439
50.295
57.813
51.126
59.063
62.046
58.291
68.219
59.839
56.533
63.66
58.344
23.811
19.47
20.76
16.933
17.817
16.724
21.53
22.718
23.483
23.528
23.389
53.73
30.17
8.408
25.866
48.46
46.942
45.897
48.486
47.974
54.422
31.918
44.042

MY
111.768
111.621
114.731
111.951
112.307
114.998
114.297
116.316
97.537
115.154
118.805
130.341
114.348
107.396
94.036
96.461
105.708
107.404
316.574
209.636
189.642
193.176
192.88
204.682
183.781
180.301
317.538
310.888
303.062
111.324
101.008
27.232
75.438
88.991
86.046
83.279
87.409
139.518
148.035
122.477
118.109

MZ
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.339
0.258
0.258
0.258
0.258
0.258
0.258
0.258
0.339
0.339
0.339
0.339
0.339
0.067
0.443
0.583
0.583
0.583
0.583
0.322
0.322
0.244
0.724

Page 99

Project : Bagan Golden Star Hotel


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

638
639
640
641
642
661
662
663
667
670
682
686
689
693
698
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726

Load
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX

FX
64.1
48.89
31.63
8.1
11.28
11.03
2.9
12.39
24.59
24.18
16.76
21.51
12.66
24.8
25.57
57.74
57.45
57.83
58.2
53.27
57.27
57.03
52.89
53.74
57.16
57.39
54.13
54.02
57.19
56.96
53.66
53.09
53.41
57.49
57.32
53.07
54.09
54.16
53.19
55.07
54.13

Chan Phuong Engineering (CPE)

Design Development Report


FY
21.06
11.14
19.66
3.33
3.98
7.87
3.81
5.36
10.2
10.83
5.27
3.33
6.42
7.45
7.75
6.88
8.66
8.96
8.28
5.99
7.37
7.36
6.26
5.09
5.93
5.93
4.77
3.58
4.53
4.5
3.91
2.86
2.37
3.06
3.01
3.17
3.24
3.5
3.04
3.77
4.42

FZ
48.26
99.17
57.21
106.68
50.98
6.42
11.45
6.45
31.69
40.35
19.81
89.85
27.98
207.85
219.76
49.74
25.42
25.04
34.45
4.19
3.62
2.63
6.23
1.65
0.72
0.95
3.14
1.63
2.99
4.08
1.81
2.84
4.73
5.54
3.69
4.51
13.67
12.69
1.84
11
12.64

MX
47.807
23.565
29.362
6.926
8.829
13.755
5.69
9.309
10.706
11.573
9.702
5.732
12.066
8.987
9.403
9.06
10.595
10.818
10.247
7.836
8.95
8.953
8.07
6.538
7.202
7.199
6.264
4.73
5.5
5.484
5.006
3.596
3.19
3.72
3.677
3.983
4.047
4.254
3.893
4.885
5.408

MY
122.146
98.131
72.868
17.827
22.016
21.13
10.498
22.839
30.067
29.421
28.981
27.051
23.111
29.785
30.648
69.964
69.508
69.938
70.56
66.694
69.551
69.244
66.185
66.841
69.322
69.614
67.345
67.233
69.492
69.22
66.768
66.332
66.741
69.527
69.323
66.303
66.884
67.006
66.549
67.969
66.98

MZ
0.724
0.583
0.339
0.115
0.115
0.115
0.067
0.115
0.067
0.067
0.115
0.067
0.115
0.067
0.067
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104

Page 100

Project : Bagan Golden Star Hotel


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

727
728
729
730
731
732
733
734
471
472
473
474
475
476
477
478

Load
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX
SEISX

FX
53.68
54.07
27.74
27.36
26.99
27.46
57.43
57.29
125.6
160.58
143.95
77.07
67.99
76.27
76.53
76.71

Design Development Report


FY

FZ

4.19
4.29
3.87
2.19
2.59
2.35
2.78
2.87
24.94
57.42
47.87
16.09
21.86
9.87
10.81
7.84

6.77
5.23
15.55
11.19
24.55
21.99
19.04
18.76
102.32
156.16
48.32
23.8
22.75
15.75
18.8
14.47

MX
5.221
5.286
4.095
2.637
3.114
2.909
3.392
3.468
26.874
65.648
62.24
27.699
31.595
22.074
22.765
17.979

MY
66.582
67.06
33.797
33.451
33.18
33.643
69.642
69.45
119.475
158.537
149.529
111.721
103.625
111.27
110.428
111.64

MZ
0.104
0.104
0.05
0.05
0.05
0.05
0.104
0.104
0.244
0.399
0.399
0.339
0.339
0.339
0.339
0.339

Table B.6 Support reactions due by seismic Y load


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489

Load
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY

FX
55.64
58.89
42.65
36.16
19.38
37.4
24.2
37.72
23.65
37.81
23.85
37.94
23.97
38.08
24.09
38.2
24.22
38.33
24.32

Chan Phuong Engineering (CPE)

FY
198.19
444.32
340.42
109.36
129.98
82.38
85.13
74.83
74.85
68.25
68.17
62.87
62.84
60.68
60.72
62.49
62.56
66.06
65.87

FZ
216.43
139.68
244.96
175.82
149.11
165.52
156.08
151.23
152.92
143.42
143.46
141.25
141.24
149.56
149.56
161.16
160.96
175.81
176.52

MX
218.382
521.412
485.504
236.909
252.212
205.562
207.598
190.022
189.994
178.177
178.092
170.706
170.744
177.974
178.047
189.472
189.572
204.851
204.763

MY

MZ

53.401
55.011
39.586
50.77
29.323
53.876
34.619
54.367
34.451
54.684
34.849
55.026
35.184
55.376
35.521
55.715
35.863
56.055
36.179

0.883
1.443
1.443
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965

Page 101

Project : Bagan Golden Star Hotel


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530

Load
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY

FX
38.42
24.22
39.01
26.88
34.07
25.97
28.52
28.55
40.26
27.73
45.22
40.42
26.44
40.55
26.54
41.01
41.41
27.47
27.05
41.87
42.29
28.32
27.9
42.71
28.75
28.84
43.19
43.01
43.01
25.17
44.5
32.03
40.6
44.74
17.02
22.68
37.68
30.97
32.14
39.33
28.61

Chan Phuong Engineering (CPE)

Design Development Report


FY
70.9
69.97
76.24
91.2
130.97
199.09
210.47
186.59
248.95
161.29
123.28
79.88
82.16
72.17
72.11
66.06
61.21
61.15
65.91
60.96
63.4
63.65
61.14
67.48
67.52
72.09
72.95
80.2
122.79
202.22
91.89
154.55
137.45
105.41
181.35
124.06
108.05
175.27
129.18
110.13
92.27

FZ
194.12
211.89
220.12
119.25
93.36
25.18
18.6
710.46
97.38
527.32
205.35
165.03
154.15
147.3
148.33
141.31
144.06
143.98
141.34
153.62
166.77
166.57
153.8
182.85
183.12
221.12
201.79
202.35
232.23
58.58
244.61
8.7
179.52
290.6
288.48
275.62
161.08
115.91
331.14
48.56
114.14

MX
223.265
222.622
243.709
254.952
302.225
352.099
379.202
311.404
453.844
394.533
246.092
199.369
200.912
184.741
184.595
174.525
172.695
172.865
174.36
181.567
194.603
194.974
181.853
211.254
211.481
230.381
230.842
253.272
302.213
360.011
295.397
341.745
349.389
325.774
394.149
352.578
334.905
386.275
319.049
144.818
116.625

MY

MZ

56.373
36.331
57.078
38.701
53.218
35.472
40.866
54.439
64.67
56.117
64.926
56.64
36.821
57.603
37.733
58.809
59.961
40.133
38.969
61.171
62.349
42.491
41.317
63.526
43.67
44.55
64.748
65.475
61.876
36.43
63.229
44.715
51.405
63.428
22.964
31.779
77.612
61.429
52.821
72.069
46.519

1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
2.44
2.999
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.965
1.493

Page 102

Project : Bagan Golden Star Hotel


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

531
532
533
534
535
536
537
538
539
540
541
613
629
630
631
632
633
634
635
636
637
638
639
640
641
642
661
662
663
667
670
682
686
689
693
698
701
702
703
704
705

Load
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY

FX
15.52
11.5
6.22
20.27
12.91
7.05
28.66
8.75
17.3
33.28
23.43
9.59
21.91
23.58
17.66
9.56
3.58
53.3
56.83
54.71
12.89
6.88
7.79
5.83
4.88
7.28
2.42
0.57
1.95
13.07
10.38
9.66
8.2
8.06
9.18
11.41
10.18
4.52
6.85
13.37
12.72

Chan Phuong Engineering (CPE)

Design Development Report


FY
95.94
84.75
84.56
91.13
102.04
98.09
109.16
107.65
108.48
95.44
139.48
61.33
60.63
141.75
130.44
121.78
147.33
235.25
358.01
192.94
149.37
178.12
91.34
103.37
27.9
25.18
57.27
9.98
48.1
55.46
57.2
35.54
21.23
47.66
48.51
52.02
49.46
57.01
56.9
48.68
42.29

FZ
209.24
65.02
45.13
123.08
63.98
114.55
16.39
10.38
24.01
109.3
298.58
167.15
415.12
46.42
351.43
116.12
130.26
146.95
109.87
136.05
130.31
179.75
40.51
85.1
336.09
134.56
17.49
3.85
17.73
130.25
127.23
28.67
131.99
59.06
69.01
75.29
13.3
2.86
4.93
18.94
15.99

MX
130.604
110.419
109.957
114.785
133.067
130.85
142.632
141.737
142.975
264.836
258.401
78.129
163.463
324.409
311.699
302.121
331.665
336.292
383.779
223.834
381.072
413.768
221.176
232.379
59.559
60.715
99.641
38.22
83.289
75.653
77.308
70.885
47.361
88.793
70.574
73.014
63.246
69.247
69.131
62.545
54.821

MY

MZ

34.007
20.377
10.987
33.329
27.822
11.486
52.081
17.25
33.075
49.075
38.672
12.426
47.43
51.038
39.768
22.268
8.054
41.72
50.283
52.182
28.511
13.734
17.399
11.17
10.603
14.196
4.15
1.451
3.348
16.252
12.656
17.022
10.096
14.762
10.786
14.031
12.868
5.447
8.255
16.562
15.926

1.493
1.493
1.493
1.493
1.493
1.493
1.965
1.965
1.965
1.965
1.965
0.388
1.835
2.415
2.415
2.415
2.415
1.162
1.162
0.883
2.999
2.999
2.415
1.965
0.477
0.477
0.477
0.388
0.477
0.388
0.388
0.477
0.388
0.477
0.388
0.388
0.605
0.605
0.605
0.605
0.605

Page 103

Project : Bagan Golden Star Hotel


Story

Point

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
471
472
473
474
475
476
477
478

Load
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY
SEISY

FX
6.6
4.53
10.57
10.42
4.61
6.52
12.54
12.29
6.41
4.72
10.4
10.18
11.83
6.27
4.89
10.17
4.64
5.8
11.54
11.63
5.75
4.78
10.08
5.71
2.32
2.91
5.79
6.31
4.79
55.64
58.89
42.65
36.16
19.38
37.4
24.2
37.72

Design Development Report


FY

FZ

50.65
50.73
42.6
38.07
45.25
45.18
37.82
34.23
40.73
40.79
34.42
31.88
31.82
37.21
37.2
34.17
36.78
36.78
34.18
37.13
39.97
39.98
37.08
21.29
21.81
21.64
20.85
37.05
37.07
198.19
444.32
340.42
109.36
129.98
82.38
85.13
74.83

4.28
4.02
17.11
14.92
3.64
3.19
14.71
13.51
6.37
6.5
13.69
13.23
12.96
12.28
12.52
18.34
10.19
9.99
17.89
18.73
12.95
10.06
15.56
24.67
17.97
9.33
9.85
3.22
3.1
216.43
139.68
244.96
175.82
149.11
165.52
156.08
151.23

MX
61.546
61.642
55.154
49.229
54.945
54.858
48.959
44.248
49.497
49.564
44.453
41.133
41.05
45.236
45.216
43.269
45.381
45.397
43.311
47.003
49.302
49.292
46.911
26.041
26.495
26.31
25.584
45.032
45.058
218.382
521.412
485.504
236.909
252.212
205.562
207.598
190.022

MY

MZ

8.025
5.496
13.155
12.995
5.601
7.916
15.648
15.308
7.784
5.723
12.938
12.733
14.779
7.579
5.915
12.673
5.745
7.197
14.423
14.346
7.117
5.89
12.56
6.719
2.855
3.546
7.057
7.654
5.825
53.401
55.011
39.586
50.77
29.323
53.876
34.619
54.367

0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.605
0.292
0.292
0.292
0.292
0.605
0.605
0.883
1.443
1.443
1.965
1.965
1.965
1.965
1.965

Chan Phuong Engineering (CPE)

Page 104

Project : Bagan Golden Star Hotel

Design Development Report

Appendix C
Column forces

Chan Phuong Engineering (CPE)

Page 105

Project : Bagan Golden Star Hotel

Design Development Report


Table B.7 Column forces

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

6.6M

C188

DEAD

-451.0

17.6

-17.1

0.0

-27.0

23.9

6.6M

C188

DEAD

1.3

-447.9

17.6

-17.1

0.0

-4.7

1.0

6.6M

C188

DEAD

2.6

-444.8

17.6

-17.1

0.0

17.9

-22.0

3.5M

C188

DEAD

-661.7

7.7

-55.5

0.0

-76.7

8.2

3.5M

C188

DEAD

1.2

-657.4

7.7

-55.5

0.0

-10.0

-1.0

3.5M

C188

DEAD

2.4

-653.0

7.7

-55.5

0.0

56.9

-10.2

3.5M

C188

SEISX

48.0

22.4

129.9

0.6

204.9

33.9

3.5M

C188

SEISY

68.6

195.8

55.9

4.0

88.2

297.6

0.6M

C188

DEAD

-906.2

31.8

-90.2

0.0

-21.4

18.1

0.6M

C188

DEAD

0.301

-905.1

31.8

-90.2

0.0

5.8

8.5

0.6M

C188

DEAD

0.601

-904.0

31.8

-90.2

0.0

33.0

-1.0

48.1

-65.9

0.2

-61.9

30.1

-0.6M

C188

DEAD

-950.4

-0.6M

C188

DEAD

0.2

-949.7

48.1

-65.9

0.2

-48.8

20.5

-0.6M

C188

DEAD

0.4

-949.0

48.1

-65.9

0.2

-35.7

10.9

-1.5M

C188

DEAD

-1117.1

19.0

-57.3

-0.1

-29.0

7.3

-1.5M

C188

DEAD

0.45

-1115.5

19.0

-57.3

-0.1

-3.1

-1.3

-1.5M

C188

DEAD

0.9

-1113.9

19.0

-57.3

-0.1

22.7

-9.9

-1.5M

C188

LIVE

-419.4

25.5

-77.3

-0.1

-41.0

10.1

-1.5M

C188

LIVE

0.45

-419.4

25.5

-77.3

-0.1

-6.0

-1.4

-1.5M

C188

LIVE

0.9

-419.4

25.5

-77.3

-0.1

28.9

-12.8

6.6M

C189

DEAD

-646.7

-12.9

-26.8

0.0

-37.9

-24.0

6.6M

C189

DEAD

1.3

-642.3

-12.9

-26.8

0.0

-2.9

-7.2

6.6M

C189

DEAD

2.6

-637.9

-12.9

-26.8

0.0

32.4

9.6

6.6M

C189

SEISY

2.6

25.2

146.6

13.7

2.0

20.1

258.1

3.5M

C189

DEAD

-821.9

-22.1

-51.2

0.0

-66.0

-17.0

-22.1

-51.2

0.0

-4.4

9.6

3.5M

C189

DEAD

1.2

-815.9

3.5M

C189

DEAD

2.4

-809.8

-22.1

-51.2

0.0

57.3

36.1

3.5M

C189

SEISX

74.9

28.2

172.6

1.1

294.7

57.5

3.5M

C189

SEISY

74.2

235.3

60.1

6.5

103.0

498.1

0.6M

C189

DEAD

-1119.5

21.9

-74.7

-0.1

-26.0

-5.8

0.6M

C189

DEAD

0.3

-1118.0

21.9

-74.7

-0.1

-3.6

-12.4

0.6M

C189

DEAD

0.6

-1116.4

21.9

-74.7

-0.1

18.9

-19.0

0.6M

C189

LIVE

-405.0

21.0

-49.9

-0.2

-21.4

6.8

0.6M

C189

LIVE

0.3

-405.0

21.0

-49.9

-0.2

-6.4

0.5

0.6M

C189

LIVE

0.6

-405.0

21.0

-49.9

-0.2

8.7

-5.8

0.6M

C189

SEISX

20.4

23.4

380.4

1.4

221.2

14.4

Chan Phuong Engineering (CPE)

Page 106

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-0.6M

C189

DEAD

-1135.0

-43.7

-141.5

0.3

-95.5

-6.7

-0.6M

C189

DEAD

0.15

-1134.3

-43.7

-141.5

0.3

-74.3

-0.2

-0.6M

C189

DEAD

0.3

-1133.5

-43.7

-141.5

0.3

-53.1

6.4

-0.6M

C189

SEISY

177.2

474.1

122.8

4.5

57.8

358.2

-0.6M

C189

SEISY

0.15

177.2

474.1

122.8

4.5

39.3

287.0

-1.5M

C189

DEAD

-1401.7

-6.0

-69.4

-0.2

-34.4

-4.1

-1.5M

C189

DEAD

0.45

-1399.4

-6.0

-69.4

-0.2

-3.1

-1.4

-1.5M

C189

DEAD

0.9

-1397.1

-6.0

-69.4

-0.2

28.3

1.3

-1.5M

C189

LIVE

-702.4

-5.0

-127.2

-0.2

-65.3

-3.3

-1.5M

C189

LIVE

0.45

-702.4

-5.0

-127.2

-0.2

-7.9

-1.1

0.9

-702.4

-5.0

-127.2

-0.2

49.6

1.2

-1.5M

C189

LIVE

-1.5M

C189

SEISX

156.2

61.6

161.8

0.4

160.1

69.7

-1.5M

C189

SEISY

139.7

442.1

73.5

1.4

70.9

519.4

-1.5M

C189

SEISY

0.45

139.7

442.1

73.5

1.4

37.6

320.2

6.6M

C190

DEAD

-520.9

-8.2

-5.0

0.0

-0.5

6.0

6.6M

C190

DEAD

1.3

-516.6

-8.2

-5.0

0.0

6.2

16.7

6.6M

C190

DEAD

2.6

-512.2

-8.2

-5.0

0.0

12.6

27.3

6.6M

C190

SEISY

2.6

107.3

133.9

9.4

3.1

16.5

295.0

3.5M

C190

DEAD

-535.5

-8.2

-5.0

0.0

-15.4

-17.8

3.5M

C190

DEAD

1.45

-528.2

-8.2

-5.0

0.0

-8.1

-5.9

3.5M

C190

DEAD

2.9

-520.9

-8.2

-5.0

0.0

-0.5

6.0

3.5M

C190

SEISX

25.1

14.2

37.6

0.5

150.4

48.1

3.5M

C190

SEISY

107.3

135.7

9.8

3.1

39.7

455.5

3.5M

C190

SEISY

1.45

107.3

135.7

9.8

3.1

25.1

257.3

-13.7

-37.3

0.1

-17.9

-11.5

0.6M

C190

DEAD

-988.1

0.6M

C190

DEAD

0.3

-986.6

-13.7

-37.3

0.1

-6.7

-7.4

0.6M

C190

DEAD

0.6

-985.1

-13.7

-37.3

0.1

4.5

-3.3

-0.6M

C190

DEAD

-992.7

-13.7

-37.3

0.1

-51.4

-23.8

-0.6M

C190

DEAD

0.45

-990.4

-13.7

-37.3

0.1

-34.7

-17.6

-0.6M

C190

DEAD

0.9

-988.1

-13.7

-37.3

0.1

-17.9

-11.5

-0.6M

C190

SEISY

147.7

276.2

39.9

4.3

31.6

267.8

-1.5M

C190

DEAD

-1160.2

-36.5

-64.6

-0.2

-31.0

-14.5

-1.5M

C190

DEAD

0.45

-1158.0

-36.5

-64.6

-0.2

-1.9

1.9

-1.5M

C190

DEAD

0.9

-1155.7

-36.5

-64.6

-0.2

27.2

18.4

-1.5M

C190

LIVE

-507.4

-39.6

-83.5

-0.2

-43.7

-15.2

-1.5M

C190

LIVE

0.45

-507.4

-39.6

-83.5

-0.2

-6.0

2.7

-1.5M

C190

LIVE

0.9

-507.4

-39.6

-83.5

-0.2

31.7

20.5

Chan Phuong Engineering (CPE)

Page 107

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C190

SEISX

48.3

52.3

144.8

0.4

150.9

66.4

-1.5M

C190

SEISY

245.0

338.6

54.7

1.4

55.9

483.8

-1.5M

C190

SEISY

0.45

245.0

338.6

54.7

1.4

31.2

331.3

3.5M

C191

DEAD

-632.2

11.8

3.4

0.0

2.2

11.0

3.5M

C191

DEAD

1.2

-627.0

11.8

3.4

0.0

-1.8

-3.1

3.5M

C191

DEAD

2.4

-621.9

11.8

3.4

0.0

-5.8

-17.3

0.6M

C191

DEAD

-637.4

11.8

3.4

0.0

6.2

25.1

0.6M

C191

DEAD

0.6

-634.8

11.8

3.4

0.0

4.2

18.1

0.6M

C191

DEAD

1.2

-632.2

11.8

3.4

0.0

2.2

11.0

0.6M

C191

SEISX

16.5

7.4

72.3

0.7

161.0

19.1

17.4

4.9

0.0

-4.2

-14.5

-0.6M

C191

DEAD

-856.7

-0.6M

C191

DEAD

0.2

-855.8

17.4

4.9

0.0

-5.2

-17.9

-0.6M

C191

DEAD

0.4

-854.9

17.4

4.9

0.0

-6.1

-21.4

-1.5M

C191

DEAD

-863.1

17.4

4.9

0.0

3.2

11.7

-1.5M

C191

DEAD

0.75

-859.9

17.4

4.9

0.0

-0.5

-1.4

-1.5M

C191

DEAD

1.5

-856.7

17.4

4.9

0.0

-4.2

-14.5

3.5M

C192

DEAD

-587.3

-9.5

-7.6

0.0

-13.3

7.1

3.5M

C192

DEAD

1.2

-582.1

-9.5

-7.6

0.0

-4.3

18.6

3.5M

C192

DEAD

2.4

-576.9

-9.5

-7.6

0.0

4.9

30.0

3.5M

C192

SEISX

15.9

19.3

132.2

0.8

184.1

40.0

3.5M

C192

SEISY

28.2

159.1

37.5

5.3

50.6

331.9

0.6M

C192

DEAD

-748.6

33.5

10.3

-0.1

19.1

-19.4

0.6M

C192

DEAD

0.3

-747.3

33.5

10.3

-0.1

16.1

-29.5

0.6M

C192

DEAD

0.6

-746.0

33.5

10.3

-0.1

13.0

-39.6

-19.6

8.8

0.0

-6.9

14.1

-0.6M

C192

DEAD

-937.5

-0.6M

C192

DEAD

0.2

-936.6

-19.6

8.8

0.0

-8.6

18.0

-0.6M

C192

DEAD

0.4

-935.8

-19.6

8.8

0.0

-10.4

21.9

-1.5M

C192

DEAD

-944.0

-19.6

8.8

0.0

6.3

-15.3

-1.5M

C192

DEAD

0.75

-940.7

-19.6

8.8

0.0

-0.3

-0.6

-1.5M

C192

DEAD

1.5

-937.5

-19.6

8.8

0.0

-6.9

14.1

-1.5M

C192

SEISY

149.1

129.6

21.8

2.0

34.1

251.5

3.5M

C193

DEAD

-643.9

11.6

-2.5

0.0

-2.2

14.4

3.5M

C193

DEAD

1.2

-638.8

11.6

-2.5

0.0

0.9

0.5

3.5M

C193

DEAD

2.4

-633.6

11.6

-2.5

0.0

3.9

-13.4

0.6M

C193

DEAD

-649.1

11.6

-2.5

0.0

-5.2

28.2

0.6M

C193

DEAD

0.6

-646.5

11.6

-2.5

0.0

-3.7

21.3

0.6M

C193

DEAD

1.2

-643.9

11.6

-2.5

0.0

-2.2

14.4

Chan Phuong Engineering (CPE)

Page 108

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

0.6M

C193

SEISX

12.1

5.4

73.6

0.7

162.4

14.0

-0.6M

C193

DEAD

-887.7

23.6

-2.2

0.0

0.9

-19.3

-0.6M

C193

DEAD

0.2

-886.8

23.6

-2.2

0.0

1.4

-24.0

-0.6M

C193

DEAD

0.4

-885.9

23.6

-2.2

0.0

1.8

-28.7

-1.5M

C193

DEAD

-894.1

23.6

-2.2

0.0

-2.3

16.1

-1.5M

C193

DEAD

0.75

-890.9

23.6

-2.2

0.0

-0.7

-1.6

-1.5M

C193

DEAD

1.5

-887.7

23.6

-2.2

0.0

0.9

-19.3

3.5M

C194

DEAD

-594.6

-14.1

-1.6

0.0

-2.0

-11.6

3.5M

C194

DEAD

1.2

-589.4

-14.1

-1.6

0.0

-0.1

5.4

3.5M

C194

DEAD

2.4

-584.2

-14.1

-1.6

0.0

1.9

22.3

-14.1

-1.6

0.0

-3.9

-28.6

0.6M

C194

DEAD

-599.8

0.6M

C194

DEAD

0.6

-597.2

-14.1

-1.6

0.0

-2.9

-20.1

0.6M

C194

DEAD

1.2

-594.6

-14.1

-1.6

0.0

-2.0

-11.6

0.6M

C194

SEISX

12.5

5.9

73.8

0.7

162.0

15.2

-0.6M

C194

DEAD

-860.8

-17.7

-2.1

0.0

1.0

12.6

-0.6M

C194

DEAD

0.2

-859.9

-17.7

-2.1

0.0

1.4

16.1

-0.6M

C194

DEAD

0.4

-859.0

-17.7

-2.1

0.0

1.8

19.7

-1.5M

C194

DEAD

-867.3

-17.7

-2.1

0.0

-2.3

-14.0

-1.5M

C194

DEAD

0.75

-864.0

-17.7

-2.1

0.0

-0.6

-0.7

-1.5M

C194

DEAD

1.5

-860.8

-17.7

-2.1

0.0

1.0

12.6

3.5M

C195

DEAD

-642.0

9.4

-0.6

0.0

-1.2

14.5

3.5M

C195

DEAD

1.2

-636.8

9.4

-0.6

0.0

-0.4

3.3

3.5M

C195

DEAD

2.4

-631.6

9.4

-0.6

0.0

0.4

-8.0

0.6M

C195

DEAD

-647.2

9.4

-0.6

0.0

-2.0

25.7

9.4

-0.6

0.0

-1.6

20.1

0.6M

C195

DEAD

0.6

-644.6

0.6M

C195

DEAD

1.2

-642.0

9.4

-0.6

0.0

-1.2

14.5

0.6M

C195

SEISX

11.4

4.0

73.8

0.7

162.9

10.8

-0.6M

C195

DEAD

-875.9

24.5

-0.8

0.0

0.0

-20.1

-0.6M

C195

DEAD

0.2

-875.1

24.5

-0.8

0.0

0.1

-25.0

-0.6M

C195

DEAD

0.4

-874.2

24.5

-0.8

0.0

0.3

-29.9

-1.5M

C195

DEAD

-882.4

24.5

-0.8

0.0

-1.3

16.6

-1.5M

C195

DEAD

0.75

-879.2

24.5

-0.8

0.0

-0.7

-1.8

-1.5M

C195

DEAD

1.5

-875.9

24.5

-0.8

0.0

0.0

-20.1

3.5M

C196

DEAD

-594.7

-13.9

-1.1

0.0

-1.1

-11.9

3.5M

C196

DEAD

1.2

-589.5

-13.9

-1.1

0.0

0.2

4.9

3.5M

C196

DEAD

2.4

-584.3

-13.9

-1.1

0.0

1.5

21.7

0.6M

C196

DEAD

-599.9

-13.9

-1.1

0.0

-2.4

-28.6

Chan Phuong Engineering (CPE)

Page 109

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

0.6M

C196

DEAD

0.6

-597.3

-13.9

-1.1

0.0

-1.8

-20.2

0.6M

C196

DEAD

1.2

-594.7

-13.9

-1.1

0.0

-1.1

-11.9

0.6M

C196

SEISX

11.7

4.0

72.5

0.7

159.8

10.9

-0.6M

C196

DEAD

-851.5

-17.9

-0.6

0.0

-0.2

12.6

-0.6M

C196

DEAD

0.2

-850.6

-17.9

-0.6

0.0

0.0

16.2

-0.6M

C196

DEAD

0.4

-849.8

-17.9

-0.6

0.0

0.1

19.8

-1.5M

C196

DEAD

-858.0

-17.9

-0.6

0.0

-1.0

-14.3

-1.5M

C196

DEAD

0.75

-854.7

-17.9

-0.6

0.0

-0.6

-0.8

-1.5M

C196

DEAD

1.5

-851.5

-17.9

-0.6

0.0

-0.2

12.6

3.5M

C197

DEAD

-642.2

9.3

-1.6

0.0

-1.3

14.4

9.3

-1.6

0.0

0.7

3.2

3.5M

C197

DEAD

1.2

-637.0

3.5M

C197

DEAD

2.4

-631.8

9.3

-1.6

0.0

2.7

-8.0

0.6M

C197

DEAD

-647.4

9.3

-1.6

0.0

-3.3

25.5

0.6M

C197

DEAD

0.6

-644.8

9.3

-1.6

0.0

-2.3

19.9

0.6M

C197

DEAD

1.2

-642.2

9.3

-1.6

0.0

-1.3

14.4

0.6M

C197

SEISX

9.0

3.9

73.8

0.7

162.9

9.8

-0.6M

C197

DEAD

-877.2

24.4

-0.8

0.0

-0.1

-20.2

-0.6M

C197

DEAD

0.2

-876.3

24.4

-0.8

0.0

0.1

-25.1

-0.6M

C197

DEAD

0.4

-875.5

24.4

-0.8

0.0

0.2

-30.0

-1.5M

C197

DEAD

-883.7

24.4

-0.8

0.0

-1.2

16.4

-1.5M

C197

DEAD

0.75

-880.4

24.4

-0.8

0.0

-0.7

-1.9

-1.5M

C197

DEAD

1.5

-877.2

24.4

-0.8

0.0

-0.1

-20.2

3.5M

C198

DEAD

-595.1

-14.0

-1.1

0.0

-1.2

-12.0

3.5M

C198

DEAD

1.2

-589.9

-14.0

-1.1

0.0

0.1

4.9

-14.0

-1.1

0.0

1.5

21.8

3.5M

C198

DEAD

2.4

-584.7

0.6M

C198

DEAD

-600.2

-14.0

-1.1

0.0

-2.6

-28.8

0.6M

C198

DEAD

0.6

-597.7

-14.0

-1.1

0.0

-1.9

-20.4

0.6M

C198

DEAD

1.2

-595.1

-14.0

-1.1

0.0

-1.2

-12.0

0.6M

C198

SEISX

9.0

3.9

72.7

0.7

160.1

9.8

-0.6M

C198

DEAD

-852.9

-18.0

-0.8

0.0

0.0

12.5

-0.6M

C198

DEAD

0.2

-852.0

-18.0

-0.8

0.0

0.1

16.1

-0.6M

C198

DEAD

0.4

-851.1

-18.0

-0.8

0.0

0.3

19.7

-1.5M

C198

DEAD

-859.3

-18.0

-0.8

0.0

-1.2

-14.5

-1.5M

C198

DEAD

0.75

-856.1

-18.0

-0.8

0.0

-0.6

-1.0

-1.5M

C198

DEAD

1.5

-852.9

-18.0

-0.8

0.0

0.0

12.5

3.5M

C199

DEAD

-627.8

11.9

-1.2

0.0

-1.3

13.9

3.5M

C199

DEAD

1.2

-622.6

11.9

-1.2

0.0

0.1

-0.4

Chan Phuong Engineering (CPE)

Page 110

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

3.5M

C199

DEAD

2.4

-617.5

11.9

-1.2

0.0

1.6

-14.7

0.6M

C199

DEAD

-633.0

11.9

-1.2

0.0

-2.8

28.1

0.6M

C199

DEAD

0.6

-630.4

11.9

-1.2

0.0

-2.1

21.0

0.6M

C199

DEAD

1.2

-627.8

11.9

-1.2

0.0

-1.3

13.9

0.6M

C199

SEISX

7.0

5.1

73.8

0.7

162.9

12.5

-0.6M

C199

DEAD

-863.0

23.1

-0.9

0.0

0.0

-19.4

-0.6M

C199

DEAD

0.2

-862.1

23.1

-0.9

0.0

0.2

-24.0

-0.6M

C199

DEAD

0.4

-861.3

23.1

-0.9

0.0

0.3

-28.6

-1.5M

C199

DEAD

-869.5

23.1

-0.9

0.0

-1.3

15.3

-1.5M

C199

DEAD

0.75

-866.2

23.1

-0.9

0.0

-0.7

-2.1

23.1

-0.9

0.0

0.0

-19.4

-1.5M

C199

DEAD

1.5

-863.0

3.5M

C200

DEAD

-596.3

-14.3

-1.1

0.0

-1.2

-12.1

3.5M

C200

DEAD

1.2

-591.1

-14.3

-1.1

0.0

0.1

5.1

3.5M

C200

DEAD

2.4

-585.9

-14.3

-1.1

0.0

1.5

22.3

0.6M

C200

DEAD

-601.5

-14.3

-1.1

0.0

-2.6

-29.2

0.6M

C200

DEAD

0.6

-598.9

-14.3

-1.1

0.0

-1.9

-20.7

0.6M

C200

DEAD

1.2

-596.3

-14.3

-1.1

0.0

-1.2

-12.1

0.6M

C200

SEISX

7.0

5.1

72.6

0.7

160.0

12.5

-0.6M

C200

DEAD

-854.0

-17.9

-0.7

0.0

0.0

12.3

-0.6M

C200

DEAD

0.2

-853.1

-17.9

-0.7

0.0

0.1

15.9

-0.6M

C200

DEAD

0.4

-852.2

-17.9

-0.7

0.0

0.3

19.5

-1.5M

C200

DEAD

-860.5

-17.9

-0.7

0.0

-1.2

-14.6

-1.5M

C200

DEAD

0.75

-857.2

-17.9

-0.7

0.0

-0.6

-1.2

-1.5M

C200

DEAD

1.5

-854.0

-17.9

-0.7

0.0

0.0

12.3

12.1

-1.2

0.0

-1.3

13.6

3.5M

C201

DEAD

-627.0

3.5M

C201

DEAD

1.2

-621.8

12.1

-1.2

0.0

0.2

-0.9

3.5M

C201

DEAD

2.4

-616.6

12.1

-1.2

0.0

1.6

-15.4

0.6M

C201

DEAD

-632.2

12.1

-1.2

0.0

-2.8

28.1

0.6M

C201

DEAD

0.6

-629.6

12.1

-1.2

0.0

-2.1

20.9

0.6M

C201

DEAD

1.2

-627.0

12.1

-1.2

0.0

-1.3

13.6

0.6M

C201

SEISX

9.4

6.3

73.8

0.7

162.9

15.4

-0.6M

C201

DEAD

-862.0

22.8

-0.8

0.0

0.0

-19.3

-0.6M

C201

DEAD

0.2

-861.2

22.8

-0.8

0.0

0.1

-23.9

-0.6M

C201

DEAD

0.4

-860.3

22.8

-0.8

0.0

0.3

-28.5

-1.5M

C201

DEAD

-868.5

22.8

-0.8

0.0

-1.3

14.9

-1.5M

C201

DEAD

0.75

-865.3

22.8

-0.8

0.0

-0.7

-2.2

-1.5M

C201

DEAD

1.5

-862.0

22.8

-0.8

0.0

0.0

-19.3

Chan Phuong Engineering (CPE)

Page 111

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

3.5M

C202

DEAD

-596.9

-14.4

-1.1

0.0

-1.2

-12.2

3.5M

C202

DEAD

1.2

-591.8

-14.4

-1.1

0.0

0.1

5.1

3.5M

C202

DEAD

2.4

-586.6

-14.4

-1.1

0.0

1.5

22.5

0.6M

C202

DEAD

-602.1

-14.4

-1.1

0.0

-2.6

-29.5

0.6M

C202

DEAD

0.6

-599.5

-14.4

-1.1

0.0

-1.9

-20.9

0.6M

C202

DEAD

1.2

-596.9

-14.4

-1.1

0.0

-1.2

-12.2

0.6M

C202

SEISX

9.4

6.3

72.6

0.7

160.0

15.4

-0.6M

C202

DEAD

-854.6

-17.9

-0.7

0.0

0.0

12.1

-0.6M

C202

DEAD

0.2

-853.8

-17.9

-0.7

0.0

0.1

15.7

-0.6M

C202

DEAD

0.4

-852.9

-17.9

-0.7

0.0

0.3

19.3

-17.9

-0.7

0.0

-1.2

-14.8

-1.5M

C202

DEAD

-861.1

-1.5M

C202

DEAD

0.75

-857.9

-17.9

-0.7

0.0

-0.6

-1.3

-1.5M

C202

DEAD

1.5

-854.6

-17.9

-0.7

0.0

0.0

12.1

3.5M

C203

DEAD

-626.7

12.0

-1.2

0.0

-1.3

13.5

3.5M

C203

DEAD

1.2

-621.5

12.0

-1.2

0.0

0.2

-0.9

3.5M

C203

DEAD

2.4

-616.3

12.0

-1.2

0.0

1.7

-15.4

0.6M

C203

DEAD

-631.9

12.0

-1.2

0.0

-2.8

27.9

0.6M

C203

DEAD

0.6

-629.3

12.0

-1.2

0.0

-2.1

20.7

0.6M

C203

DEAD

1.2

-626.7

12.0

-1.2

0.0

-1.3

13.5

0.6M

C203

SEISX

11.8

7.5

73.8

0.7

162.9

18.4

-0.6M

C203

DEAD

-861.7

22.8

-0.8

0.0

0.0

-19.5

-0.6M

C203

DEAD

0.2

-860.8

22.8

-0.8

0.0

0.2

-24.1

-0.6M

C203

DEAD

0.4

-860.0

22.8

-0.8

0.0

0.3

-28.6

-1.5M

C203

DEAD

-868.2

22.8

-0.8

0.0

-1.3

14.8

22.8

-0.8

0.0

-0.7

-2.4

-1.5M

C203

DEAD

0.75

-864.9

-1.5M

C203

DEAD

1.5

-861.7

22.8

-0.8

0.0

0.0

-19.5

3.5M

C204

DEAD

-597.5

-14.4

-1.1

0.0

-1.2

-12.3

3.5M

C204

DEAD

1.2

-592.3

-14.4

-1.1

0.0

0.1

5.1

3.5M

C204

DEAD

2.4

-587.1

-14.4

-1.1

0.0

1.5

22.4

0.6M

C204

DEAD

-602.7

-14.4

-1.1

0.0

-2.6

-29.6

0.6M

C204

DEAD

0.6

-600.1

-14.4

-1.1

0.0

-1.9

-21.0

0.6M

C204

DEAD

1.2

-597.5

-14.4

-1.1

0.0

-1.2

-12.3

0.6M

C204

SEISX

11.8

7.5

72.6

0.7

160.1

18.4

-0.6M

C204

DEAD

-855.3

-17.9

-0.7

0.0

0.0

12.0

-0.6M

C204

DEAD

0.2

-854.4

-17.9

-0.7

0.0

0.1

15.6

-0.6M

C204

DEAD

0.4

-853.5

-17.9

-0.7

0.0

0.3

19.2

-1.5M

C204

DEAD

-861.7

-17.9

-0.7

0.0

-1.2

-14.9

Chan Phuong Engineering (CPE)

Page 112

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C204

DEAD

0.75

-858.5

-17.9

-0.7

0.0

-0.6

-1.5

-1.5M

C204

DEAD

1.5

-855.3

-17.9

-0.7

0.0

0.0

12.0

3.5M

C205

DEAD

-626.5

12.0

-1.2

0.0

-1.3

13.4

3.5M

C205

DEAD

1.2

-621.3

12.0

-1.2

0.0

0.2

-1.0

3.5M

C205

DEAD

2.4

-616.1

12.0

-1.2

0.0

1.6

-15.3

0.6M

C205

DEAD

-631.7

12.0

-1.2

0.0

-2.8

27.7

0.6M

C205

DEAD

0.6

-629.1

12.0

-1.2

0.0

-2.0

20.5

0.6M

C205

DEAD

1.2

-626.5

12.0

-1.2

0.0

-1.3

13.4

0.6M

C205

SEISX

14.5

8.8

73.8

0.7

162.9

21.6

-0.6M

C205

DEAD

-861.6

22.8

-0.8

0.0

0.0

-19.6

22.8

-0.8

0.0

0.1

-24.2

-0.6M

C205

DEAD

0.2

-860.7

-0.6M

C205

DEAD

0.4

-859.8

22.8

-0.8

0.0

0.3

-28.7

-1.5M

C205

DEAD

-868.0

22.8

-0.8

0.0

-1.3

14.6

-1.5M

C205

DEAD

0.75

-864.8

22.8

-0.8

0.0

-0.7

-2.5

-1.5M

C205

DEAD

1.5

-861.6

22.8

-0.8

0.0

0.0

-19.6

3.5M

C206

DEAD

-599.4

-14.5

-1.0

0.0

-1.2

-12.5

3.5M

C206

DEAD

1.2

-594.2

-14.5

-1.0

0.0

0.1

5.0

3.5M

C206

DEAD

2.4

-589.0

-14.5

-1.0

0.0

1.4

22.4

0.6M

C206

DEAD

-604.6

-14.5

-1.0

0.0

-2.5

-29.8

0.6M

C206

DEAD

0.6

-602.0

-14.5

-1.0

0.0

-1.8

-21.2

0.6M

C206

DEAD

1.2

-599.4

-14.5

-1.0

0.0

-1.2

-12.5

0.6M

C206

SEISX

14.3

8.8

72.6

0.7

159.9

21.6

-0.6M

C206

DEAD

-857.4

-18.0

-0.7

0.0

-0.1

11.9

-0.6M

C206

DEAD

0.2

-856.5

-18.0

-0.7

0.0

0.1

15.5

-18.0

-0.7

0.0

0.2

19.0

-0.6M

C206

DEAD

0.4

-855.7

-1.5M

C206

DEAD

-863.9

-18.0

-0.7

0.0

-1.1

-15.1

-1.5M

C206

DEAD

0.75

-860.6

-18.0

-0.7

0.0

-0.6

-1.6

-1.5M

C206

DEAD

1.5

-857.4

-18.0

-0.7

0.0

-0.1

11.9

3.5M

C207

DEAD

-626.3

11.8

-1.2

0.0

-1.3

13.2

3.5M

C207

DEAD

1.2

-621.1

11.8

-1.2

0.0

0.2

-1.0

3.5M

C207

DEAD

2.4

-615.9

11.8

-1.2

0.0

1.7

-15.1

0.6M

C207

DEAD

-631.5

11.8

-1.2

0.0

-2.8

27.3

0.6M

C207

DEAD

0.6

-628.9

11.8

-1.2

0.0

-2.1

20.2

0.6M

C207

DEAD

1.2

-626.3

11.8

-1.2

0.0

-1.3

13.2

0.6M

C207

SEISX

16.8

10.1

73.9

0.7

162.9

24.7

-0.6M

C207

DEAD

-861.0

22.6

-0.9

0.0

0.0

-19.7

-0.6M

C207

DEAD

0.2

-860.2

22.6

-0.9

0.0

0.2

-24.2

Chan Phuong Engineering (CPE)

Page 113

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-0.6M

C207

DEAD

0.4

-859.3

22.6

-0.9

0.0

0.3

-28.7

-1.5M

C207

DEAD

-867.5

22.6

-0.9

0.0

-1.3

14.3

-1.5M

C207

DEAD

0.75

-864.3

22.6

-0.9

0.0

-0.7

-2.7

-1.5M

C207

DEAD

1.5

-861.0

22.6

-0.9

0.0

0.0

-19.7

3.5M

C208

DEAD

-592.7

-14.7

-1.6

0.0

-1.5

-12.6

3.5M

C208

DEAD

1.2

-587.5

-14.7

-1.6

0.0

0.5

5.1

3.5M

C208

DEAD

2.4

-582.3

-14.7

-1.6

0.0

2.4

22.9

0.6M

C208

DEAD

-597.9

-14.7

-1.6

0.0

-3.4

-30.3

0.6M

C208

DEAD

0.6

-595.3

-14.7

-1.6

0.0

-2.4

-21.5

0.6M

C208

DEAD

1.2

-592.7

-14.7

-1.6

0.0

-1.5

-12.6

10.0

72.9

0.7

160.6

24.5

0.6M

C208

SEISX

19.8

-0.6M

C208

DEAD

-848.6

-18.0

-1.1

0.0

0.2

11.7

-0.6M

C208

DEAD

0.2

-847.8

-18.0

-1.1

0.0

0.4

15.3

-0.6M

C208

DEAD

0.4

-846.9

-18.0

-1.1

0.0

0.7

18.9

-1.5M

C208

DEAD

-855.1

-18.0

-1.1

0.0

-1.4

-15.3

-1.5M

C208

DEAD

0.75

-851.9

-18.0

-1.1

0.0

-0.6

-1.8

-1.5M

C208

DEAD

1.5

-848.6

-18.0

-1.1

0.0

0.2

11.7

3.5M

C209

DEAD

-612.2

13.6

-1.5

0.0

-1.3

12.7

3.5M

C209

DEAD

1.2

-607.1

13.6

-1.5

0.0

0.5

-3.6

3.5M

C209

DEAD

2.4

-601.9

13.6

-1.5

0.0

2.3

-19.9

0.6M

C209

DEAD

-617.4

13.6

-1.5

0.0

-3.1

28.9

0.6M

C209

DEAD

0.6

-614.8

13.6

-1.5

0.0

-2.2

20.8

0.6M

C209

DEAD

1.2

-612.2

13.6

-1.5

0.0

-1.3

12.7

0.6M

C209

SEISX

28.3

11.4

73.3

0.7

162.1

28.1

21.5

-0.7

0.0

-0.1

-19.0

-0.6M

C209

DEAD

-848.0

-0.6M

C209

DEAD

0.2

-847.1

21.5

-0.7

0.0

0.0

-23.3

-0.6M

C209

DEAD

0.4

-846.2

21.5

-0.7

0.0

0.2

-27.6

-1.5M

C209

DEAD

-854.5

21.5

-0.7

0.0

-1.2

13.4

-1.5M

C209

DEAD

0.75

-851.2

21.5

-0.7

0.0

-0.7

-2.8

-1.5M

C209

DEAD

1.5

-848.0

21.5

-0.7

0.0

-0.1

-19.0

3.5M

C210

DEAD

-588.6

-19.1

2.5

0.0

1.1

-14.1

3.5M

C210

DEAD

1.2

-583.4

-19.1

2.5

0.0

-1.9

8.8

3.5M

C210

DEAD

2.4

-578.2

-19.1

2.5

0.0

-4.8

31.8

0.6M

C210

DEAD

-593.8

-19.1

2.5

0.0

4.1

-37.0

0.6M

C210

DEAD

0.6

-591.2

-19.1

2.5

0.0

2.6

-25.6

0.6M

C210

DEAD

1.2

-588.6

-19.1

2.5

0.0

1.1

-14.1

0.6M

C210

SEISX

16.2

13.9

70.0

0.7

154.9

33.1

Chan Phuong Engineering (CPE)

Page 114

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

0.6M

C210

SEISY

95.6

103.3

24.4

4.6

52.1

253.0

-0.6M

C210

DEAD

-859.8

-19.6

2.8

0.0

-2.6

12.8

-0.6M

C210

DEAD

0.2

-858.9

-19.6

2.8

0.0

-3.2

16.7

-0.6M

C210

DEAD

0.4

-858.0

-19.6

2.8

0.0

-3.7

20.6

-1.5M

C210

DEAD

-866.2

-19.6

2.8

0.0

1.6

-16.6

-1.5M

C210

DEAD

0.75

-863.0

-19.6

2.8

0.0

-0.5

-1.9

-1.5M

C210

DEAD

1.5

-859.8

-19.6

2.8

0.0

-2.6

12.8

-1.5M

C210

SEISY

119.3

91.4

26.2

2.0

36.7

255.3

6.6M

C211

DEAD

-412.7

30.0

4.6

0.0

7.0

56.6

6.6M

C211

DEAD

1.3

-408.9

30.0

4.6

0.0

1.2

17.7

30.0

4.6

0.0

-4.8

-21.4

6.6M

C211

DEAD

2.6

-405.2

3.5M

C211

DEAD

-728.7

29.4

5.1

0.0

-0.4

15.2

3.5M

C211

DEAD

1.2

-723.5

29.4

5.1

0.0

-6.5

-20.0

3.5M

C211

DEAD

2.4

-718.3

29.4

5.1

0.0

-12.5

-55.2

0.6M

C211

DEAD

-733.8

29.4

5.1

0.0

5.8

50.4

0.6M

C211

DEAD

0.6

-731.3

29.4

5.1

0.0

2.7

32.9

0.6M

C211

DEAD

1.2

-728.7

29.4

5.1

0.0

-0.4

15.2

0.6M

C211

SEISX

26.6

18.0

80.4

0.7

172.4

43.3

0.6M

C211

SEISY

58.4

116.3

30.3

4.6

65.7

298.8

-0.6M

C211

DEAD

-922.6

22.8

-0.9

0.0

0.0

-20.1

-0.6M

C211

DEAD

0.15

-922.0

22.8

-0.9

0.0

0.2

-23.5

-0.6M

C211

DEAD

0.3

-921.3

22.8

-0.9

0.0

0.3

-26.9

-1.5M

C211

DEAD

-929.1

22.8

-0.9

0.0

-1.3

14.1

-1.5M

C211

DEAD

0.75

-925.9

22.8

-0.9

0.0

-0.7

-3.0

-922.6

22.8

-0.9

0.0

0.0

-20.1

-1.5M

C211

DEAD

1.5

-1.5M

C211

SEISY

93.4

131.2

33.2

2.0

51.0

302.6

3.5M

C212

DEAD

-530.8

-25.8

2.3

0.0

-2.2

-17.9

3.5M

C212

DEAD

1.2

-525.6

-25.8

2.3

0.0

-4.9

13.1

3.5M

C212

DEAD

2.4

-520.5

-25.8

2.3

0.0

-7.6

44.2

0.6M

C212

DEAD

-536.0

-25.8

2.3

0.0

0.7

-48.9

0.6M

C212

DEAD

0.6

-533.4

-25.8

2.3

0.0

-0.8

-33.5

0.6M

C212

DEAD

1.2

-530.8

-25.8

2.3

0.0

-2.2

-17.9

0.6M

C212

SEISY

24.8

172.3

20.9

4.6

45.7

409.8

0.6M

C212

SEISY

0.6

24.8

172.3

20.9

4.6

33.0

305.8

-0.6M

C212

DEAD

-672.2

-24.7

-3.8

0.0

2.2

16.6

-0.6M

C212

DEAD

0.15

-671.6

-24.7

-3.8

0.0

2.7

20.4

-0.6M

C212

DEAD

0.3

-670.9

-24.7

-3.8

0.0

3.3

24.1

Chan Phuong Engineering (CPE)

Page 115

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C212

DEAD

-678.7

-24.7

-3.8

0.0

-3.5

-20.5

-1.5M

C212

DEAD

0.75

-675.5

-24.7

-3.8

0.0

-0.7

-1.9

-1.5M

C212

DEAD

1.5

-672.2

-24.7

-3.8

0.0

2.2

16.6

-1.5M

C212

SEISY

25.2

199.3

24.1

2.0

32.3

352.4

6.6M

C213

DEAD

-849.2

-29.6

7.0

0.0

9.0

-44.5

6.6M

C213

DEAD

1.3

-845.4

-29.6

7.0

0.0

0.1

-5.9

6.6M

C213

DEAD

2.6

-841.7

-29.6

7.0

0.0

-8.9

32.8

3.5M

C213

DEAD

-1346.5

-28.8

9.8

0.0

8.2

-28.5

3.5M

C213

DEAD

1.2

-1341.3

-28.8

9.8

0.0

-3.7

6.3

3.5M

C213

DEAD

2.4

-1336.1

-28.8

9.8

0.0

-15.5

41.1

-12.1

3.7

0.0

5.7

-16.3

3.5M

C213

LIVE

-478.0

3.5M

C213

LIVE

1.2

-478.0

-12.1

3.7

0.0

1.2

-1.7

3.5M

C213

LIVE

2.4

-478.0

-12.1

3.7

0.0

-3.3

12.8

0.6M

C213

DEAD

-1351.7

-28.8

9.8

0.0

19.7

-63.0

0.6M

C213

DEAD

0.6

-1349.1

-28.8

9.8

0.0

14.0

-45.8

0.6M

C213

DEAD

1.2

-1346.5

-28.8

9.8

0.0

8.2

-28.5

0.6M

C213

LIVE

-478.0

-12.1

3.7

0.0

9.9

-30.7

0.6M

C213

LIVE

0.6

-478.0

-12.1

3.7

0.0

7.8

-23.6

0.6M

C213

LIVE

1.2

-478.0

-12.1

3.7

0.0

5.7

-16.3

0.6M

C213

SEISX

24.8

26.2

85.8

0.7

188.3

60.4

0.6M

C213

SEISY

6.1

187.2

23.3

4.6

52.0

445.8

0.6M

C213

SEISY

0.6

6.1

187.2

23.3

4.6

37.6

331.5

-0.6M

C213

DEAD

-1731.7

-42.8

14.8

0.0

-11.3

30.5

-0.6M

C213

DEAD

0.15

-1731.1

-42.8

14.8

0.0

-13.5

36.9

0.3

-1730.4

-42.8

14.8

0.0

-15.7

43.4

-0.6M

C213

DEAD

-0.6M

C213

LIVE

-703.4

-24.8

11.7

0.0

-8.3

18.7

-0.6M

C213

LIVE

0.15

-703.4

-24.8

11.7

0.0

-10.0

22.4

-0.6M

C213

LIVE

0.3

-703.4

-24.8

11.7

0.0

-11.7

26.1

-1.5M

C213

DEAD

-1738.2

-42.8

14.8

0.0

11.1

-33.9

-1.5M

C213

DEAD

0.75

-1734.9

-42.8

14.8

0.0

-0.1

-1.7

-1.5M

C213

DEAD

1.5

-1731.7

-42.8

14.8

0.0

-11.3

30.5

-1.5M

C213

LIVE

-703.4

-24.8

11.7

0.0

9.4

-18.5

-1.5M

C213

LIVE

0.75

-703.4

-24.8

11.7

0.0

0.6

0.1

-1.5M

C213

LIVE

1.5

-703.4

-24.8

11.7

0.0

-8.3

18.7

-1.5M

C213

SEISY

18.6

210.7

26.8

2.0

37.8

379.5

3.5M

C214

DEAD

-538.5

-26.1

-37.7

0.0

-37.9

-35.7

3.5M

C214

DEAD

1.2

-533.3

-26.1

-37.7

0.0

7.6

-4.3

Chan Phuong Engineering (CPE)

Page 116

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-528.1

-26.1

-37.7

0.0

53.0

27.1

3.5M

C214

DEAD

2.4

3.5M

C214

SEISX

70.9

27.0

128.7

0.8

201.0

45.4

3.5M

C214

SEISY

377.9

199.0

56.3

5.3

84.6

353.4

0.6M

C214

DEAD

-641.1

-34.6

7.0

-0.1

5.4

-17.2

0.6M

C214

DEAD

0.3

-639.8

-34.6

7.0

-0.1

3.3

-6.8

0.6M

C214

DEAD

0.6

-638.5

-34.6

7.0

-0.1

1.2

3.6

0.6M

C214

SEISY

574.8

255.6

112.3

3.3

64.3

209.4

0.6M

C214

SEISY

0.3

574.8

255.6

112.3

3.3

30.8

133.0

0.6M

C214

SEISY

0.6

574.8

255.6

112.3

3.3

7.4

58.2

-0.6M

C214

DEAD

-701.3

-9.5

0.6

0.0

-0.7

6.6

-9.5

0.6

0.0

-0.8

8.0

-0.6M

C214

DEAD

0.15

-700.7

-0.6M

C214

DEAD

0.3

-700.0

-9.5

0.6

0.0

-0.9

9.4

-0.6M

C214

SEISY

710.5

187.1

24.4

2.0

12.2

31.7

-0.6M

C214

SEISY

0.15

710.5

187.1

24.4

2.0

10.6

7.5

-0.6M

C214

SEISY

0.3

710.5

187.1

24.4

2.0

10.1

26.3

-1.5M

C214

DEAD

-707.8

-9.5

0.6

0.0

0.2

-7.8

-1.5M

C214

DEAD

0.75

-704.6

-9.5

0.6

0.0

-0.3

-0.6

-1.5M

C214

DEAD

1.5

-701.3

-9.5

0.6

0.0

-0.7

6.6

-1.5M

C214

SEISY

710.5

187.2

24.4

2.0

44.9

313.0

-1.5M

C214

SEISY

0.75

710.5

187.2

24.4

2.0

27.2

172.3

-1.5M

C214

SEISY

1.5

710.5

187.2

24.4

2.0

12.2

31.7

6.6M

C215

DEAD

-523.3

11.0

-26.4

0.0

-38.1

16.9

6.6M

C215

DEAD

1.3

-518.9

11.0

-26.4

0.0

-3.7

2.5

6.6M

C215

DEAD

2.6

-514.6

11.0

-26.4

0.0

30.9

-11.9

220.0

13.6

2.0

20.1

285.7

6.6M

C215

SEISY

47.8

6.6M

C215

SEISY

2.6

47.8

220.0

13.6

2.0

17.3

292.5

3.5M

C215

DEAD

-738.7

-5.0

-49.6

0.0

-59.5

-11.2

3.5M

C215

DEAD

1.2

-732.7

-5.0

-49.6

0.0

0.2

-5.2

3.5M

C215

DEAD

2.4

-726.6

-5.0

-49.6

0.0

59.9

0.8

3.5M

C215

SEISX

104.3

41.6

176.0

1.1

286.4

71.6

3.5M

C215

SEISY

122.5

386.1

54.6

6.5

87.2

664.1

3.5M

C215

SEISY

2.4

122.5

386.1

54.6

6.5

46.3

269.2

0.6M

C215

DEAD

-971.9

34.4

-53.1

-0.1

-20.6

29.2

0.6M

C215

DEAD

0.3

-970.4

34.4

-53.1

-0.1

-4.7

18.9

0.6M

C215

DEAD

0.6

-968.9

34.4

-53.1

-0.1

11.3

8.6

0.6M

C215

SEISX

28.6

46.3

460.1

1.4

274.1

28.4

0.6M

C215

SEISY

145.6

419.9

189.9

4.2

112.2

251.4

Chan Phuong Engineering (CPE)

Page 117

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-0.6M

C215

DEAD

-1010.8

3.4

-1.9

0.0

1.0

-4.0

-0.6M

C215

DEAD

0.15

-1010.0

3.4

-1.9

0.0

1.3

-4.5

-0.6M

C215

DEAD

0.3

-1009.2

3.4

-1.9

0.0

1.6

-5.0

-1.5M

C215

DEAD

-1018.3

3.4

-1.9

0.0

-1.9

1.1

-1.5M

C215

DEAD

0.75

-1014.5

3.4

-1.9

0.0

-0.4

-1.4

-1.5M

C215

DEAD

1.5

-1010.8

3.4

-1.9

0.0

1.0

-4.0

-1.5M

C215

SEISY

97.4

250.2

31.9

2.4

48.4

455.9

-1.5M

C215

SEISY

0.75

97.4

250.2

31.9

2.4

24.3

267.9

6.6M

C216

DEAD

-620.7

-25.8

-24.4

0.0

-37.3

-32.3

6.6M

C216

DEAD

1.3

-616.3

-25.8

-24.4

0.0

-5.5

1.2

-25.8

-24.4

0.0

26.6

34.8

6.6M

C216

DEAD

2.6

-612.0

6.6M

C216

SEISY

196.2

209.0

8.7

2.0

12.5

264.7

6.6M

C216

SEISY

2.6

196.2

209.0

8.7

2.0

11.7

286.3

3.5M

C216

DEAD

-859.9

-52.2

-44.3

0.0

-44.8

-84.0

3.5M

C216

DEAD

1.2

-853.9

-52.2

-44.3

0.0

8.7

-21.4

3.5M

C216

DEAD

2.4

-847.8

-52.2

-44.3

0.0

62.0

41.3

3.5M

C216

SEISX

77.4

42.9

181.9

1.1

302.1

75.1

3.5M

C216

SEISY

309.0

369.2

41.2

6.5

69.6

649.0

0.6M

C216

DEAD

-1372.1

-19.2

-0.4

0.0

0.3

24.9

0.6M

C216

DEAD

0.3

-1370.5

-19.2

-0.4

0.0

0.4

30.7

0.6M

C216

DEAD

0.6

-1369.0

-19.2

-0.4

0.0

0.5

36.4

0.6M

C216

LIVE

-498.0

-5.8

0.7

-0.1

-0.8

7.5

0.6M

C216

LIVE

0.3

-498.0

-5.8

0.7

-0.1

-1.0

9.2

0.6M

C216

LIVE

0.6

-498.0

-5.8

0.7

-0.1

-1.3

10.9

162.0

20.5

3.0

12.4

17.8

0.6M

C216

SEISY

527.3

0.6M

C216

SEISY

0.3

527.3

162.0

20.5

3.0

18.7

50.2

0.6M

C216

SEISY

0.6

527.3

162.0

20.5

3.0

24.9

97.7

-0.6M

C216

DEAD

-1376.6

-19.2

-0.4

0.0

-0.1

7.6

-0.6M

C216

DEAD

0.45

-1374.3

-19.2

-0.4

0.0

0.1

16.3

-0.6M

C216

DEAD

0.9

-1372.1

-19.2

-0.4

0.0

0.3

24.9

-0.6M

C216

LIVE

-498.0

-5.8

0.7

-0.1

-0.2

2.3

-0.6M

C216

LIVE

0.45

-498.0

-5.8

0.7

-0.1

-0.5

4.9

-0.6M

C216

LIVE

0.9

-498.0

-5.8

0.7

-0.1

-0.8

7.5

-0.6M

C216

SEISY

527.3

162.2

20.5

3.0

7.9

151.9

-0.6M

C216

SEISY

0.45

527.3

162.2

20.5

3.0

3.8

78.9

-0.6M

C216

SEISY

0.9

527.3

162.2

20.5

3.0

12.4

17.8

-1.5M

C216

DEAD

-1384.2

-19.2

-0.4

0.0

-0.6

-21.3

Chan Phuong Engineering (CPE)

Page 118

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C216

DEAD

0.75

-1380.4

-19.2

-0.4

0.0

-0.3

-6.8

-1.5M

C216

DEAD

1.5

-1376.6

-19.2

-0.4

0.0

-0.1

7.6

-1.5M

C216

LIVE

-498.0

-5.8

0.7

-0.1

0.9

-6.4

-1.5M

C216

LIVE

0.75

-498.0

-5.8

0.7

-0.1

0.4

-2.0

-1.5M

C216

LIVE

1.5

-498.0

-5.8

0.7

-0.1

-0.2

2.3

-1.5M

C216

SEISY

527.3

162.4

20.6

3.0

39.2

396.6

-1.5M

C216

SEISY

0.75

527.3

162.4

20.6

3.0

23.6

274.5

-1.5M

C216

SEISY

1.5

527.3

162.4

20.6

3.0

7.9

151.9

3.5M

C217

DEAD

-607.8

-5.4

2.3

0.0

1.2

0.9

3.5M

C217

DEAD

1.2

-602.6

-5.4

2.3

0.0

-1.5

7.4

-5.4

2.3

0.0

-4.2

13.9

3.5M

C217

DEAD

2.4

-597.5

0.6M

C217

DEAD

-613.0

-5.4

2.3

0.0

3.9

-5.6

0.6M

C217

DEAD

0.6

-610.4

-5.4

2.3

0.0

2.5

-2.3

0.6M

C217

DEAD

1.2

-607.8

-5.4

2.3

0.0

1.2

0.9

0.6M

C217

SEISX

12.4

8.9

72.9

0.7

161.8

19.8

-0.6M

C217

DEAD

-779.5

3.1

2.7

0.0

-2.3

-3.4

-0.6M

C217

DEAD

0.2

-778.6

3.1

2.7

0.0

-2.8

-4.0

-0.6M

C217

DEAD

0.4

-777.8

3.1

2.7

0.0

-3.3

-4.6

-1.5M

C217

DEAD

-786.0

3.1

2.7

0.0

1.8

1.2

-1.5M

C217

DEAD

0.75

-782.7

3.1

2.7

0.0

-0.2

-1.1

-1.5M

C217

DEAD

1.5

-779.5

3.1

2.7

0.0

-2.3

-3.4

3.5M

C218

DEAD

-662.3

-10.0

0.1

0.0

-0.4

-14.3

3.5M

C218

DEAD

1.2

-657.1

-10.0

0.1

0.0

-0.5

-2.2

3.5M

C218

DEAD

2.4

-651.9

-10.0

0.1

0.0

-0.6

9.9

-10.0

0.1

0.0

-0.2

-26.3

0.6M

C218

DEAD

-667.5

0.6M

C218

DEAD

0.6

-664.9

-10.0

0.1

0.0

-0.3

-20.3

0.6M

C218

DEAD

1.2

-662.3

-10.0

0.1

0.0

-0.4

-14.3

0.6M

C218

SEISX

16.2

8.8

73.5

0.7

162.0

24.1

-0.6M

C218

DEAD

-897.2

-23.5

0.3

0.0

-0.5

17.1

-0.6M

C218

DEAD

0.2

-896.3

-23.5

0.3

0.0

-0.5

21.8

-0.6M

C218

DEAD

0.4

-895.4

-23.5

0.3

0.0

-0.6

26.5

-1.5M

C218

DEAD

-903.7

-23.5

0.3

0.0

-0.1

-18.2

-1.5M

C218

DEAD

0.75

-900.4

-23.5

0.3

0.0

-0.3

-0.5

-1.5M

C218

DEAD

1.5

-897.2

-23.5

0.3

0.0

-0.5

17.1

3.5M

C219

DEAD

-615.6

13.2

-2.2

0.0

-1.9

11.9

3.5M

C219

DEAD

1.2

-610.4

13.2

-2.2

0.0

0.8

-4.0

3.5M

C219

DEAD

2.4

-605.2

13.2

-2.2

0.0

3.5

-19.8

Chan Phuong Engineering (CPE)

Page 119

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

0.6M

C219

DEAD

-620.8

13.2

-2.2

0.0

-4.6

27.8

0.6M

C219

DEAD

0.6

-618.2

13.2

-2.2

0.0

-3.3

19.9

0.6M

C219

DEAD

1.2

-615.6

13.2

-2.2

0.0

-1.9

11.9

0.6M

C219

SEISX

17.1

8.1

72.1

0.7

158.8

22.3

-0.6M

C219

DEAD

-864.6

18.6

-2.1

0.0

1.2

-15.4

-0.6M

C219

DEAD

0.2

-863.8

18.6

-2.1

0.0

1.6

-19.2

-0.6M

C219

DEAD

0.4

-862.9

18.6

-2.1

0.0

2.0

-22.9

-1.5M

C219

DEAD

-871.1

18.6

-2.1

0.0

-2.0

12.5

-1.5M

C219

DEAD

0.75

-867.9

18.6

-2.1

0.0

-0.4

-1.5

-1.5M

C219

DEAD

1.5

-864.6

18.6

-2.1

0.0

1.2

-15.4

-10.3

-1.2

0.0

-1.0

-15.9

3.5M

C220

DEAD

-670.6

3.5M

C220

DEAD

1.2

-665.4

-10.3

-1.2

0.0

0.5

-3.5

3.5M

C220

DEAD

2.4

-660.2

-10.3

-1.2

0.0

2.0

8.9

0.6M

C220

DEAD

-675.8

-10.3

-1.2

0.0

-2.5

-28.1

0.6M

C220

DEAD

0.6

-673.2

-10.3

-1.2

0.0

-1.7

-22.0

0.6M

C220

DEAD

1.2

-670.6

-10.3

-1.2

0.0

-1.0

-15.9

0.6M

C220

SEISX

21.0

7.3

72.7

0.7

160.6

20.2

-0.6M

C220

DEAD

-907.2

-26.1

-0.6

0.0

0.1

19.0

-0.6M

C220

DEAD

0.2

-906.4

-26.1

-0.6

0.0

0.2

24.2

-0.6M

C220

DEAD

0.4

-905.5

-26.1

-0.6

0.0

0.3

29.4

-1.5M

C220

DEAD

-913.7

-26.1

-0.6

0.0

-0.8

-20.2

-1.5M

C220

DEAD

0.75

-910.5

-26.1

-0.6

0.0

-0.3

-0.6

-1.5M

C220

DEAD

1.5

-907.2

-26.1

-0.6

0.0

0.1

19.0

3.5M

C221

DEAD

-594.1

14.3

-0.7

0.0

-0.9

13.9

14.3

-0.7

0.0

0.0

-3.3

3.5M

C221

DEAD

1.2

-588.9

3.5M

C221

DEAD

2.4

-583.7

14.3

-0.7

0.0

0.8

-20.5

0.6M

C221

DEAD

-599.2

14.3

-0.7

0.0

-1.7

31.1

0.6M

C221

DEAD

0.6

-596.6

14.3

-0.7

0.0

-1.3

22.5

0.6M

C221

DEAD

1.2

-594.1

14.3

-0.7

0.0

-0.9

13.9

0.6M

C221

SEISX

18.1

7.3

71.8

0.7

158.2

20.2

-0.6M

C221

DEAD

-829.8

22.2

-0.5

0.0

0.0

-18.4

-0.6M

C221

DEAD

0.2

-828.9

22.2

-0.5

0.0

0.1

-22.8

-0.6M

C221

DEAD

0.4

-828.0

22.2

-0.5

0.0

0.2

-27.2

-1.5M

C221

DEAD

-836.3

22.2

-0.5

0.0

-0.7

15.0

-1.5M

C221

DEAD

0.75

-833.0

22.2

-0.5

0.0

-0.4

-1.7

-1.5M

C221

DEAD

1.5

-829.8

22.2

-0.5

0.0

0.0

-18.4

3.5M

C222

DEAD

-670.8

-11.3

-0.6

0.0

-0.7

-15.7

Chan Phuong Engineering (CPE)

Page 120

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

3.5M

C222

DEAD

1.2

-665.6

-11.3

-0.6

0.0

0.0

-2.1

3.5M

C222

DEAD

2.4

-660.5

-11.3

-0.6

0.0

0.7

11.5

0.6M

C222

DEAD

-676.0

-11.3

-0.6

0.0

-1.4

-29.2

0.6M

C222

DEAD

0.6

-673.4

-11.3

-0.6

0.0

-1.1

-22.4

0.6M

C222

DEAD

1.2

-670.8

-11.3

-0.6

0.0

-0.7

-15.7

0.6M

C222

SEISX

15.9

7.9

72.8

0.7

160.8

20.9

-0.6M

C222

DEAD

-905.8

-25.3

-0.3

0.0

-0.1

18.2

-0.6M

C222

DEAD

0.2

-904.9

-25.3

-0.3

0.0

-0.1

23.3

-0.6M

C222

DEAD

0.4

-904.1

-25.3

-0.3

0.0

0.0

28.4

-1.5M

C222

DEAD

-912.3

-25.3

-0.3

0.0

-0.5

-19.8

-25.3

-0.3

0.0

-0.3

-0.8

-1.5M

C222

DEAD

0.75

-909.0

-1.5M

C222

DEAD

1.5

-905.8

-25.3

-0.3

0.0

-0.1

18.2

3.5M

C223

DEAD

-656.2

-13.2

-0.8

0.0

-0.8

-15.5

3.5M

C223

DEAD

1.2

-651.0

-13.2

-0.8

0.0

0.1

0.4

3.5M

C223

DEAD

2.4

-645.8

-13.2

-0.8

0.0

1.1

16.4

0.6M

C223

DEAD

-661.4

-13.2

-0.8

0.0

-1.8

-31.3

0.6M

C223

DEAD

0.6

-658.8

-13.2

-0.8

0.0

-1.3

-23.4

0.6M

C223

DEAD

1.2

-656.2

-13.2

-0.8

0.0

-0.8

-15.5

0.6M

C223

SEISX

16.5

8.8

72.8

0.7

160.7

23.2

-0.6M

C223

DEAD

-892.1

-24.4

-0.4

0.0

0.0

17.3

-0.6M

C223

DEAD

0.2

-891.3

-24.4

-0.4

0.0

0.1

22.2

-0.6M

C223

DEAD

0.4

-890.4

-24.4

-0.4

0.0

0.2

27.1

-1.5M

C223

DEAD

-898.6

-24.4

-0.4

0.0

-0.6

-19.3

-1.5M

C223

DEAD

0.75

-895.4

-24.4

-0.4

0.0

-0.3

-1.0

-24.4

-0.4

0.0

0.0

17.3

-1.5M

C223

DEAD

1.5

-892.1

3.5M

C224

DEAD

-581.0

12.9

0.1

0.0

-0.9

10.4

3.5M

C224

DEAD

1.2

-575.8

12.9

0.1

0.0

-0.9

-5.1

3.5M

C224

DEAD

2.4

-570.6

12.9

0.1

0.0

-1.0

-20.6

0.6M

C224

DEAD

-586.1

12.9

0.1

0.0

-0.8

25.9

0.6M

C224

DEAD

0.6

-583.5

12.9

0.1

0.0

-0.8

18.1

0.6M

C224

DEAD

1.2

-581.0

12.9

0.1

0.0

-0.9

10.4

0.6M

C224

SEISX

16.4

8.9

72.0

0.7

158.4

23.2

-0.6M

C224

DEAD

-838.2

16.5

-0.7

0.0

0.1

-14.3

-0.6M

C224

DEAD

0.2

-837.4

16.5

-0.7

0.0

0.2

-17.6

-0.6M

C224

DEAD

0.4

-836.5

16.5

-0.7

0.0

0.4

-20.8

-1.5M

C224

DEAD

-844.7

16.5

-0.7

0.0

-0.9

10.5

-1.5M

C224

DEAD

0.75

-841.5

16.5

-0.7

0.0

-0.4

-1.9

Chan Phuong Engineering (CPE)

Page 121

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C224

DEAD

1.5

-838.2

16.5

-0.7

0.0

0.1

-14.3

3.5M

C225

DEAD

-579.7

13.1

-1.5

0.0

-0.8

11.1

3.5M

C225

DEAD

1.2

-574.6

13.1

-1.5

0.0

1.0

-4.6

3.5M

C225

DEAD

2.4

-569.4

13.1

-1.5

0.0

2.9

-20.3

0.6M

C225

DEAD

-584.9

13.1

-1.5

0.0

-2.7

26.7

0.6M

C225

DEAD

0.6

-582.3

13.1

-1.5

0.0

-1.7

18.9

0.6M

C225

DEAD

1.2

-579.7

13.1

-1.5

0.0

-0.8

11.1

0.6M

C225

SEISX

17.1

7.9

72.0

0.7

158.4

21.0

-0.6M

C225

DEAD

-835.3

17.5

-0.1

0.0

-0.3

-14.9

-0.6M

C225

DEAD

0.2

-834.4

17.5

-0.1

0.0

-0.3

-18.3

17.5

-0.1

0.0

-0.3

-21.8

-0.6M

C225

DEAD

0.4

-833.5

-1.5M

C225

DEAD

-841.8

17.5

-0.1

0.0

-0.4

11.4

-1.5M

C225

DEAD

0.75

-838.5

17.5

-0.1

0.0

-0.4

-1.8

-1.5M

C225

DEAD

1.5

-835.3

17.5

-0.1

0.0

-0.3

-14.9

3.5M

C226

DEAD

-655.4

-13.6

-0.6

0.0

-0.8

-15.6

3.5M

C226

DEAD

1.2

-650.2

-13.6

-0.6

0.0

0.0

0.9

3.5M

C226

DEAD

2.4

-645.0

-13.6

-0.6

0.0

0.8

17.3

0.6M

C226

DEAD

-660.6

-13.6

-0.6

0.0

-1.5

-31.9

0.6M

C226

DEAD

0.6

-658.0

-13.6

-0.6

0.0

-1.2

-23.7

0.6M

C226

DEAD

1.2

-655.4

-13.6

-0.6

0.0

-0.8

-15.6

0.6M

C226

SEISX

18.3

9.9

72.8

0.7

160.8

25.6

-0.6M

C226

DEAD

-891.2

-24.2

-0.3

0.0

-0.1

17.1

-0.6M

C226

DEAD

0.2

-890.4

-24.2

-0.3

0.0

0.0

21.9

-0.6M

C226

DEAD

0.4

-889.5

-24.2

-0.3

0.0

0.1

26.8

-24.2

-0.3

0.0

-0.6

-19.4

-1.5M

C226

DEAD

-897.7

-1.5M

C226

DEAD

0.75

-894.5

-24.2

-0.3

0.0

-0.3

-1.1

-1.5M

C226

DEAD

1.5

-891.2

-24.2

-0.3

0.0

-0.1

17.1

3.5M

C227

DEAD

-656.9

-13.7

-0.7

0.0

-0.8

-15.7

3.5M

C227

DEAD

1.2

-651.8

-13.7

-0.7

0.0

0.1

0.8

3.5M

C227

DEAD

2.4

-646.6

-13.7

-0.7

0.0

0.9

17.3

0.6M

C227

DEAD

-662.1

-13.7

-0.7

0.0

-1.6

-32.1

0.6M

C227

DEAD

0.6

-659.5

-13.7

-0.7

0.0

-1.2

-23.9

0.6M

C227

DEAD

1.2

-656.9

-13.7

-0.7

0.0

-0.8

-15.7

0.6M

C227

SEISX

20.6

10.9

72.8

0.7

160.7

28.0

-0.6M

C227

DEAD

-893.1

-24.3

-0.4

0.0

0.0

17.0

-0.6M

C227

DEAD

0.2

-892.2

-24.3

-0.4

0.0

0.0

21.9

-0.6M

C227

DEAD

0.4

-891.4

-24.3

-0.4

0.0

0.1

26.7

Chan Phuong Engineering (CPE)

Page 122

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C227

DEAD

-899.6

-24.3

-0.4

0.0

-0.6

-19.6

-1.5M

C227

DEAD

0.75

-896.3

-24.3

-0.4

0.0

-0.3

-1.3

-1.5M

C227

DEAD

1.5

-893.1

-24.3

-0.4

0.0

0.0

17.0

3.5M

C228

DEAD

-593.2

12.8

-0.8

0.0

-0.9

10.1

3.5M

C228

DEAD

1.2

-588.0

12.8

-0.8

0.0

0.1

-5.2

3.5M

C228

DEAD

2.4

-582.8

12.8

-0.8

0.0

1.0

-20.5

0.6M

C228

DEAD

-598.4

12.8

-0.8

0.0

-1.8

25.4

0.6M

C228

DEAD

0.6

-595.8

12.8

-0.8

0.0

-1.4

17.8

0.6M

C228

DEAD

1.2

-593.2

12.8

-0.8

0.0

-0.9

10.1

0.6M

C228

SEISX

20.7

11.0

71.9

0.7

158.3

28.0

16.4

-0.5

0.0

0.0

-14.5

-0.6M

C228

DEAD

-850.0

-0.6M

C228

DEAD

0.2

-849.2

16.4

-0.5

0.0

0.1

-17.8

-0.6M

C228

DEAD

0.4

-848.3

16.4

-0.5

0.0

0.2

-21.1

-1.5M

C228

DEAD

-856.5

16.4

-0.5

0.0

-0.7

10.1

-1.5M

C228

DEAD

0.75

-853.3

16.4

-0.5

0.0

-0.4

-2.2

-1.5M

C228

DEAD

1.5

-850.0

16.4

-0.5

0.0

0.0

-14.5

3.5M

C229

DEAD

-594.4

12.8

-0.8

0.0

-0.9

10.3

3.5M

C229

DEAD

1.2

-589.2

12.8

-0.8

0.0

0.2

-5.1

3.5M

C229

DEAD

2.4

-584.1

12.8

-0.8

0.0

1.2

-20.5

0.6M

C229

DEAD

-599.6

12.8

-0.8

0.0

-1.9

25.7

0.6M

C229

DEAD

0.6

-597.0

12.8

-0.8

0.0

-1.4

18.0

0.6M

C229

DEAD

1.2

-594.4

12.8

-0.8

0.0

-0.9

10.3

0.6M

C229

SEISX

18.6

9.9

71.9

0.7

158.4

25.6

-0.6M

C229

DEAD

-851.1

16.5

-0.4

0.0

-0.1

-14.4

16.5

-0.4

0.0

0.0

-17.7

-0.6M

C229

DEAD

0.2

-850.3

-0.6M

C229

DEAD

0.4

-849.4

16.5

-0.4

0.0

0.0

-21.0

-1.5M

C229

DEAD

-857.6

16.5

-0.4

0.0

-0.7

10.3

-1.5M

C229

DEAD

0.75

-854.4

16.5

-0.4

0.0

-0.4

-2.0

-1.5M

C229

DEAD

1.5

-851.1

16.5

-0.4

0.0

-0.1

-14.4

3.5M

C230

DEAD

-657.5

-13.8

-0.7

0.0

-0.8

-15.9

3.5M

C230

DEAD

1.2

-652.3

-13.8

-0.7

0.0

0.1

0.7

3.5M

C230

DEAD

2.4

-647.1

-13.8

-0.7

0.0

0.9

17.3

0.6M

C230

DEAD

-662.7

-13.8

-0.7

0.0

-1.6

-32.3

0.6M

C230

DEAD

0.6

-660.1

-13.8

-0.7

0.0

-1.2

-24.1

0.6M

C230

DEAD

1.2

-657.5

-13.8

-0.7

0.0

-0.8

-15.9

0.6M

C230

SEISX

23.0

12.0

72.8

0.7

160.6

30.6

-0.6M

C230

DEAD

-893.7

-24.4

-0.4

0.0

0.0

16.9

Chan Phuong Engineering (CPE)

Page 123

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-0.6M

C230

DEAD

0.2

-892.8

-24.4

-0.4

0.0

0.0

21.7

-0.6M

C230

DEAD

0.4

-892.0

-24.4

-0.4

0.0

0.1

26.6

-1.5M

C230

DEAD

-900.2

-24.4

-0.4

0.0

-0.6

-19.8

-1.5M

C230

DEAD

0.75

-896.9

-24.4

-0.4

0.0

-0.3

-1.5

-1.5M

C230

DEAD

1.5

-893.7

-24.4

-0.4

0.0

0.0

16.9

3.5M

C231

DEAD

-593.3

12.7

-0.8

0.0

-0.9

10.0

3.5M

C231

DEAD

1.2

-588.1

12.7

-0.8

0.0

0.1

-5.3

3.5M

C231

DEAD

2.4

-582.9

12.7

-0.8

0.0

1.0

-20.5

0.6M

C231

DEAD

-598.5

12.7

-0.8

0.0

-1.8

25.2

0.6M

C231

DEAD

0.6

-595.9

12.7

-0.8

0.0

-1.3

17.6

-593.3

12.7

-0.8

0.0

-0.9

10.0

0.6M

C231

DEAD

1.2

0.6M

C231

SEISX

23.3

12.0

71.9

0.7

158.3

30.4

-0.6M

C231

DEAD

-850.4

16.3

-0.4

0.0

-0.1

-14.6

-0.6M

C231

DEAD

0.2

-849.5

16.3

-0.4

0.0

0.0

-17.9

-0.6M

C231

DEAD

0.4

-848.7

16.3

-0.4

0.0

0.1

-21.1

-1.5M

C231

DEAD

-856.9

16.3

-0.4

0.0

-0.7

9.9

-1.5M

C231

DEAD

0.75

-853.7

16.3

-0.4

0.0

-0.4

-2.4

-1.5M

C231

DEAD

1.5

-850.4

16.3

-0.4

0.0

-0.1

-14.6

3.5M

C232

DEAD

-583.4

12.8

-1.2

0.0

-1.2

9.9

3.5M

C232

DEAD

1.2

-578.2

12.8

-1.2

0.0

0.3

-5.4

3.5M

C232

DEAD

2.4

-573.0

12.8

-1.2

0.0

1.7

-20.7

0.6M

C232

DEAD

-588.6

12.8

-1.2

0.0

-2.7

25.2

0.6M

C232

DEAD

0.6

-586.0

12.8

-1.2

0.0

-2.0

17.5

0.6M

C232

DEAD

1.2

-583.4

12.8

-1.2

0.0

-1.2

9.9

13.2

72.2

0.7

158.8

33.2

0.6M

C232

SEISX

25.7

-0.6M

C232

DEAD

-836.5

16.3

-1.0

0.0

0.4

-14.8

-0.6M

C232

DEAD

0.2

-835.6

16.3

-1.0

0.0

0.6

-18.0

-0.6M

C232

DEAD

0.4

-834.8

16.3

-1.0

0.0

0.8

-21.3

-1.5M

C232

DEAD

-843.0

16.3

-1.0

0.0

-1.2

9.8

-1.5M

C232

DEAD

0.75

-839.7

16.3

-1.0

0.0

-0.4

-2.5

-1.5M

C232

DEAD

1.5

-836.5

16.3

-1.0

0.0

0.4

-14.8

3.5M

C233

DEAD

-654.3

-13.7

-0.8

0.0

-0.9

-15.9

3.5M

C233

DEAD

1.2

-649.2

-13.7

-0.8

0.0

0.2

0.6

3.5M

C233

DEAD

2.4

-644.0

-13.7

-0.8

0.0

1.2

17.2

0.6M

C233

DEAD

-659.5

-13.7

-0.8

0.0

-1.9

-32.4

0.6M

C233

DEAD

0.6

-656.9

-13.7

-0.8

0.0

-1.4

-24.2

0.6M

C233

DEAD

1.2

-654.3

-13.7

-0.8

0.0

-0.9

-15.9

Chan Phuong Engineering (CPE)

Page 124

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

0.6M

C233

SEISX

26.3

13.1

72.9

0.7

160.9

33.1

-0.6M

C233

DEAD

-889.5

-24.3

-0.5

0.0

0.1

16.6

-0.6M

C233

DEAD

0.2

-888.6

-24.3

-0.5

0.0

0.2

21.5

-0.6M

C233

DEAD

0.4

-887.8

-24.3

-0.5

0.0

0.3

26.3

-1.5M

C233

DEAD

-896.0

-24.3

-0.5

0.0

-0.7

-19.9

-1.5M

C233

DEAD

0.75

-892.7

-24.3

-0.5

0.0

-0.3

-1.6

-1.5M

C233

DEAD

1.5

-889.5

-24.3

-0.5

0.0

0.1

16.6

6.6M

C234

DEAD

-424.2

-11.5

0.1

0.0

0.0

-17.5

6.6M

C234

DEAD

1.3

-420.5

-11.5

0.1

0.0

-0.1

-2.5

6.6M

C234

DEAD

2.6

-416.8

-11.5

0.1

0.0

-0.1

12.6

-15.4

1.0

0.0

0.1

-16.8

3.5M

C234

DEAD

-697.7

3.5M

C234

DEAD

1.2

-692.5

-15.4

1.0

0.0

-1.0

1.7

3.5M

C234

DEAD

2.4

-687.3

-15.4

1.0

0.0

-2.1

20.2

0.6M

C234

DEAD

-702.9

-15.4

1.0

0.0

1.3

-35.2

0.6M

C234

DEAD

0.6

-700.3

-15.4

1.0

0.0

0.7

-26.1

0.6M

C234

DEAD

1.2

-697.7

-15.4

1.0

0.0

0.1

-16.8

0.6M

C234

SEISX

18.5

13.9

71.5

0.7

158.7

35.3

-0.6M

C234

DEAD

-940.7

-25.4

1.0

0.0

-1.0

17.3

-0.6M

C234

DEAD

0.2

-939.8

-25.4

1.0

0.0

-1.2

22.4

-0.6M

C234

DEAD

0.4

-939.0

-25.4

1.0

0.0

-1.4

27.5

-1.5M

C234

DEAD

-947.2

-25.4

1.0

0.0

0.5

-20.8

-1.5M

C234

DEAD

0.75

-943.9

-25.4

1.0

0.0

-0.3

-1.8

-1.5M

C234

DEAD

1.5

-940.7

-25.4

1.0

0.0

-1.0

17.3

-1.5M

C234

SEISY

202.4

81.3

41.0

2.0

58.9

254.9

-25.6

-5.3

0.0

-8.0

-38.9

6.6M

C235

DEAD

-406.8

6.6M

C235

DEAD

1.3

-403.0

-25.6

-5.3

0.0

-1.0

-5.5

3.5M

C235

DEAD

-645.9

-27.4

-5.8

0.0

-4.2

-27.6

3.5M

C235

DEAD

1.2

-640.7

-27.4

-5.8

0.0

2.9

5.3

3.5M

C235

DEAD

2.4

-635.6

-27.4

-5.8

0.0

9.9

38.2

0.6M

C235

DEAD

-651.1

-27.4

-5.8

0.0

-11.2

-60.4

0.6M

C235

DEAD

0.6

-648.5

-27.4

-5.8

0.0

-7.7

-44.1

0.6M

C235

DEAD

1.2

-645.9

-27.4

-5.8

0.0

-4.2

-27.6

0.6M

C235

SEISX

51.5

14.6

75.9

0.7

166.5

37.3

0.6M

C235

SEISY

151.3

111.2

33.3

4.6

72.0

288.6

-0.6M

C235

DEAD

-889.0

-41.9

-5.7

0.0

3.8

29.9

-0.6M

C235

DEAD

0.15

-888.3

-41.9

-5.7

0.0

4.7

36.2

-0.6M

C235

DEAD

0.3

-887.7

-41.9

-5.7

0.0

5.6

42.5

Chan Phuong Engineering (CPE)

Page 125

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C235

DEAD

-895.5

-41.9

-5.7

0.0

-4.8

-33.1

-1.5M

C235

DEAD

0.75

-892.2

-41.9

-5.7

0.0

-0.5

-1.6

-1.5M

C235

DEAD

1.5

-889.0

-41.9

-5.7

0.0

3.8

29.9

-1.5M

C235

SEISY

232.2

122.8

43.0

2.0

61.9

302.2

3.5M

C236

DEAD

-560.5

23.5

2.5

0.0

-2.2

21.8

3.5M

C236

DEAD

1.2

-555.3

23.5

2.5

0.0

-5.2

-6.4

3.5M

C236

DEAD

2.4

-550.1

23.5

2.5

0.0

-8.2

-34.6

0.6M

C236

DEAD

-565.7

23.5

2.5

0.0

0.9

49.8

0.6M

C236

DEAD

0.6

-563.1

23.5

2.5

0.0

-0.6

35.8

0.6M

C236

DEAD

1.2

-560.5

23.5

2.5

0.0

-2.2

21.8

178.4

17.1

4.6

38.4

421.3

0.6M

C236

SEISY

50.9

0.6M

C236

SEISY

0.6

50.9

178.4

17.1

4.6

28.0

313.5

-0.6M

C236

DEAD

-756.9

35.9

-4.1

0.0

2.6

-30.3

-0.6M

C236

DEAD

0.15

-756.3

35.9

-4.1

0.0

3.2

-35.6

-0.6M

C236

DEAD

0.3

-755.6

35.9

-4.1

0.0

3.8

-41.0

-1.5M

C236

DEAD

-763.4

35.9

-4.1

0.0

-3.6

23.6

-1.5M

C236

DEAD

0.75

-760.2

35.9

-4.1

0.0

-0.5

-3.3

-1.5M

C236

DEAD

1.5

-756.9

35.9

-4.1

0.0

2.6

-30.3

-1.5M

C236

SEISY

58.6

202.2

25.2

2.0

36.4

360.0

3.5M

C237

DEAD

-564.9

-9.0

3.5

0.0

2.3

-2.1

3.5M

C237

DEAD

1.2

-559.7

-9.0

3.5

0.0

-1.8

8.7

3.5M

C237

DEAD

2.4

-554.5

-9.0

3.5

0.0

-6.0

19.5

0.6M

C237

DEAD

-570.1

-9.0

3.5

0.0

6.4

-13.0

0.6M

C237

DEAD

0.6

-567.5

-9.0

3.5

0.0

4.4

-7.6

-564.9

-9.0

3.5

0.0

2.3

-2.1

0.6M

C237

DEAD

1.2

0.6M

C237

SEISX

34.0

14.6

74.6

0.7

163.5

35.6

0.6M

C237

SEISY

189.6

109.4

33.5

4.6

73.0

273.0

-0.6M

C237

DEAD

-801.9

0.2

4.6

0.0

-3.6

-2.8

-0.6M

C237

DEAD

0.2

-801.0

0.2

4.6

0.0

-4.5

-2.8

-0.6M

C237

DEAD

0.4

-800.1

0.2

4.6

0.0

-5.4

-2.9

-1.5M

C237

DEAD

-808.4

0.2

4.6

0.0

3.3

-2.5

-1.5M

C237

DEAD

0.75

-805.1

0.2

4.6

0.0

-0.1

-2.7

-1.5M

C237

DEAD

1.5

-801.9

0.2

4.6

0.0

-3.6

-2.8

-1.5M

C237

SEISY

244.6

91.9

44.5

2.0

63.2

295.4

6.6M

C238

DEAD

-515.8

-0.7

-1.7

0.0

-2.6

-1.5

6.6M

C238

DEAD

1.3

-512.1

-0.7

-1.7

0.0

-0.4

-0.6

6.6M

C238

DEAD

2.6

-508.3

-0.7

-1.7

0.0

1.9

0.4

Chan Phuong Engineering (CPE)

Page 126

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

3.5M

C238

DEAD

-824.5

4.2

-1.2

0.0

-1.3

7.1

3.5M

C238

DEAD

1.2

-819.4

4.2

-1.2

0.0

0.2

2.2

3.5M

C238

DEAD

2.4

-814.2

4.2

-1.2

0.0

1.7

-2.8

0.6M

C238

DEAD

-829.7

4.2

-1.2

0.0

-2.8

12.0

0.6M

C238

DEAD

0.6

-827.1

4.2

-1.2

0.0

-2.1

9.6

0.6M

C238

DEAD

1.2

-824.5

4.2

-1.2

0.0

-1.3

7.1

0.6M

C238

SEISX

5.3

22.1

84.3

0.7

181.2

51.0

0.6M

C238

SEISY

34.1

166.7

24.2

4.6

52.3

385.6

0.6M

C238

SEISY

0.6

34.1

166.7

24.2

4.6

37.5

284.3

-0.6M

C238

DEAD

-1071.2

13.9

-1.3

0.0

0.6

-13.4

13.9

-1.3

0.0

0.8

-15.5

-0.6M

C238

DEAD

0.15

-1070.6

-0.6M

C238

DEAD

0.3

-1069.9

13.9

-1.3

0.0

0.9

-17.6

-0.6M

C238

LIVE

-420.8

0.1

0.5

0.0

-0.2

-0.5

-0.6M

C238

LIVE

0.15

-420.8

0.1

0.5

0.0

-0.3

-0.5

-0.6M

C238

LIVE

0.3

-420.8

0.1

0.5

0.0

-0.4

-0.6

-1.5M

C238

DEAD

-1077.7

13.9

-1.3

0.0

-1.3

7.5

-1.5M

C238

DEAD

0.75

-1074.5

13.9

-1.3

0.0

-0.4

-3.0

-1.5M

C238

DEAD

1.5

-1071.2

13.9

-1.3

0.0

0.6

-13.4

-1.5M

C238

LIVE

-420.8

0.1

0.5

0.0

0.6

-0.4

-1.5M

C238

LIVE

0.75

-420.8

0.1

0.5

0.0

0.2

-0.4

-1.5M

C238

LIVE

1.5

-420.8

0.1

0.5

0.0

-0.2

-0.5

-1.5M

C238

SEISY

8.7

154.6

32.0

2.0

44.7

341.7

6.6M

C239

DEAD

-487.8

1.7

0.4

0.0

0.5

6.2

6.6M

C239

DEAD

1.3

-484.0

1.7

0.4

0.0

0.0

4.1

1.7

0.4

0.0

-0.4

2.0

6.6M

C239

DEAD

2.6

-480.3

3.5M

C239

DEAD

-809.5

8.6

1.3

0.0

0.0

7.6

3.5M

C239

DEAD

1.2

-804.3

8.6

1.3

0.0

-1.5

-2.7

3.5M

C239

DEAD

2.4

-799.2

8.6

1.3

0.0

-3.0

-12.9

0.6M

C239

DEAD

-814.7

8.6

1.3

0.0

1.5

17.8

0.6M

C239

DEAD

0.6

-812.1

8.6

1.3

0.0

0.7

12.7

0.6M

C239

DEAD

1.2

-809.5

8.6

1.3

0.0

0.0

7.6

0.6M

C239

SEISX

52.8

20.2

93.7

0.7

201.0

48.1

0.6M

C239

SEISY

148.6

145.7

30.3

4.6

64.9

353.8

0.6M

C239

SEISY

0.6

148.6

145.7

30.3

4.6

46.5

264.9

-0.6M

C239

DEAD

-1051.7

14.0

0.7

0.0

-0.8

-13.6

-0.6M

C239

DEAD

0.15

-1051.1

14.0

0.7

0.0

-0.9

-15.7

-0.6M

C239

DEAD

0.3

-1050.4

14.0

0.7

0.0

-1.0

-17.8

Chan Phuong Engineering (CPE)

Page 127

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C239

DEAD

-1058.2

14.0

0.7

0.0

0.2

7.4

-1.5M

C239

DEAD

0.75

-1055.0

14.0

0.7

0.0

-0.3

-3.1

-1.5M

C239

DEAD

1.5

-1051.7

14.0

0.7

0.0

-0.8

-13.6

-1.5M

C239

SEISY

179.5

137.5

40.6

2.0

51.4

349.4

6.6M

C240

DEAD

-404.0

-12.6

1.0

0.0

1.4

-23.1

6.6M

C240

DEAD

1.3

-400.3

-12.6

1.0

0.0

0.2

-6.7

3.5M

C240

DEAD

-692.6

-5.0

2.2

0.0

0.7

3.6

3.5M

C240

DEAD

1.2

-687.4

-5.0

2.2

0.0

-1.9

9.7

3.5M

C240

DEAD

2.4

-682.2

-5.0

2.2

0.0

-4.5

15.7

0.6M

C240

DEAD

-697.7

-5.0

2.2

0.0

3.3

-2.5

-5.0

2.2

0.0

2.0

0.5

0.6M

C240

DEAD

0.6

-695.1

0.6M

C240

DEAD

1.2

-692.6

-5.0

2.2

0.0

0.7

3.6

0.6M

C240

SEISX

37.5

16.5

73.4

0.7

162.1

40.4

0.6M

C240

SEISY

218.8

119.7

34.2

4.6

74.4

300.6

-0.6M

C240

DEAD

-989.6

9.9

1.7

0.0

-1.5

-10.4

-0.6M

C240

DEAD

0.2

-988.8

9.9

1.7

0.0

-1.8

-12.4

-0.6M

C240

DEAD

0.4

-987.9

9.9

1.7

0.0

-2.2

-14.4

-1.5M

C240

DEAD

-996.1

9.9

1.7

0.0

1.0

4.4

-1.5M

C240

DEAD

0.75

-992.9

9.9

1.7

0.0

-0.2

-3.0

-1.5M

C240

DEAD

1.5

-989.6

9.9

1.7

0.0

-1.5

-10.4

-1.5M

C240

SEISY

290.6

105.4

44.7

2.0

63.4

325.8

3.5M

C241

DEAD

-541.4

-0.2

13.8

0.0

7.7

-2.4

3.5M

C241

DEAD

1.2

-536.2

-0.2

13.8

0.0

-9.0

-2.2

3.5M

C241

DEAD

2.4

-531.0

-0.2

13.8

0.0

-25.6

-2.0

-0.2

13.8

0.0

24.3

-2.6

0.6M

C241

DEAD

-546.6

0.6M

C241

DEAD

0.6

-544.0

-0.2

13.8

0.0

16.0

-2.5

0.6M

C241

DEAD

1.2

-541.4

-0.2

13.8

0.0

7.7

-2.4

0.6M

C241

SEISX

172.6

39.0

71.3

0.7

156.1

90.8

0.6M

C241

SEISY

217.1

184.6

25.6

4.6

56.1

430.6

0.6M

C241

SEISY

0.6

217.1

184.6

25.6

4.6

40.3

318.9

-0.6M

C241

DEAD

-703.1

-7.2

10.3

0.0

-7.1

8.7

-0.6M

C241

DEAD

0.153

-702.4

-7.2

10.3

0.0

-8.7

9.8

-0.6M

C241

DEAD

0.307

-701.8

-7.2

10.3

0.0

-10.3

10.9

-1.5M

C241

DEAD

-709.6

-7.2

10.3

0.0

8.3

-2.1

-1.5M

C241

DEAD

0.75

-706.3

-7.2

10.3

0.0

0.6

3.3

-1.5M

C241

DEAD

1.5

-703.1

-7.2

10.3

0.0

-7.1

8.7

-1.5M

C241

SEISY

288.5

179.4

31.6

2.0

50.9

391.5

Chan Phuong Engineering (CPE)

Page 128

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C241

SEISY

0.75

288.5

179.4

31.6

2.0

27.2

257.1

3.5M

C242

DEAD

-468.2

8.6

14.7

0.0

9.5

9.8

3.5M

C242

DEAD

1.2

-463.0

8.6

14.7

0.0

-8.3

-0.5

3.5M

C242

DEAD

2.4

-457.8

8.6

14.7

0.0

-26.0

-10.9

0.6M

C242

DEAD

-473.3

8.6

14.7

0.0

27.1

20.2

0.6M

C242

DEAD

0.6

-470.7

8.6

14.7

0.0

18.3

15.0

0.6M

C242

DEAD

1.2

-468.2

8.6

14.7

0.0

9.5

9.8

0.6M

C242

SEISY

213.1

138.8

25.5

4.6

59.1

336.9

0.6M

C242

SEISY

0.6

213.1

138.8

25.5

4.6

43.4

252.9

-0.6M

C242

DEAD

-621.6

13.0

13.7

0.0

-9.6

-6.9

13.0

13.7

0.0

-12.4

-9.5

-0.6M

C242

DEAD

0.2

-620.8

-0.6M

C242

DEAD

0.4

-619.9

13.0

13.7

0.0

-15.1

-12.1

-1.5M

C242

DEAD

-628.1

13.0

13.7

0.0

10.9

12.6

-1.5M

C242

DEAD

0.75

-624.9

13.0

13.7

0.0

0.6

2.8

-1.5M

C242

DEAD

1.5

-621.6

13.0

13.7

0.0

-9.6

-6.9

-1.5M

C242

SEISY

275.6

121.4

34.0

2.0

61.5

348.6

-1.5M

C242

SEISY

0.75

275.6

121.4

34.0

2.0

36.0

258.4

0.6M

C243

DEAD

-401.4

-30.3

13.8

0.0

28.2

-67.2

0.6M

C243

SEISY

127.1

125.6

22.4

4.6

49.6

313.2

-0.6M

C243

DEAD

-575.6

-51.8

17.9

0.0

-12.3

43.2

-0.6M

C243

DEAD

0.2

-574.7

-51.8

17.9

0.0

-15.9

53.5

-0.6M

C243

DEAD

0.4

-573.9

-51.8

17.9

0.0

-19.5

63.9

-1.5M

C243

DEAD

-582.1

-51.8

17.9

0.0

14.6

-34.6

-1.5M

C243

DEAD

0.75

-578.8

-51.8

17.9

0.0

1.1

4.3

-51.8

17.9

0.0

-12.3

43.2

-1.5M

C243

DEAD

1.5

-575.6

-1.5M

C243

SEISY

161.1

111.4

26.2

2.0

42.4

341.2

-1.5M

C243

SEISY

0.75

161.1

111.4

26.2

2.0

22.7

258.8

6.6M

C244

DEAD

-539.1

17.1

28.8

0.0

42.3

14.2

6.6M

C244

DEAD

1.3

-535.3

17.1

28.8

0.0

4.7

-8.1

6.6M

C244

DEAD

2.6

-531.6

17.1

28.8

0.0

-33.2

-30.3

3.5M

C244

DEAD

-820.5

14.4

32.7

0.0

20.7

27.3

3.5M

C244

DEAD

1.2

-815.3

14.4

32.7

0.0

-19.1

10.0

3.5M

C244

DEAD

2.4

-810.1

14.4

32.7

0.0

-58.4

-7.4

0.6M

C244

DEAD

-825.7

14.4

32.7

0.0

59.9

44.5

0.6M

C244

DEAD

0.6

-823.1

14.4

32.7

0.0

40.4

35.9

0.6M

C244

DEAD

1.2

-820.5

14.4

32.7

0.0

20.7

27.3

0.6M

C244

SEISY

99.0

179.8

13.5

4.6

29.2

425.1

Chan Phuong Engineering (CPE)

Page 129

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

99.0

179.8

13.5

4.6

20.8

315.8

0.6M

C244

SEISY

0.6

-0.6M

C244

DEAD

-1092.0

43.3

30.2

0.0

-21.3

-30.3

-0.6M

C244

DEAD

0.153

-1091.3

43.3

30.2

0.0

-25.9

-37.0

-0.6M

C244

DEAD

0.307

-1090.7

43.3

30.2

0.0

-30.5

-43.6

-1.5M

C244

DEAD

-1098.5

43.3

30.2

0.0

24.2

34.7

-1.5M

C244

DEAD

0.75

-1095.2

43.3

30.2

0.0

1.5

2.2

-1.5M

C244

DEAD

1.5

-1092.0

43.3

30.2

0.0

-21.3

-30.3

-1.5M

C244

SEISY

115.9

177.4

14.2

2.0

22.4

390.5

-1.5M

C244

SEISY

0.75

115.9

177.4

14.2

2.0

11.6

257.3

6.6M

C245

DEAD

-428.6

78.4

1.3

0.0

1.6

118.8

78.4

1.3

0.0

0.0

16.9

6.6M

C245

DEAD

1.3

-424.9

6.6M

C245

DEAD

2.6

-421.2

78.4

1.3

0.0

-1.6

-85.1

3.5M

C245

DEAD

-671.0

54.9

5.3

0.0

5.2

38.5

3.5M

C245

DEAD

1.2

-665.8

54.9

5.3

0.0

-1.1

-27.5

3.5M

C245

DEAD

2.4

-660.6

54.9

5.3

0.0

-7.4

-93.4

0.6M

C245

DEAD

-676.2

54.9

5.3

0.0

11.4

104.3

0.6M

C245

DEAD

0.6

-673.6

54.9

5.3

0.0

8.4

71.5

0.6M

C245

DEAD

1.2

-671.0

54.9

5.3

0.0

5.2

38.5

0.6M

C245

SEISX

34.0

20.2

68.3

0.7

152.8

47.8

0.6M

C245

SEISY

226.6

122.8

25.9

4.6

59.6

311.2

-0.6M

C245

DEAD

-905.0

59.2

10.4

0.0

-8.2

-48.4

-0.6M

C245

DEAD

0.15

-904.4

59.2

10.4

0.0

-9.7

-57.3

-0.6M

C245

DEAD

0.3

-903.7

59.2

10.4

0.0

-11.3

-66.1

-1.5M

C245

DEAD

-911.5

59.2

10.4

0.0

7.5

40.5

59.2

10.4

0.0

-0.3

-3.9

-1.5M

C245

DEAD

0.75

-908.3

-1.5M

C245

DEAD

1.5

-905.0

59.2

10.4

0.0

-8.2

-48.4

-1.5M

C245

SEISY

331.1

129.2

32.1

2.0

52.8

319.0

6.6M

C246

DEAD

-487.5

-18.0

5.1

0.0

7.7

-27.4

6.6M

C246

DEAD

1.3

-483.8

-18.0

5.1

0.0

1.1

-4.1

6.6M

C246

DEAD

2.6

-480.1

-18.0

5.1

0.0

-5.6

19.2

6.6M

C246

SEISX

105.8

281.8

6.1

0.2

9.4

424.1

6.6M

C246

SEISX

2.6

105.8

281.8

6.1

0.2

7.2

316.1

3.5M

C246

DEAD

-765.9

-14.4

5.3

0.0

1.8

-4.7

3.5M

C246

DEAD

1.2

-760.7

-14.4

5.3

0.0

-4.6

12.6

3.5M

C246

DEAD

2.4

-755.5

-14.4

5.3

0.0

-10.9

29.7

3.5M

C246

SEISX

2.4

209.9

182.1

12.5

0.7

19.4

252.4

0.6M

C246

DEAD

-771.1

-14.4

5.3

0.0

8.2

-21.9

Chan Phuong Engineering (CPE)

Page 130

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

0.6M

C246

DEAD

0.6

-768.5

-14.4

5.3

0.0

5.0

-13.3

0.6M

C246

DEAD

1.2

-765.9

-14.4

5.3

0.0

1.8

-4.7

0.6M

C246

SEISX

209.9

182.4

12.6

0.7

27.4

415.7

0.6M

C246

SEISX

0.6

209.9

182.4

12.6

0.7

19.7

305.4

0.6M

C246

SEISY

43.7

30.6

93.3

4.6

203.5

66.9

-0.6M

C246

DEAD

-934.2

-9.3

2.6

0.0

-2.6

8.8

-0.6M

C246

DEAD

0.151

-933.5

-9.3

2.6

0.0

-3.0

10.2

-0.6M

C246

DEAD

0.302

-932.9

-9.3

2.6

0.0

-3.4

11.6

-0.6M

C246

LIVE

-402.5

-11.1

3.6

0.0

-2.7

7.9

-0.6M

C246

LIVE

0.151

-402.5

-11.1

3.6

0.0

-3.3

9.6

0.302

-402.5

-11.1

3.6

0.0

-3.8

11.3

-0.6M

C246

LIVE

-1.5M

C246

DEAD

-940.6

-9.3

2.6

0.0

1.4

-5.2

-1.5M

C246

DEAD

0.75

-937.4

-9.3

2.6

0.0

-0.6

1.8

-1.5M

C246

DEAD

1.5

-934.2

-9.3

2.6

0.0

-2.6

8.8

-1.5M

C246

LIVE

-402.5

-11.1

3.6

0.0

2.7

-8.7

-1.5M

C246

LIVE

0.75

-402.5

-11.1

3.6

0.0

0.0

-0.4

-1.5M

C246

LIVE

1.5

-402.5

-11.1

3.6

0.0

-2.7

7.9

-1.5M

C246

SEISX

265.5

164.5

16.7

0.3

22.2

316.8

0.6M

C247

SEISX

379.9

113.8

11.3

0.5

23.6

266.9

0.6M

C247

SEISY

75.2

18.4

84.9

3.5

176.0

42.3

-0.6M

C247

SEISX

446.6

126.6

14.4

0.3

3.7

26.5

-0.6M

C247

SEISX

0.151

446.6

126.6

14.4

0.3

5.9

19.4

-0.6M

C247

SEISX

0.302

446.6

126.6

14.4

0.3

8.1

28.0

-1.5M

C247

SEISX

446.6

126.8

14.4

0.3

18.1

209.8

126.8

14.4

0.3

7.2

115.3

-1.5M

C247

SEISX

0.75

446.6

-1.5M

C247

SEISX

1.5

446.6

126.8

14.4

0.3

3.7

26.5

6.6M

C248

DEAD

-744.4

3.0

-8.7

0.0

-13.1

5.1

6.6M

C248

DEAD

1.3

-741.3

3.0

-8.7

0.0

-1.8

1.1

6.6M

C248

DEAD

2.6

-738.1

3.0

-8.7

0.0

9.7

-2.9

3.5M

C248

DEAD

-1213.5

-0.7

-10.5

0.0

-5.9

0.6

3.5M

C248

DEAD

1.2

-1209.2

-0.7

-10.5

0.0

7.0

1.3

3.5M

C248

DEAD

2.4

-1204.9

-0.7

-10.5

0.0

19.6

2.1

0.6M

C248

DEAD

-1217.8

-0.7

-10.5

0.0

-18.6

-0.2

0.6M

C248

DEAD

0.6

-1215.7

-0.7

-10.5

0.0

-12.3

0.2

0.6M

C248

DEAD

1.2

-1213.5

-0.7

-10.5

0.0

-5.9

0.6

0.6M

C248

SEISY

143.8

9.2

87.0

3.5

190.1

22.2

-0.6M

C248

DEAD

-1455.7

-1.2

-8.0

0.0

5.2

1.8

Chan Phuong Engineering (CPE)

Page 131

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-0.6M

C248

DEAD

0.153

-1455.1

-1.2

-8.0

0.0

6.4

2.0

-0.6M

C248

DEAD

0.307

-1454.6

-1.2

-8.0

0.0

7.6

2.1

-0.6M

C248

LIVE

-500.2

6.1

-2.9

0.0

2.0

-5.0

-0.6M

C248

LIVE

0.153

-500.2

6.1

-2.9

0.0

2.4

-5.9

-0.6M

C248

LIVE

0.307

-500.2

6.1

-2.9

0.0

2.9

-6.8

-1.5M

C248

DEAD

-1461.1

-1.2

-8.0

0.0

-6.9

0.0

-1.5M

C248

DEAD

0.75

-1458.4

-1.2

-8.0

0.0

-0.9

0.9

-1.5M

C248

DEAD

1.5

-1455.7

-1.2

-8.0

0.0

5.2

1.8

-1.5M

C248

LIVE

-500.2

6.1

-2.9

0.0

-2.3

4.2

-1.5M

C248

LIVE

0.75

-500.2

6.1

-2.9

0.0

-0.2

-0.4

1.5

-500.2

6.1

-2.9

0.0

2.0

-5.0

-1.5M

C248

LIVE

3.5M

C249

SEISX

423.7

107.3

10.1

0.5

8.9

119.0

3.5M

C249

SEISX

1.2

423.7

107.3

10.1

0.5

3.4

19.3

3.5M

C249

SEISX

2.4

423.7

107.3

10.1

0.5

15.6

142.5

0.6M

C249

SEISX

423.7

107.5

10.1

0.5

21.1

248.3

0.6M

C249

SEISX

0.6

423.7

107.5

10.1

0.5

15.1

183.6

0.6M

C249

SEISX

1.2

423.7

107.5

10.1

0.5

8.9

119.0

0.6M

C249

SEISY

47.6

6.9

77.1

3.5

161.7

15.8

-0.6M

C249

SEISX

521.2

107.7

12.3

0.3

3.3

38.6

-0.6M

C249

SEISX

0.151

521.2

107.7

12.3

0.3

4.9

28.2

-0.6M

C249

SEISX

0.302

521.2

107.7

12.3

0.3

6.7

25.3

-1.5M

C249

SEISX

521.2

107.9

12.3

0.3

16.1

193.3

-1.5M

C249

SEISX

0.75

521.2

107.9

12.3

0.3

7.1

113.4

-1.5M

C249

SEISX

1.5

521.2

107.9

12.3

0.3

3.3

38.6

107.7

10.0

0.5

9.0

120.4

3.5M

C250

SEISX

415.9

3.5M

C250

SEISX

1.2

415.9

107.7

10.0

0.5

3.5

18.9

3.5M

C250

SEISX

2.4

415.9

107.7

10.0

0.5

15.4

142.2

0.6M

C250

SEISX

415.9

108.0

10.0

0.5

21.0

250.2

0.6M

C250

SEISX

0.6

415.9

108.0

10.0

0.5

15.0

185.3

0.6M

C250

SEISX

1.2

415.9

108.0

10.0

0.5

9.0

120.4

0.6M

C250

SEISY

34.4

8.6

76.9

3.5

161.4

19.3

-0.6M

C250

SEISX

510.4

108.1

12.8

0.3

2.6

37.4

-0.6M

C250

SEISX

0.151

510.4

108.1

12.8

0.3

4.6

27.2

-0.6M

C250

SEISX

0.302

510.4

108.1

12.8

0.3

6.5

24.9

-1.5M

C250

SEISX

510.4

108.3

12.8

0.3

16.7

192.8

-1.5M

C250

SEISX

0.75

510.4

108.3

12.8

0.3

7.1

112.6

-1.5M

C250

SEISX

1.5

510.4

108.3

12.8

0.3

2.6

37.4

Chan Phuong Engineering (CPE)

Page 132

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

0.6M

C251

SEISX

382.9

113.3

11.6

0.5

23.9

265.1

0.6M

C251

SEISY

82.6

20.7

84.2

3.5

174.5

45.9

-0.6M

C251

SEISX

437.1

121.4

13.6

0.3

5.4

29.1

-0.6M

C251

SEISX

0.151

437.1

121.4

13.6

0.3

7.2

20.7

-0.6M

C251

SEISX

0.302

437.1

121.4

13.6

0.3

9.2

26.2

-1.5M

C251

SEISX

437.1

121.6

13.6

0.3

16.5

204.6

-1.5M

C251

SEISX

0.75

437.1

121.6

13.6

0.3

7.0

114.1

-1.5M

C251

SEISX

1.5

437.1

121.6

13.6

0.3

5.4

29.1

6.6M

C252

DEAD

-471.7

11.7

-9.6

0.0

-14.6

17.8

6.6M

C252

DEAD

1.3

-468.6

11.7

-9.6

0.0

-2.2

2.5

11.7

-9.6

0.0

10.4

-12.9

6.6M

C252

DEAD

2.6

-465.5

3.5M

C252

DEAD

-773.0

4.7

-11.2

0.0

-5.4

4.9

3.5M

C252

DEAD

1.2

-768.6

4.7

-11.2

0.0

8.3

-0.8

3.5M

C252

DEAD

2.4

-764.3

4.7

-11.2

0.0

21.7

-6.5

0.6M

C252

DEAD

-777.3

4.7

-11.2

0.0

-18.9

10.5

0.6M

C252

DEAD

0.6

-775.1

4.7

-11.2

0.0

-12.2

7.7

0.6M

C252

DEAD

1.2

-773.0

4.7

-11.2

0.0

-5.4

4.9

0.6M

C252

SEISY

63.7

15.5

92.9

3.5

197.8

35.2

-0.6M

C252

DEAD

-921.0

5.2

-6.8

0.0

4.3

-2.8

-0.6M

C252

DEAD

0.153

-920.5

5.2

-6.8

0.0

5.4

-3.6

-0.6M

C252

DEAD

0.307

-919.9

5.2

-6.8

0.0

6.4

-4.4

-1.5M

C252

DEAD

-926.4

5.2

-6.8

0.0

-6.0

5.1

-1.5M

C252

DEAD

0.75

-923.7

5.2

-6.8

0.0

-0.8

1.2

-1.5M

C252

DEAD

1.5

-921.0

5.2

-6.8

0.0

4.3

-2.8

-8.4

13.7

0.0

20.6

-12.4

6.6M

C253

DEAD

-609.8

6.6M

C253

DEAD

1.3

-606.7

-8.4

13.7

0.0

2.9

-1.6

6.6M

C253

DEAD

2.6

-603.6

-8.4

13.7

0.0

-15.0

9.3

3.5M

C253

DEAD

-994.1

-8.2

15.4

0.0

6.9

-3.8

3.5M

C253

DEAD

1.2

-989.8

-8.2

15.4

0.0

-11.9

6.0

3.5M

C253

DEAD

2.4

-985.4

-8.2

15.4

0.0

-30.3

15.7

0.6M

C253

DEAD

-998.4

-8.2

15.4

0.0

25.4

-13.5

0.6M

C253

DEAD

0.6

-996.2

-8.2

15.4

0.0

16.2

-8.7

0.6M

C253

DEAD

1.2

-994.1

-8.2

15.4

0.0

6.9

-3.8

0.6M

C253

SEISY

63.3

8.8

86.8

3.5

189.1

20.3

-0.6M

C253

DEAD

-1202.3

-7.7

9.5

0.0

-7.5

6.9

-0.6M

C253

DEAD

0.153

-1201.7

-7.7

9.5

0.0

-8.9

8.1

-0.6M

C253

DEAD

0.307

-1201.2

-7.7

9.5

0.0

-10.4

9.3

Chan Phuong Engineering (CPE)

Page 133

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-0.6M

C253

SEISX

469.1

91.4

16.4

0.3

3.6

49.5

-0.6M

C253

SEISX

0.153

469.1

91.4

16.4

0.3

6.1

39.5

-0.6M

C253

SEISX

0.307

469.1

91.4

16.4

0.3

8.7

32.9

-1.5M

C253

DEAD

-1207.7

-7.7

9.5

0.0

6.9

-4.7

-1.5M

C253

DEAD

0.75

-1205.0

-7.7

9.5

0.0

-0.3

1.1

-1.5M

C253

DEAD

1.5

-1202.3

-7.7

9.5

0.0

-7.5

6.9

-1.5M

C253

SEISX

469.1

91.6

16.5

0.3

21.7

180.2

-1.5M

C253

SEISX

0.75

469.1

91.6

16.5

0.3

9.2

112.7

-1.5M

C253

SEISX

1.5

469.1

91.6

16.5

0.3

3.6

49.5

6.6M

C254

DEAD

-453.6

-6.4

-8.6

0.0

-12.9

-9.0

-6.4

-8.6

0.0

-1.6

-0.8

6.6M

C254

DEAD

1.3

-449.8

6.6M

C254

DEAD

2.6

-446.1

-6.4

-8.6

0.0

9.7

7.4

6.6M

C254

SEISX

63.7

292.7

6.0

0.2

9.3

441.1

6.6M

C254

SEISX

2.6

63.7

292.7

6.0

0.2

7.0

326.9

3.5M

C254

DEAD

-711.0

-7.7

-9.2

0.0

-4.2

-1.2

3.5M

C254

DEAD

1.2

-705.8

-7.7

-9.2

0.0

7.0

8.0

3.5M

C254

DEAD

2.4

-700.6

-7.7

-9.2

0.0

18.1

17.1

3.5M

C254

SEISX

2.4

130.9

190.5

12.4

0.7

19.1

265.8

0.6M

C254

DEAD

-716.2

-7.7

-9.2

0.0

-15.4

-10.4

0.6M

C254

DEAD

0.6

-713.6

-7.7

-9.2

0.0

-9.8

-5.8

0.6M

C254

DEAD

1.2

-711.0

-7.7

-9.2

0.0

-4.2

-1.2

0.6M

C254

SEISX

130.9

190.8

12.4

0.7

27.0

431.5

0.6M

C254

SEISX

0.6

130.9

190.8

12.4

0.7

19.5

316.3

0.6M

C254

SEISY

15.8

33.3

92.2

4.6

201.2

73.5

-5.1

-5.1

0.0

3.0

6.0

-0.6M

C254

DEAD

-864.1

-0.6M

C254

DEAD

0.151

-863.4

-5.1

-5.1

0.0

3.8

6.7

-0.6M

C254

DEAD

0.302

-862.8

-5.1

-5.1

0.0

4.5

7.5

-1.5M

C254

DEAD

-870.6

-5.1

-5.1

0.0

-4.6

-1.6

-1.5M

C254

DEAD

0.75

-867.3

-5.1

-5.1

0.0

-0.8

2.2

-1.5M

C254

DEAD

1.5

-864.1

-5.1

-5.1

0.0

3.0

6.0

-1.5M

C254

SEISX

161.6

168.1

16.6

0.3

22.0

317.4

6.6M

C255

SEISX

80.9

280.0

6.0

0.2

9.1

420.4

6.6M

C255

SEISX

2.6

80.9

280.0

6.0

0.2

6.9

313.5

3.5M

C255

DEAD

-578.8

-7.3

0.6

0.0

-0.5

-0.9

3.5M

C255

DEAD

1.2

-573.6

-7.3

0.6

0.0

-1.2

7.9

3.5M

C255

DEAD

2.4

-568.4

-7.3

0.6

0.0

-1.9

16.6

0.6M

C255

DEAD

-583.9

-7.3

0.6

0.0

0.2

-9.6

Chan Phuong Engineering (CPE)

Page 134

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

0.6M

C255

DEAD

0.6

-581.3

-7.3

0.6

0.0

-0.1

-5.2

0.6M

C255

DEAD

1.2

-578.8

-7.3

0.6

0.0

-0.5

-0.9

0.6M

C255

SEISX

157.1

182.6

12.4

0.7

26.9

416.1

0.6M

C255

SEISX

0.6

157.1

182.6

12.4

0.7

19.3

306.1

0.6M

C255

SEISY

8.0

13.4

92.1

4.6

199.5

30.7

-0.6M

C255

DEAD

-710.6

-4.3

-0.6

0.0

-0.2

5.2

-0.6M

C255

DEAD

0.151

-709.9

-4.3

-0.6

0.0

-0.1

5.9

-0.6M

C255

DEAD

0.302

-709.3

-4.3

-0.6

0.0

0.0

6.5

-1.5M

C255

DEAD

-717.1

-4.3

-0.6

0.0

-1.2

-1.2

-1.5M

C255

DEAD

0.75

-713.8

-4.3

-0.6

0.0

-0.7

2.0

-4.3

-0.6

0.0

-0.2

5.2

-1.5M

C255

DEAD

1.5

-710.6

-1.5M

C255

SEISX

202.7

162.8

16.5

0.3

21.9

310.8

6.6M

C256

DEAD

-442.5

-33.1

-1.7

0.0

-2.5

-50.6

6.6M

C256

DEAD

1.3

-438.8

-33.1

-1.7

0.0

-0.3

-7.7

6.6M

C256

DEAD

2.6

-435.0

-33.1

-1.7

0.0

1.9

35.3

6.6M

C256

SEISX

150.4

252.0

5.9

0.2

9.2

376.6

6.6M

C256

SEISX

2.6

150.4

252.0

5.9

0.2

6.9

286.2

3.5M

C256

DEAD

-698.2

-22.1

-2.2

0.0

-1.4

-7.0

3.5M

C256

DEAD

1.2

-693.1

-22.1

-2.2

0.0

1.2

19.6

3.5M

C256

DEAD

2.4

-687.9

-22.1

-2.2

0.0

3.9

46.1

0.6M

C256

DEAD

-703.4

-22.1

-2.2

0.0

-4.1

-33.6

0.6M

C256

DEAD

0.6

-700.8

-22.1

-2.2

0.0

-2.8

-20.3

0.6M

C256

DEAD

1.2

-698.2

-22.1

-2.2

0.0

-1.4

-7.0

0.6M

C256

SEISX

291.0

163.1

12.5

0.7

27.0

382.2

163.1

12.5

0.7

19.5

283.7

0.6M

C256

SEISX

0.6

291.0

0.6M

C256

SEISY

17.8

11.0

92.6

4.6

201.3

25.0

-0.6M

C256

DEAD

-844.1

-11.9

-1.6

0.0

0.5

11.0

-0.6M

C256

DEAD

0.151

-843.5

-11.9

-1.6

0.0

0.8

12.8

-0.6M

C256

DEAD

0.302

-842.8

-11.9

-1.6

0.0

1.0

14.5

-1.5M

C256

DEAD

-850.6

-11.9

-1.6

0.0

-2.0

-6.9

-1.5M

C256

DEAD

0.75

-847.3

-11.9

-1.6

0.0

-0.7

2.0

-1.5M

C256

DEAD

1.5

-844.1

-11.9

-1.6

0.0

0.5

11.0

-1.5M

C256

SEISX

370.2

151.1

16.5

0.3

21.9

303.2

3.5M

C261

DEAD

-622.1

16.7

3.7

0.0

2.5

11.6

3.5M

C261

DEAD

1.2

-616.9

16.7

3.7

0.0

-1.9

-8.4

3.5M

C261

DEAD

2.4

-611.8

16.7

3.7

0.0

-6.2

-28.3

0.6M

C261

DEAD

-627.3

16.7

3.7

0.0

6.8

31.6

Chan Phuong Engineering (CPE)

Page 135

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

0.6M

C261

DEAD

0.6

-624.7

16.7

3.7

0.0

4.7

21.6

0.6M

C261

DEAD

1.2

-622.1

16.7

3.7

0.0

2.5

11.6

0.6M

C261

SEISX

23.6

21.8

70.1

0.7

155.1

52.0

0.6M

C261

SEISY

90.7

107.7

23.5

4.6

49.8

263.8

-0.6M

C261

DEAD

-899.1

18.8

5.0

0.0

-4.0

-16.8

-0.6M

C261

DEAD

0.2

-898.2

18.8

5.0

0.0

-5.0

-20.6

-0.6M

C261

DEAD

0.4

-897.3

18.8

5.0

0.0

-6.0

-24.3

-1.5M

C261

DEAD

-905.5

18.8

5.0

0.0

3.6

11.4

-1.5M

C261

DEAD

0.75

-902.3

18.8

5.0

0.0

-0.2

-2.7

-1.5M

C261

DEAD

1.5

-899.1

18.8

5.0

0.0

-4.0

-16.8

96.4

30.6

2.0

41.8

266.1

-1.5M

C261

SEISY

109.3

3.5M

C262

SEISX

99.5

19.8

122.9

0.6

187.4

30.7

3.5M

C262

SEISY

276.2

170.1

50.9

4.0

78.2

267.3

0.6M

C262

SEISY

415.1

61.2

19.2

1.8

7.2

19.7

0.6M

C262

SEISY

0.302

415.1

61.2

19.2

1.8

12.8

10.7

0.6M

C262

SEISY

0.604

415.1

61.2

19.2

1.8

18.5

23.7

-0.6M

C262

SEISY

415.1

61.4

19.3

1.8

11.8

73.0

-0.6M

C262

SEISY

0.45

415.1

61.4

19.3

1.8

4.0

45.6

-0.6M

C262

SEISY

0.9

415.1

61.4

19.3

1.8

7.2

19.7

-1.5M

C262

SEISY

415.1

61.5

19.4

1.8

40.8

165.2

-1.5M

C262

SEISY

0.75

415.1

61.5

19.4

1.8

26.3

119.1

-1.5M

C262

SEISY

1.5

415.1

61.5

19.4

1.8

11.8

73.0

6.6M

C263

SEISY

5.2

230.0

14.2

1.7

20.1

316.4

6.6M

C263

SEISY

2.6

5.2

230.0

14.2

1.7

17.5

283.5

42.1

149.8

0.8

227.7

67.3

3.5M

C263

SEISX

93.7

3.5M

C263

SEISY

22.5

358.9

47.1

5.3

71.7

578.2

3.5M

C263

SEISY

2.4

22.5

358.9

47.1

5.3

42.7

286.6

0.6M

C263

DEAD

-531.9

2.3

12.8

0.0

-15.7

-2.1

0.6M

C263

DEAD

0.3

-530.6

2.3

12.8

0.0

-19.5

-2.8

0.6M

C263

DEAD

0.6

-529.3

2.3

12.8

0.0

-23.3

-3.5

-0.6M

C263

DEAD

-535.8

2.3

12.8

0.0

-4.1

0.0

-0.6M

C263

DEAD

0.45

-533.9

2.3

12.8

0.0

-9.9

-1.1

-0.6M

C263

DEAD

0.9

-531.9

2.3

12.8

0.0

-15.7

-2.1

-1.5M

C263

DEAD

-542.3

2.3

12.8

0.0

15.1

3.4

-1.5M

C263

DEAD

0.75

-539.1

2.3

12.8

0.0

5.5

1.7

-1.5M

C263

DEAD

1.5

-535.8

2.3

12.8

0.0

-4.1

0.0

-1.5M

C263

SEISY

46.4

142.6

17.6

2.4

37.8

326.2

Chan Phuong Engineering (CPE)

Page 136

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

6.6M

C264

SEISY

75.1

208.9

11.8

1.7

16.7

284.7

6.6M

C264

SEISY

2.6

75.1

208.9

11.8

1.7

14.6

260.8

3.5M

C264

DEAD

-444.1

-38.8

56.6

0.0

78.1

-56.1

3.5M

C264

DEAD

1.2

-438.9

-38.8

56.6

0.0

10.2

-9.5

3.5M

C264

DEAD

2.4

-433.7

-38.8

56.6

0.0

-57.8

37.1

3.5M

C264

SEISX

115.4

38.8

149.1

0.8

227.0

62.2

3.5M

C264

SEISY

210.1

325.0

34.0

5.3

50.8

529.5

3.5M

C264

SEISY

2.4

210.1

325.0

34.0

5.3

31.9

254.8

0.6M

C264

DEAD

-703.2

-10.4

17.0

0.0

-20.9

13.8

0.6M

C264

DEAD

0.3

-701.9

-10.4

17.0

0.0

-25.9

16.9

-10.4

17.0

0.0

-31.0

20.1

0.6M

C264

DEAD

0.6

-700.6

-0.6M

C264

DEAD

-707.1

-10.4

17.0

0.0

-5.5

4.4

-0.6M

C264

DEAD

0.45

-705.1

-10.4

17.0

0.0

-13.2

9.1

-0.6M

C264

DEAD

0.9

-703.2

-10.4

17.0

0.0

-20.9

13.8

-1.5M

C264

DEAD

-713.6

-10.4

17.0

0.0

20.1

-11.3

-1.5M

C264

DEAD

0.75

-710.3

-10.4

17.0

0.0

7.3

-3.4

-1.5M

C264

DEAD

1.5

-707.1

-10.4

17.0

0.0

-5.5

4.4

-1.5M

C264

SEISY

351.4

131.1

12.3

2.4

27.2

313.1

3.5M

C265

DEAD

-482.0

47.1

59.8

0.0

88.5

57.8

3.5M

C265

DEAD

1.2

-476.8

47.1

59.8

0.0

16.8

1.3

3.5M

C265

DEAD

2.4

-471.7

47.1

59.8

0.0

-55.1

-55.2

3.5M

C265

SEISX

89.0

24.1

138.6

0.8

219.6

47.0

3.5M

C265

SEISY

110.6

206.2

11.1

5.3

16.5

407.6

0.6M

C265

DEAD

-773.1

11.9

21.7

0.0

-26.8

-14.1

11.9

21.7

0.0

-33.3

-17.7

0.6M

C265

DEAD

0.3

-771.8

0.6M

C265

DEAD

0.6

-770.5

11.9

21.7

0.0

-39.7

-21.3

-0.6M

C265

DEAD

-777.0

11.9

21.7

0.0

-7.1

-3.4

-0.6M

C265

DEAD

0.45

-775.0

11.9

21.7

0.0

-17.0

-8.8

-0.6M

C265

DEAD

0.9

-773.1

11.9

21.7

0.0

-26.8

-14.1

-1.5M

C265

DEAD

-783.5

11.9

21.7

0.0

25.8

14.5

-1.5M

C265

DEAD

0.75

-780.2

11.9

21.7

0.0

9.4

5.6

-1.5M

C265

DEAD

1.5

-777.0

11.9

21.7

0.0

-7.1

-3.4

-1.5M

C265

SEISY

116.1

122.1

4.7

2.4

10.3

302.8

3.5M

C266

SEISY

44.0

103.7

4.7

2.5

17.8

340.1

0.6M

C266

DEAD

-475.3

-4.6

22.2

0.0

-27.4

6.5

0.6M

C266

DEAD

0.3

-474.0

-4.6

22.2

0.0

-34.0

7.9

0.6M

C266

DEAD

0.6

-472.7

-4.6

22.2

0.0

-40.6

9.3

Chan Phuong Engineering (CPE)

Page 137

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-0.6M

C266

DEAD

-479.2

-4.6

22.2

0.0

-7.3

2.4

-0.6M

C266

DEAD

0.45

-477.3

-4.6

22.2

0.0

-17.4

4.5

-0.6M

C266

DEAD

0.9

-475.3

-4.6

22.2

0.0

-27.4

6.5

-1.5M

C266

DEAD

-485.7

-4.6

22.2

0.0

26.1

-4.6

-1.5M

C266

DEAD

0.75

-482.5

-4.6

22.2

0.0

9.4

-1.1

-1.5M

C266

DEAD

1.5

-479.2

-4.6

22.2

0.0

-7.3

2.4

-1.5M

C266

SEISY

130.3

147.2

7.3

2.4

15.1

331.4

3.5M

C267

SEISY

7.9

110.1

7.4

2.5

27.2

355.4

0.6M

C267

DEAD

-412.6

-14.0

68.7

0.1

5.5

-9.6

0.6M

C267

DEAD

0.3

-411.3

-14.0

68.7

0.1

-15.1

-5.4

-14.0

68.7

0.1

-35.7

-1.2

0.6M

C267

DEAD

0.6

-410.0

-0.6M

C267

DEAD

-416.5

-14.0

68.7

0.1

67.3

-22.2

-0.6M

C267

DEAD

0.45

-414.5

-14.0

68.7

0.1

36.4

-15.9

-0.6M

C267

DEAD

0.9

-412.6

-14.0

68.7

0.1

5.5

-9.6

-0.6M

C267

SEISY

17.6

289.3

20.7

3.5

23.9

301.0

-1.5M

C267

DEAD

-557.4

-12.1

52.7

-0.2

24.4

0.2

-1.5M

C267

DEAD

0.45

-555.5

-12.1

52.7

-0.2

0.7

5.7

-1.5M

C267

DEAD

0.9

-553.5

-12.1

52.7

-0.2

-23.1

11.1

-1.5M

C267

SEISY

147.0

232.8

63.2

1.2

55.3

334.3

6.6M

C268

SEISY

2.6

9.8

161.0

15.9

1.7

20.0

250.0

3.5M

C268

SEISX

102.4

25.3

144.4

0.8

228.7

46.3

3.5M

C268

SEISY

152.6

196.4

55.1

5.3

85.1

380.4

0.6M

C268

DEAD

-636.5

-6.8

74.3

0.1

9.8

-6.7

0.6M

C268

DEAD

0.3

-635.2

-6.8

74.3

0.1

-12.5

-4.6

-6.8

74.3

0.1

-34.8

-2.6

0.6M

C268

DEAD

0.6

-633.9

-0.6M

C268

DEAD

-640.4

-6.8

74.3

0.1

76.7

-12.8

-0.6M

C268

DEAD

0.45

-638.5

-6.8

74.3

0.1

43.3

-9.7

-0.6M

C268

DEAD

0.9

-636.5

-6.8

74.3

0.1

9.8

-6.7

-0.6M

C268

SEISY

110.7

265.0

38.8

3.5

45.0

350.6

-1.5M

C268

DEAD

-880.2

-2.6

62.6

-0.2

28.2

3.9

-1.5M

C268

DEAD

0.45

-878.3

-2.6

62.6

-0.2

0.0

5.1

-1.5M

C268

DEAD

0.9

-876.3

-2.6

62.6

-0.2

-28.3

6.2

-1.5M

C268

LIVE

-483.0

2.3

100.6

-0.1

43.0

5.3

-1.5M

C268

LIVE

0.45

-483.0

2.3

100.6

-0.1

-2.3

4.3

-1.5M

C268

LIVE

0.9

-483.0

2.3

100.6

-0.1

-47.6

3.3

-1.5M

C268

SEISY

109.9

355.9

68.8

1.2

63.2

381.8

3.5M

C269

SEISX

97.5

19.2

137.0

0.6

213.8

32.4

Chan Phuong Engineering (CPE)

Page 138

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

3.5M

C269

SEISY

107.9

162.2

72.4

4.0

109.7

272.3

0.6M

C269

DEAD

-525.8

28.3

71.0

0.1

4.9

5.8

0.6M

C269

DEAD

0.3

-524.7

28.3

71.0

0.1

-16.5

-2.7

0.6M

C269

DEAD

0.601

-523.6

28.3

71.0

0.1

-37.8

-11.2

-0.6M

C269

DEAD

-529.0

28.3

71.0

0.1

68.9

31.3

-0.6M

C269

DEAD

0.45

-527.4

28.3

71.0

0.1

36.9

18.6

-0.6M

C269

DEAD

0.9

-525.8

28.3

71.0

0.1

4.9

5.8

-1.5M

C269

DEAD

-700.2

36.7

45.4

-0.1

19.4

18.3

-1.5M

C269

DEAD

0.45

-698.6

36.7

45.4

-0.1

-1.0

1.7

-1.5M

C269

DEAD

0.9

-697.0

36.7

45.4

-0.1

-21.4

-14.8

-11.2

-24.5

0.0

-36.1

19.4

6.6M

C270

DEAD

-606.6

6.6M

C270

DEAD

1.3

-602.3

-11.2

-24.5

0.0

-4.2

34.1

6.6M

C270

DEAD

2.6

-597.9

-11.2

-24.5

0.0

28.0

48.5

6.6M

C270

SEISY

2.6

31.4

159.7

3.2

2.0

4.6

282.3

3.5M

C270

DEAD

-805.7

64.3

-52.2

0.0

-64.9

90.1

3.5M

C270

DEAD

1.2

-799.7

64.3

-52.2

0.0

-2.0

13.0

3.5M

C270

DEAD

2.4

-793.6

64.3

-52.2

0.0

60.9

-64.2

3.5M

C270

SEISX

62.1

25.7

168.0

1.1

291.6

53.3

3.5M

C270

SEISY

114.8

238.7

12.1

6.5

21.0

512.4

0.6M

C270

DEAD

-1282.5

23.7

-8.7

0.0

10.4

-29.5

0.6M

C270

DEAD

0.3

-1280.9

23.7

-8.7

0.0

13.0

-36.6

0.6M

C270

DEAD

0.6

-1279.4

23.7

-8.7

0.0

15.6

-43.7

0.6M

C270

LIVE

-477.4

4.7

-2.8

-0.1

3.2

-5.8

0.6M

C270

LIVE

0.3

-477.4

4.7

-2.8

-0.1

4.0

-7.2

0.6

-477.4

4.7

-2.8

-0.1

4.9

-8.6

0.6M

C270

LIVE

-0.6M

C270

DEAD

-1287.0

23.7

-8.7

0.0

2.5

-8.1

-0.6M

C270

DEAD

0.45

-1284.7

23.7

-8.7

0.0

6.5

-18.8

-0.6M

C270

DEAD

0.9

-1282.5

23.7

-8.7

0.0

10.4

-29.5

-0.6M

C270

LIVE

-477.4

4.7

-2.8

-0.1

0.7

-1.5

-0.6M

C270

LIVE

0.45

-477.4

4.7

-2.8

-0.1

2.0

-3.6

-0.6M

C270

LIVE

0.9

-477.4

4.7

-2.8

-0.1

3.2

-5.8

-1.5M

C270

DEAD

-1294.6

23.7

-8.7

0.0

-10.7

27.5

-1.5M

C270

DEAD

0.75

-1290.8

23.7

-8.7

0.0

-4.1

9.7

-1.5M

C270

DEAD

1.5

-1287.0

23.7

-8.7

0.0

2.5

-8.1

-1.5M

C270

LIVE

-477.4

4.7

-2.8

-0.1

-3.5

5.5

-1.5M

C270

LIVE

0.75

-477.4

4.7

-2.8

-0.1

-1.4

2.0

-1.5M

C270

LIVE

1.5

-477.4

4.7

-2.8

-0.1

0.7

-1.5

Chan Phuong Engineering (CPE)

Page 139

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C270

SEISY

130.3

149.8

7.4

3.0

14.3

381.9

-1.5M

C270

SEISY

0.75

130.3

149.8

7.4

3.0

8.7

269.3

6.6M

C271

DEAD

-508.0

19.5

-7.5

0.0

-4.2

-24.2

6.6M

C271

DEAD

1.3

-503.6

19.5

-7.5

0.0

5.9

-49.6

6.6M

C271

DEAD

2.6

-499.3

19.5

-7.5

0.0

15.7

-74.8

6.6M

C271

SEISY

2.6

72.4

133.7

5.5

3.1

10.0

304.9

3.5M

C271

DEAD

-522.6

19.5

-7.5

0.0

-26.2

32.7

3.5M

C271

DEAD

1.45

-515.3

19.5

-7.5

0.0

-15.4

4.3

3.5M

C271

DEAD

2.9

-508.0

19.5

-7.5

0.0

-4.2

-24.2

3.5M

C271

SEISX

9.9

14.2

38.6

0.5

153.4

46.5

135.5

5.7

3.1

22.7

444.2

3.5M

C271

SEISY

72.4

0.6M

C271

DEAD

-892.4

-13.6

-9.9

0.0

11.8

17.8

0.6M

C271

DEAD

0.3

-890.9

-13.6

-9.9

0.0

14.7

21.8

0.6M

C271

DEAD

0.6

-889.4

-13.6

-9.9

0.0

17.7

25.9

-0.6M

C271

DEAD

-896.9

-13.6

-9.9

0.0

2.7

5.5

-0.6M

C271

DEAD

0.45

-894.7

-13.6

-9.9

0.0

7.3

11.7

-0.6M

C271

DEAD

0.9

-892.4

-13.6

-9.9

0.0

11.8

17.8

-1.5M

C271

DEAD

-904.5

-13.6

-9.9

0.0

-12.3

-14.8

-1.5M

C271

DEAD

0.75

-900.7

-13.6

-9.9

0.0

-4.8

-4.6

-1.5M

C271

DEAD

1.5

-896.9

-13.6

-9.9

0.0

2.7

5.5

-1.5M

C271

SEISY

179.8

177.9

10.8

3.0

20.5

413.5

-1.5M

C271

SEISY

0.75

179.8

177.9

10.8

3.0

12.3

279.9

3.5M

C272

SEISY

51.5

92.8

2.2

2.5

8.4

281.9

3.5M

C273

SEISY

71.6

94.7

4.4

2.5

16.6

289.2

18.3

0.1

0.0

0.3

36.5

6.6M

C288

DEAD

-403.5

6.6M

C288

DEAD

1.05

-400.5

18.3

0.1

0.0

0.3

17.3

3.5M

C288

DEAD

-600.7

-2.6

-2.8

0.2

-8.4

-29.4

3.5M

C288

DEAD

1.2

-595.5

-2.6

-2.8

0.2

-5.1

-26.4

3.5M

C288

DEAD

2.4

-590.3

-2.6

-2.8

0.2

-1.7

-23.3

3.5M

C288

SEISY

69.1

155.9

25.0

5.1

31.4

326.3

0.6M

C288

DEAD

-781.3

-77.6

7.2

-0.5

17.2

-23.4

0.6M

C288

DEAD

0.3

-780.0

-77.6

7.2

-0.5

15.1

-0.1

0.6M

C288

DEAD

0.6

-778.7

-77.6

7.2

-0.5

12.9

23.1

-0.6M

C288

DEAD

-910.3

-7.6

8.6

0.0

-6.6

4.9

-0.6M

C288

DEAD

0.2

-909.4

-7.6

8.6

0.0

-8.3

6.4

-0.6M

C288

DEAD

0.4

-908.6

-7.6

8.6

0.0

-10.0

8.0

-1.5M

C288

DEAD

-916.8

-7.6

8.6

0.0

6.4

-6.6

Chan Phuong Engineering (CPE)

Page 140

Project : Bagan Golden Star Hotel

Design Development Report

STORY

COLUMN

SECTION

Load

Loc

V2

V3

M2=Mzz

text

text

(mm x mm)

text

(m)

(KN)

(KN)

(KN)

(KN.m)

(KN.m)

-1.5M

C288

DEAD

0.75

-913.5

-7.6

8.6

0.0

-0.1

-0.8

-1.5M

C288

DEAD

1.5

-910.3

-7.6

8.6

0.0

-6.6

4.9

-1.5M

C288

SEISY

298.6

140.1

19.6

2.0

31.5

259.4

Chan Phuong Engineering (CPE)

Page 141

Project : Bagan Golden Star Hotel

Design Development Report

Appendix D
Beam forces

Chan Phuong Engineering (CPE)

Page 142

Project : Bagan Golden Star Hotel

Design Development Report


Table B.8 Beam forces

Line
Text

Station OutputCase
m

Text

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

73.1

0.0

15.5

0.0

142.5

-0.6M

B803

ENVE MAX

0.3

0.6M

B804

ENVE MAX

0.35

122.3

0.0

21.7

0.0

294.4

0.6M

B804

ENVE MAX

3.85

223.3

0.0

26.8

0.0

269.6

0.6M

B804

ENVE MAX

3.85

237.8

0.0

33.5

0.0

271.2

-0.6M

B804

ENVE MAX

0.35

121.2

0.0

3.5

0.0

289.6

-0.6M

B804

ENVE MAX

1.23

129.8

0.0

5.7

0.0

182.6

0.6M

B805

ENVE MAX

0.35

189.6

0.0

20.7

0.0

321.7

0.6M

B805

ENVE MAX

3.4

289.8

0.0

29.0

0.0

338.5

-0.6M

B808

ENVE MAX

0.15

38.3

0.0

25.4

0.0

100.7

-0.6M

B810

ENVE MAX

0.3

93.9

0.0

22.2

0.0

224.4

-0.6M

B812

ENVE MAX

0.3

10.2

0.0

4.4

0.0

111.9

44.4

0.0

21.4

0.0

186.8

-0.6M

B813

ENVE MAX

0.3

-0.6M

B815

ENVE MAX

0.3

29.2

0.0

17.2

0.0

113.2

-0.6M

B824

ENVE MAX

0.25

84.0

0.0

7.7

0.0

166.0

-0.6M

B825

ENVE MAX

0.3

25.4

0.0

5.6

0.0

121.4

-0.6M

B826

ENVE MAX

0.25

96.9

0.0

6.4

0.0

185.4

-0.6M

B828

ENVE MAX

0.25

90.8

0.0

5.8

0.0

181.3

-0.6M

B828

ENVE MAX

0.535

91.7

0.0

5.8

0.0

155.3

-0.6M

B829

ENVE MAX

0.3

40.7

0.0

12.0

0.0

137.3

-0.6M

B830

ENVE MAX

0.25

86.8

0.0

3.6

0.0

171.1

-0.6M

B831

ENVE MAX

0.3

48.1

0.0

5.7

0.0

147.4

-0.6M

B832

ENVE MAX

0.3

-38.7

0.0

41.3

0.0

103.3

-0.6M

B832

ENVE MAX

0.75

-32.1

0.0

41.3

0.0

119.2

-0.6M

B832

ENVE MAX

0.75

-8.0

0.0

39.7

0.0

121.3

-0.6M

B832

ENVE MAX

0.857

-6.4

0.0

39.7

0.0

122.1

-30.6

0.0

38.4

0.0

124.1

-0.6M

B832

ENVE MAX

0.857

-0.6M

B834

ENVE MAX

0.15

44.0

0.0

21.5

0.0

108.0

-0.6M

B835

ENVE MAX

0.15

45.9

0.0

17.3

0.0

120.6

-0.6M

B836

ENVE MAX

0.15

49.0

0.0

17.4

0.0

121.7

-0.6M

B838

ENVE MAX

0.15

25.7

0.0

23.5

0.0

101.2

-0.6M

B839

ENVE MAX

0.15

-5.4

0.0

32.3

0.0

111.8

-0.6M

B839

ENVE MAX

0.6

1.2

0.0

32.3

0.0

112.7

-0.6M

B839

ENVE MAX

0.6

19.2

0.0

16.4

0.0

111.0

-0.6M

B887

ENVE MAX

4.1

55.2

0.0

14.4

0.0

225.3

-0.6M

B887

ENVE MAX

4.1

64.9

0.0

20.1

0.0

221.7

-0.6M

B905

ENVE MAX

0.15

55.2

0.0

5.4

0.0

124.2

Chan Phuong Engineering (CPE)

Page 143

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

5.4

0.0

6.5

0.0

132.1

-0.6M

B916

ENVE MAX

7.08

-0.6M

B916

ENVE MAX

7.08

7.1

0.0

3.5

0.0

132.8

-0.6M

B916

ENVE MAX

8.053

27.3

0.0

1.9

0.0

120.4

-0.6M

B916

ENVE MAX

8.053

22.1

0.0

2.0

0.0

118.0

0.6M

B948

ENVE MAX

0.3

-24.2

0.0

95.0

0.0

115.6

0.6M

B973

ENVE MAX

0.25

25.1

0.0

24.1

0.0

120.8

-0.6M

B973

ENVE MAX

0.25

35.9

0.0

22.3

0.0

129.3

-1.5M

B973

ENVE MAX

0.25

44.3

0.0

58.3

0.0

159.2

0.6M

B974

ENVE MAX

0.35

79.6

0.0

54.2

0.0

285.8

0.6M

B974

ENVE MAX

0.66

84.6

0.0

54.2

0.0

260.4

89.5

0.0

54.2

0.0

235.9

0.6M

B974

ENVE MAX

0.97

0.6M

B974

ENVE MAX

0.97

2.1

0.0

48.6

0.0

235.1

0.6M

B974

ENVE MAX

2.6

0.0

48.6

0.0

235.0

0.6M

B974

ENVE MAX

93.0

0.0

39.7

0.0

233.7

0.6M

B974

ENVE MAX

10.9

0.0

14.8

0.0

164.8

0.6M

B974

ENVE MAX

136.8

0.0

-8.7

0.0

159.7

0.6M

B974

ENVE MAX

2.95

8.7

0.0

-10.9

0.0

107.9

0.6M

B974

ENVE MAX

2.95

210.7

0.0

-13.7

0.0

110.3

-1.5M

B974

ENVE MAX

0.35

59.9

0.0

57.5

0.0

160.0

0.6M

B993

ENVE MAX

0.15

146.2

0.0

11.9

0.0

247.6

-0.6M

B999

ENVE MAX

0.3

1.6

0.0

22.4

0.0

162.1

-0.6M

B999

ENVE MAX

0.857

3.7

0.0

22.4

0.0

160.6

-0.6M

B999

ENVE MAX

0.857

10.3

0.0

17.2

0.0

160.6

-0.6M

B999

ENVE MAX

43.2

0.0

13.8

0.0

148.6

98.9

0.0

5.1

0.0

129.1

-0.6M

B999

ENVE MAX

6.001

-0.6M

B999

ENVE MAX

6.001

166.9

0.0

32.1

0.0

112.7

-0.6M

B999

ENVE MAX

7.6

210.1

0.0

43.2

0.0

136.4

-0.6M

B1001

ENVE MAX

0.3

-9.2

0.0

55.0

0.0

113.3

-0.6M

B1001

ENVE MAX

0.575

-5.1

0.0

55.0

0.0

115.3

0.6M

B1008

ENVE MAX

0.2

67.8

0.0

10.6

0.0

129.9

0.6M

B1009

ENVE MAX

0.3

86.3

0.0

-4.1

0.0

227.2

0.6M

B1009

ENVE MAX

0.91

95.3

0.0

-4.1

0.0

171.9

0.6M

B1009

ENVE MAX

0.91

96.1

0.0

-3.9

0.0

171.1

0.6M

B1011

ENVE MAX

0.3

-6.6

0.0

7.4

0.0

149.3

0.6M

B1012

ENVE MAX

0.3

162.8

0.0

4.0

0.0

291.5

0.6M

B1015

ENVE MAX

0.15

-13.4

0.0

41.9

0.0

178.2

0.6M

B1015

ENVE MAX

0.475

-11.7

0.0

41.9

0.0

182.3

Chan Phuong Engineering (CPE)

Page 144

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

-10.0

0.0

41.9

0.0

185.8

0.6M

B1015

ENVE MAX

0.8

0.6M

B1015

ENVE MAX

0.8

-3.8

0.0

38.4

0.0

186.3

0.6M

B1015

ENVE MAX

-2.8

0.0

38.4

0.0

187.0

0.6M

B1015

ENVE MAX

0.3

0.0

33.9

0.0

187.2

0.6M

B1015

ENVE MAX

1.3

1.9

0.0

33.9

0.0

195.6

0.6M

B1015

ENVE MAX

1.6

3.5

0.0

33.9

0.0

206.8

0.6M

B1015

ENVE MAX

1.6

8.4

0.0

31.0

0.0

208.5

0.6M

B1015

ENVE MAX

10.5

0.0

31.0

0.0

216.9

0.6M

B1015

ENVE MAX

17.8

0.0

27.8

0.0

217.9

0.6M

B1015

ENVE MAX

2.4

19.8

0.0

27.8

0.0

219.7

27.5

0.0

25.4

0.0

219.5

0.6M

B1015

ENVE MAX

2.4

0.6M

B1015

ENVE MAX

2.7

29.1

0.0

25.4

0.0

216.9

0.6M

B1015

ENVE MAX

4.5

100.4

0.0

26.8

0.0

181.6

0.6M

B1015

ENVE MAX

103.9

0.0

26.8

0.0

163.2

0.6M

B1015

ENVE MAX

125.6

0.0

33.4

0.0

163.3

0.6M

B1015

ENVE MAX

5.5

129.0

0.0

33.4

0.0

154.7

0.6M

B1016

ENVE MAX

0.15

-32.7

0.0

38.8

0.0

152.8

0.6M

B1016

ENVE MAX

0.575

-30.5

0.0

38.8

0.0

166.2

0.6M

B1019

ENVE MAX

0.35

-22.2

0.0

39.6

0.0

155.6

0.6M

B1019

ENVE MAX

2.3

20.2

0.0

23.6

0.0

199.9

0.6M

B1019

ENVE MAX

2.3

17.5

0.0

27.7

0.0

200.9

0.6M

B1020

ENVE MAX

0.35

87.7

0.0

28.9

0.0

240.2

0.6M

B1020

ENVE MAX

0.63

92.1

0.0

28.9

0.0

215.0

0.6M

B1020

ENVE MAX

0.91

96.6

0.0

28.9

0.0

188.6

96.9

0.0

23.6

0.0

186.7

0.6M

B1020

ENVE MAX

0.91

0.6M

B1021

ENVE MAX

0.15

-60.2

0.0

54.8

0.0

122.9

0.6M

B1021

ENVE MAX

0.575

-53.4

0.0

54.8

0.0

147.0

0.6M

B1021

ENVE MAX

-46.6

0.0

54.8

0.0

171.5

0.6M

B1021

ENVE MAX

-38.7

0.0

43.9

0.0

172.9

0.6M

B1021

ENVE MAX

1.5

-30.7

0.0

43.9

0.0

221.1

0.6M

B1021

ENVE MAX

-22.7

0.0

43.9

0.0

263.9

0.6M

B1021

ENVE MAX

-9.9

0.0

36.1

0.0

264.6

0.6M

B1022

ENVE MAX

2.3

-16.2

0.0

65.0

0.0

136.3

0.6M

B1022

ENVE MAX

2.3

75.3

0.0

15.8

0.0

155.0

0.6M

B1023

ENVE MAX

0.575

-61.7

0.0

40.0

0.0

107.9

0.6M

B1023

ENVE MAX

-54.9

0.0

40.0

0.0

145.5

0.6M

B1023

ENVE MAX

-46.1

0.0

31.2

0.0

147.0

Chan Phuong Engineering (CPE)

Page 145

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

-38.1

0.0

31.2

0.0

197.3

0.6M

B1023

ENVE MAX

1.5

0.6M

B1023

ENVE MAX

-30.1

0.0

31.2

0.0

242.3

0.6M

B1023

ENVE MAX

-16.4

0.0

25.7

0.0

243.0

0.6M

B1023

ENVE MAX

2.5

-8.4

0.0

25.7

0.0

266.6

0.6M

B1023

ENVE MAX

-0.4

0.0

25.7

0.0

300.2

0.6M

B1023

ENVE MAX

8.9

0.0

21.8

0.0

300.7

0.6M

B1023

ENVE MAX

3.5

16.9

0.0

21.8

0.0

323.4

0.6M

B1023

ENVE MAX

24.9

0.0

21.8

0.0

339.9

0.6M

B1023

ENVE MAX

96.6

0.0

14.6

0.0

338.6

0.6M

B1023

ENVE MAX

4.5

107.2

0.0

14.6

0.0

290.9

117.9

0.0

14.6

0.0

237.1

0.6M

B1023

ENVE MAX

0.6M

B1023

ENVE MAX

144.7

0.0

18.7

0.0

235.9

0.6M

B1023

ENVE MIN

3.5

-61.1

0.0

-18.8

0.0

105.0

0.6M

B1023

ENVE MIN

-50.5

0.0

-18.8

0.0

125.4

0.6M

B1023

ENVE MIN

4.8

0.0

-20.5

0.0

124.2

0.6M

B1023

ENVE MIN

4.5

12.8

0.0

-20.5

0.0

119.5

0.6M

B1025

ENVE MAX

0.15

-28.3

0.0

36.1

0.0

150.0

0.6M

B1025

ENVE MAX

0.475

-26.7

0.0

36.1

0.0

158.9

0.6M

B1025

ENVE MAX

0.8

-25.0

0.0

36.1

0.0

167.3

0.6M

B1025

ENVE MAX

0.8

-11.3

0.0

33.2

0.0

168.7

0.6M

B1025

ENVE MAX

-10.3

0.0

33.2

0.0

170.9

0.6M

B1025

ENVE MAX

-14.4

0.0

28.7

0.0

172.0

0.6M

B1025

ENVE MAX

1.3

-12.9

0.0

28.7

0.0

176.1

0.6M

B1025

ENVE MAX

1.6

-11.3

0.0

28.7

0.0

194.2

-4.0

0.0

26.4

0.0

197.9

0.6M

B1025

ENVE MAX

1.6

0.6M

B1025

ENVE MAX

-1.9

0.0

26.4

0.0

216.6

0.6M

B1025

ENVE MAX

3.2

0.0

22.5

0.0

219.6

-1.5M

B1025

ENVE MAX

1.5

-13.5

0.0

11.2

0.0

120.4

-1.5M

B1025

ENVE MAX

-11.6

0.0

11.2

0.0

188.6

-1.5M

B1025

ENVE MAX

-5.9

0.0

5.9

0.0

198.8

0.6M

B1031

ENVE MAX

0.575

-41.5

0.0

48.6

0.0

117.6

0.6M

B1031

ENVE MAX

-39.3

0.0

48.6

0.0

134.7

0.6M

B1031

ENVE MAX

-26.3

0.0

37.9

0.0

135.2

0.6M

B1032

ENVE MAX

0.15

-38.8

0.0

108.4

0.0

140.0

0.6M

B1032

ENVE MAX

0.475

-33.6

0.0

108.4

0.0

151.7

0.6M

B1033

ENVE MAX

0.3

89.6

0.0

10.8

0.0

280.5

0.6M

B1033

ENVE MAX

0.65

94.7

0.0

10.8

0.0

248.3

Chan Phuong Engineering (CPE)

Page 146

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

kN

Line

kN

kN

kN-m

kN-m

kN-m

Text

99.9

0.0

10.8

0.0

217.7

0.6M

B1033

ENVE MAX

0.6M

B1033

ENVE MAX

99.6

0.0

9.6

0.0

217.3

0.6M

B1033

ENVE MAX

1.5

107.0

0.0

9.6

0.0

175.5

0.6M

B1033

ENVE MAX

114.3

0.0

9.6

0.0

128.8

0.6M

B1033

ENVE MAX

146.3

0.0

12.9

0.0

131.3

-1.5M

B1033

ENVE MAX

0.3

80.3

0.0

8.3

0.0

172.3

0.6M

B1035

ENVE MAX

0.25

22.1

0.0

-1.4

0.0

122.2

0.6M

B1035

ENVE MAX

0.875

30.5

0.0

-1.4

0.0

105.8

0.6M

B1035

ENVE MAX

0.875

27.4

0.0

-1.4

0.0

105.2

-1.5M

B1035

ENVE MAX

0.25

39.5

0.0

9.0

0.0

164.4

47.6

0.0

9.0

0.0

137.2

-1.5M

B1035

ENVE MAX

0.875

-1.5M

B1035

ENVE MAX

0.875

28.3

0.0

8.0

0.0

136.3

-1.5M

B1035

ENVE MAX

3.5

138.8

0.0

10.6

0.0

116.8

-1.5M

B1035

ENVE MAX

3.5

170.6

0.0

22.3

0.0

116.4

0.6M

B1044

ENVE MAX

-52.2

0.0

1.8

0.0

126.3

0.6M

B1044

ENVE MAX

-41.8

0.0

3.9

0.0

127.4

0.6M

B1044

ENVE MAX

1.5

-39.2

0.0

3.9

0.0

176.5

0.6M

B1044

ENVE MAX

-36.6

0.0

3.9

0.0

228.2

0.6M

B1044

ENVE MAX

-22.0

0.0

4.6

0.0

229.0

0.6M

B1044

ENVE MAX

2.5

-19.4

0.0

4.6

0.0

258.7

0.6M

B1046

ENVE MAX

0.3

120.3

0.0

7.8

0.0

268.0

0.6M

B1061

ENVE MAX

0.3

106.45

111.7

81.9

69.8

10.5

200.2

0.6M

B1062

ENVE MAX

0.15

118.6

0.0

59.8

0.0

197.2

0.6M

B1063

ENVE MAX

0.2

94.0

0.0

36.1

0.0

103.0

37.4

0.0

18.7

0.0

131.4

0.6M

B1070

ENVE MAX

0.3

0.6M

B1072

ENVE MAX

0.3

20.0

0.0

5.3

0.0

148.5

0.6M

B1073

ENVE MAX

3.72

125.5

0.0

31.6

0.0

179.4

0.6M

B1073

ENVE MAX

130.9

0.0

31.6

0.0

190.4

0.6M

B1074

ENVE MAX

0.35

37.9

0.0

22.4

0.0

174.0

-0.6M

B1085

ENVE MAX

0.15

206.1

0.0

39.6

0.0

345.9

-0.6M

B1088

ENVE MAX

0.15

250.7

0.0

30.9

0.0

411.2

-0.6M

B1149

ENVE MAX

0.15

75.1

0.0

27.9

0.0

135.6

-0.6M

B1154

ENVE MAX

0.2

74.6

0.0

-0.3

0.0

140.7

-0.6M

B1155

ENVE MAX

0.2

39.2

0.0

9.5

0.0

109.8

-1.5M

B1157

ENVE MAX

1.5

-21.6

0.0

7.1

0.0

133.6

-1.5M

B1158

ENVE MAX

28.4

0.0

7.6

0.0

262.7

-1.5M

B1158

ENVE MAX

0.5

31.0

0.0

7.6

0.0

253.5

Chan Phuong Engineering (CPE)

Page 147

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

kN

Line

kN

kN

kN-m

kN-m

kN-m

Text

33.6

0.0

7.6

0.0

242.8

-1.5M

B1158

ENVE MAX

-1.5M

B1158

ENVE MAX

61.1

0.0

11.5

0.0

240.3

-1.5M

B1158

ENVE MAX

1.5

64.1

0.0

11.5

0.0

209.0

-1.5M

B1159

ENVE MAX

1.6

-7.5

0.0

10.4

0.0

146.4

-1.5M

B1159

ENVE MAX

1.6

-9.7

0.0

10.0

0.0

165.8

-1.5M

B1159

ENVE MAX

-8.1

0.0

10.0

0.0

183.7

-1.5M

B1159

ENVE MAX

-6.0

0.0

9.8

0.0

201.0

-1.5M

B1159

ENVE MAX

2.4

-4.4

0.0

9.8

0.0

215.9

-1.5M

B1159

ENVE MAX

2.4

-3.2

0.0

9.4

0.0

227.9

-1.5M

B1159

ENVE MAX

2.7

-2.0

0.0

9.4

0.0

239.9

-0.8

0.0

9.4

0.0

251.4

-1.5M

B1159

ENVE MAX

-1.5M

B1159

ENVE MAX

0.5

0.0

9.0

0.0

258.7

-1.5M

B1159

ENVE MAX

3.2

1.3

0.0

9.0

0.0

259.8

-1.5M

B1159

ENVE MAX

3.2

8.3

0.0

8.5

0.0

261.7

-1.5M

B1159

ENVE MAX

3.6

9.9

0.0

8.5

0.0

266.0

-1.5M

B1159

ENVE MAX

11.4

0.0

8.5

0.0

269.4

-1.5M

B1160

ENVE MAX

23.4

0.0

3.7

0.0

269.1

-1.5M

B1160

ENVE MAX

0.4

25.4

0.0

3.7

0.0

263.3

-1.5M

B1160

ENVE MAX

0.8

27.5

0.0

3.7

0.0

256.6

-1.5M

B1160

ENVE MAX

0.8

6.9

0.0

4.0

0.0

253.2

-1.5M

B1160

ENVE MAX

7.9

0.0

4.0

0.0

251.9

-1.5M

B1160

ENVE MAX

27.0

0.0

4.4

0.0

244.0

-1.5M

B1160

ENVE MAX

1.6

22.9

0.0

4.2

0.0

217.1

-1.5M

B1160

ENVE MAX

1.6

37.1

0.0

4.5

0.0

204.0

39.5

0.0

4.5

0.0

188.7

-1.5M

B1160

ENVE MAX

-1.5M

B1160

ENVE MAX

45.5

0.0

4.8

0.0

170.2

-1.5M

B1160

ENVE MAX

2.4

48.0

0.0

4.8

0.0

151.5

-1.5M

B1160

ENVE MAX

2.4

39.0

0.0

5.0

0.0

132.0

-0.6M

B1179

ENVE MAX

-33.5

0.0

2.3

0.0

100.6

-0.6M

B1179

ENVE MAX

1.809

1.8

0.0

-0.5

0.0

285.9

-0.6M

B1179

ENVE MAX

1.809

19.6

0.0

-0.4

0.0

284.9

0.6M

B1182

ENVE MAX

1.971

-2.6

0.0

14.7

0.0

112.8

0.6M

B1182

ENVE MAX

1.971

1.6

0.0

10.9

0.0

113.0

0.6M

B1184

ENVE MAX

44.9

0.0

5.3

0.0

158.5

0.6M

B1184

ENVE MAX

0.91

58.3

0.0

5.3

0.0

114.8

0.6M

B1184

ENVE MAX

0.91

64.0

0.0

5.5

0.0

114.5

3.5M

B783

ENVE MAX

0.3

-3.5

0.0

13.0

0.0

102.3

Chan Phuong Engineering (CPE)

Page 148

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

175.4

0.0

13.6

0.0

107.9

3.5M

B783

ENVE MAX

5.9

3.5M

B803

ENVE MAX

0.3

-5.7

0.0

4.1

0.0

106.0

3.5M

B804

ENVE MAX

0.35

89.5

0.0

39.9

0.0

227.4

0.6M

B804

ENVE MAX

0.35

122.3

0.0

21.7

0.0

294.4

0.6M

B804

ENVE MAX

3.85

223.3

0.0

26.8

0.0

269.6

0.6M

B804

ENVE MAX

3.85

237.8

0.0

33.5

0.0

271.2

3.5M

B805

ENVE MAX

0.35

166.7

0.0

17.8

0.0

283.9

3.5M

B805

ENVE MAX

3.4

244.6

0.0

2.8

0.0

268.3

0.6M

B805

ENVE MAX

0.35

189.6

0.0

20.7

0.0

321.7

0.6M

B805

ENVE MAX

3.4

289.8

0.0

29.0

0.0

338.5

82.6

0.0

21.4

0.0

130.2

3.5M

B806

ENVE MAX

0.15

3.5M

B810

ENVE MAX

0.3

91.0

0.0

0.2

0.0

228.0

3.5M

B811

ENVE MAX

0.3

14.6

0.0

8.6

0.0

136.8

3.5M

B811

ENVE MAX

0.875

22.0

0.0

8.6

0.0

126.3

3.5M

B811

ENVE MAX

0.875

23.5

0.0

2.5

0.0

125.7

3.5M

B812

ENVE MAX

0.3

21.3

0.0

7.0

0.0

163.9

3.5M

B813

ENVE MAX

0.3

79.2

0.0

23.5

0.0

278.9

3.5M

B814

ENVE MAX

0.3

13.2

0.0

81.6

0.0

209.5

3.5M

B824

ENVE MAX

0.25

144.4

0.0

11.1

0.0

307.1

3.5M

B825

ENVE MAX

0.3

19.6

0.0

11.6

0.0

175.7

3.5M

B826

ENVE MAX

0.25

150.9

0.0

7.7

0.0

308.9

3.5M

B828

ENVE MAX

0.25

144.1

0.0

8.7

0.0

306.3

3.5M

B828

ENVE MAX

0.535

148.1

0.0

8.7

0.0

264.6

3.5M

B829

ENVE MAX

0.3

49.8

0.0

26.0

0.0

208.3

141.3

0.0

1.0

0.0

306.2

3.5M

B830

ENVE MAX

0.25

3.5M

B831

ENVE MAX

0.3

59.7

0.0

13.7

0.0

221.4

3.5M

B832

ENVE MAX

0.3

-25.1

0.0

16.4

0.0

105.3

3.5M

B832

ENVE MAX

0.75

-18.8

0.0

16.4

0.0

115.2

3.5M

B832

ENVE MAX

0.75

-4.9

0.0

16.0

0.0

116.6

3.5M

B832

ENVE MAX

0.857

-3.4

0.0

16.0

0.0

117.0

3.5M

B832

ENVE MAX

0.857

-19.3

0.0

16.1

0.0

118.4

3.5M

B833

ENVE MAX

1.902

-15.8

0.0

14.5

0.0

117.2

3.5M

B833

ENVE MAX

1.902

25.8

0.0

20.3

0.0

120.6

3.5M

B887

ENVE MAX

4.1

30.0

0.0

12.1

0.0

175.2

3.5M

B887

ENVE MAX

4.1

36.0

0.0

17.8

0.0

177.1

3.5M

B916

ENVE MAX

7.08

12.0

0.0

-2.7

0.0

109.0

3.5M

B916

ENVE MAX

7.08

9.9

0.0

-3.6

0.0

109.4

Chan Phuong Engineering (CPE)

Page 149

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

35.3

0.0

-4.4

0.0

107.3

3.5M

B916

ENVE MAX

8.053

3.5M

B916

ENVE MAX

8.053

19.5

0.0

-4.3

0.0

106.2

3.5M

B935

ENVE MAX

0.3

-4.4

0.0

12.1

0.0

109.1

3.5M

B935

ENVE MAX

5.9

198.8

0.0

14.8

0.0

112.2

0.6M

B948

ENVE MAX

0.3

-24.2

0.0

95.0

0.0

115.6

3.5M

B973

ENVE MAX

0.25

46.2

0.0

32.2

0.0

151.2

0.6M

B973

ENVE MAX

0.25

25.1

0.0

24.1

0.0

120.8

0.6M

B974

ENVE MAX

0.35

79.6

0.0

54.2

0.0

285.8

0.6M

B974

ENVE MAX

0.66

84.6

0.0

54.2

0.0

260.4

0.6M

B974

ENVE MAX

0.97

89.5

0.0

54.2

0.0

235.9

2.1

0.0

48.6

0.0

235.1

0.6M

B974

ENVE MAX

0.97

0.6M

B974

ENVE MAX

2.6

0.0

48.6

0.0

235.0

0.6M

B974

ENVE MAX

93.0

0.0

39.7

0.0

233.7

0.6M

B974

ENVE MAX

10.9

0.0

14.8

0.0

164.8

0.6M

B974

ENVE MAX

136.8

0.0

-8.7

0.0

159.7

0.6M

B974

ENVE MAX

2.95

8.7

0.0

-10.9

0.0

107.9

0.6M

B974

ENVE MAX

2.95

210.7

0.0

-13.7

0.0

110.3

0.6M

B993

ENVE MAX

0.15

146.2

0.0

11.9

0.0

247.6

3.5M

B998

ENVE MAX

0.3

-4.7

0.0

14.5

0.0

110.3

3.5M

B998

ENVE MAX

5.9

200.4

0.0

10.1

0.0

121.9

3.5M

B999

ENVE MAX

17.7

0.0

22.5

0.0

109.9

3.5M

B1006

ENVE MAX

3.9

81.7

0.0

-3.1

0.0

102.7

3.5M

B1008

ENVE MAX

0.2

86.9

0.0

13.9

0.0

164.2

0.6M

B1008

ENVE MAX

0.2

67.8

0.0

10.6

0.0

129.9

86.3

0.0

-4.1

0.0

227.2

0.6M

B1009

ENVE MAX

0.3

0.6M

B1009

ENVE MAX

0.91

95.3

0.0

-4.1

0.0

171.9

0.6M

B1009

ENVE MAX

0.91

96.1

0.0

-3.9

0.0

171.1

3.5M

B1011

ENVE MAX

0.3

16.7

0.0

18.6

0.0

196.7

0.6M

B1011

ENVE MAX

0.3

-6.6

0.0

7.4

0.0

149.3

3.5M

B1012

ENVE MAX

0.3

165.4

0.0

5.2

0.0

287.8

0.6M

B1012

ENVE MAX

0.3

162.8

0.0

4.0

0.0

291.5

3.5M

B1015

ENVE MAX

0.15

-0.8

0.0

54.5

0.0

155.1

3.5M

B1015

ENVE MAX

0.475

0.6

0.0

54.5

0.0

155.1

3.5M

B1015

ENVE MAX

0.8

2.0

0.0

54.5

0.0

154.7

3.5M

B1015

ENVE MAX

0.8

0.4

0.0

49.5

0.0

154.7

3.5M

B1015

ENVE MAX

1.3

0.0

49.5

0.0

154.5

3.5M

B1015

ENVE MAX

5.2

0.0

42.6

0.0

154.3

Chan Phuong Engineering (CPE)

Page 150

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

6.5

0.0

42.6

0.0

159.0

3.5M

B1015

ENVE MAX

1.3

3.5M

B1015

ENVE MAX

1.6

7.8

0.0

42.6

0.0

171.1

3.5M

B1015

ENVE MAX

1.6

7.3

0.0

38.6

0.0

173.5

3.5M

B1015

ENVE MAX

9.0

0.0

38.6

0.0

184.9

3.5M

B1015

ENVE MAX

13.4

0.0

33.6

0.0

186.8

3.5M

B1015

ENVE MAX

2.4

15.2

0.0

33.6

0.0

192.9

3.5M

B1015

ENVE MAX

2.4

18.4

0.0

30.4

0.0

193.7

3.5M

B1015

ENVE MAX

2.7

19.7

0.0

30.4

0.0

196.3

3.5M

B1015

ENVE MAX

4.8

93.7

0.0

28.2

0.0

218.7

3.5M

B1015

ENVE MAX

4.8

52.8

0.0

30.6

0.0

217.7

53.9

0.0

30.6

0.0

218.8

3.5M

B1015

ENVE MAX

3.5M

B1015

ENVE MAX

111.4

0.0

34.3

0.0

219.3

3.5M

B1015

ENVE MAX

5.3

113.1

0.0

34.3

0.0

218.6

3.5M

B1015

ENVE MAX

5.6

114.8

0.0

34.3

0.0

217.5

3.5M

B1015

ENVE MAX

5.6

113.6

0.0

37.0

0.0

216.8

0.6M

B1015

ENVE MAX

0.15

-13.4

0.0

41.9

0.0

178.2

0.6M

B1015

ENVE MAX

0.475

-11.7

0.0

41.9

0.0

182.3

0.6M

B1015

ENVE MAX

0.8

-10.0

0.0

41.9

0.0

185.8

0.6M

B1015

ENVE MAX

0.8

-3.8

0.0

38.4

0.0

186.3

0.6M

B1015

ENVE MAX

-2.8

0.0

38.4

0.0

187.0

0.6M

B1015

ENVE MAX

0.3

0.0

33.9

0.0

187.2

0.6M

B1015

ENVE MAX

1.3

1.9

0.0

33.9

0.0

195.6

0.6M

B1015

ENVE MAX

1.6

3.5

0.0

33.9

0.0

206.8

0.6M

B1015

ENVE MAX

1.6

8.4

0.0

31.0

0.0

208.5

10.5

0.0

31.0

0.0

216.9

0.6M

B1015

ENVE MAX

0.6M

B1015

ENVE MAX

17.8

0.0

27.8

0.0

217.9

0.6M

B1015

ENVE MAX

2.4

19.8

0.0

27.8

0.0

219.7

0.6M

B1015

ENVE MAX

2.4

27.5

0.0

25.4

0.0

219.5

0.6M

B1015

ENVE MAX

2.7

29.1

0.0

25.4

0.0

216.9

0.6M

B1015

ENVE MAX

4.5

100.4

0.0

26.8

0.0

181.6

0.6M

B1015

ENVE MAX

103.9

0.0

26.8

0.0

163.2

0.6M

B1015

ENVE MAX

125.6

0.0

33.4

0.0

163.3

0.6M

B1015

ENVE MAX

5.5

129.0

0.0

33.4

0.0

154.7

3.5M

B1016

ENVE MAX

0.15

-11.0

0.0

53.6

0.0

141.9

3.5M

B1016

ENVE MAX

0.575

-9.2

0.0

53.6

0.0

146.2

0.6M

B1016

ENVE MAX

0.15

-32.7

0.0

38.8

0.0

152.8

0.6M

B1016

ENVE MAX

0.575

-30.5

0.0

38.8

0.0

166.2

Chan Phuong Engineering (CPE)

Page 151

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

11.2

0.0

58.1

0.0

174.7

3.5M

B1019

ENVE MAX

0.35

0.6M

B1019

ENVE MAX

0.35

-22.2

0.0

39.6

0.0

155.6

0.6M

B1019

ENVE MAX

2.3

20.2

0.0

23.6

0.0

199.9

0.6M

B1019

ENVE MAX

2.3

17.5

0.0

27.7

0.0

200.9

0.6M

B1020

ENVE MAX

0.35

87.7

0.0

28.9

0.0

240.2

0.6M

B1020

ENVE MAX

0.63

92.1

0.0

28.9

0.0

215.0

0.6M

B1020

ENVE MAX

0.91

96.6

0.0

28.9

0.0

188.6

0.6M

B1020

ENVE MAX

0.91

96.9

0.0

23.6

0.0

186.7

3.5M

B1021

ENVE MAX

0.15

-20.6

0.0

58.2

0.0

114.7

3.5M

B1021

ENVE MAX

0.575

-14.7

0.0

58.2

0.0

122.1

-8.7

0.0

58.2

0.0

127.1

3.5M

B1021

ENVE MAX

3.5M

B1021

ENVE MAX

-8.3

0.0

41.0

0.0

127.3

3.5M

B1021

ENVE MAX

1.5

-1.3

0.0

41.0

0.0

134.3

3.5M

B1021

ENVE MAX

5.7

0.0

41.0

0.0

153.5

3.5M

B1021

ENVE MAX

8.5

0.0

28.5

0.0

153.8

0.6M

B1021

ENVE MAX

0.15

-60.2

0.0

54.8

0.0

122.9

0.6M

B1021

ENVE MAX

0.575

-53.4

0.0

54.8

0.0

147.0

0.6M

B1021

ENVE MAX

-46.6

0.0

54.8

0.0

171.5

0.6M

B1021

ENVE MAX

-38.7

0.0

43.9

0.0

172.9

0.6M

B1021

ENVE MAX

1.5

-30.7

0.0

43.9

0.0

221.1

0.6M

B1021

ENVE MAX

-22.7

0.0

43.9

0.0

263.9

0.6M

B1021

ENVE MAX

-9.9

0.0

36.1

0.0

264.6

0.6M

B1022

ENVE MAX

2.3

-16.2

0.0

65.0

0.0

136.3

0.6M

B1022

ENVE MAX

2.3

75.3

0.0

15.8

0.0

155.0

-61.7

0.0

40.0

0.0

107.9

0.6M

B1023

ENVE MAX

0.575

0.6M

B1023

ENVE MAX

-54.9

0.0

40.0

0.0

145.5

0.6M

B1023

ENVE MAX

-46.1

0.0

31.2

0.0

147.0

0.6M

B1023

ENVE MAX

1.5

-38.1

0.0

31.2

0.0

197.3

0.6M

B1023

ENVE MAX

-30.1

0.0

31.2

0.0

242.3

0.6M

B1023

ENVE MAX

-16.4

0.0

25.7

0.0

243.0

0.6M

B1023

ENVE MAX

2.5

-8.4

0.0

25.7

0.0

266.6

0.6M

B1023

ENVE MAX

-0.4

0.0

25.7

0.0

300.2

0.6M

B1023

ENVE MAX

8.9

0.0

21.8

0.0

300.7

0.6M

B1023

ENVE MAX

3.5

16.9

0.0

21.8

0.0

323.4

0.6M

B1023

ENVE MAX

24.9

0.0

21.8

0.0

339.9

0.6M

B1023

ENVE MAX

96.6

0.0

14.6

0.0

338.6

0.6M

B1023

ENVE MAX

4.5

107.2

0.0

14.6

0.0

290.9

Chan Phuong Engineering (CPE)

Page 152

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

kN

Line

kN

kN

kN-m

kN-m

kN-m

Text

117.9

0.0

14.6

0.0

237.1

0.6M

B1023

ENVE MAX

0.6M

B1023

ENVE MAX

144.7

0.0

18.7

0.0

235.9

0.6M

B1023

ENVE MIN

3.5

-61.1

0.0

-18.8

0.0

105.0

0.6M

B1023

ENVE MIN

-50.5

0.0

-18.8

0.0

125.4

0.6M

B1023

ENVE MIN

4.8

0.0

-20.5

0.0

124.2

0.6M

B1023

ENVE MIN

4.5

12.8

0.0

-20.5

0.0

119.5

3.5M

B1025

ENVE MAX

0.15

-10.2

0.0

34.7

0.0

138.3

3.5M

B1025

ENVE MAX

0.575

-4.2

0.0

34.7

0.0

141.3

3.5M

B1025

ENVE MAX

1.8

0.0

34.7

0.0

141.9

3.5M

B1025

ENVE MAX

0.0

0.0

26.2

0.0

141.9

7.0

0.0

26.2

0.0

145.7

3.5M

B1025

ENVE MAX

1.5

3.5M

B1025

ENVE MAX

14.0

0.0

26.2

0.0

155.8

3.5M

B1025

ENVE MAX

14.4

0.0

20.5

0.0

155.9

0.6M

B1025

ENVE MAX

0.15

-28.3

0.0

36.1

0.0

150.0

0.6M

B1025

ENVE MAX

0.475

-26.7

0.0

36.1

0.0

158.9

0.6M

B1025

ENVE MAX

0.8

-25.0

0.0

36.1

0.0

167.3

0.6M

B1025

ENVE MAX

0.8

-11.3

0.0

33.2

0.0

168.7

0.6M

B1025

ENVE MAX

-10.3

0.0

33.2

0.0

170.9

0.6M

B1025

ENVE MAX

-14.4

0.0

28.7

0.0

172.0

0.6M

B1025

ENVE MAX

1.3

-12.9

0.0

28.7

0.0

176.1

0.6M

B1025

ENVE MAX

1.6

-11.3

0.0

28.7

0.0

194.2

0.6M

B1025

ENVE MAX

1.6

-4.0

0.0

26.4

0.0

197.9

0.6M

B1025

ENVE MAX

-1.9

0.0

26.4

0.0

216.6

0.6M

B1025

ENVE MAX

3.2

0.0

22.5

0.0

219.6

-41.5

0.0

48.6

0.0

117.6

0.6M

B1031

ENVE MAX

0.575

0.6M

B1031

ENVE MAX

-39.3

0.0

48.6

0.0

134.7

0.6M

B1031

ENVE MAX

-26.3

0.0

37.9

0.0

135.2

3.5M

B1032

ENVE MAX

0.15

0.0

0.0

73.4

0.0

134.2

3.5M

B1032

ENVE MAX

0.475

4.6

0.0

73.4

0.0

133.5

0.6M

B1032

ENVE MAX

0.15

-38.8

0.0

108.4

0.0

140.0

0.6M

B1032

ENVE MAX

0.475

-33.6

0.0

108.4

0.0

151.7

0.6M

B1033

ENVE MAX

0.3

89.6

0.0

10.8

0.0

280.5

0.6M

B1033

ENVE MAX

0.65

94.7

0.0

10.8

0.0

248.3

0.6M

B1033

ENVE MAX

99.9

0.0

10.8

0.0

217.7

0.6M

B1033

ENVE MAX

99.6

0.0

9.6

0.0

217.3

0.6M

B1033

ENVE MAX

1.5

107.0

0.0

9.6

0.0

175.5

0.6M

B1033

ENVE MAX

114.3

0.0

9.6

0.0

128.8

Chan Phuong Engineering (CPE)

Page 153

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

kN

Line

kN

kN

kN-m

kN-m

kN-m

Text

146.3

0.0

12.9

0.0

131.3

0.6M

B1033

ENVE MAX

3.5M

B1035

ENVE MAX

0.25

62.1

0.0

13.4

0.0

214.6

3.5M

B1035

ENVE MAX

0.875

70.6

0.0

13.4

0.0

173.1

3.5M

B1035

ENVE MAX

0.875

66.1

0.0

12.4

0.0

172.5

3.5M

B1035

ENVE MAX

3.5

150.8

0.0

22.7

0.0

140.7

3.5M

B1035

ENVE MAX

3.5

164.7

0.0

29.5

0.0

141.6

0.6M

B1035

ENVE MAX

0.25

22.1

0.0

-1.4

0.0

122.2

0.6M

B1035

ENVE MAX

0.875

30.5

0.0

-1.4

0.0

105.8

0.6M

B1035

ENVE MAX

0.875

27.4

0.0

-1.4

0.0

105.2

0.6M

B1044

ENVE MAX

-52.2

0.0

1.8

0.0

126.3

-41.8

0.0

3.9

0.0

127.4

0.6M

B1044

ENVE MAX

0.6M

B1044

ENVE MAX

1.5

-39.2

0.0

3.9

0.0

176.5

0.6M

B1044

ENVE MAX

-36.6

0.0

3.9

0.0

228.2

0.6M

B1044

ENVE MAX

-22.0

0.0

4.6

0.0

229.0

0.6M

B1044

ENVE MAX

2.5

-19.4

0.0

4.6

0.0

258.7

3.5M

B1046

ENVE MAX

0.3

137.7

0.0

16.3

0.0

266.2

0.6M

B1046

ENVE MAX

0.3

120.3

0.0

7.8

0.0

268.0

3.5M

B1059

ENVE MAX

1.6

-17.5

0.0

9.1

0.0

100.1

3.5M

B1059

ENVE MAX

1.6

-13.7

0.0

9.1

0.0

102.9

3.5M

B1059

ENVE MAX

-12.4

0.0

9.1

0.0

112.7

3.5M

B1059

ENVE MAX

-6.5

0.0

9.1

0.0

115.0

3.5M

B1059

ENVE MAX

2.4

-5.2

0.0

9.1

0.0

120.8

3.5M

B1059

ENVE MAX

2.4

-0.5

0.0

9.0

0.0

121.7

3.5M

B1059

ENVE MAX

2.7

0.5

0.0

9.0

0.0

123.6

1.4

0.0

9.0

0.0

128.8

3.5M

B1059

ENVE MAX

3.5M

B1059

ENVE MAX

3.1

0.0

8.9

0.0

130.4

3.5M

B1059

ENVE MAX

3.2

3.7

0.0

8.9

0.0

131.7

3.5M

B1059

ENVE MAX

3.2

11.7

0.0

8.7

0.0

132.4

3.5M

B1059

ENVE MAX

3.6

13.0

0.0

8.7

0.0

134.8

3.5M

B1059

ENVE MAX

14.5

0.0

8.7

0.0

136.4

3.5M

B1059

ENVE MAX

22.0

0.0

7.4

0.0

137.9

3.5M

B1059

ENVE MAX

4.8

25.5

0.0

7.4

0.0

131.8

3.5M

B1059

ENVE MAX

4.8

13.4

0.0

7.6

0.0

131.9

3.5M

B1059

ENVE MAX

14.3

0.0

7.6

0.0

132.0

3.5M

B1059

ENVE MAX

30.5

0.0

8.1

0.0

131.7

3.5M

B1059

ENVE MAX

5.3

31.8

0.0

8.1

0.0

129.3

3.5M

B1059

ENVE MAX

5.6

33.1

0.0

8.1

0.0

126.5

Chan Phuong Engineering (CPE)

Page 154

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

30.5

0.0

8.3

0.0

125.3

3.5M

B1059

ENVE MAX

5.6

3.5M

B1059

ENVE MAX

6.001

32.2

0.0

8.3

0.0

118.8

3.5M

B1059

ENVE MAX

6.001

36.1

0.0

8.7

0.0

116.5

0.6M

B1061

ENVE MAX

0.3

106.45

111.7

81.9

69.8

10.5

200.2

0.6M

B1062

ENVE MAX

0.15

118.6

0.0

59.8

0.0

197.2

0.6M

B1063

ENVE MAX

0.2

94.0

0.0

36.1

0.0

103.0

0.6M

B1070

ENVE MAX

0.3

37.4

0.0

18.7

0.0

131.4

0.6M

B1072

ENVE MAX

0.3

20.0

0.0

5.3

0.0

148.5

0.6M

B1073

ENVE MAX

3.72

125.5

0.0

31.6

0.0

179.4

0.6M

B1073

ENVE MAX

130.9

0.0

31.6

0.0

190.4

37.9

0.0

22.4

0.0

174.0

0.6M

B1074

ENVE MAX

0.35

0.6M

B1182

ENVE MAX

1.971

-2.6

0.0

14.7

0.0

112.8

0.6M

B1182

ENVE MAX

1.971

1.6

0.0

10.9

0.0

113.0

0.6M

B1184

ENVE MAX

44.9

0.0

5.3

0.0

158.5

0.6M

B1184

ENVE MAX

0.91

58.3

0.0

5.3

0.0

114.8

0.6M

B1184

ENVE MAX

0.91

64.0

0.0

5.5

0.0

114.5

10M

B776

ENVE MAX

3.1

22.0

0.0

-0.4

0.0

152.4

10M

B776

ENVE MAX

3.1

21.5

0.0

-0.4

0.0

152.1

10M

B777

ENVE MAX

3.1

23.6

0.0

0.3

0.0

150.5

10M

B778

ENVE MAX

3.1

18.5

0.0

0.2

0.0

150.2

10M

B778

ENVE MAX

3.1

18.0

0.0

0.2

0.0

150.0

10M

B779

ENVE MAX

3.1

17.3

0.0

0.3

0.0

150.6

10M

B779

ENVE MAX

3.1

16.8

0.0

0.3

0.0

150.5

10M

B780

ENVE MAX

3.1

17.2

0.0

0.2

0.0

150.6

16.7

0.0

0.2

0.0

150.5

10M

B780

ENVE MAX

3.1

10M

B781

ENVE MAX

3.1

20.9

0.0

0.2

0.0

150.8

10M

B782

ENVE MAX

3.1

18.9

0.0

0.2

0.0

150.8

10M

B782

ENVE MAX

3.1

18.5

0.0

0.2

0.0

150.8

10M

B783

ENVE MAX

3.1

20.2

0.0

0.1

0.0

150.7

10M

B783

ENVE MAX

3.1

19.8

0.0

0.1

0.0

150.8

6.6M

B805

ENVE MAX

0.35

101.8

0.0

8.8

0.0

182.7

6.6M

B805

ENVE MAX

3.4

218.0

0.0

20.1

0.0

183.3

6.6M

B812

ENVE MAX

0.3

18.8

0.0

3.6

0.0

116.5

6.6M

B813

ENVE MAX

0.3

40.0

0.0

16.6

0.0

184.1

6.6M

B824

ENVE MAX

0.25

102.2

0.0

7.7

0.0

229.6

6.6M

B825

ENVE MAX

0.3

-0.1

0.0

3.3

0.0

128.5

6.6M

B826

ENVE MAX

0.25

108.9

0.0

3.1

0.0

234.4

Chan Phuong Engineering (CPE)

Page 155

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

104.6

0.0

4.5

0.0

235.0

6.6M

B828

ENVE MAX

0.25

6.6M

B828

ENVE MAX

0.535

108.6

0.0

4.5

0.0

204.6

6.6M

B829

ENVE MAX

0.3

27.4

0.0

16.7

0.0

157.8

6.6M

B830

ENVE MAX

0.25

101.2

0.0

-2.0

0.0

232.4

6.6M

B831

ENVE MAX

0.3

35.2

0.0

4.0

0.0

171.8

6.6M

B833

ENVE MAX

1.902

-37.3

0.0

7.7

0.0

107.1

6.6M

B833

ENVE MAX

1.902

14.4

0.0

21.4

0.0

108.6

10M

B887

ENVE MAX

4.1

8.9

0.0

12.4

0.0

183.9

10M

B887

ENVE MAX

4.1

15.0

0.0

12.3

0.0

182.9

6.6M

B887

ENVE MAX

4.1

20.0

0.0

11.3

0.0

199.2

24.4

0.0

15.3

0.0

197.8

6.6M

B887

ENVE MAX

4.1

10M

B916

ENVE MAX

7.08

0.3

0.0

-1.2

0.0

126.3

10M

B916

ENVE MAX

7.08

1.5

0.0

-2.0

0.0

126.7

10M

B916

ENVE MAX

8.053

21.3

0.0

-2.6

0.0

115.7

10M

B916

ENVE MAX

8.053

19.4

0.0

-3.0

0.0

113.5

6.6M

B916

ENVE MAX

7.08

5.8

0.0

0.8

0.0

115.3

6.6M

B916

ENVE MAX

7.08

2.3

0.0

-0.6

0.0

115.9

6.6M

B916

ENVE MAX

8.053

27.8

0.0

-1.7

0.0

105.9

6.6M

B916

ENVE MAX

8.053

16.1

0.0

-2.2

0.0

103.9

10M

B927

ENVE MAX

3.1

20.4

0.0

0.1

0.0

152.4

10M

B927

ENVE MAX

3.1

20.0

0.0

0.1

0.0

152.6

10M

B928

ENVE MAX

3.1

21.9

0.0

0.3

0.0

150.5

10M

B929

ENVE MAX

3.1

17.4

0.0

0.2

0.0

150.4

10M

B929

ENVE MAX

3.1

17.0

0.0

0.2

0.0

150.5

19.5

0.0

0.2

0.0

150.7

10M

B930

ENVE MAX

3.1

10M

B931

ENVE MAX

3.1

16.5

0.0

0.2

0.0

150.7

10M

B931

ENVE MAX

3.1

16.0

0.0

0.2

0.0

150.6

10M

B932

ENVE MAX

3.1

20.7

0.0

0.2

0.0

150.6

10M

B933

ENVE MAX

3.1

19.1

0.0

0.2

0.0

150.9

10M

B933

ENVE MAX

3.1

18.6

0.0

0.2

0.0

150.8

10M

B934

ENVE MAX

3.1

24.5

0.0

0.6

0.0

151.4

6.6M

B968

ENVE MAX

153.7

0.0

13.3

0.0

231.2

6.6M

B975

ENVE MAX

90.7

0.0

9.7

0.0

158.7

6.6M

B975

ENVE MAX

0.475

93.1

0.0

9.7

0.0

115.0

6.6M

B980

ENVE MAX

150.8

0.0

33.1

0.0

279.6

6.6M

B980

ENVE MAX

0.475

154.0

0.0

33.1

0.0

207.2

6.6M

B980

ENVE MAX

0.95

157.2

0.0

33.1

0.0

140.3

Chan Phuong Engineering (CPE)

Page 156

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

Line

kN

kN

kN

kN-m

kN-m

kN-m

Text

164.9

0.0

38.8

0.0

136.0

6.6M

B980

ENVE MAX

0.95

6.6M

B980

ENVE MIN

53.3

0.0

-27.1

0.0

108.6

10M

B998

ENVE MAX

3.1

24.4

0.0

3.0

0.0

161.9

6.6M

B1004

ENVE MAX

0.3

55.0

0.0

32.0

0.0

277.4

6.6M

B1004

ENVE MAX

0.575

56.8

0.0

32.0

0.0

262.0

6.6M

B1004

ENVE MAX

0.85

58.6

0.0

32.0

0.0

248.6

6.6M

B1004

ENVE MAX

0.85

55.8

0.0

29.6

0.0

248.4

6.6M

B1005

ENVE MAX

4.3

6.5

0.0

18.4

0.0

151.1

6.6M

B1005

ENVE MAX

4.3

46.1

0.0

-1.8

0.0

150.2

6.6M

B1008

ENVE MAX

0.2

57.3

0.0

22.6

0.0

104.4

45.2

0.0

-8.3

0.0

101.0

6.6M

B1009

ENVE MAX

0.3

6.6M

B1010

ENVE MAX

4.3

-2.0

0.0

13.1

0.0

213.4

6.6M

B1010

ENVE MAX

4.3

74.6

0.0

-5.9

0.0

218.7

6.6M

B1012

ENVE MAX

0.3

78.2

0.0

5.5

0.0

139.2

6.6M

B1013

ENVE MAX

0.3

54.4

0.0

14.6

0.0

125.0

6.6M

B1016

ENVE MAX

0.857

-68.8

0.0

15.3

0.0

134.1

6.6M

B1016

ENVE MAX

0.857

-20.7

0.0

12.9

0.0

142.5

6.6M

B1020

ENVE MAX

0.35

68.1

0.0

14.1

0.0

156.0

6.6M

B1020

ENVE MAX

0.63

69.4

0.0

14.1

0.0

136.8

6.6M

B1020

ENVE MAX

0.91

70.6

0.0

14.1

0.0

117.2

6.6M

B1020

ENVE MAX

0.91

76.3

0.0

10.4

0.0

116.2

6.6M

B1021

ENVE MAX

-86.6

0.0

48.1

0.0

157.9

6.6M

B1021

ENVE MAX

-69.2

0.0

40.1

0.0

160.2

6.6M

B1021

ENVE MAX

1.5

-67.1

0.0

40.1

0.0

241.9

-64.9

0.0

40.1

0.0

336.1

6.6M

B1021

ENVE MAX

6.6M

B1021

ENVE MAX

-42.2

0.0

31.8

0.0

338.2

6.6M

B1021

ENVE MIN

-186.8

0.0

-19.2

0.0

113.6

6.6M

B1021

ENVE MIN

-127.1

0.0

-16.6

0.0

114.7

6.6M

B1023

ENVE MAX

-70.4

0.0

34.4

0.0

149.9

6.6M

B1023

ENVE MAX

-54.6

0.0

26.5

0.0

151.7

6.6M

B1023

ENVE MAX

1.5

-52.4

0.0

26.5

0.0

221.0

6.6M

B1023

ENVE MAX

-50.3

0.0

26.5

0.0

297.2

6.6M

B1023

ENVE MAX

-28.7

0.0

22.7

0.0

298.7

6.6M

B1023

ENVE MAX

2.5

-26.6

0.0

22.7

0.0

345.1

6.6M

B1023

ENVE MAX

-24.4

0.0

22.7

0.0

389.7

6.6M

B1023

ENVE MAX

-9.7

0.0

20.2

0.0

390.4

6.6M

B1023

ENVE MAX

3.5

-7.5

0.0

20.2

0.0

414.3

Chan Phuong Engineering (CPE)

Page 157

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

kN

Line

kN

kN

kN-m

kN-m

kN-m

Text

-5.3

0.0

20.2

0.0

436.6

6.6M

B1023

ENVE MAX

6.6M

B1023

ENVE MAX

147.0

0.0

14.3

0.0

440.5

6.6M

B1023

ENVE MAX

4.5

150.4

0.0

14.3

0.0

366.1

6.6M

B1023

ENVE MAX

153.7

0.0

14.3

0.0

290.1

6.6M

B1023

ENVE MAX

191.6

0.0

16.2

0.0

288.1

6.6M

B1023

ENVE MIN

-150.7

0.0

-21.3

0.0

100.8

6.6M

B1023

ENVE MIN

-94.4

0.0

-15.7

0.0

101.6

6.6M

B1023

ENVE MIN

2.5

-91.0

0.0

-15.7

0.0

127.5

6.6M

B1023

ENVE MIN

-87.7

0.0

-15.7

0.0

152.3

6.6M

B1023

ENVE MIN

-50.6

0.0

-11.6

0.0

152.7

-47.7

0.0

-11.6

0.0

168.5

6.6M

B1023

ENVE MIN

3.5

6.6M

B1023

ENVE MIN

-44.9

0.0

-11.6

0.0

178.2

6.6M

B1023

ENVE MIN

53.3

0.0

-8.9

0.0

179.0

6.6M

B1023

ENVE MIN

4.5

55.4

0.0

-8.9

0.0

148.3

6.6M

B1023

ENVE MIN

57.6

0.0

-8.9

0.0

116.5

6.6M

B1023

ENVE MIN

71.7

0.0

-13.0

0.0

115.6

6.6M

B1035

ENVE MAX

0.25

12.7

0.0

0.9

0.0

126.0

6.6M

B1035

ENVE MAX

0.55

13.7

0.0

0.9

0.0

122.0

6.6M

B1043

ENVE MAX

4.3

-19.5

0.0

11.1

0.0

375.4

6.6M

B1043

ENVE MAX

4.3

111.9

0.0

3.6

0.0

379.3

6.6M

B1043

ENVE MAX

6.45

192.9

0.0

3.4

0.0

104.3

6.6M

B1043

ENVE MIN

4.3

-100.3

0.0

0.4

0.0

152.5

6.6M

B1043

ENVE MIN

4.3

22.8

0.0

-4.3

0.0

155.8

6.6M

B1044

ENVE MAX

-45.3

0.0

10.9

0.0

153.7

-36.6

0.0

11.2

0.0

155.2

6.6M

B1044

ENVE MAX

6.6M

B1044

ENVE MAX

1.5

-34.4

0.0

11.2

0.0

198.6

6.6M

B1044

ENVE MAX

-32.2

0.0

11.2

0.0

240.4

6.6M

B1044

ENVE MAX

-15.9

0.0

10.4

0.0

241.1

6.6M

B1044

ENVE MAX

2.5

-13.7

0.0

10.4

0.0

258.7

6.6M

B1091

ENVE MAX

6.9

119.1

0.0

4.7

0.0

277.5

6.6M

B1091

ENVE MAX

6.9

195.5

0.0

38.4

0.0

306.1

10M

B1174

ENVE MAX

52.1

0.0

1.2

0.0

162.4

10M

B1181

ENVE MAX

1.702

2.9

0.0

6.4

0.0

158.9

10M

B1181

ENVE MAX

1.702

10.6

0.0

2.9

0.0

160.5

6.6M

B1186

ENVE MAX

-17.1

0.0

36.5

0.0

135.0

6.6M

B1186

ENVE MAX

-38.3

0.0

31.5

0.0

140.7

6.6M

B1187

ENVE MAX

46.2

0.0

-6.7

0.0

307.4

Chan Phuong Engineering (CPE)

Page 158

Project : Bagan Golden Star Hotel


Line
Text

Station OutputCase
m

Text

Design Development Report


P

V2

V3

M2

M3

kN

Line

kN

kN

kN-m

kN-m

kN-m

Text

81.0

0.0

-6.2

0.0

233.3

6.6M

B1187

ENVE MAX

6.6M

B1187

ENVE MAX

39.4

0.0

3.5

0.0

228.0

6.6M

B1187

ENVE MIN

9.4

0.0

-19.8

0.0

127.1

Chan Phuong Engineering (CPE)

Page 159

Вам также может понравиться