The Second Bridge over the Narmada River in Gujurat, India links Mumbai and Ahmedabad. Built in a record 32 months through a public-private partnership, the bridge consists of 13 spans of 96.2 meters and 4.63 km of approach roads. Using innovative precast segmental construction, the box girders were erected with a purpose-designed launching girder. Upon completion, it received an award for being the most outstanding bridge from the Indian Institution of Bridge Engineers.
The Second Bridge over the Narmada River in Gujurat, India links Mumbai and Ahmedabad. Built in a record 32 months through a public-private partnership, the bridge consists of 13 spans of 96.2 meters and 4.63 km of approach roads. Using innovative precast segmental construction, the box girders were erected with a purpose-designed launching girder. Upon completion, it received an award for being the most outstanding bridge from the Indian Institution of Bridge Engineers.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
The Second Bridge over the Narmada River in Gujurat, India links Mumbai and Ahmedabad. Built in a record 32 months through a public-private partnership, the bridge consists of 13 spans of 96.2 meters and 4.63 km of approach roads. Using innovative precast segmental construction, the box girders were erected with a purpose-designed launching girder. Upon completion, it received an award for being the most outstanding bridge from the Indian Institution of Bridge Engineers.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
Client Main Features The foundations to piers were single
Larsen and Toubro Limited, India The award-winning Second Bridge over cast in-situ sunk in caisson with varying the Narmada River near Zadeshwar, depths between 42 m and 65 m Services Provided Gujurat, links Mumbai and Ahmedabad. below riverbed. Design It was built in a record period of Upon completion, the Indian Institution Tender documents 32 months in a build-operate-transfer of Bridge Engineers (IIBE) recognized Construction technology BOT scheme. the project with a first prize Supervision of construction It consists of 13 main spans of 96.2 m for the “Most Outstanding Bridge and 4.63 km of approach roads. National Awards 2000.” Dates The box girders were built using 1997 - 2000 innovative first-time technologies in India, adopting precast segmental Project Data construction for the superstructure and A 1.4-km river bridge of 96.2-m spans erecting the precast quality segments Foundations to piers with varying using a purpose designed launching depths between 42 m and 65 m girder. The two-lane deck consists of a below riverbed 7.5-m wide carriageway with 1.5-m Construction cost: US$ 26 million wide footpaths on either side and is located 29 m downstream of the existing bridge.